ML080720582: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/12/2008
| issue date = 03/12/2008
| title = Notification of Occupational Radiation Safety Inspection on May 12-16 and June 2-6, 2008, and Request for Information
| title = Notification of Occupational Radiation Safety Inspection on May 12-16 and June 2-6, 2008, and Request for Information
| author name = Bonser B R
| author name = Bonser B
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Morris J R
| addressee name = Morris J
| addressee affiliation = Duke Energy Carolinas, LLC, Duke Power Co
| addressee affiliation = Duke Energy Carolinas, LLC, Duke Power Co
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:March 12, 2008  
{{#Wiki_filter:March 12, 2008 Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635  
 
Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635


==SUBJECT:==
==SUBJECT:==
CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  


==Dear Mr. Morris:==
==Dear Mr. Morris:==
On May 12-16 and June 2-6, 2008, the NRC will perform the baseline Occupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be reviewed and collected at that time.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)


On May 12-16 and June 2-6, 2008, the NRC will perform the baseline O ccupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this letter, please contact us.
It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be review ed and collected at that time.
Sincerely,  
 
/RA/
We have discussed the schedule for these inspection activities with your staff and understand
Brian R. Bonser, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.
 
50-413, 50-414 License No. NPF-35 and NPF-52  
that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.
 
In accordance with 10 CFR 2.390 of the NRC
=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).  
 
Should you have any questions concerning this letter, please contact us.  
 
Sincerely,      
      /RA/ Brian R. Bonser, Chief Plant Support Branch 2 Division of Reactor Safety  
 
Docket No. 50-413, 50-414 License No. NPF-35 and NPF-52  


==Enclosure:==
==Enclosure:==
Pre-Inspection Document Request  
Pre-Inspection Document Request (cc: w/encl See Page 3)


(cc: w/encl See Page 3)
March 12, 2008 Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635  
March 12, 2008  
 
Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635


==SUBJECT:==
==SUBJECT:==
CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  
CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION  


==Dear Mr. Morris:==
==Dear Mr. Morris:==
On May 12-16 and June 2-6, 2008, the NRC will perform the baseline Occupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be reviewed and collected at that time.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)


On May 12-16 and June 2-6, 2008, the NRC will perform the baseline O ccupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
OFFICE RII:DRS RII:DRS SIGNATURE
/RA/
/RA/
NAME B. Bonser
: h. Gepford DATE 03/12/2008 03/07/2008 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO


It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be review ed and collected at that time.  
DPC 3 cc w/encl:
Randy D. Hart Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution George Strickland Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Kay Nicholson Technical Specialist Catawba Nuclear Station 4800 Concord Road York, SC 29745 Allison Jones-Young Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Anthony Jackson Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Lawrence Rudy Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 David A. Repka Winston Strawn LLP Electronic Mail Distribution Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution R. L. Gill, Jr.
Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006 Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC P.O. Box 1006 - EC03XM 526 South Church St.
Charlotte, NC 28201-1006


We have discussed the schedule for these inspection activities with your staff and understand
Enclosure Pre-Inspection Document Request Occupational Radiation Safety Cornerstone Licensee:
 
Catawba Nuclear Station Docket Numbers: 50-413,414 Inspection Dates: May 12-16 and June 2-6, 2008 Inspection Procedures to be performed:
that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.  
71121.01 Access Controls to Radiologically Significant Areas 71121.02 ALARA Planning and Controls 71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems
[limited scope, Sections 02.01(e), 2.02 (d & e)]
71122.02 Radioactive Material Processing and Transportation 71151 Performance Indicator Verification 60855 Operation of an ISFSI (RP aspects)
The most recent inspection completed for inspection procedures 71121.01, 71122.01, 71151, and 60855 was performed on August 6-10, 2007. The most recent inspection completed for inspection procedures 71121.01 and 71122.02 was completed December 1, 2006. Unless otherwise specified, documentation is requested from the date of the previous inspection to the present.
We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review. If any of the requested information is too burdensome to provide electronically or as hard copies during the bagman trip, simply indicate that the requested material is available for onsite review by the inspectors.
If you have any questions, please call Heather Gepford at 404-562-4659. Thank you in advance for all your effort in putting together this material.
Assistance Requested During Bagman Trip Introductions to, and discussions with, licensee personnel who will be assisting with the inspection Plant familiarization Atour@
Walk-down of the ISFSI Discussion of groundwater monitoring program with cognizant personnel Assistance Requested During On-Site Inspection Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.
Discussions with appropriate individuals regarding access controls and ALARA planning.  


