ML093380095: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML093380095 | | number = ML093380095 | ||
| issue date = 12/03/2009 | | issue date = 12/03/2009 | ||
| title = TSTF-511 LAR Acceptance Review | | title = TSTF-511 LAR Acceptance Review | ||
| author name = Lamb J | | author name = Lamb J | ||
| author affiliation = NRC/NRR/DORL/LPWB | | author affiliation = NRC/NRR/DORL/LPWB | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ADAMS Accession No. ML093380095 From: | {{#Wiki_filter:ADAMS Accession No. ML093380095 From: | ||
Lamb, John Sent: | |||
Thursday, December 03, 2009 1:17 PM To: | |||
Mashburn, Fredrick C Jr; Casey, Kevin E Cc: | |||
Raghavan, Rags; Milano, Patrick; Boyce, Tom (NRR); Lingam, Siva; Feintuch, Karl | |||
==Subject:== | ==Subject:== | ||
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) | FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) | ||
: Fred, By letter dated October 20, 2009 (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | : Fred, By {{letter dated|date=October 20, 2009|text=letter dated October 20, 2009}} (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | ||
Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. | ||
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence. | ||
If you have any questions, please contact me at (301) 415-3100. | If you have any questions, please contact me at (301) 415-3100. | ||
Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties | Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties | ||
Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC) | Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC) | ||
==Subject:== | ==Subject:== | ||
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) | FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440) | ||
Sent Date: | Sent Date: 12/3/2009 1:16:55 PM Received Date: 12/3/2009 1:16:55 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients: | ||
fcmashburn@tva.gov (Mashburn, Fredrick C Jr) | fcmashburn@tva.gov (Mashburn, Fredrick C Jr) | ||
Tracking Status: None kecasey@tva.gov (Casey, Kevin E) | Tracking Status: None kecasey@tva.gov (Casey, Kevin E) | ||
| Line 41: | Line 45: | ||
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl) | Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl) | ||
Tracking Status: None Post Office: | Tracking Status: None Post Office: | ||
HQCLSTR01.nrc.gov Files | HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 19798 12/3/2009 Options Expiration Date: | ||
Priority: | Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received:}} | ||
Latest revision as of 07:56, 14 January 2025
| ML093380095 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 12/03/2009 |
| From: | John Lamb Watts Bar Special Projects Branch |
| To: | Casey K, Mashburn F Tennessee Valley Authority |
| Lingam, S NRR/DORL 415-1564 | |
| References | |
| TAC ME2439, TAC ME2440 | |
| Download: ML093380095 (1) | |
Text
ADAMS Accession No. ML093380095 From:
Lamb, John Sent:
Thursday, December 03, 2009 1:17 PM To:
Mashburn, Fredrick C Jr; Casey, Kevin E Cc:
Raghavan, Rags; Milano, Patrick; Boyce, Tom (NRR); Lingam, Siva; Feintuch, Karl
Subject:
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440)
- Fred, By letter dated October 20, 2009 (ML092960438), Tennessee Valley Authority (TVA) submitted a license amendment for Sequoyah Nuclear Plant (SQN), Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 6.2.2 to support compliance with Title 10 of the Code of Federal Regulations (10 CFR) Part 26. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of 10 CFR, an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-3100.
Sincerely, John G. Lamb, Senior Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327 and 50-328 E-mail Properties
Mail Envelope Properties (BE1CC4A72435624D84F8699734202B3E157A9F89BC)
Subject:
FYI - Acceptance Review - SQN 1 & 2 - TSTF-511 (TAC Nos. ME2439 and ME2440)
Sent Date: 12/3/2009 1:16:55 PM Received Date: 12/3/2009 1:16:55 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
fcmashburn@tva.gov (Mashburn, Fredrick C Jr)
Tracking Status: None kecasey@tva.gov (Casey, Kevin E)
Tracking Status: None Rags.Raghavan@nrc.gov (Raghavan, Rags)
Tracking Status: None Patrick.Milano@nrc.gov (Milano, Patrick)
Tracking Status: None Tom.Boyce@nrc.gov (Boyce, Tom (NRR))
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
Tracking Status: None Post Office:
HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 19798 12/3/2009 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: