| number = ML103620570 | | number = ML103620570 | ||
| issue date = 12/22/2010 | | issue date = 12/22/2010 | ||
| title = | | title = Summary of Meeting with Vogtle Electric Generating Plant to Discuss Plans to Construct and Operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant | ||
| author name = Franke M | | author name = Franke M | ||
| author affiliation = NRC/RGN-II/DRS/EB3 | | author affiliation = NRC/RGN-II/DRS/EB3 | ||
| addressee name = Tynan T | | addressee name = Tynan T | ||
| addressee affiliation = Southern Nuclear Operating Co, Inc | | addressee affiliation = Southern Nuclear Operating Co, Inc | ||
| docket = 05000424, 05000425 | | docket = 05000424, 05000425 | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 22, 2010 Mr. Tom E. Tynan Vice President | ||
- Vogtle Southern Nuclear Operating Company, Inc. | |||
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECTz PUBLIC MEETING | |||
==SUMMARY== | |||
1SFS1 PLANS | |||
- VOGTLE ELECTRIC GENERATING PLANT DOCKET NOS.: 50-424 and 50-425 | |||
==Dear Mr. Tynan:== | |||
This refers to the meeting conducted at your staffs request at the Region Il Office in Atlanta, Georgia, on December 15, 2010 at 1:30 p.m. The meetings purpose was to discuss plans to construct and operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant. Enclosed is a list of attendees and a copy of the slides presented at the meeting. | |||
Vogtle representatives presented an overview of current spent fuel storage status and plans for long term spent fuel storage. The meeting did not result in specific action items or decisions. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). | |||
ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room)Should you have any questions concerning this meeting, please contact me at (404) 997-4436. | |||
Sincerely, IRA! | |||
Mark E. Franke, Chief Engineering Branch 3 Division of Reactor Safety | |||
==Enclosures:== | |||
As Stated Docket Nos.: 50-424 50-425 License Nos.: NPF-68, NPF-81 cc w/encls: (See page 2) | |||
SNOPCO 2 | |||
cc w/encl: | |||
Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution B. D. McKinney, Jr. | |||
Regulatory Response Manager Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution (cc w/encl contd See page 3) | |||
SNOPCO 3 | |||
(cc w/encl contd) | |||
F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Sommerville Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq. | |||
Troutman Sanders Electronic Mail Distribution Director Consumers Utility Counsel Division Govenors Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution | |||
MLI 03620570 C | |||
SENSITIVE xLJ NON-SENSITIVE xLJ SUNSI REVIEW COMPLETE | |||
LIST OF ATTENDEES Nuclear Regulatory Commission H. Christensen, Deputy Director, Division of Reactor Safety (DRS), Region II (Rh) | |||
M. Franke, Branch Chief, Engineering Branch 3 (EB3), DRS, RH R. Carrion, Senior Reactor Inspector, EB3, DRS, RIl C. Fletcher, Senior Reactor Inspector, EB3, DRS, Ril Southern Nuclear Operating Company M. Ajiuni | |||
- Licensing Director R. Bunt | |||
- Engineering Supervisor - Dry Spent Fuel Storage J. Cash | |||
- Project Manager | |||
- Vogtle ISFSI D. Davis Engineering Supervisor Dry Cask Storage R. Dedrickson | |||
- Plant Manager, VogUe A. Wesley | |||
- Vogtle Site Engineering Supervisor T. Sides | |||
- Sr. Licensing Engineer Members of the Public Carlyn Greene, Director, Backend Publications, The Ux Consulting Company, LLC | |||
