{{#Wiki_filter:Exelkn.Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Nuclear Delta, PA 17314 May 25, 2007 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station Unit Nos. 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 | {{#Wiki_filter:Exelkn. | ||
Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Nuclear Delta, PA 17314 May 25, 2007 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station Unit Nos. | |||
2 and 3 Facility Operating License Nos. | |||
DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Annual Radiological Environmental Operating Report No. 64 January 1, 2006 through December 31, 2006 In accordance with the requirements of Section 5.6.2 of the Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications, this letter submits the Annual Radiological Environmental Operating Report No. 64. This report provides the 2006 results for the Radiological Environmental Monitoring Program (REMP) as called for in the Offsite Dose Calculation Manual.In assessing the data collected for the REMP, we have concluded that the operation of PBAPS, Units 2 and 3, had no adverse impact on the environment. | Annual Radiological Environmental Operating Report No. | ||
64 January 1, 2006 through December 31, 2006 In accordance with the requirements of Section 5.6.2 of the Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications, this letter submits the Annual Radiological Environmental Operating Report No. | |||
: 64. | |||
This report provides the 2006 results for the Radiological Environmental Monitoring Program (REMP) as called for in the Offsite Dose Calculation Manual. | |||
In assessing the data collected for the REMP, we have concluded that the operation of PBAPS, Units 2 and 3, had no adverse impact on the environment. | |||
Low levels of Co-60 and Cs-137 were found downstream in sediment sampling location. | Low levels of Co-60 and Cs-137 were found downstream in sediment sampling location. | ||
Calculated doses were at small fractions of | Calculated doses were at small fractions of 10CFR50 limits. | ||
There are no commitments contained in this letter. | |||
If you have any questions or require additional information, please do not hesitate to contact us. | |||
Sincerely, Joseph P. Grimes Site Vice President Peach Bottom Atomic Power Station MJM/FLJ/MT/bcb Enclosure ccn 07-56 cc: | |||
Samuel Collins, Administrator, Region I, US NRC Fred Bower, US NRC Senior Resident Inspector, PBAPS}} | |||
Latest revision as of 23:24, 14 January 2025
| ML071550103 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/25/2007 |
| From: | Grimes J Exelon Nuclear |
| To: | Document Control Desk, NRC/NRR/ADRO |
| References | |
| Download: ML071550103 (1) | |
Text
Exelkn.
Peach Bottom Atomic Power Station www.exeloncorp.com 1848 Lay Road Nuclear Delta, PA 17314 May 25, 2007 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station Unit Nos.
2 and 3 Facility Operating License Nos.
DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278
SUBJECT:
Annual Radiological Environmental Operating Report No.
64 January 1, 2006 through December 31, 2006 In accordance with the requirements of Section 5.6.2 of the Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specifications, this letter submits the Annual Radiological Environmental Operating Report No.
- 64.
This report provides the 2006 results for the Radiological Environmental Monitoring Program (REMP) as called for in the Offsite Dose Calculation Manual.
In assessing the data collected for the REMP, we have concluded that the operation of PBAPS, Units 2 and 3, had no adverse impact on the environment.
Low levels of Co-60 and Cs-137 were found downstream in sediment sampling location.
Calculated doses were at small fractions of 10CFR50 limits.
There are no commitments contained in this letter.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, Joseph P. Grimes Site Vice President Peach Bottom Atomic Power Station MJM/FLJ/MT/bcb Enclosure ccn 07-56 cc: