ML072430579: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 22: Line 22:


==Dear Mr. Crane:==
==Dear Mr. Crane:==
On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Line 29: Line 28:
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


C. Crane                                         2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                              /RA/
/RA/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85


Line 38: Line 37:
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)
Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)


C. Crane                                                     2 The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
                                                                  /ra/
/ra/
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85
Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85


==Enclosure:==
==Enclosure:==
Limerick Inspection/ Activity Plan Distribution w/encl: (via E-mail)                                 L. Pinkham - Resident OA S. Collins, RA                                                     D. Screnci, PAO M. Dapas, DRA                                                     N. Sheehan, PAO D. Lew, DRP                                                       DRS Director J. Clifford, DRP                                                   DRS Deputy Director P. Krohn, DRP                                                     DRS Branch Chiefs(6)
Limerick Inspection/ Activity Plan Distribution w/encl:
R. Fuhrmeister, DRP                                               RidsNrrDirslpab@nrc.gov R. Laufer, RI OEDO                                                 ROPreports@nrc.gov H. Chernoff, NRR                                                   JWT1@NRC.GOV P. Bamford, PM, NRR                                               Region I Docket Room (with concurrences)
(via E-mail)
S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector SUNSI Review Complete: __PGK__ (Reviewers Initials)
S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP R. Laufer, RI OEDO H. Chernoff, NRR P. Bamford, PM, NRR S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector L. Pinkham - Resident OA D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs(6)
DOCUMENT NAME: S:\ROP 8 Mid Cycle Review\Letters for Mid Cycle\Branch 4 Mid-cycle letters\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.
RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov JWT1@NRC.GOV Region I Docket Room (with concurrences)
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE             RI/DRP               N RI/DRP NAME               TSetzer                   PKrohn DATE               08/27/07                 08/ 27 /07 OFFICIAL RECORD COPY
SUNSI Review Complete: __PGK__ (Reviewers Initials)
DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 4 Mid-cycle letters\\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME TSetzer PKrohn DATE 08/27/07 08/ 27 /07 OFFICIAL RECORD COPY


Page 1 of 2                                                                                    Limerick 08/27/2007    13:52:40                                                                Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit                                                                                                                        No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                    Title                                        on Site       Start    End            Type ISFSI         - ISFSI CONSTRUCTION INSPECTION                                                                             1 1, 2           IP 60855.1               Operation of an Independent Spent Fuel Storage Installation at Operating Plants                     04/01/2007 09/30/2007 Other Routine TRI FIRE       - TRIENNIAL FIRE PROTECTION INSPECTION                                                                     4 1, 2          IP 7111105T              Fire Protection [Triennial]                                                                          07/16/2007 07/20/2007 Baseline Inspections 1, 2           IP 7111105T              Fire Protection [Triennial]                                                                         07/30/2007 08/03/2007 Baseline Inspections 7111401       - EP EXERCISE & PI VERIFICATION                                                                             8 1, 2          IP 7111401              Exercise Evaluation                                                                                  08/06/2007 08/10/2007 Baseline Inspections 7111111B       - LOR INSP + P/F REVIEW                                                                                     3 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                            10/22/2007 10/26/2007 Baseline Inspections 1, 2           IP 7111111B              Licensed Operator Requalification Program                                                           10/29/2007 11/02/2007 Baseline Inspections 7111111B       - LSRO REQUAL AN OPTEST @PB + P/F REVIEW                                                                   2 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                            11/01/2007 11/01/2007 Baseline Inspections 01/07EXM       - INITIAL LSRO OPERATOR EXAM                                                                               3 1                U01632                LIMERICK LSRO EXAM (FY08)                                                                            11/19/2007 11/23/2007 Not Applicable 1                 U01632               LIMERICK LSRO EXAM (FY08)                                                                           01/07/2008 01/08/2008 Not Applicable 7111121       - CDBI (COMPONENT DESIGN BASES INSPECTION)                                                                 7 1, 2          IP 7111121              Component Design Bases Inspection                                                                    10/01/2007 10/05/2007 Baseline Inspections 1, 2           IP 7111121              Component Design Bases Inspection                                                                   10/15/2007 10/19/2007 Baseline Inspections 1, 2           IP 7111121              Component Design Bases Inspection                                                                   10/29/2007 11/02/2007 Baseline Inspections 1, 2           IP 7111121              Component Design Bases Inspection                                                                   11/05/2007 11/09/2007 Baseline Inspections 7112203       - PUB RAD SAFETY - REMP                                                                                     1 1, 2           IP 7112203              Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P             11/12/2007 11/16/2007 Baseline Inspections 7112201        - PUB RAD SAFETY - RETS                                                                                    1 1, 2           IP 7112201              Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems                             11/26/2007 11/30/2007 Baseline Inspections 7112101       - OCC RAD SAFETY - ACCESS                                                                                   1 1, 2           IP 7112101              Access Control to Radiologically Significant Areas                                                   01/07/2008 01/11/2008 Baseline Inspections 7111108G       - U1 INSERVICE INSPECTION                                                                                   1 1              IP 7111108G              Inservice Inspection Activities - BWR                                                                03/10/2008 03/14/2008 Baseline Inspections 7112102       - OCC RAD SAFETY - ALARA                                                                                   1 1, 2          IP 7112102              ALARA Planning and Controls                                                                          03/10/2008 03/14/2008 Baseline Inspections 7111111B       - LSRO REQUAL INSPECTION                                                                                   3 1, 2          IP 7111111B              Licensed Operator Requalification Program                                                            06/05/2008 06/09/2008 Baseline Inspections 7112202       - PUB RAD SAFETY - RADWASTE                                                                                 1 1, 2          IP 7112202              Radioactive Material Processing and Transportation                                                  06/02/2008 06/06/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:52:40 Report 22 1
ISFSI
- ISFSI CONSTRUCTION INSPECTION Other Routine 04/01/2007 09/30/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4
TRI FIRE
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]
Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]
8 7111401
- EP EXERCISE & PI VERIFICATION Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111401 IP Exercise Evaluation 3
7111111B
- LOR INSP + P/F REVIEW Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111111B IP Licensed Operator Requalification Program Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111111B IP Licensed Operator Requalification Program 2
7111111B
- LSRO REQUAL AN OPTEST @PB + P/F REVIEW Baseline Inspections 11/01/2007 11/01/2007 1, 2 7111111B IP Licensed Operator Requalification Program 3
01/07EXM
- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007 1
U01632 LIMERICK LSRO EXAM (FY08)
Not Applicable 01/07/2008 01/08/2008 1
U01632 LIMERICK LSRO EXAM (FY08) 7 7111121
- CDBI (COMPONENT DESIGN BASES INSPECTION)
Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1
7112203
- PUB RAD SAFETY - REMP Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 1
7112201
- PUB RAD SAFETY - RETS Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
7112101
- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1
7111108G
- U1 INSERVICE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1
7111108G IP Inservice Inspection Activities - BWR 1
7112102
- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls 3
7111111B
- LSRO REQUAL INSPECTION Baseline Inspections 06/05/2008 06/09/2008 1, 2 7111111B IP Licensed Operator Requalification Program 1
7112202
- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/02/2008 06/06/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 2                                                                                    Limerick 08/27/2007    13:52:40                                                              Inspection / Activity Plan Report 22 07/01/2007 - 12/31/2008 Unit                                                                                                        No. of Staff   Planned Dates          Inspection Number      Inspection Activity                                                  Title                        on Site       Start    End            Type ISFSI         - ISFSI DRY RUN INSPECTIONS                                                               4 1, 2           IP 60854                Preoperational Testing Of An ISFSI                                                 06/09/2008 06/27/2008 Other Routine 1, 2           IP 60856                Review of 10 CFR 72.212(b) Evaluations                                             06/09/2008 06/27/2008 Other Routine 10/20EXM       - INITIAL OPERATOR LICENSING EXAMS                                                         4 1                U01745                FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM                                    09/22/2008 09/26/2008 Not Applicable 1                 U01745               FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM                                     10/20/2008 10/31/2008 Not Applicable 7112103       - OCC RAD SAFETY - INSTRUMENTS                                                             1 1, 2           IP 7112103              Radiation Monitoring Instrumentation and Protective Equipment                       08/04/2008 08/08/2008 Baseline Inspections 7111107B      - HEAT SINK INSP                                                                          1 1, 2           IP 7111107B              Heat Sink Performance                                                               08/18/2008 08/22/2008 Baseline Inspections EP            - EP PROGRAM INSPECTION                                                                    1 1, 2           IP 7111402              Alert and Notification System Testing                                               08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 7111403              Emergency Response Organization Augmentation Testing                               08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                   08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                   08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 71151-EP01           Drill/Exercise Performance                                                         08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 71151-EP02           ERO Drill Participation                                                             08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 71151-EP03           Alert & Notification System                                                         08/25/2008 08/29/2008 Baseline Inspections 71152B        - PI&R                                                                                    4 1, 2           IP 71152B                Identification and Resolution of Problems                                           08/25/2008 08/29/2008 Baseline Inspections 1, 2           IP 71152B                Identification and Resolution of Problems                                           09/08/2008 09/12/2008 Baseline Inspections MODS          - MODS AND 50.59                                                                          3 1, 2           IP 7111102              Evaluation of Changes, Tests, or Experiments                                       09/22/2008 09/26/2008 Baseline Inspections 1, 2           IP 7111117B              Permanent Plant Modifications                                                       09/22/2008 09/26/2008 Baseline Inspections This report does not include INPO and OUTAGE activities.
Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:52:40 Report 22 4
ISFSI
- ISFSI DRY RUN INSPECTIONS Other Routine 06/09/2008 06/27/2008 1, 2 60854 IP Preoperational Testing Of An ISFSI Other Routine 06/09/2008 06/27/2008 1, 2 60856 IP Review of 10 CFR 72.212(b) Evaluations 4
10/20EXM
- INITIAL OPERATOR LICENSING EXAMS Not Applicable 09/22/2008 09/26/2008 1
U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM Not Applicable 10/20/2008 10/31/2008 1
U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1
7112103
- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 08/04/2008 08/08/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1
7111107B
- HEAT SINK INSP Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111107B IP Heat Sink Performance 1
EP
- EP PROGRAM INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP03 IP Alert & Notification System 4
71152B
- PI&R Baseline Inspections 08/25/2008 08/29/2008 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/08/2008 09/12/2008 1, 2 71152B IP Identification and Resolution of Problems 3
MODS
- MODS AND 50.59 Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 22:09, 14 January 2025

Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008
ML072430579
Person / Time
Site: Limerick  
Issue date: 08/31/2007
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Crane C
Exelon Generation Co, Exelon Nuclear
KROHN, PG
References
Download: ML072430579 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 31, 2007 Mr. Christopher M. Crane President and CNO Exelon Nuclear Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

LIMERICK GENERATING STATION

Dear Mr. Crane:

On August 15, 2007, the NRC staff completed its performance review of Limerick Generating Station for the first half of the calender year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous twelve months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter of 2007 at Limerick Generating Station Units 1 and 2 was within the Licensee Response Column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also plan on conducting an Independent Spent Fuel Storage Installation dry run inspection during June 2008.

The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85

Enclosure:

Limerick Inspection/ Activity Plan cc w/encl:

Chief Operating Officer, Exelon Generation Company, LLC Site Vice President - Limerick Generating Station Plant Manager, Limerick Generating Station Regulatory Assurance Manager - Limerick Senior Vice President - Nuclear Services Vice President - Mid-Atlantic Operations Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs, Exelon Generation Company, LLC Manager, Licensing - Limerick Generating Station Vice President, General Counsel and Secretary Associate General Counsel, Exelon Generation Company Correspondence Control Desk Director, Bureau of Radiation Protection, PA Department of Environmental Protection J. Johnsrud, National Energy Committee, Sierra Club Chairman, Board of Supervisors of Limerick Township J. Bradley Fewell, Assistant General Counsel, Exelon Nuclear Institute of Nuclear Power Operations (INPO)

2 C. Crane The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at 610-337-5120 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/ra/

Paul G. Krohn, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352, 50-353 License Nos. NPF-39, NPF-85

Enclosure:

Limerick Inspection/ Activity Plan Distribution w/encl:

(via E-mail)

S. Collins, RA M. Dapas, DRA D. Lew, DRP J. Clifford, DRP P. Krohn, DRP R. Fuhrmeister, DRP R. Laufer, RI OEDO H. Chernoff, NRR P. Bamford, PM, NRR S. Hansell, DRP - Sr Resident Inspector C. Bickett, DRP - Resident Inspector L. Pinkham - Resident OA D. Screnci, PAO N. Sheehan, PAO DRS Director DRS Deputy Director DRS Branch Chiefs(6)

RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov JWT1@NRC.GOV Region I Docket Room (with concurrences)

SUNSI Review Complete: __PGK__ (Reviewers Initials)

DOCUMENT NAME: S:\\ROP 8 Mid Cycle Review\\Letters for Mid Cycle\\Branch 4 Mid-cycle letters\\LIM 2007 Mid-cycle Letter-R1.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N RI/DRP NAME TSetzer PKrohn DATE 08/27/07 08/ 27 /07 OFFICIAL RECORD COPY

Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/27/2007 13:52:40 Report 22 1

ISFSI

- ISFSI CONSTRUCTION INSPECTION Other Routine 04/01/2007 09/30/2007 1, 2 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 4

TRI FIRE

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111105T IP Fire Protection [Triennial]

Baseline Inspections 07/30/2007 08/03/2007 1, 2 7111105T IP Fire Protection [Triennial]

8 7111401

- EP EXERCISE & PI VERIFICATION Baseline Inspections 08/06/2007 08/10/2007 1, 2 7111401 IP Exercise Evaluation 3

7111111B

- LOR INSP + P/F REVIEW Baseline Inspections 10/22/2007 10/26/2007 1, 2 7111111B IP Licensed Operator Requalification Program Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111111B IP Licensed Operator Requalification Program 2

7111111B

- LSRO REQUAL AN OPTEST @PB + P/F REVIEW Baseline Inspections 11/01/2007 11/01/2007 1, 2 7111111B IP Licensed Operator Requalification Program 3

01/07EXM

- INITIAL LSRO OPERATOR EXAM Not Applicable 11/19/2007 11/23/2007 1

U01632 LIMERICK LSRO EXAM (FY08)

Not Applicable 01/07/2008 01/08/2008 1

U01632 LIMERICK LSRO EXAM (FY08) 7 7111121

- CDBI (COMPONENT DESIGN BASES INSPECTION)

Baseline Inspections 10/01/2007 10/05/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/15/2007 10/19/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 10/29/2007 11/02/2007 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 11/05/2007 11/09/2007 1, 2 7111121 IP Component Design Bases Inspection 1

7112203

- PUB RAD SAFETY - REMP Baseline Inspections 11/12/2007 11/16/2007 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 1

7112201

- PUB RAD SAFETY - RETS Baseline Inspections 11/26/2007 11/30/2007 1, 2 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1

7112101

- OCC RAD SAFETY - ACCESS Baseline Inspections 01/07/2008 01/11/2008 1, 2 7112101 IP Access Control to Radiologically Significant Areas 1

7111108G

- U1 INSERVICE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1

7111108G IP Inservice Inspection Activities - BWR 1

7112102

- OCC RAD SAFETY - ALARA Baseline Inspections 03/10/2008 03/14/2008 1, 2 7112102 IP ALARA Planning and Controls 3

7111111B

- LSRO REQUAL INSPECTION Baseline Inspections 06/05/2008 06/09/2008 1, 2 7111111B IP Licensed Operator Requalification Program 1

7112202

- PUB RAD SAFETY - RADWASTE Baseline Inspections 06/02/2008 06/06/2008 1, 2 7112202 IP Radioactive Material Processing and Transportation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Limerick Inspection / Activity Plan 07/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/27/2007 13:52:40 Report 22 4

ISFSI

- ISFSI DRY RUN INSPECTIONS Other Routine 06/09/2008 06/27/2008 1, 2 60854 IP Preoperational Testing Of An ISFSI Other Routine 06/09/2008 06/27/2008 1, 2 60856 IP Review of 10 CFR 72.212(b) Evaluations 4

10/20EXM

- INITIAL OPERATOR LICENSING EXAMS Not Applicable 09/22/2008 09/26/2008 1

U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM Not Applicable 10/20/2008 10/31/2008 1

U01745 FY09 - LIMERICK INITIAL OPERATOR LICENSING EXAM 1

7112103

- OCC RAD SAFETY - INSTRUMENTS Baseline Inspections 08/04/2008 08/08/2008 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1

7111107B

- HEAT SINK INSP Baseline Inspections 08/18/2008 08/22/2008 1, 2 7111107B IP Heat Sink Performance 1

EP

- EP PROGRAM INSPECTION Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 08/25/2008 08/29/2008 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP02 IP ERO Drill Participation Baseline Inspections 08/25/2008 08/29/2008 1, 2 71151-EP03 IP Alert & Notification System 4

71152B

- PI&R Baseline Inspections 08/25/2008 08/29/2008 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 09/08/2008 09/12/2008 1, 2 71152B IP Identification and Resolution of Problems 3

MODS

- MODS AND 50.59 Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/22/2008 09/26/2008 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.