ML101170330: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Franke, Mark From: Franke, Mark Sent: Wednesday, October 07, 2009 1:00 PM To: Sykes, Marvin  
{{#Wiki_filter:Franke, Mark From:
Franke, Mark Sent:
Wednesday, October 07, 2009 1:00 PM To:
Sykes, Marvin


==Subject:==
==Subject:==
Crystal River talking points Marvin, Some thoughts for talking points: " In 1976, Crystal River repaired a concrete delamination issue affecting the dome. A Containment Construction Integrity Test was successfully performed after the repair." A containment pressure test that simulates accident pressure conditions was last performed in 2005 and was successful.
Crystal River talking points
* The licensee is in the process of discovery to determine the extent of cracking and its impact on the structure." The licensee will resolve the issue before startup.* NRC inspectors are onsite to independently inspect and review the adequacy of licensee actions.231}}
: Marvin, Some thoughts for talking points:
In 1976, Crystal River repaired a concrete delamination issue affecting the dome. A Containment Construction Integrity Test was successfully performed after the repair.
A containment pressure test that simulates accident pressure conditions was last performed in 2005 and was successful.
The licensee is in the process of discovery to determine the extent of cracking and its impact on the structure.
" The licensee will resolve the issue before startup.
NRC inspectors are onsite to independently inspect and review the adequacy of licensee actions.
231}}

Latest revision as of 05:26, 14 January 2025

E-Mail from Franke to Sykes, Crystal River Talking Points
ML101170330
Person / Time
Site: Crystal River 
Issue date: 10/07/2009
From: Mark Franke
NRC/RGN-II
To: Marvin Sykes
NRC/RGN-II
References
FOIA/PA-2010-0116
Download: ML101170330 (1)


Text

Franke, Mark From:

Franke, Mark Sent:

Wednesday, October 07, 2009 1:00 PM To:

Sykes, Marvin

Subject:

Crystal River talking points

Marvin, Some thoughts for talking points:

In 1976, Crystal River repaired a concrete delamination issue affecting the dome. A Containment Construction Integrity Test was successfully performed after the repair.

A containment pressure test that simulates accident pressure conditions was last performed in 2005 and was successful.

The licensee is in the process of discovery to determine the extent of cracking and its impact on the structure.

" The licensee will resolve the issue before startup.

NRC inspectors are onsite to independently inspect and review the adequacy of licensee actions.