ML073170389: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:2) EP 1.71 is a Class I, Group 2 s       v unit as perthe PBRF Find Status Survey P h (FSSP) and Technical Basis Document WD)-06-004.
{{#Wiki_filter:Description
: 3) Surveys in EP 1.71 were performed wing a scintilintion d         mopthhd to measure gamma energies representative of Co-60. Sample #EP2-5 from Suwey Request (SR)-13 as re&mce.dfor tbis decision-Description acquisition of survey measmmen&.
: 2) EP 1.71 is a Class I, Group 2 s v
5 ) Instmmetrt eficiency d e k m h t i o n s are developed in accordance with the BSL'LVS-002, WEP 05-086, these determinations are appropriate for the types of radiation involved and the media being surveyed.
unit as perthe PBRF Find Status Survey P h (FSSP) and Technical Basis Document WD)-06-004.
CS-09)1
: 3) Surveys in EP 1.71 were performed wing a scintilintion d m
opthhd to measure gamma energies representative of Co-60. Sample #EP2-5 from Suwey Request (SR)-13 as re&mce.d for tbis decision-acquisition of survey measmmen&.
5 ) Instmmetrt eficiency dekmhtions are developed in accordance with the BSL'LVS-002, WEP 05-086, these determinations are appropriate for the types of radiation involved and the media being surveyed.
CS-09) 1  


"
FSS Design # EP 1.71 S w e y Unit: 1.71 1.O History~scription 1 1 The subject pipe system is the 2" hot drain pipe for C a d "H". Tbe function of this pipe was to convey water fkom the 2 inch riser in Canal "H" to the HD sump in Pump Room #22 on the -25' elevation of the Reactor Building.
                            -                                            .<
1 -2 EP 1.7 1 consists of 2" d i e t e r piping that is appmxhate1y 120 feet in length.
FSS Design # EP 1.71                 Revision # Original                      Page 2 of 3 S w e y Unit: 1.71 1.O   History~scription 11    The subject pipe system is the 2" hot drain pipe for C a d "H".Tbe function of this pipe was to convey water fkom the 2 inch riser in Canal "H"to the HD sump in Pump Room #22 on the -25' elevation ofthe Reactor Building.
2.0 Survey Design Information 2-1 EP 1..71 was surveyed IAW Procedure #BSVLVS-002.
1-2   EP 1.7 1 consists of 2" d i e t e r piping that is appmxhate1y 120 feet in length.
2.2 100% of the 2" ID pipe was accessible for survey. The accessible 2" ID pipe was surveyed by static measurement at one foot increments, for a total of 1 20 s w e y measurements.
2.0     Survey Design Information 2-1     EP 1. .71 was surveyed IAW Procedure #BSVLVS-002.
2.3 Surface area for the 2" ID piping is 486 cm2 for each foot of piping, C
2.2     100% of the 2" ID pipe was accessible for survey. The accessible 2" ID pipe was surveyed by static measurement at one foot increments, for a total of 120 s w e y measurements.
O
2.3     Surface area for the 2" ID piping is 486 cm2for each foot of piping, C             O to a total 2"~ID piping surface
~
                                                            ~      area of 58,373 cm2(5.8 m2) for the entire length of (approximately 1 20') of 2"' piping.
~
3.0   S w e y Unit Measurement LocationslData 3.1     Pipe Mar radiological survey forms are provided in Attachment 2 of this release record.
to a total 2" ID piping surface area of 58,373 cm2 (5.8 m2) for the entire length of (approximately 1 20') of 2"' piping.
4.0   Survey Unit InvestigationdResults 4.1     None 5.0   Data Assessment Results 5.1     Data assessment results are provided in the EPlBuried Pipe (BPI Survey Report provided in Attachment I .
3.0 Swey Unit Measurement LocationslData 3.1 Pipe Mar radiological survey forms are provided in Attachment 2 of this release record.
5.2     ALL measurement results are less thttn the Derived Concentration Guideline Level @CGL) for radionuclide specific EP that corresponds to the 1 mdyr dose goal established in Table 3-3 ofthe FSSP.
4.0 Survey Unit InvestigationdResults 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EPlBuried Pipe (BPI Survey Report provided in Attachment I.
m  enimplementing the Unity Rule, provided in Section 3.6.3of the FSSP,and applying the Nuclide Fraction p),         provided in TBD-06-004, the survey unit that is constituted by EP 1.71 passes FSS.
5.2 ALL measurement results are less thttn the Derived Concentration Guideline Level @CGL) for radionuclide specific EP that corresponds to the 1 mdyr dose goal established in Table 3-3 of the FSSP.
5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC)was not employed for this survey unit.
men implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction p),
provided in TBD-06-004, the survey unit that is constituted by EP 1.71 passes FSS.
5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.
Revision # Original Page 2 of 3


                        -.
FSS Design#EP 1.71 Revision # Ori@
                        ..,                                    -
Page 3 of 3 Survey Unit: 1 -7 1
FSS Design#EP 1.71                 Revision # Ori@                       Page 3 of 3 Survey Unit: 1 -71 5-5     Statistical S m m q Table 6.0
5-5 Statistical S m m q Table 6.0 Documen&tion of evduations perta3Ilmg to compliance with the unrestricted use limit of 25 mredyr and dose wntributiom from Embedded Pipe md radionucIides contributing 10% in aggregate of the total dose %r both structural scenarios and soils.
                                          .
6.1 A miw of the survey results has shown that the dose contribution for EP 1.71 to be lesstban 1 &.
* Documen&tion of evduations perta3Ilmg to compliance with the unrestricted use limit of 25 mredyr and dose wntributiom from Embedded Pipe md radionucIides contributing 10% in aggregate of the total dose %r both structural scenarios and soils.
The dose cmtrihdon is e s t k k d t o be 0.01 3 mremlyr based on the average of the actual gross counts measured.
6.1     A miw of the survey results has shown that the dose contribution for EP 1.71 to be lesstban 1 &.       The dose cmtrihdon is e s t k k d t o be 0.013 mremlyr based on the average of the actual gross counts measured.
7.0 Attachments - BST EPBP S w e y Report - Pipe Interior aadiofogicd Survey Form - DQA Worksheet -Disc containing RR for EP 1.71 8t Spreadskt  
7.0   Attachments Attachment 1 - BST EPBP S w e y Report Attachment 2 - Pipe Interior aadiofogicdSurvey Form Attachment 3 - DQA Worksheet Attachment 4 -Disc containing RR for EP 1.71 8t Spreadskt


SECTION 7 ATTACHMENT 2 Ir PAGE(S)
SECTION 7 ATTACHMENT 2 Ir PAGE(S)  


BSI EPlBP SURVEY REPORT Detector-Sled#
BSI EPlBP SURVEY REPORT Detector-Sled #
LUESNOTBACKGROUNDCORRECTED RP Engineer I Date
LUESNOTBACKGROUNDCORRECTED RP Engineer I Date  


EP 1.71 2" Pipe TBD 06-004 Group 2
EP 1.71 2" Pipe TBD 06-004 Group 2  


SECTION 7 ATTACEWLENT 2 12 PAGE(S)
SECTION 7 ATTACEWLENT 2 12 PAGE(S)  


Pipe Interior Radiological Suwey Form (Continuation 'Form)
Pipe Interior Radiological Suwey Form (Continuation 'Form)
Package Page 3of 3 REFERENCE COP              Attachment 3, Page 2
REFERENCE COP Package Page 3 of 3, Page 2  


Pipe Interior Radiological Survey Form Date:      L'3'9. 0 G               Time: -           //no Building: -9 f i            .      Elevation:         s               Access Point Area:       - L'?T   i 2 y ~ ~ ~ L 4
Pipe Interior Radiological Survey Form L'3'9. 0 G Date:
System: f;7&$~$$~ fie >w;d Pipe Diameter:                       7 '                     PipeID#           /.   ?/
Time: -  
                                                                  - 3 Type of Survey Sled Size          ='ve"""P
//no Building: -9 fi Elevation: s Access Point Area: - L'?
                  ~.':,i. 1 -( d k i n c h Characterization                                    other            /
T i 2 y ~ ~ ~ L System: f;7&$~$$~ 4 fie >w;d Pipe Diameter:
3/+,
7 '
Detector:                   Yq-L 3-                      Detector ID #:                     &aLf+J       3-     (3-1 Cal Date:                 /     12 " 03-                 Cal Due Date:                   /I-,   / 7   -
PipeID#  
                                    -
/. ? /
[r                                                                              0 Instrument:             gZT-0 \                         Instrument ID #:               % ( 33-37 Cal Date:                 / / - / 7- c > 5               Cal Due Date:                 ((:   13     ,.rC From the Daily Pipe Survey Detector Control Form for the Selected Detector . .
Type of Survey ='ve"""P Characterization - 3 other
Background Value             7     cpm;",
/
t.
~.':,i.-(
                                              %. :
1 d k i n c h Sled Size Yq-L 3-3/+,
MDCRstatii,             11.3         cpm z Efficiency Factor for Pipe Diameter     6. O O O Z ~         (taken from detector calibration certificate) .-.
Detector:
:. MDCstatiC          783 1,           dPm/l00cm2 Is the MDCstati,acceptable? @-NO                     (if no, adjust sample count time and recalculate MDCR,,d Comments:        ,(?A~~'uY',hii
Detector ID #:  
                    -                          SdhJ      "'/
&aLf+J 3- (3-1 Cal Date:  
I                               .A.
/ [ r 12 " 03-Cal Due Date:  
                                                                                          ----p,-
/I-, / 7 - 0 Instrument:
Pipe Interior Radiological Survey
gZT \\
                                                                                                    '-2. **,*,,,
Instrument ID #:  
Radiological Survey Commenced: Date:           f *3a -0         Time:         /I     b Package Page 1 of     2 Attacwent 3, Page 1
% ( 33-37 Cal Date:  
/ / - / 7  
- c > 5 Cal Due Date:
((: 13,. r C From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 7
cpm;",
: t.
MDCRstatii, 11.3 cpm z Efficiency Factor for Pipe Diameter
: 6. O O O Z ~
(taken from detector calibration certificate).-.
783 1, MDCstatiC dPm/l00cm2 Is the MDCstati, acceptable? @-
NO (if no, adjust sample count time and recalculate MDCR,,d  
,(?A~~'uY',hii S d h J "'/
Comments:
I  
.A.  
----p,-
Pipe Interior Radiological Survey  
'-2.
Radiological Survey Commenced: Date:
f *3 a -0 Time:  
/ I b
Package Page 1 of 2 Attacwent 3, Page 1  


