IR 05000498/2010501: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 01/10/2011 | | issue date = 01/10/2011 | ||
| title = IR 05000498-10-501 and 05000499-10-501, on 12/31/2010, South Texas Project Electric Generating Station, Unit 1 and 2 - NRC Emergency Preparedness Annual | | title = IR 05000498-10-501 and 05000499-10-501, on 12/31/2010, South Texas Project Electric Generating Station, Unit 1 and 2 - NRC Emergency Preparedness Annual | ||
| author name = Shannon M | | author name = Shannon M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Halpin E | | addressee name = Halpin E | ||
| addressee affiliation = South Texas Project Nuclear Operating Co | | addressee affiliation = South Texas Project Nuclear Operating Co | ||
| docket = 05000298, 05000499 | | docket = 05000298, 05000499 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:January 10, 2011 | ||
==SUBJECT:== | |||
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2010501 AND 05000499/2010501 | |||
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2010501 AND 05000499/2010501 | |||
==Dear Mr. Halpin:== | ==Dear Mr. Halpin:== | ||
On December 31, 2010, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2010. Issuance of this letter closes NRC Inspection Report 05000498/2010501 and 05000499/2010501. Observations and findings in these areas were provided in the quarterly integrated reports for your site. | On December 31, 2010, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2010. Issuance of this letter closes NRC Inspection Report 05000498/2010501 and 05000499/2010501. Observations and findings in these areas were provided in the quarterly integrated reports for your site. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | |||
/RA/ | |||
Michael P. Shannon, Chief | |||
Plant Support Branch 1 | |||
Division of Reactor Safety | |||
Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80 | Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80 | ||
STP Nuclear Operating Company - 2 - | UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 | ||
STP Nuclear Operating Company | |||
- 2 - | |||
cc: | cc: | ||
| Line 52: | Line 60: | ||
Charles T. Bowman, General Manager, Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 | Charles T. Bowman, General Manager, Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 | ||
STP Nuclear Operating Company - 3 - | STP Nuclear Operating Company | ||
- 3 - | |||
Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 | Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 | ||
Cheryl Mele City of Austin | Cheryl Mele City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 | ||
Electric Utility Department 721 Barton Springs Road Austin, TX 78704 | |||
J. J. Nesrsta/R. K. Temple Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX 78296 | J. J. Nesrsta/R. K. Temple Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX 78296 | ||
| Line 75: | Line 83: | ||
Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 | Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414 | ||
STP Nuclear Operating Company - 4 - | STP Nuclear Operating Company | ||
- 4 - | |||
Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 | Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711 | ||
| Line 93: | Line 103: | ||
Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698 | Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698 | ||
C. Kierksey City of Austin | C. Kierksey City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 | ||
Electric Utility Department 721 Barton Springs Road Austin, TX 78704 | |||
STP Nuclear Operating Company | STP Nuclear Operating Company | ||
- 5 - | |||
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Art.Howell@nrc.gov) | Electronic distribution by RIV: | ||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | DRP Director (Kriss.Kennedy@nrc.gov) | ||
DRP Deputy Director (Troy.Pruett@nrc.gov) | DRP Deputy Director (Troy.Pruett@nrc.gov) | ||
| Line 112: | Line 122: | ||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | STP Administrative Assistant (Lynn.Wright@nrc.gov) | ||
Project Engineer, DRP/A (Laura.Micewski@nrc.gov) | Project Engineer, DRP/A (Laura.Micewski@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Mohan.Thadani@nrc.gov) | Project Manager (Mohan.Thadani@nrc.gov) | ||
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) | Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) | ||
| Line 121: | Line 132: | ||
DRS/TSB STA (Dale.Powers@nrc.gov) | DRS/TSB STA (Dale.Powers@nrc.gov) | ||
ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MPS x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MPShannon /RA/ 1/10/2011 OFFICIAL RECORD COPY | ADAMS:
No x Yes x SUNSI Review Complete Reviewer Initials: MPS | ||
x Publicly Available x Non-Sensitive | |||
Non-publicly Available | |||
Sensitive C:PSB-1 | |||
MPShannon | |||
/RA/ | |||
1/10/2011 | |||
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax | |||
}} | }} | ||
Latest revision as of 00:30, 14 January 2025
| ML110120633 | |
| Person / Time | |
|---|---|
| Site: | Cooper, South Texas |
| Issue date: | 01/10/2011 |
| From: | Shannon M Plant Support Branch-1 |
| To: | Halpin E South Texas |
| References | |
| IR-10-501 | |
| Download: ML110120633 (5) | |
Text
January 10, 2011
SUBJECT:
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000498/2010501 AND 05000499/2010501
Dear Mr. Halpin:
On December 31, 2010, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the South Texas Project Electric Generating Station, Units 1 and 2. This inspection began on January 1, 2010. Issuance of this letter closes NRC Inspection Report 05000498/2010501 and 05000499/2010501. Observations and findings in these areas were provided in the quarterly integrated reports for your site.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch 1
Division of Reactor Safety
Dockets: 50-498; 50-499 Licenses: NPF-76; NPF-80
UNITED STATES NUCLEAR REGULATORY COMMISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125
STP Nuclear Operating Company
- 2 -
cc:
Kevin Richards, Senior Vice President and Assistant to CEO STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
David W. Rencurrel Senior Vice President Units 1 and 2 STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
M. C. Reddix Manager, Security STP Nuclear Operating Company P. O. Box 289 Wadsworth, Texas 77483
Louis Peter, Plant General Manager STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
Tim Powell, Vice President, Engineering STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
A. W. Harrison, Manager, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
Charles T. Bowman, General Manager, Oversight STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
STP Nuclear Operating Company
- 3 -
Marilyn Kistler Senior Staff Specialist, Licensing STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483
Cheryl Mele City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
J. J. Nesrsta/R. K. Temple Ed Alercon/Kevin Pollo City Public Service P.O. Box 1771 San Antonio, TX 78296
A. H. Gutterman, Esq..
Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004
Richard A. Ratliff, P.E., L.M.P.
Radiation Safety Licensing Branch Manager Division for Regulatory Services Texas Department of State Health Mail Code 2385 P.O. Box 149347 Austin, TX 78714-9347
Brian Almon Public Utility Commission of Texas P.O. Box 13326 Austin, TX 78711-3326
Environmental and Natural Resources Policy Director, Office of the Governor P.O. Box 12428 Austin, TX 78711-3189
Mr. Nate McDonald Judge, Matagorda County Matagorda County Courthouse 1700 Seventh Street Bay City, TX 77414
STP Nuclear Operating Company
- 4 -
Anthony P. Jones, Chief Boiler Inspector Texas Department of Licensing and Regulation Boiler Division E.O. Thompson State Office Building P.O. Box 12157 Austin, TX 78711
Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087
Ted Enos 4200 South Hulen, Suite 422 Fort Worth, TX 76109
Kevin Howell/Catherine Callaway/Jim von Suskil NRG Energy, Inc.
1301 McKinney, Suite 2300 Houston, TX 77010
Peter G. Nemeth Crain, Caton, & James, P.C.
P.O. Box 289 Mail Code: N5005 Wadsworth, TX 77483
Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76201-3698
C. Kierksey City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704
STP Nuclear Operating Company
- 5 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (John.Dixon@nrc.gov)
Resident Inspector (Binesh.Tharakan@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (David.Proulx@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Project Engineer, DRP/A (Laura.Micewski@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Mohan.Thadani@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource OEDO RIV Coordinator (Geoffrey.Miller@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MPS
x Publicly Available x Non-Sensitive
Non-publicly Available
Sensitive C:PSB-1
MPShannon
/RA/
1/10/2011
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax