ML091520329: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091520329
| number = ML091520329
| issue date = 07/07/2008
| issue date = 07/07/2008
| title = NRC Region Iii, Initial License Exam, Job Performance Measure, JPM: RO, SRO-U System C, Title: Open PORV Block Valves
| title = NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO, SRO-U System C, Title: Open PORV Block Valves
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO, SRO-U SYSTEM c TITLE:
OPEN PORV BLOCK VALVES CANDIDATE:
EXAMINER:


JPM: RO, SRO-U SYSTEM c TITLE: OPEN PORV BLOCK VALVES
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:
 
Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03 Importance:
CANDIDATE: _____________________________________________
RO: 4.1 SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.
 
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.
EXAMINER: _____________________________________________
Preferred Evaluation Location: Simulator
 
__X__
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Open PORV Block Valves  
In Plant Preferred Evaluation Method:
 
Perform
Alternate Path: YES  
__X__
 
Simulate  
Facility JPM #: NEW  
 
K/A: 010A2.03   Importance: RO: 4.1   SRO: 4.2  
 
K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.  
 
Task Standard: At least one PORV in service per SOP-1B, Attachment 6.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____
 
Preferred Evaluation Method: Perform __X__ Simulate _____


==References:==
==References:==
SOP-1B, Primary Coolant System - Cooldown  
SOP-1B, Primary Coolant System - Cooldown Validation Time: 15 minutes Time Critical:
 
NO Candidate: __________________________________________________
Validation Time: 15 minutes Time Critical: NO  
Time Start: ________
 
Time Finish:
Candidate: __________________________________________________  
Performance Time:
 
________ minutes Performance Rating:
Time Start: ________ Time Finish: ________
SAT______
 
UNSAT ______
Performance Time: ________ minutes  
Comments:
 
Examiner: _______________________________
Performance Rating: SAT______ UNSAT ______  
Date:
 
Signature  
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3  525°F To Mode 4 Or Mode 5 Checklist, Rev. 28
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant has been taken off-line, with the reactor tripped.
The Plant has been taken off-line, with the reactor tripped.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs. PCS boron has been verified at Cold Shutdown concentration.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.  
PCS boron has been verified at Cold Shutdown concentration.
 
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist.
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.  
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate GCL 9-1 GCL-9-1 located.
S  U Comment:  Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
 
Proc. Step TASK ELEMENT 2 STANDARD GradeGCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves. MO-1042A  MO-1043A SOP-1B, Att. 6 located
 
S  U Comment:  Evaluator provides the operator a working copy of SOP-1B, Attachment 6.


Proc. Step TASK ELEMENT 3 STANDARD Grade2.0a.1 ENSURE the following conditions: 1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate GCL 9-1 GCL-9-1 located.
S U Comment:
Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.
Proc. Step TASK ELEMENT 2 STANDARD Grade GCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.
MO-1042A MO-1043A SOP-1B, Att. 6 located S U Comment:
Evaluator provides the operator a working copy of SOP-1B, Attachment 6.
Proc. Step TASK ELEMENT 3 STANDARD Grade 2.0a.1 ENSURE the following conditions:
: 1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.
HS-1042B (HS-1043B) checked in CLOSE position.
HS-1042B (HS-1043B) checked in CLOSE position.
S U Comment:
S U Comment:  


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade2.0a.2 ENSURE the following conditions: 2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.0a.2 ENSURE the following conditions:
: 2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.
MO-1042A (MO-1043A) checked closed.
MO-1042A (MO-1043A) checked closed.
S U Comment:
S U Comment:
 
Proc. Step TASK ELEMENT 5 STANDARD Grade 2.0a.3 ENSURE the following conditions:
Proc. Step TASK ELEMENT 5 STANDARD Grade2.0a.3 ENSURE the following conditions: 3. PCS pressure control established: SOP-1     2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:
: 3. PCS pressure control established:
Proc. Step TASK ELEMENT 6 STANDARD Grade2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:
Proc. Step TASK ELEMENT 6 STANDARD Grade 2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.
HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.
S U Comment: NOTE: Operator can do either "channel" first. Typically the left side valve operations (non-parentheses) are completed first.
S U Comment:
CRITICAL STEP
NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.
 
CRITICAL STEP  
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point). 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
HS-1042A (HS-1043A) operated intermittently until red light lights.
 
S  U Comment:  NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 8 STANDARD Grade1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 1. CLOSE affected PORV Isolation Valve.


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
: 1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
: 2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
HS-1042A (HS-1043A) operated intermittently until red light lights.
S U Comment:
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
: 1. CLOSE affected PORV Isolation Valve.
MO-1042A (MO-1043A), PORV Isolation Valve closed.
MO-1042A (MO-1043A), PORV Isolation Valve closed.
S U Comment: NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened. Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
S U Comment:
CRITICAL STEP
NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.
Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.
CRITICAL STEP  


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Graden/a The following alarms annunciate with PORV opening: 1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise). 2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade n/a The following alarms annunciate with PORV opening:
Following alarms are acknowledged: 1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1. 2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM. 3. Acoustic Monitor 'Reset" pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
: 1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise).
S U Comment: NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure. Operator should acknowledge and consult ARPs. Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident. Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
: 2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).
Following alarms are acknowledged:
: 1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1.
: 2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM.
: 3. Acoustic Monitor Reset pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).
S U Comment:
NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.
Operator should acknowledge and consult ARPs.
Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.
Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).
Proc. Step TASK ELEMENT 10 STANDARD Grade 1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
: 2. RESTORE PCS pressure as directed by CRS.
PCS pressure restored to band as directed by CRS.
S U Comment:
Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
CRITICAL STEP


Proc. Step TASK ELEMENT 10 STANDARD Grade1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 2. RESTORE PCS pressure as directed by CRS. PCS pressure restored to band as directed by CRS. S U Comment: Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:
CRITICAL STEP
: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time..
Since PORV still indicates open, the operator will NOT perform this step.
S U Comment:
Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.
Proc. Step TASK ELEMENT 12 STANDARD Grade 2.0a.1 ENSURE the following conditions:
: 1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.
(HS-1042B) HS-1043B checked in CLOSE position.
S U Comment:
Proc. Step TASK ELEMENT 13 STANDARD Grade 2.0a.2 ENSURE the following conditions:
: 2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.
(MO-1042A) MO-1043A checked closed.
S U Comment:


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken: 3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time -..
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade 2.0a.3 ENSURE the following conditions:
Since PORV still indicates open, the operator will NOT perform this step. S U Comment: Evaluator Cue:  If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.
: 3. PCS pressure control established:
SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:
NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
Proc. Step TASK ELEMENT 15 STANDARD Grade 2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.
S U Comment:
CRITICAL STEP


NOTE:  The same sequence as above will be repeated, with the parentheses swapped for the other "channel". The following operation will not cause a PORV opening.
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade 2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:
Proc. Step TASK ELEMENT 12 STANDARD Grade2.0a.1 ENSURE the following conditions: 1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.
: 1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
(HS-1042B) HS-1043B checked in CLOSE position.
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
S  U Comment: 
(HS-1042A) HS-1043A operated intermittently until red light lights.
 
S U Comment:
Proc. Step TASK ELEMENT 13 STANDARD Grade2.0a.2 ENSURE the following conditions: 2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.
NOTE: PORV does not open and stays closed.
(MO-1042A) MO-1043A checked closed.
CRITICAL STEP Proc. Step TASK ELEMENT 17 STANDARD Grade 2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
S  U Comment: 
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade2.0a.3 ENSURE the following conditions: 3. PCS pressure control established: SOP-1      2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia  S  U Comment:  NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.
 
Proc. Step TASK ELEMENT 15 STANDARD Grade2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.
(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.
S  U Comment:
CRITICAL STEP
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed: 1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point). 2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.  
(HS-1042A) HS-1043A operated intermittently until red light lights.
S U Comment: NOTE: PORV does not open and stays closed.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 17 STANDARD Grade2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.
Determines that this step does not apply.
Determines that this step does not apply.
S U Comment:
S U Comment:  


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade2.0e WHEN the following conditions exist, 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit). 2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed. THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.  
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade 2.0e WHEN the following conditions exist,
(MO-1042A) MO-1043 A to the full open position. S U Comment:
: 1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
CRITICAL STEP
: 2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed.
 
THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.
Proc. Step TASK ELEMENT 19 STANDARD Grade2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.
(MO-1042A) MO-1043 A to the full open position.
S U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 19 STANDARD Grade 2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.
Operator asks if CRS wants this done.
Operator asks if CRS wants this done.
S U Comment: Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
S U Comment:
 
Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.
Proc. Step TASK ELEMENT 20 STANDARD Graden/a Notify the CRS that one PORV Block Valve is open.
Proc. Step TASK ELEMENT 20 STANDARD Grade n/a Notify the CRS that one PORV Block Valve is open.
CRS notified that one PORV Block Valve is open. S U Comment:
CRS notified that one PORV Block Valve is open.
 
S U Comment:
END OF TASK  
END OF TASK  


RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
The Plant has been taken off-line, with the reactor tripped.
The Plant has been taken off-line, with the reactor tripped.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs. PCS boron has been verified at Cold Shutdown concentration.
P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.
GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.  
PCS boron has been verified at Cold Shutdown concentration.
 
GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.
INITIATING CUES:
INITIATING CUES:
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3   525°F To Mode 4 Or Mode 5 Checklist.  
The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.  
 
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS
 
IC-69  MFPs tripped, P-8A, AFWP, inservice. NOP and NOT (2060#, 532 F)  Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)  Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)  Double charging and letdown inservice. Cover gas valved out to VCT, N 2 tag next to VCT vent switch
 
USE CAE or:


Location Description Delay Ramp Event Value Final Insert Time Malfunctions: (NONE)       RC 19 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 2                 Remotes: CV-1042B-R PORV Relief Valve Open Light ON 5 sec. ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec. ON Trigger 2 Overrides: (NONE)                       Triggers: Numbe r Event ActionDescription 1 ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3   4}}
RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.
NOP and NOT (2060#, 532 F)
Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)
Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)
Double charging and letdown inservice.
Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:
Location Description Delay Ramp Event Value Final Insert Time Malfunctions:
(NONE)
RC 19 PORV Relief Valve Partially Lifts 5 sec.
100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec.
100 Trigger 2 Remotes:
CV-1042B-R PORV Relief Valve Open Light ON 5 sec.
ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec.
ON Trigger 2 Overrides:
(NONE)
Triggers:
Number Event Action Description 1
ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3
4}}

Latest revision as of 11:35, 14 January 2025

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO, SRO-U System C, Title: Open PORV Block Valves
ML091520329
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520329 (13)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO, SRO-U SYSTEM c TITLE:

OPEN PORV BLOCK VALVES CANDIDATE:

EXAMINER:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 2 of 13 JULY 2008 JOB PERFORMANCE MEASURE DATA PAGE Task:

Open PORV Block Valves Alternate Path: YES Facility JPM #: NEW K/A: 010A2.03 Importance:

RO: 4.1 SRO: 4.2 K/A Statement: Ability to (a) predict the impacts of the following malfunctions or operations on the PZR PCS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: PORV failures.

Task Standard: At least one PORV in service per SOP-1B, Attachment 6.

Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

SOP-1B, Primary Coolant System - Cooldown Validation Time: 15 minutes Time Critical:

NO Candidate: __________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 3 of 13 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-1B, Attachment 6, Opening of PORV Isolation Valves, Rev. 8 GCL 9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, Rev. 28 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 4 of 13 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Locate GCL 9-1 GCL-9-1 located.

S U Comment:

Evaluator provides the operator a working copy GCL 9-1, completed through Step 2.10.

Proc. Step TASK ELEMENT 2 STANDARD Grade GCL 9-1, Sep 2.11 OPEN PORV Isolation Valves. Refer to SOP-1B, Attachment 6, Opening Of PORV Isolation Valves.

MO-1042A MO-1043A SOP-1B, Att. 6 located S U Comment:

Evaluator provides the operator a working copy of SOP-1B, Attachment 6.

Proc. Step TASK ELEMENT 3 STANDARD Grade 2.0a.1 ENSURE the following conditions:

1. HS-1042B (HS-1043B), PZR to Quench Tank T-73 in CLOSE position.

HS-1042B (HS-1043B) checked in CLOSE position.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 5 of 13 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 2.0a.2 ENSURE the following conditions:

2. MO-1042A (MO-1043A), Power Relief Valve Isolation closed.

MO-1042A (MO-1043A) checked closed.

S U Comment:

Proc. Step TASK ELEMENT 5 STANDARD Grade 2.0a.3 ENSURE the following conditions:

3. PCS pressure control established:

SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:

Proc. Step TASK ELEMENT 6 STANDARD Grade 2.0b PLACE HS-1042B (HS-1043B), PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.

HS-1042B (HS-1043B) placed to OPEN for approx. 15 seconds AND THEN HS-1042B (HS-1043B) placed to CLOSE, with handswitch left in CLOSE position.

S U Comment:

NOTE: Operator can do either channel first. Typically the left side valve operations (non-parentheses) are completed first.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 6 of 13 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade 2.0c OPERATE HS-1042A (HS-1043A), Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:

1. MO-1042A (MO-1043A) red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
2. PRV-1042B (PRV-1043B), Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

HS-1042A (HS-1043A) operated intermittently until red light lights.

S U Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open and stay open. This will require the block valve to be closed.

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade 1.0a.1 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

1. CLOSE affected PORV Isolation Valve.

MO-1042A (MO-1043A), PORV Isolation Valve closed.

S U Comment:

NOTE: 5 seconds after MO-1042A (MO-1043A) has a red light, associated PORV will open, necessitating closing its block valve that was opened.

Evaluator: Operator action by procedure states that if 1800 psia is exceeded, affected PORV Isolation Valve must be closed. Operator should close valve before this pressure is reached.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 7 of 13 JULY 2008 Proc. Step TASK ELEMENT 9 STANDARD Grade n/a The following alarms annunciate with PORV opening:

1. EK-1373, SV AND/OR PORV OPEN, (Audible Acoustic Monitor alarm on back of Panel C-11A in alarm from FI-1042B Accelerometer (#4) Hi noise).
2. EK0743, Pressurizer PWR Operated Relief Valve Discharge HI Temp (TIA-0106, Relief and Safety Valve Discharge Temp, reads up-scale).

Following alarms are acknowledged:

1. EK-1373, Operator Action: Refer to ONP-18: Follow Up Action: Check Acoustic Monitor Panel for open valve; Check TIA-0106 discharge temperature; Refer to ONP-23.1.
2. EK-0743, Operator Action: Refer to ONP-23.1; Follow Up Action: Evaluate desired position of MO-1042A; Refer to LCOs; Refer to ORM.
3. Acoustic Monitor Reset pushbutton pushed to silence audible Acoustic Monitor alarm (PORV MOV Block Valve must be closed, for alarm to clear).

S U Comment:

NOTE: Alarms do not affect this JPM. PORV MOV Block valve must be closed by procedure.

Operator should acknowledge and consult ARPs.

Evaluator Cue: If Operator begins to reference ONPs, STATE: Follow in-use SOP, ONPs will be referenced/entered if PCS leakage or loss of PZR pressure control remain evident.

Evaluator Cue: If Operator begins to reference LCOs, STATE: Another Operator will reference Technical Specifications and the ORM (Operating Requirements Manual).

Proc. Step TASK ELEMENT 10 STANDARD Grade 1.0a.2 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

2. RESTORE PCS pressure as directed by CRS.

PCS pressure restored to band as directed by CRS.

S U Comment:

Evaluator Cue: GIVE PCS pressure band of 2010 to 2100 psia, if asked by operator.

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 8 of 13 JULY 2008 Proc. Step TASK ELEMENT 11 STANDARD Grade 1.0a.3 IF a PORV opens during performance of Step 2.0c AND the applicable PCS pressure action limit is exceeded (SOP-1, 1800 psia), THEN the following actions shall be taken:

3. When directed by CRS, repeat Section 2.0 to open PORV Isolation Valve one additional time..

Since PORV still indicates open, the operator will NOT perform this step.

S U Comment:

Evaluator Cue: If asked direction concerning repeating the steps with the PORV, direct them to perform the other PORV.

NOTE: The same sequence as above will be repeated, with the parentheses swapped for the other channel. The following operation will not cause a PORV opening.

Proc. Step TASK ELEMENT 12 STANDARD Grade 2.0a.1 ENSURE the following conditions:

1. (HS-1042B) HS-1043B, PZR to Quench Tank T-73 in CLOSE position.

(HS-1042B) HS-1043B checked in CLOSE position.

S U Comment:

Proc. Step TASK ELEMENT 13 STANDARD Grade 2.0a.2 ENSURE the following conditions:

2. (MO-1042A) MO-1043A, Power Relief Valve Isolation closed.