In accordance with 10 CFR 2.390 of the NRC
2 Enclosure Schedule of transportation shipments during the inspection and notification of opportunities for observations of shipment preparation/receipt; discussions with appropriate individuals regarding the transportation program.
=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) 
General Information Request Telephone numbers of contacts Plant and Radiation Protection organizational charts, including personnel involved in solid radwaste processing and transportation of radwaste/radioactive materials.
 
Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, liquid and solid radioactive waste program, etc.)
_________________________ OFFICE RII:DRS RII:DRS      SIGNATURE    /RA/    /RA/      NAME B. Bonser h. Gepford      DATE 03/12/2008 03/07/2008      E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO DPC                                                                  3 cc w/encl: Randy D. Hart Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution
Outage schedule, including work activities to be conducted during the week(s) of the inspection List of active radiation work permits, including those specific to outage activities, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.
 
List of radiation protection procedures Corrective Action Program procedures Audits and self-assessments performed since the last inspection that encompass the areas of (1) access controls, (2) the ALARA program and implementation, (3) liquid and solid radwaste processing, and (4) transportation of radioactive material/radwaste.
George Strickland Engineer Catawba Nuclear Station 4800 Concord Road York, SC  29745
71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems Procedures for onsite/offsite surface/groundwater monitoring activities and leak detection Summary of spill, leak, or unexpected liquid discharge data documented in the site=s 10 CFR 50.75(g) files. Note: Only provide summary, 50.75(g) file details may be reviewed during onsite inspection.
 
List of PIPs issued since August 2007 for tritium or other radioisotopes in ground water wells, or identification of spills or leaks from contaminated systems, structures, and components.
Kay Nicholson Technical Specialist Catawba Nuclear Station 4800 Concord Road York, SC  29745
Audits and self assessments conducted since August 2007 for groundwater monitoring.
 
Annual Effluent/REMP Reports for CY 2007: focus on surface and groundwater monitoring.
Allison Jones-Young Engineer Catawba Nuclear Station 4800 Concord Road York, SC  29745
71121.01 Access Controls to Radiologically Significant Areas Site and corporate procedures associated with the access control program. Procedures should include:
 
Anthony Jackson Engineer Catawba Nuclear Station 4800 Concord Road York, SC  29745
 
Lawrence Rudy Engineer Catawba Nuclear Station 4800 Concord Road York, SC  29745
 
Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC  28202
 
Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC  28202
 
David A. Repka Winston  Strawn LLP Electronic Mail Distribution
 
Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution
 
Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office Electronic Mail Distribution
 
Vanessa Quinn Federal Emergency Management Agency Electronic Mail Distribution
 
Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution
 
R. L. Gill, Jr.
Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC  28201-0006
 
Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC P.O. Box 1006 - EC03XM 526 South Church St.
Charlotte, NC  28201-1006
 
Enclosure Pre-Inspection Document Request Occupational Radiation Safety Cornerstone Licensee:  Catawba Nuclear Station Docket Numbers: 50-413,414 Inspection Dates: May 12-16 and June 2-6, 2008 Inspection Procedures to be performed:
71121.01  Access Controls to Radiologically Significant Areas 71121.02  ALARA Planning and Controls 71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems [limited scope, Sections 02.01(e), 2.02 (d & e)] 71122.02  Radioactive Material Processing and Transportation 71151  Performance Indicator Verification 60855  Operation of an ISFSI (RP aspects)
The most recent inspection completed for inspection procedures 71121.01, 71122.01, 71151, and 60855 was performed on August 6-10, 2007. The most recent inspection completed for inspection procedures 71121.01 and 71122.02 was completed December 1, 2006. Unless otherwise specified, documentation is requested from the date of the previous inspection to the present. We would prefer as much of the information as possible in electronic form. An index to the CD
 
contents is also helpful. For those items requesting a list of documents/ar eas, the inspectors will select documents/areas from the list for on-site review. If any of the requested information is too burdensome to provide electronically or as hard copies during the bagman trip, simply indicate that the requested material is available for onsite review by the inspectors.
If you have any questions, please call Heather Gepford at 404-562-4659. Thank you in advance for all your effort in putting together this material.
_____________________________________________________________________________


