ML110960073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 28: Line 28:
: 2. Letter from TVA to NRC, "Decommissioning Funding Assurance,"
: 2. Letter from TVA to NRC, "Decommissioning Funding Assurance,"
dated September 4, 2009
dated September 4, 2009
: 3. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 - Status of Decommissioning Funding Assurance (TAC Nos. ME0491, ME0492, ME0493, ME0571, ME0572, and ME0587)," dated December 10, 2009 pit           r printed on recycled paper
: 3. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 - Status of Decommissioning Funding Assurance (TAC Nos. ME0491, ME0492, ME0493, ME0571, ME0572, and ME0587)," dated December 10, 2009 pit r
printed on recycled paper


U.S. Nuclear Regulatory Commission Page 2 March 31, 2011 In accordance with the requirements of 10 CFR 50.75(f)(1), the Tennessee Valley Authority (TVA) is reporting on the status of decommissioning funding for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3; Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Watts Bar Nuclear Plant (WBN), Unit 1. The reporting requirements and corresponding TVA information are provided below.
U.S. Nuclear Regulatory Commission Page 2 March 31, 2011 In accordance with the requirements of 10 CFR 50.75(f)(1), the Tennessee Valley Authority (TVA) is reporting on the status of decommissioning funding for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3; Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Watts Bar Nuclear Plant (WBN), Unit 1. The reporting requirements and corresponding TVA information are provided below.
: 1. The amount of decommissioning funds estimated to be requiredpursuantto 10 CFR 50.75(b) and (c):
: 1. The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c):
Decommissioning cost estimates were calculated using the formulas provided in NUREG-1307, Revision 14, "Report on Waste Burial Charges," utilizing the waste burial adjustment factors for Generic Low-Level Waste (LLW) Disposal Site and Direct Disposal with Vendors. Bureau of Labor Statistics indices for the end of the 2010 calendar year were taken from the sources referenced by NUREG-1 307.
Decommissioning cost estimates were calculated using the formulas provided in NUREG-1307, Revision 14, "Report on Waste Burial Charges," utilizing the waste burial adjustment factors for Generic Low-Level Waste (LLW) Disposal Site and Direct Disposal with Vendors. Bureau of Labor Statistics indices for the end of the 2010 calendar year were taken from the sources referenced by NUREG-1 307.
The calculated estimates for the end of calendar year (CY) 2010 are provided in Table 1 below.
The calculated estimates for the end of calendar year (CY) 2010 are provided in Table 1 below.
Table 1. Decommissioning Cost Estimates for end of CY 2010 BFN                 3               609.1               1827.3 SQN                 2                 467                 934 WBN                 1                 467                 467
Table 1. Decommissioning Cost Estimates for end of CY 2010 BFN 3
: 2. The amount accumulatedin the TVA decommissioning fund at the end of the calendaryear 2010 for the items included in 10 CFR 50.75(b) and (c):
609.1 1827.3 SQN 2
467 934 WBN 1
467 467
: 2. The amount accumulated in the TVA decommissioning fund at the end of the calendar year 2010 for the items included in 10 CFR 50.75(b) and (c):
TVA's decommissioning fund balances at the end of CY 2010 are provided below in Table 2.
TVA's decommissioning fund balances at the end of CY 2010 are provided below in Table 2.
Table 2. Decommissionii F.7 -1F75             V BFN, Unit 1                         164.95 BFN, Unit 2                         157.71 BFN, Unit 3                         142.01 SQN, Unit 1                         227.45 SQN, Unit 2                         216.43 WBN, Unit 1                         105.79
Table 2. Decommissionii F.7  
-1F75 V
BFN, Unit 1 164.95 BFN, Unit 2 157.71 BFN, Unit 3 142.01 SQN, Unit 1 227.45 SQN, Unit 2 216.43 WBN, Unit 1 105.79