Pipe Interior Radiological Survey Form Date:         6-0 6             Time:               D R'fS Building:     T&#xa3;kc~-               Elevation:         - LJ-           Access Point Area: -31 meodd rdm@
Pipe Interior Radiological Survey Form Date: 6  
-0 6 Time:
D R'fS Building:
T&#xa3;kc~-
Elevation:  
- LJ-Access Point Area: -31 meodd rdm@
fx0.u su,+
fx0.u su,+
System:       M4-r-H+$+&;J         Pipe Diameter:             7 " -.
System:
                                                                      -- ---
M4-r-H +$+&;J Pipe Diameter:
Pipe ID # /,7/ -ro c u d @ &#r
7 "
                                                                ,
Pipe ID # /,7/ -ro cud@ &#r Type of Survey Investigation Characterization
Type of Survey Investigation           Characterization (~inal Survev 1 Other                           <
(~inal Survev 1 Other Sled Size 2 "\\kby c ?aLc c h inch Detector:
Sled Size   2 "\kby c ?aLc c h inch Detector:             Yv-Ld;L                           Detector ID #:               $ f l d / ~ 0 3 ~ ~ ' &   / 2 /
Yv-Ld;L Detector ID #:  
Cal Date:               / I 05
$ f l d / ~ 0 3 ~ ~ ' & / 2 /
                                    -                   Cal Due Date:                         f     17-0 d Instrument:           9350 -1                         Instrument ID #:                     212'233 Cal Date:               / 7 c d 5                       Cal Due Date:                       11   - 17.bG From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value             5     cpm MDCRstIc                 /& 7       cpm Efficiency Factor for Pipe Diameter     ~),OWW             (taken from detector calibration certificate)
Cal Date:  
MDCstatlc             1g3'0       dPdl00~m2 Is the MDCsab, acceptable?
/ I - 1 7 - 0 5 Cal Due Date:
Comments:       d       o     ~
f 1 7 - 0 d Instrument:
~ ~~
9 3 5 0 - 1 Instrument ID #:
No
212'233 Cal Date:  
                                            ' s u~R ~ ~
/
f adjust sample count tune and recalculate MDCRbuc)
7 c d 5 Cal Due Date:
( ~no, L ~ '~        b        ~          d Pipe Interior Radiological Survey Radiological Survey Commenced: Date:     2 Cb-
11 - 1 7. b G From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5
* 0         Tie:         O r / S/
cpm MDCRstIc  
Package Page 1 of 2 Attachment 3, Page 1
/& 7 cpm Efficiency Factor for Pipe Diameter  
~),OWW (taken from detector calibration certificate)
MDCstatlc 1 g3'0 d P d l 0 0 ~ m 2 Is the MDCsab, acceptable? a No
( ~ f no, adjust sample count tune and recalculate MDCRbuc)
Comments:
d o
~
~
~
~
~
~
b
~
d
~ ' s u R ~ L ~ '
Pipe Interior Radiological Survey Radiological Survey Commenced: Date: 2
* Cb- 0 T i e :
O r / S/
Package Page 1 of 2, Page 1  


Pipe Interior Radiological Survey Form (Continuation Form)
Pipe Interior Radiological Survey Form (Continuation Form)
Package Page 2of-3 Attachment 3, Page 2 REFERENCE COPY
REFERENCE COPY Package Page 2 of 3-, Page 2  


BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:     3-q-Ob                    Time:             l o&(
BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:
Pipe ID#:     /. 7/               Pipe Diameter:           25                   Access Point Area: 5- C 4 r \ ; f k ~k4 Building:     Q-g                   Elevation:           - LJ-                       System:       C A J L & & -~ ~ ~ R R Type of Survey     Investigation             Characterization             Final Survey     ,      Other   1 Gross                             C06O     J                                   Cs Detector ID# I Sled ID#         4       -      &Z/J-QS~/             NO c $ L . ~
3 - q - O b Time:
Detector Cal Date:           1     vF + z o - ~ ~ - D bDetector Cal Due Date:             20-     Kc&- a 7 Instrument:             235-0-1                         Instrument ID #:             Z/ L Z 7 3 Instrument Cal Date:         // -r 7 - (I5-             Instrument Cal Due Date:               //-/7-8       Q From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value           i 9, I cpm MDCRsmic             I , $ , "/pm Efficiency Factor for Pipe Diameter       0. 0003 8-             (from detector efficiency determination) hlDCstatie       3443             d~m/         1-           cm2 Is the MDCStati,acceptable?                     NO         (ifno, adjust sample count time and recalculate MDCR,,,ti,)
l o&(
Pipe ID#:  
/. 7/
Pipe Diameter:
25 Access Point Area: 5-C4r\\;fk~ k4 Building:
Q-g Elevation:  
- LJ-System:
C A J L & & ~ ~ ~ R R Type of Survey Investigation Characterization Final Survey Other 1 Gross C06O J Cs Detector ID# I Sled ID#
4
&Z/J-QS~ /
N O c L
~
Detector Cal Date:
1 v
F + z o - ~ ~ - D b Detector Cal Due Date:
20- Kc&- a 7 Instrument:
235-0-1 Instrument ID #:
Z/ L Z73 Instrument Cal Date:  
// -r 7 - (I 5-Instrument Cal Due Date:  
//-/7-8 Q
From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value i 9, I cpm MDCRsmic I,$,  
"/pm Efficiency Factor for Pipe Diameter
: 0. 0003 8-(from detector efficiency determination) hlDCstatie 3443 d ~ m /
1-cm2 Is the MDCStati, acceptable?
NO (ifno, adjust sample count time and recalculate MDCR,,,ti,)
Comments:
Comments:
Ca/nDr 157-6 Techmcian Signature           r ..h t - ~ f i e w Pipe Interior Radiological survey Package Page 1 o f L REFERENCE COPY Attachment 3, Page 1
C a / n D r 157-6 Techmcian Signature r..h t - ~ f i e w Pipe Interior Radiological survey REFERENCE COPY n
Package Page 1 o f L, Page 1
 
V Pipe Interior Radiological Survey Form (Continuation Form)
BSIILVSPipeCrawler-002 Revision 4 Date:
3 06 Pipe ID#:
1, 7 /
Pipe Diameter:
L "
Access Point Area: - ~ j -
crt/v~~
if Building:
Q g Elevation:
~ -z J-System:
REFERENCE COPY Package Page of 3, Page 2


V                                      BSIILVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form (Continuation Form)
SECTION 7 ATTACHMENT 3 1
Date:    3-9-0 6 Pipe ID#:    1,7 /          Pipe Diameter:  L  "      Access Point Area: -~j-  crt/v~  if ~
PAGE(S)
Building:    Qg                Elevation:  ~ -zJ-            System:
Package Page    of 3 REFERENCE COPY Attachment 3, Page 2


SECTION 7 ATTACHMENT 3 1 PAGE(S)
Page 1 of 1  


Page 1 of 1 SECTION 7 ATTACHMENT 4 1 DISC}}
SECTION 7 ATTACHMENT 4 1 DISC}}

Latest revision as of 20:10, 14 January 2025

Survey Unit Release Record EP 1.71
ML073170389
Person / Time
Site: Plum Brook  File:National Aeronautics and Space Administration icon.png
Issue date: 11/07/2007
From:
US National Aeronautics & Space Admin (NASA)
To:
NRC/RGN-III/DNMS/DB
References
EP 1.71
Download: ML073170389 (25)


Text

Description

2) EP 1.71 is a Class I, Group 2 s v

unit as perthe PBRF Find Status Survey P h (FSSP) and Technical Basis Document WD)-06-004.

3) Surveys in EP 1.71 were performed wing a scintilintion d m

opthhd to measure gamma energies representative of Co-60. Sample #EP2-5 from Suwey Request (SR)-13 as re&mce.d for tbis decision-acquisition of survey measmmen&.

5 ) Instmmetrt eficiency dekmhtions are developed in accordance with the BSL'LVS-002, WEP 05-086, these determinations are appropriate for the types of radiation involved and the media being surveyed.

CS-09) 1

FSS Design # EP 1.71 S w e y Unit: 1.71 1.O History~scription 1 1 The subject pipe system is the 2" hot drain pipe for C a d "H". Tbe function of this pipe was to convey water fkom the 2 inch riser in Canal "H" to the HD sump in Pump Room #22 on the -25' elevation of the Reactor Building.

1 -2 EP 1.7 1 consists of 2" d i e t e r piping that is appmxhate1y 120 feet in length.