Assistance Requested During Bagman Trip
3 Enclosure Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)
* Introductions to, and discussions with, licensee personnel who will be assisting with the inspection
Key controls for all high radiation areas Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)
* Plant familiarization Atour@
Calculations of internal exposures List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose gradients (factor of five or more), including underwater diving activities.
* Walk-down of the ISFSI
RWPs for the top five dose rate areas or tasks.
* Discussion of groundwater monitoring program with cognizant personnel Assistance Requested During On-Site Inspection
Plant/elevation maps of all HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm),
* Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.
and VHRAs. Include areas with the potential to become a HRA during routine operations or outages.
* Discussions with appropriate individuals regarding access controls and ALARA planning.
Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.
2 Enclosure
List of all PCEs, including skin dose assessment if applicable, since the last inspection.
* Schedule of transportation shipments during the inspection and notification of opportunities for observations of shipment preparation/receipt; discussions with appropriate individuals regarding the transportation program.
List of PIPs generated since the last inspection related to access controls, including the following:
General Information Request
Access controls, including high radiation area radiological incidents Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors 71121.02: ALARA Planning and Controls Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:
* Telephone numbers of contacts
ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews Radiation work permit preparation and worker compliance Processes used to estimate and track work activity specific exposures Making changes to dose estimates during task performance Work controls Engineering controls Exposure mitigation requirements
* Plant and Radiation Protection organizational charts, including personnel involved in solid radwaste processing and transportation of radwaste/radioactive materials.
* Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, liquid and solid radioactive waste program, etc.)
* Outage schedule, including work activities to be conducted during the week(s) of the inspection
* List of active radiation work permits, including those specific to outage activities, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.
* List of radiation protection procedures
* Corrective Action Program procedures
* Audits and self-assessments performed since the last inspection that encompass the areas of (1) access controls, (2) the ALARA program and implementation, (3) liquid and solid radwaste processing, and (4) transportation of radioactive material/radwaste.
71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems
* Procedures for onsite/offsite surface/groundwater monitoring activities and leak detection
* Summary of spill, leak, or unexpected liquid disc harge data document ed in the site
=s 10 CFR 50.75(g) files. Note: Only provide summary, 50.75(g) file details may be reviewed during onsite inspection.
* List of PIPs issued since August 2007 for tritium or other radioisotopes in ground water wells, or identification of spills or leaks from contaminated systems, structures, and components.
* Audits and self assessments conducted since August 2007 for groundwater monitoring.
* Annual Effluent/REMP Reports for CY 2007:  focus on surface and groundwater monitoring. 71121.01 Access Controls to Radiologically Significant Areas
* Site and corporate procedures associated with the access control program. Procedures should include:
3 Enclosure Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs) Key controls for all high radiation areas   Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.) Calculations of internal exposures
* List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose gradients (factor of five or more), including underwater diving activities.
* RWPs for the top five dose rate areas or tasks.
* Plant/elevation maps of all HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs. Include areas with the potential to become a HRA during routine operations or outages.
* Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.
* List of all PCEs, including skin dose assessment if applicable, since the last inspection.
* List of PIPs generated since the last inspection related to access controls, including the following: Access controls, including high radiation area radiological incidents   Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors  