U.S. Nuclear Regulatory Commission Page 3 March 31, 2011 Note that these fund balances are all in excess of the 2010 fund balances required for each plant based on the updated TVA plan provided in Enclosure 1 and discussed under item 3, below.
U.S. Nuclear Regulatory Commission Page 3 March 31, 2011 Note that these fund balances are all in excess of the 2010 fund balances required for each plant based on the updated TVA plan provided in Enclosure 1 and discussed under item 3, below.
: 3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c):
: 3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c):
By letter dated March 31, 2009 (Reference 1), TVA reported that due to a downturn which resulted in lower market valuations for many investments held in TVA's decommissioning trust fund, the decommissioning trust fund balances for TVA's BFN, SQN, and WBN were below Nuclear Regulatory Commission (NRC) minimum required amounts. Subsequently, by letter dated September 4, 2009 (Reference 2), TVA provided NRC with the details of a plan which utilized an external sinking fund approach to provide decommissioning funding assurance for each nuclear unit at the end of its respective term of licensed operation. The NRC staff reviewed TVA's plan and determined that it provides reasonable assurance of adequate decommissioning funding at the time permanent termination of operations is expected (Reference 3).
By {{letter dated|date=March 31, 2009|text=letter dated March 31, 2009}} (Reference 1), TVA reported that due to a downturn which resulted in lower market valuations for many investments held in TVA's decommissioning trust fund, the decommissioning trust fund balances for TVA's BFN, SQN, and WBN were below Nuclear Regulatory Commission (NRC) minimum required amounts. Subsequently, by {{letter dated|date=September 4, 2009|text=letter dated September 4, 2009}} (Reference 2), TVA provided NRC with the details of a plan which utilized an external sinking fund approach to provide decommissioning funding assurance for each nuclear unit at the end of its respective term of licensed operation. The NRC staff reviewed TVA's plan and determined that it provides reasonable assurance of adequate decommissioning funding at the time permanent termination of operations is expected (Reference 3). to this letter provides TVA's updated plan for providing decommissioning funding for each of its operating nuclear reactors based on the cost estimates at the end of CY 2010. This plan constitutes the schedule of the annual amounts remaining for items in 10 CFR 50.75(b) and (c). TVA will continue to follow the plan reflected in Enclosure 1, as updated.
Enclosure 1 to this letter provides TVA's updated plan for providing decommissioning funding for each of its operating nuclear reactors based on the cost estimates at the end of CY 2010. This plan constitutes the schedule of the annual amounts remaining for items in 10 CFR 50.75(b) and (c). TVA will continue to follow the plan reflected in Enclosure 1, as updated.
TVA discussed the updated plan. provided in Enclosure 1 with the NRC during a conference call on March 23, 2011. During that call, the NRC requested that TVA recalculate the plan provided in Enclosure 1 using actual fund balances for each of the units at the end of CY 2010. For information only, Enclosure 2 provides the results of this recalculation.
TVA discussed the updated plan. provided in Enclosure 1 with the NRC during a conference call on March 23, 2011. During that call, the NRC requested that TVA recalculate the plan provided in Enclosure 1 using actual fund balances for each of the units at the end of CY 2010. For information only, Enclosure 2 provides the results of this recalculation.
: 4. The assumptions used regardingrates of escalationin decommissioning costs, rates of earningson decommissioning funds, and rates of other factors used in funding projections:
: 4. The assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections:
* The assumed escalation in decommissioning costs is 4 percent.
The assumed escalation in decommissioning costs is 4 percent.
* TVA assumed a projected annual real rate of return on decommissioning funds of 5 percent, as authorized by the TVA Board of Directors, TVA's rate-making authority.
TVA assumed a projected annual real rate of return on decommissioning funds of 5 percent, as authorized by the TVA Board of Directors, TVA's rate-making authority.
: 5. Any contracts upon which the licensee is relying pursuantto 10 CFR 50.75(e)(1)(v):
: 5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v):
None.
None.


U.S. Nuclear Regulatory Commission Page 4 March 31, 2011
U.S. Nuclear Regulatory Commission Page 4 March 31, 2011
: 6. Any modifications occurringto a licensee's current method of providing financial assurancesince the last submitted report:
: 6. Any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report:
None.
None.
: 7. Any material changes to trust agreements.
: 7. Any material changes to trust agreements.
Line 59: Line 64:


==Enclosures:==
==Enclosures:==
: 1. Updated Projected Decommissioning Funding Levels for TVA Operating Units
: 1.
: 2. Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances cc:
Updated Projected Decommissioning Funding Levels for TVA Operating Units
NRC   Regional Administrator - Region II NRC   Senior Resident Inspector - Browns Ferry Nuclear Plant NRC   Senior Resident Inspector - Sequoyah Nuclear Plant NRC   Senior Resident Inspector- Watts Bar Nuclear Plant
: 2.
Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances cc:
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector-Watts Bar Nuclear Plant