2.0 Survey Design Information 2-1 EP 1..71 was surveyed IAW Procedure #BSVLVS-002.

2.2 100% of the 2" ID pipe was accessible for survey. The accessible 2" ID pipe was surveyed by static measurement at one foot increments, for a total of 1 20 s w e y measurements.

2.3 Surface area for the 2" ID piping is 486 cm2 for each foot of piping, C

O

~

~

to a total 2" ID piping surface area of 58,373 cm2 (5.8 m2) for the entire length of (approximately 1 20') of 2"' piping.

3.0 Swey Unit Measurement LocationslData 3.1 Pipe Mar radiological survey forms are provided in Attachment 2 of this release record.

4.0 Survey Unit InvestigationdResults 4.1 None 5.0 Data Assessment Results 5.1 Data assessment results are provided in the EPlBuried Pipe (BPI Survey Report provided in Attachment I.

5.2 ALL measurement results are less thttn the Derived Concentration Guideline Level @CGL) for radionuclide specific EP that corresponds to the 1 mdyr dose goal established in Table 3-3 of the FSSP.

men implementing the Unity Rule, provided in Section 3.6.3 of the FSSP, and applying the Nuclide Fraction p),

provided in TBD-06-004, the survey unit that is constituted by EP 1.71 passes FSS.

5.4 Background was not subtracted from the survey measurements and the Elevated Measurement Comparison (EMC) was not employed for this survey unit.

Revision # Original Page 2 of 3

FSS Design#EP 1.71 Revision # Ori@

Page 3 of 3 Survey Unit: 1 -7 1

5-5 Statistical S m m q Table 6.0 Documen&tion of evduations perta3Ilmg to compliance with the unrestricted use limit of 25 mredyr and dose wntributiom from Embedded Pipe md radionucIides contributing 10% in aggregate of the total dose %r both structural scenarios and soils.

6.1 A miw of the survey results has shown that the dose contribution for EP 1.71 to be lesstban 1 &.

The dose cmtrihdon is e s t k k d t o be 0.01 3 mremlyr based on the average of the actual gross counts measured.

7.0 Attachments - BST EPBP S w e y Report - Pipe Interior aadiofogicd Survey Form - DQA Worksheet -Disc containing RR for EP 1.71 8t Spreadskt

SECTION 7 ATTACHMENT 2 Ir PAGE(S)

BSI EPlBP SURVEY REPORT Detector-Sled #

LUESNOTBACKGROUNDCORRECTED RP Engineer I Date

EP 1.71 2" Pipe TBD 06-004 Group 2

SECTION 7 ATTACEWLENT 2 12 PAGE(S)

Pipe Interior Radiological Suwey Form (Continuation 'Form)

REFERENCE COP Package Page 3 of 3, Page 2

Pipe Interior Radiological Survey Form L'3'9. 0 G Date:

Time: -

//no Building: -9 fi Elevation: s Access Point Area: - L'?

T i 2 y ~ ~ ~ L System: f;7&$~$$~ 4 fie >w;d Pipe Diameter:

7 '

PipeID#

/. ? /

Type of Survey ='ve"""P Characterization - 3 other

/

~.':,i.-(

1 d k i n c h Sled Size Yq-L 3-3/+,

Detector:

Detector ID #:

&aLf+J 3- (3-1 Cal Date:

/ [ r 12 " 03-Cal Due Date:

/I-, / 7 - 0 Instrument:

gZT \\

Instrument ID #:

% ( 33-37 Cal Date:

/ / - / 7

- c > 5 Cal Due Date:

((: 13,. r C From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 7

cpm;",

t.

MDCRstatii, 11.3 cpm z Efficiency Factor for Pipe Diameter

6. O O O Z ~

(taken from detector calibration certificate).-.

783 1, MDCstatiC dPm/l00cm2 Is the MDCstati, acceptable? @-

NO (if no, adjust sample count time and recalculate MDCR,,d

,(?A~~'uY',hii S d h J "'/

Comments:

I

.A.


p,-

Pipe Interior Radiological Survey

'-2.