71121.02: ALARA Planning and Controls
4 Enclosure ALARA documents related to current outage:
* Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:  ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews  Radiation work permit preparation and worker compliance  Processes used to estimate and track work activity specific exposures  Making changes to dose estimates during task performance  Work controls  Engineering controls  Exposure mitigation requirements 4 Enclosure
List approximately 10-15 work activities planned during the inspection likely to result in the highest personnel collective exposures and those which present the greatest radiological risk to workers (e.g. work in HRAs, diving, potentially changing radiological conditions).
* ALARA documents related to current outage:
Include the dose projections and ALARA package numbers.
* List approximately 10-15 work activities planned during the inspection likely to result in the highest personnel collective exposures and those which present the greatest radiological risk to workers (e.g. work in HRAs, diving, potentially changing radiological conditions).
ALARA planning packages for the five highest dose jobs being performed during the outage Temporary shielding requests generated for the outage.
Include the dose projections and ALARA package numbers. ALARA planning packages for the five highest dose jobs being performed during the outage Temporary shielding requests generated for the outage.
ALARA documents related to previous outage:
* ALARA documents related to previous outage: Completed ALARA packages (including post-job reviews) for the five work activities that were completed during the last outage which had the greatest collective dose and/or presented significant radiological risk. List of five activities (including ALARA package number) from the previous outage in which the work scope changed or was extended and alternative ALARA measures were taken to respond to the emergent conditions. List of five activities from the previous outage in which the estimated work hours were significantly different than the actual hours expended. List of five activities in which the estimated and actual hours expended were accurate.
Completed ALARA packages (including post-job reviews) for the five work activities that were completed during the last outage which had the greatest collective dose and/or presented significant radiological risk.
* Documents related to the ALARA planning process: Annual ALARA goals for 2006-2008, previous/current outage ALARA goals, and the methodology utilized to make the projections. Most recent annual ALARA report and most recent refueling outage report. ALARA Committee activity summaries (e.g. meeting minutes) for three months or 3 meetings after the last refueling outage and the three months or 3 meetings prior to the upcoming refueling outage.
List of five activities (including ALARA package number) from the previous outage in which the work scope changed or was extended and alternative ALARA measures were taken to respond to the emergent conditions.
* Outline of the source term reduction strategy. Information should include: Historic trends and current status of plant source term Factors that affect the source term Activities employed to reduce the source term Specific sources identified for reduction actions Source term reduction evaluation Results achieved since last inspection of the ALARA program
List of five activities from the previous outage in which the estimated work hours were significantly different than the actual hours expended.
* Records for declared pregnant workers since November 2006, listing their monthly radiation exposure during the term or year-to-date.
List of five activities in which the estimated and actual hours expended were accurate.
* List of PIPs generated since November 2006 related to the ALARA program, including the following: ALARA planning       Post-job review identified problems Radiation worker practices 5 Enclosure  Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities
Documents related to the ALARA planning process:
Annual ALARA goals for 2006-2008, previous/current outage ALARA goals, and the methodology utilized to make the projections.
Most recent annual ALARA report and most recent refueling outage report.
ALARA Committee activity summaries (e.g. meeting minutes) for three months or 3 meetings after the last refueling outage and the three months or 3 meetings prior to the upcoming refueling outage.
Outline of the source term reduction strategy. Information should include:
Historic trends and current status of plant source term Factors that affect the source term Activities employed to reduce the source term Specific sources identified for reduction actions Source term reduction evaluation Results achieved since last inspection of the ALARA program Records for declared pregnant workers since November 2006, listing their monthly radiation exposure during the term or year-to-date.
List of PIPs generated since November 2006 related to the ALARA program, including the following:
ALARA planning Post-job review identified problems Radiation worker practices


71122.02 Radioactive Material Processing and Transportation
5 Enclosure Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities 71122.02 Radioactive Material Processing and Transportation Site and corporate procedures/manuals describing licensee compliance with 10 CFR Parts 20, 61, and 71 and 49 CFR Parts 170-189. Procedures/manuals should include:
* Site and corporate procedures/manuals describing licensee compliance with 10 CFR Parts 20, 61, and 71 and 49 CFR Parts 170-189. Procedures/manuals should include: Solid and liquid radwaste processing procedures Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers. Waste stream mixing and/or sampling procedures, including (1) waste concentration averaging, (2) use of scaling factors and calculations used to account for difficult-to-measure radionuclides, and (3) ensuring waste stream composition data accounts for changing operational parameters   Shipping/transportation procedures Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports
Solid and liquid radwaste processing procedures Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.
* Process Control Program (PCP).
Waste stream mixing and/or sampling procedures, including (1) waste concentration averaging, (2) use of scaling factors and calculations used to account for difficult-to-measure radionuclides, and (3) ensuring waste stream composition data accounts for changing operational parameters Shipping/transportation procedures Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports Process Control Program (PCP).
* Most recent Annual Radioactive Effluents Release Report.
Most recent Annual Radioactive Effluents Release Report.
* Most recent radio-chemical sample analysis results (i.e., A10 CFR Part 61" analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials, etc.).
Most recent radio-chemical sample analysis results (i.e., A10 CFR Part 61 analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials, etc.).
* List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since November 2006 and associated 10 CFR 50.59 documentation, as appropriate.
List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since November 2006 and associated 10 CFR 50.59 documentation, as appropriate.
* Copies of applicable transport cask Certificate of Compliance for the last three transport cask shipments.
Copies of applicable transport cask Certificate of Compliance for the last three transport cask shipments.
* Training and qualification records for personnel responsible for radioactive waste processing and radioactive material shipment preparation activities.
Training and qualification records for personnel responsible for radioactive waste processing and radioactive material shipment preparation activities.
* Copy of the Radioactive Shipping Log for the last 12 months. (The inspector will select transportation shipping packages for review during the inspection.)
Copy of the Radioactive Shipping Log for the last 12 months. (The inspector will select transportation shipping packages for review during the inspection.)
* List of PIPs generated since November 2006 involving radioactive waste and radioactive material/waste transportation.
List of PIPs generated since November 2006 involving radioactive waste and radioactive material/waste transportation.
* Available for onsite review during the inspection: Site drawing(s) showing the location of all stored radioactive materials and all stored radioactive waste. Plant drawings sufficient to permit the inspector to walk-down the liquid and solid radioactive waste processing systems to verify current system configuration/operation agree with the descriptions contained in the UFSAR and in the PCP. Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.
Available for onsite review during the inspection:
6 Enclosure  Information concerning the site
Site drawing(s) showing the location of all stored radioactive materials and all stored radioactive waste.
=s waste disposal volume and waste reduction program. Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of radioactive materials and radioactive waste as specified by 49 CFR 172.
Plant drawings sufficient to permit the inspector to walk-down the liquid and solid radioactive waste processing systems to verify current system configuration/operation agree with the descriptions contained in the UFSAR and in the PCP.
71151  Performance Indicator Verification
Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.  
* Procedure(s) for identifying, notification, tracking, and correcting PI occurrences.
* List of all PIPs since August 2007 using keywords: HRA, LHRA, VHRA, unintended dose, unlocked door, offsite dose, ODCM, etc.
* Monthly PI reports since August 2007 and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences.
* List of all dose rate alarms > 1 R/hr and all dose alarms since August 2007.
* All final release point effluent monitor out-of-service dates since August 2007.
* Most recent gaseous and liquid effluent release permits. 60855 Operation of an ISFSI
* Procedures associated with the ISFSI facility.
Procedures s hould include:  Radiological surveys, postings, and radiation control barricades  Environmental monitoring (including TLDs)  Loading of casks  Routine activities
* Radiation surveys of the ISFSI since August 2007.
* ALARA reviews and planning and associated RWPs for cask loading activities
* Environmental monitoring results (e.g. TLDs)
* Radiological records for the loading of casks since August 2007.
* Records of contamination incidents since August 2007.
* List of PIPs related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since August 2007. Inspector Contact Information:
Heather Gepford, Ph.D., CHP (404) 562-4659 Heather.Gepford@nrc.gov


Mailing Address US NRC Region II ATTN: Heather Gepford 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415}}
6 Enclosure Information concerning the site=s waste disposal volume and waste reduction program.
Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of radioactive materials and radioactive waste as specified by 49 CFR 172.
71151 Performance Indicator Verification Procedure(s) for identifying, notification, tracking, and correcting PI occurrences.
List of all PIPs since August 2007 using keywords: HRA, LHRA, VHRA, unintended dose, unlocked door, offsite dose, ODCM, etc.
Monthly PI reports since August 2007 and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences.
List of all dose rate alarms > 1 R/hr and all dose alarms since August 2007.
All final release point effluent monitor out-of-service dates since August 2007.
Most recent gaseous and liquid effluent release permits.
60855 Operation of an ISFSI Procedures associated with the ISFSI facility. Procedures should include:
Radiological surveys, postings, and radiation control barricades Environmental monitoring (including TLDs)
Loading of casks Routine activities Radiation surveys of the ISFSI since August 2007.
ALARA reviews and planning and associated RWPs for cask loading activities Environmental monitoring results (e.g. TLDs)
Radiological records for the loading of casks since August 2007.
Records of contamination incidents since August 2007.
List of PIPs related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since August 2007.
Inspector Contact Information:
Heather Gepford, Ph.D., CHP (404) 562-4659 Heather.Gepford@nrc.gov Mailing Address US NRC Region II ATTN: Heather Gepford 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415}}

Latest revision as of 18:44, 14 January 2025

Notification of Occupational Radiation Safety Inspection on May 12-16 and June 2-6, 2008, and Request for Information
ML080720582
Person / Time
Site: Catawba  
(NPF-035, NPF-052)
Issue date: 03/12/2008
From: Brian Bonser
NRC/RGN-II/DRS/PSB2
To: Morris J
Duke Energy Carolinas, Duke Power Co
References
Download: ML080720582 (11)


Text

March 12, 2008 Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Morris:

On May 12-16 and June 2-6, 2008, the NRC will perform the baseline Occupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be reviewed and collected at that time.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Brian R. Bonser, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.