(MO-1042A) MO-1043A checked closed.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 9 of 13 JULY 2008 Proc. Step TASK ELEMENT 14 STANDARD Grade 2.0a.3 ENSURE the following conditions:

3. PCS pressure control established:

SOP-1 2010 to 2100 psia PCS pressure checked between 2010 and 2100 psia S U Comment:

NOTE: this PCS pressure band can be that which was set in JPM Task Element Step 9.

Proc. Step TASK ELEMENT 15 STANDARD Grade 2.0b PLACE (HS-1042B) HS-1043B, PZR Quench Tank T-73 to OPEN for approximately 15 seconds, AND THEN PLACE to CLOSE, leaving handswitch in CLOSE position when complete.

(HS-1042B) HS-1043B placed to OPEN for approx. 15 seconds AND THEN (HS-1042B) HS-1043B placed to CLOSE, with handswitch left in CLOSE position.

S U Comment:

CRITICAL STEP

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 10 of 13 JULY 2008 Proc. Step TASK ELEMENT 16 STANDARD Grade 2.0c OPERATE (HS-1042A) HS-1043A, Power Relief Valve Isolation intermittently to the OPEN position until either of the following conditions is observed:

1. (MO-1042A) MO-1043A red position indication lamp lights (indicates valve is 5% open, green position indication lamp is also lighted at this point).
2. (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

(HS-1042A) HS-1043A operated intermittently until red light lights.

S U Comment:

NOTE: PORV does not open and stays closed.

CRITICAL STEP Proc. Step TASK ELEMENT 17 STANDARD Grade 2.0d IF (PRV-1042B) PRV-1043B, Power Operated Relief opens AND then reseats, THEN repeat Step 2.0c.

Determines that this step does not apply.

S U Comment:

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 11 of 13 JULY 2008 Proc. Step TASK ELEMENT 18 STANDARD Grade 2.0e WHEN the following conditions exist,

1. (MO-1042A) MO-1043A, Power Relief Valve Isolation is 5% open (red position indication lamp lit).
2. (PRV-1042B) PRV-1043B, Power Operated Relief is closed.

THEN FULLY OPEN (MO-1042A) MO-1043A, Power Relief Isolation.

(MO-1042A) MO-1043 A to the full open position.

S U Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 19 STANDARD Grade 2.0f Repeat this attachment for remaining PORV Channel Isolation Valve.

Operator asks if CRS wants this done.

S U Comment:

Evaluator Cue: If asked by operator to open other channel PORV block valve, REPLY no for the present time.

Proc. Step TASK ELEMENT 20 STANDARD Grade n/a Notify the CRS that one PORV Block Valve is open.

CRS notified that one PORV Block Valve is open.

S U Comment:

END OF TASK

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 12 of 13 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

The Plant has been taken off-line, with the reactor tripped.

P-8A Auxiliary Feedwater Pump is in service supplying feedwater to both S/Gs.

PCS boron has been verified at Cold Shutdown concentration.

GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist, is complete through step 2.10.

INITIATING CUES:

The CRS directs you to open the PORV Isolation Valves, MO-1042A and MO-1043A, per step 2.11 of GCL-9-1, Mode 3 525°F To Mode 4 Or Mode 5 Checklist.

RO, SRO-U SYSTEM c PALISADES NUCLEAR PLANT Page 13 of 13 JULY 2008 SIMULATOR OPERATOR INSTRUCTIONS IC-69 MFPs tripped, P-8A, AFWP, inservice.

NOP and NOT (2060#, 532 F)

Banks of backup PZR heaters secured for reduced spray flow (GCL 9-1, step 2.8)

Two PCPs secured with associated PZR Spray Valves closed (GCL-9-1, Steps 2.9 and 2.10)

Double charging and letdown inservice.

Cover gas valved out to VCT, N2 tag next to VCT vent switch USE CAE or:

Location Description Delay Ramp Event Value Final Insert Time Malfunctions:

(NONE)

RC 19 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 1 RC 20 PORV Relief Valve Partially Lifts 5 sec. 100 Trigger 2 Remotes:

CV-1042B-R PORV Relief Valve Open Light ON 5 sec.

ON Trigger 1 CV-1043B-R PORV Relief Valve Open Light ON 5 sec.

ON Trigger 2 Overrides:

(NONE)

Triggers:

Number Event Action Description 1

ZLO2P(16).and..not.et_array(2) 2 ZLO2P(19).and..not.et_array(1) set thkkarc20=1.0 3

4