Radiological Survey Commenced: Date:

f *3 a -0 Time:

/ I b

Package Page 1 of 2 Attacwent 3, Page 1

Pipe Interior Radiological Survey Form Date: 6

-0 6 Time:

D R'fS Building:

T£kc~-

Elevation:

- LJ-Access Point Area: -31 meodd rdm@

fx0.u su,+

System:

M4-r-H +$+&;J Pipe Diameter:

7 "

Pipe ID # /,7/ -ro cud@ &#r Type of Survey Investigation Characterization

(~inal Survev 1 Other Sled Size 2 "\\kby c ?aLc c h inch Detector:

Yv-Ld;L Detector ID #:

$ f l d / ~ 0 3 ~ ~ ' & / 2 /

Cal Date:

/ I - 1 7 - 0 5 Cal Due Date:

f 1 7 - 0 d Instrument:

9 3 5 0 - 1 Instrument ID #:

212'233 Cal Date:

/

7 c d 5 Cal Due Date:

11 - 1 7. b G From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value 5

cpm MDCRstIc

/& 7 cpm Efficiency Factor for Pipe Diameter

~),OWW (taken from detector calibration certificate)

MDCstatlc 1 g3'0 d P d l 0 0 ~ m 2 Is the MDCsab, acceptable? a No

( ~ f no, adjust sample count tune and recalculate MDCRbuc)

Comments:

d o

~

~

~

~

~

~

b

~

d

~ ' s u R ~ L ~ '

Pipe Interior Radiological Survey Radiological Survey Commenced: Date: 2

  • Cb- 0 T i e :

O r / S/

Package Page 1 of 2, Page 1

Pipe Interior Radiological Survey Form (Continuation Form)

REFERENCE COPY Package Page 2 of 3-, Page 2

BSYLVSPipeCrawler-002 Revision 4 Pipe Interior Radiological Survey Form Date:

3 - q - O b Time:

l o&(

Pipe ID#:

/. 7/

Pipe Diameter:

25 Access Point Area: 5-C4r\\;fk~ k4 Building:

Q-g Elevation:

- LJ-System:

C A J L & & ~ ~ ~ R R Type of Survey Investigation Characterization Final Survey Other 1 Gross C06O J Cs Detector ID# I Sled ID#

4

&Z/J-QS~ /

N O c L

~

Detector Cal Date:

1 v

F + z o - ~ ~ - D b Detector Cal Due Date:

20- Kc&- a 7 Instrument:

235-0-1 Instrument ID #:

Z/ L Z73 Instrument Cal Date:

// -r 7 - (I 5-Instrument Cal Due Date:

//-/7-8 Q

From the Daily Pipe Survey Detector Control Form for the Selected Detector Background Value i 9, I cpm MDCRsmic I,$,

"/pm Efficiency Factor for Pipe Diameter

0. 0003 8-(from detector efficiency determination) hlDCstatie 3443 d ~ m /

1-cm2 Is the MDCStati, acceptable?

NO (ifno, adjust sample count time and recalculate MDCR,,,ti,)

Comments:

C a / n D r 157-6 Techmcian Signature r..h t - ~ f i e w Pipe Interior Radiological survey REFERENCE COPY n

Package Page 1 o f L, Page 1

V Pipe Interior Radiological Survey Form (Continuation Form)

BSIILVSPipeCrawler-002 Revision 4 Date:

3 06 Pipe ID#:

1, 7 /

Pipe Diameter:

L "

Access Point Area: - ~ j -

crt/v~~

if Building:

Q g Elevation:

~ -z J-System:

REFERENCE COPY Package Page of 3, Page 2

SECTION 7 ATTACHMENT 3 1

PAGE(S)

Page 1 of 1

SECTION 7 ATTACHMENT 4 1 DISC