50-413, 50-414 License No. NPF-35 and NPF-52

Enclosure:

Pre-Inspection Document Request (cc: w/encl See Page 3)

March 12, 2008 Mr. J. R. Morris Site Vice President Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Catawba Site 4800 Concord Road York, SC 29745-9635

SUBJECT:

CATAWBA NUCLEAR STATION, NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Morris:

On May 12-16 and June 2-6, 2008, the NRC will perform the baseline Occupational Radiation Safety Inspection at the Catawba Nuclear Station (NRC Inspection Procedures 71121.01, 71121.02, and 71122.02 and the radiation safety sections of 71151 and 60855). Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

It is important that all of these documents are up to date and complete, in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector has scheduled a three-day pre-inspection visit with your staff for April 21-23, 2008. The material requested will be reviewed and collected at that time.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Marc Sawicki of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Heather Gepford, at (404) 562-4659, or the Plant Support Branch 1 Chief, Brian Bonser, at (404) 562-4653.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)

OFFICE RII:DRS RII:DRS SIGNATURE

/RA/

/RA/

NAME B. Bonser

h. Gepford DATE 03/12/2008 03/07/2008 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO

DPC 3 cc w/encl:

Randy D. Hart Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC Electronic Mail Distribution George Strickland Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Kay Nicholson Technical Specialist Catawba Nuclear Station 4800 Concord Road York, SC 29745 Allison Jones-Young Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Anthony Jackson Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Lawrence Rudy Engineer Catawba Nuclear Station 4800 Concord Road York, SC 29745 Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 David A. Repka Winston Strawn LLP Electronic Mail Distribution Henry J. Porter Assistant Director Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office Electronic Mail Distribution Vanessa Quinn Federal Emergency Management Agency Electronic Mail Distribution Peggy Force Assistant Attorney General State of North Carolina Electronic Mail Distribution R. L. Gill, Jr.

Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006 Dhiaa M. Jamil Group Executive and Chief Nuclear Officer Duke Energy Carolinas, LLC P.O. Box 1006 - EC03XM 526 South Church St.

Charlotte, NC 28201-1006

Enclosure Pre-Inspection Document Request Occupational Radiation Safety Cornerstone Licensee:

Catawba Nuclear Station Docket Numbers: 50-413,414 Inspection Dates: May 12-16 and June 2-6, 2008 Inspection Procedures to be performed:

71121.01 Access Controls to Radiologically Significant Areas 71121.02 ALARA Planning and Controls 71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems

[limited scope, Sections 02.01(e), 2.02 (d & e)]

71122.02 Radioactive Material Processing and Transportation 71151 Performance Indicator Verification 60855 Operation of an ISFSI (RP aspects)

The most recent inspection completed for inspection procedures 71121.01, 71122.01, 71151, and 60855 was performed on August 6-10, 2007. The most recent inspection completed for inspection procedures 71121.01 and 71122.02 was completed December 1, 2006. Unless otherwise specified, documentation is requested from the date of the previous inspection to the present.

We would prefer as much of the information as possible in electronic form. An index to the CD contents is also helpful. For those items requesting a list of documents/areas, the inspectors will select documents/areas from the list for on-site review. If any of the requested information is too burdensome to provide electronically or as hard copies during the bagman trip, simply indicate that the requested material is available for onsite review by the inspectors.

If you have any questions, please call Heather Gepford at 404-562-4659. Thank you in advance for all your effort in putting together this material.

Assistance Requested During Bagman Trip Introductions to, and discussions with, licensee personnel who will be assisting with the inspection Plant familiarization Atour@

Walk-down of the ISFSI Discussion of groundwater monitoring program with cognizant personnel Assistance Requested During On-Site Inspection Identification of work activities during the inspection for inspector observations, including notification of pre-job briefings, notification of diving activities, audio/visual surveillance for remote job coverage.

Discussions with appropriate individuals regarding access controls and ALARA planning.

2 Enclosure Schedule of transportation shipments during the inspection and notification of opportunities for observations of shipment preparation/receipt; discussions with appropriate individuals regarding the transportation program.

General Information Request Telephone numbers of contacts Plant and Radiation Protection organizational charts, including personnel involved in solid radwaste processing and transportation of radwaste/radioactive materials.

Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, liquid and solid radioactive waste program, etc.)

Outage schedule, including work activities to be conducted during the week(s) of the inspection List of active radiation work permits, including those specific to outage activities, with their administrative limits, electronic dosimeter dose rate limit, and dose limit.

List of radiation protection procedures Corrective Action Program procedures Audits and self-assessments performed since the last inspection that encompass the areas of (1) access controls, (2) the ALARA program and implementation, (3) liquid and solid radwaste processing, and (4) transportation of radioactive material/radwaste.

71122.01 Radioactive Gases and Liquid Effluent Treatment & Monitoring Systems Procedures for onsite/offsite surface/groundwater monitoring activities and leak detection Summary of spill, leak, or unexpected liquid discharge data documented in the site=s 10 CFR 50.75(g) files. Note: Only provide summary, 50.75(g) file details may be reviewed during onsite inspection.

List of PIPs issued since August 2007 for tritium or other radioisotopes in ground water wells, or identification of spills or leaks from contaminated systems, structures, and components.

Audits and self assessments conducted since August 2007 for groundwater monitoring.

Annual Effluent/REMP Reports for CY 2007: focus on surface and groundwater monitoring.

71121.01 Access Controls to Radiologically Significant Areas Site and corporate procedures associated with the access control program. Procedures should include:

3 Enclosure Radiological surveys, postings, and radiation control barricades Security and control of high radiation sources/objects stored in pools Radiation Work Permits Radiological Job-Coverage Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)

Key controls for all high radiation areas Radioactive material control, including contamination and hot particles Dosimetry monitoring (electronic dosimeters, multi-badging, etc.)

Calculations of internal exposures List of the 10 most exposure significant work areas within radiation areas, high radiation areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low dose rates but high collective dose. Identify any high radiation areas with significant dose gradients (factor of five or more), including underwater diving activities.

RWPs for the top five dose rate areas or tasks.

Plant/elevation maps of all HRAs, LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm),

and VHRAs. Include areas with the potential to become a HRA during routine operations or outages.

Internal dose assessments, including calculations, for any internal exposures greater that 50 mrem CEDE since the last inspection.

List of all PCEs, including skin dose assessment if applicable, since the last inspection.

List of PIPs generated since the last inspection related to access controls, including the following:

Access controls, including high radiation area radiological incidents Radiological events caused by radiation worker errors Radiological events caused by radiation protection technician errors 71121.02: ALARA Planning and Controls Site and corporate procedures associated with maintaining site dose ALARA, including those involving ALARA work activities. These procedures should include:

ALARA program implementation, including ALARA committee activities and ALARA planning, briefing, and reviews Radiation work permit preparation and worker compliance Processes used to estimate and track work activity specific exposures Making changes to dose estimates during task performance Work controls Engineering controls Exposure mitigation requirements

4 Enclosure ALARA documents related to current outage:

List approximately 10-15 work activities planned during the inspection likely to result in the highest personnel collective exposures and those which present the greatest radiological risk to workers (e.g. work in HRAs, diving, potentially changing radiological conditions).

Include the dose projections and ALARA package numbers.

ALARA planning packages for the five highest dose jobs being performed during the outage Temporary shielding requests generated for the outage.

ALARA documents related to previous outage:

Completed ALARA packages (including post-job reviews) for the five work activities that were completed during the last outage which had the greatest collective dose and/or presented significant radiological risk.

List of five activities (including ALARA package number) from the previous outage in which the work scope changed or was extended and alternative ALARA measures were taken to respond to the emergent conditions.

List of five activities from the previous outage in which the estimated work hours were significantly different than the actual hours expended.

List of five activities in which the estimated and actual hours expended were accurate.

Documents related to the ALARA planning process:

Annual ALARA goals for 2006-2008, previous/current outage ALARA goals, and the methodology utilized to make the projections.

Most recent annual ALARA report and most recent refueling outage report.