ENCLOSURE I Updated Projected Decommissioning Funding Levels for TVA Operating Units Real Return 5.0%
ENCLOSURE I Updated Projected Decommissioning Funding Levels for TVA Operating Units Real BFNI 12-20-20339, BFN2 6-28-2034..,..
Annual BFNI 12-20-20339, Annual Funding Projected Fund      Annual BFN2 6-28-2034..,..
BFN31"7-2-2036 SQNI 9-17-2020, j
Annua, Funding Prjected Fund        Annual BFN31"7-2-2036 Annual Funding Projected Fund      Annual SQNI 9-17-2020, Annual Funding Prjected Fund j     Annual SQN29ý16-202i Annual Funding i
SQN29ý16-202i i  
Poected Fund
. J WBN1.11-9,2035..
                                                                                                                                                                                                            . J   Annual WBN1.11-9,2035..
Return Annual Projected
Ana" Funding Projected Fund Year  Disbursement     Assurance Balance Disbursement     Assurance   Balance Disbursement     Assurance     Balance Disbursement     Assurance   Balance   Disbursement     Assurance       Balance   Disbursement     Assurance   Balance 2008                               $107.4                                  $102;7:%                                  $92.5                              $148.1                                    $140.9                                  $6W.9
: Annua, Prjected Annual Projected Annual Prjected Annual Poected Ana" Projected 5.0%
:$1.9 2009 2010
Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Year Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044
                            $2.0
$2.0
                            $2.1
$2.1
                                    $114.8
$3.1
                                    $122.7
$3.1
                                                                  $2.1
$3.1
                                                                  $2.2
$3.1
                                                                            $109.9
$3.1
                                                                            $117.6                        _$2;o.6
$3.1
                                                                                                          $2.0 ...
$3.1
                                                                                                                      $99.0
$3.1
                                                                                                                      $105.9
$3.1
                                                                                                                                                  $4.5
$3.1
                                                                                                                                                  $4.7
$3.1
                                                                                                                                                          $160.0
$3.1
                                                                                                                                                          $172.7
$3.1
                                                                                                                                                                                          $4.0
$3.1
* 0i:
$3.1
                                                                                                                                                                                          $4.3
$3.1
                                                                                                                                                                                                      $152.0
$3.1
                                                                                                                                                                                                      $163.9 111:9                    $1.4
$3.1
                                                                                                                                                                                                                                    $1.5
$3.1
                                                                                                                                                                                                                                              $73.8
$3.1
                                                                                                                                                                                                                                              $78.9
$3.1
                                                                            $126.6                                                                                                        $8.0 2011                      $3.1    $132.0                       $3.1                                    $2.8                                    $8.9                                              $180.0                         $2.6 2012                      $3.1    $141.7                        $3.1      $136.A                        $2.8      $122.4                      $8.9   $208.7                        $8.0        $197.0                         $2.6      $92.3 2013                      $3.1    $152.0                      $3.1      $146.0                        $2.8      $131.3                      $8.9    $228.0                        $8.0        $214.8                        $2.6      $99.5 2014                      $3.1     $162.7                      $3.1     $156.5                        $2.8      $140.7                      $8.9    $248.3                         $8.0        $233.5                        $2.6    $107.1 2015                      $3.1     $174.0                      $3.1     $167.4                        $2.8      $150.5                      $8.9    $269.6                        $8.0        $253.2                        $2.6     $115.0 2016                      $3.1    $185.8                      $3.1      $178.9                         $2.8      $160.8                      $8.9    $292.0                         $8.0       $273.8                        $2.6    $123.4 2017                      $3.1    $198.2                      $3.1      $191.0                        $2.8       $171.6                       $8.9    $315.5                         $8.0        $295.4                        $2.6    $132.1 2018                      $3.1    $211.3                      $3.1      $203.7                        $2.8       $182.9                      $8.9    $340.2                        $8.0        $318.2                        $2.6    $141.3 2019                      $3.1    $224.9                      $3.1      $217.0                        $2.8       $194.9                      $8.9    $366.1                        $8.0        $342.0                        $2.6    $151.0 2020                      $3.1    $239.3                      $3.1      $231.0                        $2.8       $207.4  Fractional Yr.             $388.0                        $8.0       $367.1                        $2.6    $161.1 2021                      $3.1    $254.4                      $3.1      $245.6                         $2.8      $220.5                                         Fractional Yr.     $8.0       $388.0                         $2.6    $171.7 2022                      $3.1    $270.3                       $3.1      $261.0                        $2.8      $234.3  Additional 3.5 yrs.                                                                                    $2.6    $182.9 2023                      $3.1     $286.9                      $3.1      $277.2                        $2.8       $248.8 Eamings Credit                $79.0    Additional 3.5 yrs.                                            $2.6    $194.6 2024                      $3.1    $304.4                      $3.1     $294.2                        $2.8      $264.0      $467.0                   $467.0    Earnings Credit                    $79.0                        $2.6    $206.9 2025                      $3.1    $322.8                      $3.1     $312.0                         $2.8      $280.0                                             $467.0                      $467.0                         $2.6    $219.9 2026                      $3.1    $342.0                       $3.1      $330.8                         $2.8      $296.8                                                                                                         $2.6    $233.4 2027                      $3.1    $362.3                      $3.1     $350.4                        $2.8       $314.4                                                                                                        $2.6    $247.7 2028                      $3.1    $383.5                      $3.1      $371.1                         $2.8      $332.9                                                                                                        $2.6    $262.7 2029                      $3.1    $405.8                      $3.1     $392.8                        $2.8      $352.3                                                                                                        $2.6     $278.4 2030                      $3.1    $429.3                      $3.1      $415.6                         $2.8      $372.7                                                                                                        $2.6     $294.9 2031                      $3.1    $453.9                      $3.1      $439.5                        $2.8      $394.1                                                                                                        $2.6     $312.2 2032                      $3.1    $479.7                      $3.1      $464.6                         $2.8      $416.6                                                                                                         $2.6    $330.4 2033  Fractional Yr.      $3.1    $506.1                      $3.1      $490.9                         $2.8       $440.2                                                                                                        $2.6    $349.5 Fractional Yr.      $3.1     $506.1 2034                                                                                                      $2.8      $465.0                                                                                                        $2.6    $369.6 2035  Additional 3.5 yrs.                                                                                 $2.8      $491.0                                                                                    Fractional Yr.       $2.6    $388.0
$3.1
                                    $103.0  Additional 3.5 yrs.                                           $2.8 2036  Earnings Credit                                                                Fractional Yr.                  $506.1 2037      $609.1                    $609.1  Eaminqs Credit                $103.0                                                                                                                             Additional 3.5 yrs.
$3.1
                                                    -        .           I-2038                                            $609.1                    $609.Additional 3.5 yrs.                                                                                                       Earnings Credit               $79.0 2039                                                                                Eaminas Credit                  $103.0                                                                                        $467.0{                  $467.0 2040                                                                                    $609.1                       $609.1 2041 2042 2043 2044 Total    $609.1                               $609.1                                 $609.1                                  $467.0                                 $467.0                                     $467.0 ALL DOLLARS IN MILLIONS
$107.4
$114.8
$122.7
$132.0
$141.7
$152.0
$162.7
$174.0
$185.8
$198.2
$211.3
$224.9
$239.3
$254.4
$270.3
$286.9
$304.4
$322.8
$342.0
$362.3
$383.5
$405.8
$429.3
$453.9
$479.7
$506.1
$2.1
$2.2
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$3.1
$102;7:%
$109.9
$117.6
$126.6
$136.A
$146.0
$156.5
$167.4
$178.9
$191.0
$203.7
$217.0
$231.0
$245.6
$261.0
$277.2
$294.2
$312.0
$330.8
$350.4
$371.1
$392.8
$415.6
$439.5
$464.6
$490.9
$506.1
:$1.9
$2.0
_$2;o.6
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$2.8
$92.5
$99.0
$105.9
$122.4
$131.3
$140.7
$150.5
$160.8
$171.6
$182.9
$194.9
$207.4
$220.5
$234.3
$248.8
$264.0
$280.0
$296.8
$314.4
$332.9
$352.3
$372.7
$394.1
$416.6
$440.2
$465.0
$491.0
$506.1
$4.5
$4.7
$8.9
$8.9
$8.9
$8.9
$8.9
$8.9
$8.9
$8.9
$8.9
$148.1
$160.0
$172.7
$208.7
$228.0
$248.3
$269.6
$292.0
$315.5
$340.2
$366.1
$388.0
$4.0
$4.30i:
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$8.0
$140.9
$152.0
$163.9 1 11:9
$180.0
$197.0
$214.8
$233.5
$253.2
$273.8
$295.4
$318.2
$342.0
$367.1
$388.0
$79.0
$467.0 Fractional Yr.
Additional 3.5 yrs.
Eamings Credit
$79.0 Fractional Yr.
$1.4
$1.5
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$2.6
$467.0
$467.0 Additional 3.5 yrs.
Earnings Credit
$467.0
$6W.9
$73.8
$78.9
$92.3
$99.5
$107.1
$115.0
$123.4
$132.1
$141.3
$151.0
$161.1
$171.7
$182.9
$194.6
$206.9
$219.9
$233.4
$247.7
$262.7
$278.4
$294.9
$312.2
$330.4
$349.5
$369.6
$388.0
$79.0
$467.0 Fractional Yr.
Additional 3.5 yrs.
Earnings Credit Fractional Yr.
Fractional Yr.
$103.0 Additional 3.5 yrs.
Eaminqs Credit Fractional Yr.
$609.1
$609.1
$103.0 I-
$609.1
$609.1 Additional 3.5 yrs.
Eaminas Credit
$103.0
$609.1
$609.1 Additional 3.5 yrs.
Earnings Credit
$467.0{
Total
$609.1
$609.1
$609.1
$467.0
$467.0  
$467.0 ALL DOLLARS IN MILLIONS


ENCLOSURE 2 Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances Real   I*,     'BFN11220-2033"                           BFN2 6-28-2034                           BFN3 7-292036             .          SQNi 9-172020 *           ; ,!N2,9-1542021                                     WBNI11--92035 Return                     Annual   Projected                     Annual - IProjected                     Annual JProjected                     Annual Projected                       Annual   Projected                     Annual TProjected 5.0%     Annual     I Funding       Fund       Annual     I Funding       Fund       Annual         Funding   Fund       Annual         Funding   Fund         Annual         Funding     Fund       Annual         Funding     Fund Year   Diabursement Assurance       Balance Disbursement Assurance         Balance Disbursement       Assurance Balance   Disbursement     Assurance Balance   Disbursement               4 Assurance Balance   Disbursement     AssuranceI Balance 2010                                 $165.0                                                                       $14oP.C                              -$227.5.                                   $216.4
ENCLOSURE 2 Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances Real I*,  
                                                                                                                                                                                                    $228.9                                ::$105.8..
'BFN11220-2033" BFN2 6-28-2034 BFN3 7-292036 SQNi 9-172020 *  
                            $0.0     $173.3                      $0.2      $165.8                      $0.3    $149.4                        $1.8    $240.6                        $1.6                                    $0.7      $111.8 2012                      $0.0     $181.9                      $0.2      $174.3                      $0.3   $157.1                        $1.8    $254.5                        $1.6       $242.0                        $0.7      $118.0 2013                      $0.0     $191.0                      $0.2       $183.3                       $0.3    $165.2                       $1.8    $269.0                        $1.6      $255.7                       $0.7     $124.6 2014                      $0.0     $200.6                      $0.2       $192.7                      $0.3    $173.7                        $1.8    $284.3                        $1.6      $270.1                        $0.7      $131.5 2015                      $0.0     $210.6                      $0.2       $202.5                      $0.3    $182.7                        $1.8    $300.3                        $1.6      $285.3                        $0.7      $138.8 2016                      $0.0      $221.1                      $0.2      $212.9                      $0.3   $192.1                        $1.8    $317.2                        $1.6      $301.2                       $0.7      $146.4 2017                      $0.0      $232.2                      $0.2      $223.7                       $0.3    $202.0                        $1.8    $334.9                         $1.6      $317.9                       $0.7      $154.4 2018                      $0.0     $243.8                      $b.2      $235.2                      $0.3   $212.3                       $1.8    $353.4                        $1.6      $335.4                        $0.7      $162.8 2019                      $0.0     $256.0                      $0.2      $247.1                      $0.3   $223.2                        $1.8    $372.9                        $1.6      $353.9                        $0.7      $171.6 2020                      $0.0     $268.8                      $0.2        $259.7                      $0.3   $234.6    Fractional Yr.      $1.8    $388.0                        $1.6      $373.2                        $0.7     $180.9 2021                      $0.0     $282.2                      $0.2       $272.9                      $0.3    $246.6                                           Fractional Yr.      $1.6      $388.0                        $0.7      $190.6 2022                      $0.0    $296.3                       $0.2       $286.8                      $0.3    $259.2  Additional 3.5 yrs.                                                                                   $0.7      $200.8 2023                                                                                                                                                                              r*
;,!N2,9-1542021 WBNI11--92035 Return Annual Projected Annual - IProjected Annual JProjected Annual Projected Annual Projected Annual TProjected 5.0%