Vogtle Electric Generating Plant Overview of Plans for an Independent Spent Fuel Storage Installation Russ Dedrickson Plant Manager VEGP December 15, 2010 CD SOuTHERN COMPAN | |||
3 | |||
Oo 0. | |||
3 | |||
*Lo oI Co CD I | |||
_Co 0. | |||
00 D) | |||
CD CD Cl) | |||
I CD 1\\) | |||
Suthern Nuclear Dry Storage Experience | |||
* OperationaI ISFS1 at Farley and Hatch | |||
* Loaded industry-first HI-STAR in 2000 | |||
* Loaded industry-first HI-STORM in 2001 | |||
* 4 Casks Loaded 42 (HNP),1 2 (FNP) | |||
* Used Fuel Loading Outages managed in house 3 | |||
if, V | |||
CD | |||
71 Cl) | |||
C C | |||
0a I | |||
0) | |||
CD Co 00 m | |||
0 D) | |||
CD CD CD | |||
L() | |||
C) o | |||
*c a) 0) | |||
I-C0 ctI h. | |||
*j; O | |||
ir V) 0 a) | |||
I) | |||
C) | |||
LL U | |||
C) | |||
C U)0. | |||
Wet Storage | |||
*Two pools interconnected via the Cask Loading Pit | |||
*354 Total Cells | |||
*Pools are at grade level 6 | |||
C | |||
.2 UI 1 | |||
wII WI II 0 | |||
liii 2009D 2O.tO VEG? Spent Fuel pool Outage Use LocationS | |||
a | |||
a 2O5U 2016 201t1 2O12 2O3 2014 fl | |||
C) | |||
.1o 0 | |||
a) 0 | |||
-J I. | |||
C)0 Cl) | |||
C.) | |||
2 201 Dry Storage Loading Plan Number of Casks Loaded by Year LJUnitl and Unit2 120 100 C) ouC0 | |||
-J Cl) | |||
OUC,) | |||
C.) | |||
20 2035 8 | |||
Spent Fuel Characteristics Current pool inventory: | |||
* 56% of assemblies are high burnup (exceed 45 GWD/MTU burnup) | |||
Future core discharges: | |||
* Average burnup 48 GWD/MTU | |||
* Highest burnup 53 GWD/MTU 9 | |||
MPC 32 Loading Configuration Higher Dose Assemblies Lower Dose Assemblies Loaded as Shielding Minimal Gap Between Outer Assemblies 10 | |||
:2 C.) | |||
Co Cl) | |||
Ca C) | |||
Selected Cask Design | |||
* Holtec Dry Cask Storage System Multi-Purpose Canister MPC-32 HI-STORM 100S Storage Overpack HI-TRAC 1 25D Transfer Overpack Vertical Cask Transporter Low Profile Transporter Forced Helium drying system Cask Transfer Facility 12 | |||
Vertical Cask Transporter 13 I | |||
& Cask Transfer Facility L | |||
I I | |||
I I | |||
..1 | |||
Proposed ISFSI Location and Design 14 | |||
C.)0 | |||
-J CoIi Co V | |||
0) | |||
Cl)00. | |||
0 0 | |||
1. | |||
I | |||
CD Cl) | |||
C-)E | |||
-0 0 | |||
*Ct5 | |||
Major Modifications | |||
* Auxiliary Building Modifications | |||
* Itlaul Roads | |||
* cask Transfer Facility | |||
* lFSl Pad | |||
* pent Fuel Cask Crane Trolley | |||
0 F | |||
C C) | |||
Cl) | |||
C) ci)D LL IC G)0 | |||
SheduIe for Major Milestones 19 | |||
S Schedule Dsign work 201 0-2011 COnstruction 2011-2012 Ecuipment delivery 4 | |||
th Qtr 2012 Dry Run 1 | |||
st Qtr 2013 NFC Demonstration Qtr 2013 1 | |||
st Four Cask on Pad 3 | |||
rd Qtr 2013 1 6H Cask on Pad 3rd Qtr 2016 20 | |||
Licensing Overview Terry Sides Sr1 Licensing Engineer Southern Nuclear Operating Company 21 | |||
Licensing Overview | |||
* ceneraI License Requirements | |||
* Fart 50 Licensing Bases | |||
* Fart 50/72 Modifications | |||
* Frogram Changes | |||
* Industry Participation/Operating Experience 22 | |||
General License | |||
iii CFR 72, Subpart K Requires: | |||
* NRCapprovedcaskdesign | |||
* Use in accordance with CoC Limited to fuel licensed to possess | |||
* Cask design bounds reactor site parameters | |||
* Evaluate direct radiation/effluents | |||
* Evaluate impact on reactor plant Modification of existing programs Document in 72.212 Report 23 | |||
Part 50 Licensing Bases Spent Fuel Cask Crane: | |||
125 Ton design capacity | |||
* Single Failure Proof Crane NUREG-0554 | |||
* Special lift devices ANSI Ni 4.6-i 976 | |||