ALARA Committee activity summaries (e.g. meeting minutes) for three months or 3 meetings after the last refueling outage and the three months or 3 meetings prior to the upcoming refueling outage.

Outline of the source term reduction strategy. Information should include:

Historic trends and current status of plant source term Factors that affect the source term Activities employed to reduce the source term Specific sources identified for reduction actions Source term reduction evaluation Results achieved since last inspection of the ALARA program Records for declared pregnant workers since November 2006, listing their monthly radiation exposure during the term or year-to-date.

List of PIPs generated since November 2006 related to the ALARA program, including the following:

ALARA planning Post-job review identified problems Radiation worker practices

5 Enclosure Occurrences where the collective exposure was greater than intended dose determined to be ALARA for the individual work activities 71122.02 Radioactive Material Processing and Transportation Site and corporate procedures/manuals describing licensee compliance with 10 CFR Parts 20, 61, and 71 and 49 CFR Parts 170-189. Procedures/manuals should include:

Solid and liquid radwaste processing procedures Procedure(s) for transferring radioactive waste resin and sludge discharges into shipping/disposal containers.

Waste stream mixing and/or sampling procedures, including (1) waste concentration averaging, (2) use of scaling factors and calculations used to account for difficult-to-measure radionuclides, and (3) ensuring waste stream composition data accounts for changing operational parameters Shipping/transportation procedures Cask loading and closure procedures (licensee and vendor) applicable to last three cask transports Process Control Program (PCP).

Most recent Annual Radioactive Effluents Release Report.

Most recent radio-chemical sample analysis results (i.e., A10 CFR Part 61 analysis) for each of the radioactive waste streams (e.g., dry active waste (DAW), ion exchange resins, mechanical filters, and sludges and activated materials, etc.).

List and documentation of any changes made to the radioactive waste processing systems (liquid and solid) and/or the PCP since November 2006 and associated 10 CFR 50.59 documentation, as appropriate.

Copies of applicable transport cask Certificate of Compliance for the last three transport cask shipments.

Training and qualification records for personnel responsible for radioactive waste processing and radioactive material shipment preparation activities.

Copy of the Radioactive Shipping Log for the last 12 months. (The inspector will select transportation shipping packages for review during the inspection.)

List of PIPs generated since November 2006 involving radioactive waste and radioactive material/waste transportation.

Available for onsite review during the inspection:

Site drawing(s) showing the location of all stored radioactive materials and all stored radioactive waste.

Plant drawings sufficient to permit the inspector to walk-down the liquid and solid radioactive waste processing systems to verify current system configuration/operation agree with the descriptions contained in the UFSAR and in the PCP.

Documentation describing the status of any radioactive waste process equipment that is not operational and/or is abandoned in place.

6 Enclosure Information concerning the site=s waste disposal volume and waste reduction program.

Training curriculum and primary lesson plans for qualifying persons, including vendors, for radwaste processing, packaging, and making shipments of radioactive materials and radioactive waste as specified by 49 CFR 172.

71151 Performance Indicator Verification Procedure(s) for identifying, notification, tracking, and correcting PI occurrences.

List of all PIPs since August 2007 using keywords: HRA, LHRA, VHRA, unintended dose, unlocked door, offsite dose, ODCM, etc.

Monthly PI reports since August 2007 and copies of associated corrective action reports for Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent Occurrences.

List of all dose rate alarms > 1 R/hr and all dose alarms since August 2007.

All final release point effluent monitor out-of-service dates since August 2007.

Most recent gaseous and liquid effluent release permits.

60855 Operation of an ISFSI Procedures associated with the ISFSI facility. Procedures should include:

Radiological surveys, postings, and radiation control barricades Environmental monitoring (including TLDs)

Loading of casks Routine activities Radiation surveys of the ISFSI since August 2007.

ALARA reviews and planning and associated RWPs for cask loading activities Environmental monitoring results (e.g. TLDs)

Radiological records for the loading of casks since August 2007.

Records of contamination incidents since August 2007.

List of PIPs related to the ISFSI with respect to radiation protection (i.e. access controls, ALARA, contamination, radiation levels, etc.) since August 2007.

Inspector Contact Information:

Heather Gepford, Ph.D., CHP (404) 562-4659 Heather.Gepford@nrc.gov Mailing Address US NRC Region II ATTN: Heather Gepford 61 Forsyth Street, SW Suite 23T85 Atlanta, GA 30303-3415