                            $0.0    $311.1                       $0.2        $301.4                      $0.3    $272.4  Earnings Credit              $79.0    Additional 3.5 y s.                                           $0.7      $211.5 2024                      $0.0     $326.7                      $0.2        $316.7                      $0.3    $286.3      $467.0                    $467.0   Earnings Credit                $79.0                         $0.7      $222.8 2025                      $0.0    $343.0                      $0.2        $332.7                      $0.3    $300.9                                              $467.0                      $467.0                        $0.7      $234.6 2026                      $0.0    $360.2                      $0.2        $349.6                      $0.3   $316.2                                                                                                         $0.7      $247.0 2027                      $0.0    $378.2                       $0.2        $367.3                      $0.3   $332.3                                                                                                        $0.7     $260.0 2028                      $0.0     $397.1                      $0.2        $385.9                      $0.3    $349.2                                                                                                        $0.7     $273.7 2029                      $0.0     $416.9                      $0.2        $405.4                      $0.3    $366.9                                                                                                        $0.7     $288.1 2030                      $0.0     $437.8                      $0.2        $425.9                      $0.3    $385.5                                                                                                        $0.7     $303.1 2031                      $0.0    $459.7                      $0.2        $447.4                      $0.3    $405.0                                                                                                        $0.7      $319.0 2032                      $0.0    $482.7                      $0.2        $470.0                      $0.3    $425.6                                                                                                        $0.7    $335.6 2033  Fractional Yr.      $0.0     $506.1                      $0.2        $493.7                       $0.3    $447.1                                                                                                         $0.7      $353.1 L          I 2034                                          Fractional Yr.     $0.2        $506.1                      $0.3    $469.7                                                                                                        $0.7    $371.4 2035  Additional 3.5 yrs.                                                                                 $0.3    $493.5                                                                                    Fractional Yr.       $0.7    $388.0 2036  Eaminasv Credit              $103.0   Additional 3.5 yrs.                     Fractional Yr.     $0.3    $506.1 2037      $609.1                   $609.1   Earnings Credit                $103.0                                                                                                                        Additional 3.5 yrs.
Annual I Funding Fund Annual I Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Year Diabursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance 4 Balance Disbursement AssuranceI Balance 2010 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044
2038                                            $609.1                     $609.1   Additional 3.5 yrs.                                                                                                   Earnings Credit                 $79.0 2039                                                                                Eaminas Credit              $103;0                                                                                      $467.0                     $467.0 2040                                                                                    $609.1                  $609.1 2041 2042 2043 2044 Total     $609.1                                 $609.1                                 $609.1                               $467.0                                 $467.0                                 $467.0 ALL DOLLARS IN MILLIONS}}
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$0.0
$165.0
$173.3
$181.9
$191.0
$200.6
$210.6
$221.1
$232.2
$243.8
$256.0
$268.8
$282.2
$296.3
$311.1
$326.7
$343.0
$360.2
$378.2
$397.1
$416.9
$437.8
$459.7
$482.7
$506.1
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$b.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$0.2
$165.8
$174.3
$183.3
$192.7
$202.5
$212.9
$223.7
$235.2
$247.1
$259.7
$272.9
$286.8
$301.4
$316.7
$332.7
$349.6
$367.3
$385.9
$405.4
$425.9
$447.4
$470.0
$493.7
$506.1
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$0.3
$14oP.C
$149.4
$157.1
$165.2
$173.7
$182.7
$192.1
$202.0
$212.3
$223.2
$234.6
$246.6
$259.2
$272.4
$286.3
$300.9
$316.2
$332.3
$349.2
$366.9
$385.5
$405.0
$425.6
$447.1
$469.7
$493.5
$506.1
$1.8
$1.8
$1.8
$1.8
$1.8
$1.8
$1.8
$1.8
$1.8
$1.8
-$227.5.
$240.6
$254.5
$269.0
$284.3
$300.3
$317.2
$334.9
$353.4
$372.9
$388.0
$79.0
$467.0
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6
$1.6 s.
$216.4
$228.9
$242.0
$255.7
$270.1
$285.3
$301.2
$317.9
$335.4
$353.9
$373.2
$388.0 Fractional Yr.
Additional 3.5 yrs.
Earnings Credit
$467.0 Fractional Yr.
Additional 3.5 y Earnings Credit
$467.0 r*
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
$0.7
::$105.8..
$111.8
$118.0
$124.6
$131.5
$138.8
$146.4
$154.4
$162.8
$171.6
$180.9
$190.6
$200.8
$211.5
$222.8
$234.6
$247.0
$260.0
$273.7
$288.1
$303.1
$319.0
$335.6
$353.1
$371.4
$388.0
$79.0
$467.0 Fractional Yr. L I
Fractional Yr.
Additional 3.5 yrs.
Eaminas Credit Fractional Yr.
$103.0 v
Additional 3.5 yrs.
Earnings Credit Fractional Yr.
$609.1
$609.1
$103.0
$609.1
$609.1 Additional 3.5 yrs.
Eaminas Credit
$103;0
$609.1  
$609.1 Additional 3.5 yrs.
Earnings Credit  
$79.0
$467.0  
$467.0 Total  
$609.1  
$609.1  
$609.1  
$467.0  
$467.0  
$467.0 ALL DOLLARS IN MILLIONS}}