* Crane operators ANSI B30.2-i 976 Inspected ANSI B30.2-1 976 | |||
* Procedures NUREG-0612 As a result, cask drop accident is not credible 24 | |||
I Part 50 Modifications I | |||
Cask crane trolley replacement | |||
* DCP/10 CFR 50.59 | |||
* No change to original Licensing/Design Bases | |||
* 125 ton capacity | |||
* NUREG-0554 | |||
* Existing bridge/structure qualified for 125 tons Cask drop accident remains not credible 25 | |||
Prt 50172 Modifications HauI Route | |||
* CoC 1014, Appendix A, Section 5.5 | |||
* Completely within PA | |||
* Cask Transporter - ANSI N14.6/redundant drop protection | |||
* Capable of stopping and holding load during DBE | |||
* Fire/hazards review of route | |||
* Address Part 50 impacts (e.g., underground conveyances, etc.) | |||
26 | |||
Part 50172 Modifications Cask Transfer Facility CoC 1014, Appendix B, Section 3.5 External to Part 50 structures | |||
* Near-grade transfer | |||
* Cask transporter used for MPC transfer | |||
* NUREG-0612, Section 5.1 | |||
* Redundant drop features | |||
.* Capable of stopping and holding load during DBE 27 | |||
GEneral License iG CFR 72, Subpart K Ue of existing Part 50 plans/programs: | |||
* QAprogram | |||
* Emergency Plan | |||
* Radiation Protection Program | |||
* Security Plan | |||
* Training Program | |||
* Corrective Action Program 28 | |||
C) cJ ci) | |||
Lii ci) | |||
I. | |||
o E | |||
Co 00 u_ a D | |||
c0. | |||
C) | |||
I Co 0 | |||
ci) | |||
C.) | |||
o CI) | |||
Cl) | |||
C Cl) | |||
I 0 | |||
C CI) t CO ci) | |||
o.k 0 | |||
.S Cl) 0 | |||
-i-- | |||
_j w | |||
*_Cl) | |||
Cl) | |||
C) 4D Cl) | |||
I | |||
>1 is C/)O. | |||
a.. | |||
C 0 | |||
Loading Procedure Demitrius Davis Dry Storage Engineering Supervisor Southern Nuclear Operating Company 30 | |||
0 CD CD 0 | |||
2: | |||
(0 | |||
-o | |||
-0 C) | |||
CD0 C | |||
CD C,) | |||
==SUMMARY== | |||
Mark Ajiuni Licensing Manager Southern Nuclear Operating Company SUTNEN COMPANY}} | |||
Latest revision as of 00:50, 14 January 2025
| ML103620570 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/22/2010 |
| From: | Mark Franke NRC/RGN-II/DRS/EB3 |
| To: | Tynan T Southern Nuclear Operating Co |
| References | |
| Download: ML103620570 (37) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 22, 2010 Mr. Tom E. Tynan Vice President
- Vogtle Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECTz PUBLIC MEETING
SUMMARY
1SFS1 PLANS
- VOGTLE ELECTRIC GENERATING PLANT DOCKET NOS.: 50-424 and 50-425
Dear Mr. Tynan:
This refers to the meeting conducted at your staffs request at the Region Il Office in Atlanta, Georgia, on December 15, 2010 at 1:30 p.m. The meetings purpose was to discuss plans to construct and operate an Independent Spent Fuel Storage Installation (ISFSI) at the Vogtle Electric Generating Plant. Enclosed is a list of attendees and a copy of the slides presented at the meeting.
Vogtle representatives presented an overview of current spent fuel storage status and plans for long term spent fuel storage. The meeting did not result in specific action items or decisions.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room)Should you have any questions concerning this meeting, please contact me at (404) 997-4436.
Sincerely, IRA!
Mark E. Franke, Chief Engineering Branch 3 Division of Reactor Safety
Enclosures:
As Stated Docket Nos.: 50-424 50-425 License Nos.: NPF-68, NPF-81 cc w/encls: (See page 2)
SNOPCO 2
cc w/encl:
Division of Radiological Health TN Dept. of Environment & Conservation Electronic Mail Distribution B. D. McKinney, Jr.
Regulatory Response Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Hickox, T. Mark Vogtle Electric Generating Plant Electronic Mail Distribution M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution T. D. Honeycutt Regulatory Response Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution R. D. Baker Licensing Supervisor Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution E. G. Anners Licensing Engineer Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution N. J. Stringfellow Licensing Manager Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Paula Marino Vice President Engineering Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bob Masse Resident Manager Vogtle Electric Generating Plant Oglethorpe Power Corporation Electronic Mail Distribution Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution S. C. Swanson Site Support Manager Vogtle Electric Generating Plant Electronic Mail Distribution Chris Clark Commissioner Georgia Department of Natural Resources Electronic Mail Distribution Lee Foley Manager of Contracts Generation Oglethorpe Power Corporation Electronic Mail Distribution (cc w/encl contd See page 3)
SNOPCO 3
(cc w/encl contd)
F. Allen Barnes Director Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Cynthia A. Sanders Radioactive Materials Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James A. Sommerville Program Coordination Branch Chief Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution James C. Hardeman Environmental Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Ted V. Jackson Emergency Response and Radiation Program Manager Environmental Protection Division Georgia Department of Natural Resources Electronic Mail Distribution Mr. Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia Electronic Mail Distribution Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Electronic Mail Distribution Office of the Attorney General Electronic Mail Distribution Office of the County Commissioner Burke County Commission Electronic Mail Distribution Arthur H. Domby, Esq.
Troutman Sanders Electronic Mail Distribution Director Consumers Utility Counsel Division Govenors Office of Consumer Affairs 2 M. L. King, Jr. Drive Plaza Level East; Suite 356 Atlanta, GA 30334-4600 Senior Resident Inspector U.S. Nuclear Regulatory Commission Vogtle Electric Generating Plant U.S. NRC 7821 River Road Waynesboro, GA 30830 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution
MLI 03620570 C
SENSITIVE xLJ NON-SENSITIVE xLJ SUNSI REVIEW COMPLETE
LIST OF ATTENDEES Nuclear Regulatory Commission H. Christensen, Deputy Director, Division of Reactor Safety (DRS), Region II (Rh)
M. Franke, Branch Chief, Engineering Branch 3 (EB3), DRS, RH R. Carrion, Senior Reactor Inspector, EB3, DRS, RIl C. Fletcher, Senior Reactor Inspector, EB3, DRS, Ril Southern Nuclear Operating Company M. Ajiuni
- Licensing Director R. Bunt
- Engineering Supervisor - Dry Spent Fuel Storage J. Cash
- Project Manager
- Vogtle ISFSI D. Davis Engineering Supervisor Dry Cask Storage R. Dedrickson
- Plant Manager, VogUe A. Wesley
- Vogtle Site Engineering Supervisor T. Sides
- Sr. Licensing Engineer Members of the Public Carlyn Greene, Director, Backend Publications, The Ux Consulting Company, LLC
Vogtle Electric Generating Plant Overview of Plans for an Independent Spent Fuel Storage Installation Russ Dedrickson Plant Manager VEGP December 15, 2010 CD SOuTHERN COMPAN
3
Oo 0.
3
- Lo oI Co CD I
_Co 0.
00 D)
CD CD Cl)
I CD 1\\)
Suthern Nuclear Dry Storage Experience
- OperationaI ISFS1 at Farley and Hatch
- Loaded industry-first HI-STAR in 2000
- Loaded industry-first HI-STORM in 2001
- Used Fuel Loading Outages managed in house 3
if, V
CD
71 Cl)
C C
0a I
0)
CD Co 00 m
0 D)
CD CD CD
L()
C) o
- c a) 0)
I-C0 ctI h.
- j; O
ir V) 0 a)
I)
C)
LL U
C)
C U)0.
Wet Storage
- Two pools interconnected via the Cask Loading Pit
- 354 Total Cells
- Pools are at grade level 6
C
.2 UI 1
wII WI II 0
liii 2009D 2O.tO VEG? Spent Fuel pool Outage Use LocationS
a
a 2O5U 2016 201t1 2O12 2O3 2014 fl
C)
.1o 0
a) 0
-J I.
C)0 Cl)
C.)
2 201 Dry Storage Loading Plan Number of Casks Loaded by Year LJUnitl and Unit2 120 100 C) ouC0
-J Cl)
OUC,)
C.)
20 2035 8
Spent Fuel Characteristics Current pool inventory:
- 56% of assemblies are high burnup (exceed 45 GWD/MTU burnup)
Future core discharges:
- Average burnup 48 GWD/MTU
- Highest burnup 53 GWD/MTU 9
MPC 32 Loading Configuration Higher Dose Assemblies Lower Dose Assemblies Loaded as Shielding Minimal Gap Between Outer Assemblies 10
- 2 C.)
Co Cl)
Ca C)
Selected Cask Design
- Holtec Dry Cask Storage System Multi-Purpose Canister MPC-32 HI-STORM 100S Storage Overpack HI-TRAC 1 25D Transfer Overpack Vertical Cask Transporter Low Profile Transporter Forced Helium drying system Cask Transfer Facility 12
Vertical Cask Transporter 13 I
& Cask Transfer Facility L
I I
I I
..1
Proposed ISFSI Location and Design 14
C.)0
-J CoIi Co V
0)
Cl)00.
0 0
1.
I
CD Cl)
C-)E
-0 0
- Ct5
Major Modifications
- Auxiliary Building Modifications
- Itlaul Roads
- cask Transfer Facility
- lFSl Pad
- pent Fuel Cask Crane Trolley
0 F
C C)
Cl)
SheduIe for Major Milestones 19
S Schedule Dsign work 201 0-2011 COnstruction 2011-2012 Ecuipment delivery 4
th Qtr 2012 Dry Run 1
st Qtr 2013 NFC Demonstration Qtr 2013 1
st Four Cask on Pad 3
rd Qtr 2013 1 6H Cask on Pad 3rd Qtr 2016 20
Licensing Overview Terry Sides Sr1 Licensing Engineer Southern Nuclear Operating Company 21
Licensing Overview
- ceneraI License Requirements
- Fart 50 Licensing Bases
- Fart 50/72 Modifications
- Frogram Changes
- Industry Participation/Operating Experience 22
General License
iii CFR 72, Subpart K Requires:
- NRCapprovedcaskdesign
- Use in accordance with CoC Limited to fuel licensed to possess
- Cask design bounds reactor site parameters
- Evaluate direct radiation/effluents
- Evaluate impact on reactor plant Modification of existing programs Document in 72.212 Report 23
Part 50 Licensing Bases Spent Fuel Cask Crane:
125 Ton design capacity
- Single Failure Proof Crane NUREG-0554
- Special lift devices ANSI Ni 4.6-i 976
- Crane operators ANSI B30.2-i 976 Inspected ANSI B30.2-1 976
- Procedures NUREG-0612 As a result, cask drop accident is not credible 24
I Part 50 Modifications I
Cask crane trolley replacement
- DCP/10 CFR 50.59
- No change to original Licensing/Design Bases
- 125 ton capacity
- Existing bridge/structure qualified for 125 tons Cask drop accident remains not credible 25
Prt 50172 Modifications HauI Route
- CoC 1014, Appendix A, Section 5.5
- Completely within PA
- Cask Transporter - ANSI N14.6/redundant drop protection
- Capable of stopping and holding load during DBE
- Fire/hazards review of route
- Address Part 50 impacts (e.g., underground conveyances, etc.)
26
Part 50172 Modifications Cask Transfer Facility CoC 1014, Appendix B, Section 3.5 External to Part 50 structures
- Near-grade transfer
- Cask transporter used for MPC transfer
- NUREG-0612, Section 5.1
- Redundant drop features
.* Capable of stopping and holding load during DBE 27
GEneral License iG CFR 72, Subpart K Ue of existing Part 50 plans/programs:
- QAprogram
- Radiation Protection Program
- Security Plan
- Training Program
- Corrective Action Program 28
C) cJ ci)
Lii ci)
I.
o E
Co 00 u_ a D
c0.
C)
I Co 0
ci)
C.)
o CI)
Cl)
C Cl)
I 0
C CI) t CO ci)
o.k 0
.S Cl) 0
-i--
_j w
- _Cl)
Cl)
C) 4D Cl)
I
>1 is C/)O.
a..
C 0
Loading Procedure Demitrius Davis Dry Storage Engineering Supervisor Southern Nuclear Operating Company 30
0 CD CD 0
2:
(0
-o
-0 C)
CD0 C
CD C,)
SUMMARY
Mark Ajiuni Licensing Manager Southern Nuclear Operating Company SUTNEN COMPANY