Latest revision as of 07:18, 13 January 2025

Submittal of Decommissioning Funding Status Report
ML110960073
Person / Time
Site: Browns Ferry, Watts Bar, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/31/2011
From: Krich R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC ME0491, TAC ME0492, TAC ME0493, TAC ME0571, TAC ME0572, TAC ME0587
Download: ML110960073 (6)


Text

Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing March 31, 2011 10 CFR 50.75(f)(1)

ATTN: Document Control Desk U S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296 Sequoyah Nuclear Plant, Units 1 and 2 Facility Operating License Nos. DPR-77 and DPR-79 NRC Docket Nos. 50-327 and 50-328 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket No. 50-390

Subject:

Decommissioning Funding Status Report

References:

1. Letter from TVA to NRC, "TVA - Decommissioning Funding Status Report - Browns Ferry (BFN) TAC Nos. ME0491, ME0492 and ME0493); Sequoyah (SQN) (TAC Nos ME0571 and ME0572); and Watts Bar (WBN) (TAC No. ME0587) Nuclear Plants," dated March 31, 2009
2. Letter from TVA to NRC, "Decommissioning Funding Assurance,"

dated September 4, 2009

3. Letter from NRC to TVA, "Browns Ferry Nuclear Plant, Units 1, 2, and 3; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 - Status of Decommissioning Funding Assurance (TAC Nos. ME0491, ME0492, ME0493, ME0571, ME0572, and ME0587)," dated December 10, 2009 pit r

printed on recycled paper

U.S. Nuclear Regulatory Commission Page 2 March 31, 2011 In accordance with the requirements of 10 CFR 50.75(f)(1), the Tennessee Valley Authority (TVA) is reporting on the status of decommissioning funding for Browns Ferry Nuclear Plant (BFN), Units 1, 2, and 3; Sequoyah Nuclear Plant (SQN), Units 1 and 2; and Watts Bar Nuclear Plant (WBN), Unit 1. The reporting requirements and corresponding TVA information are provided below.

1. The amount of decommissioning funds estimated to be required pursuant to 10 CFR 50.75(b) and (c):

Decommissioning cost estimates were calculated using the formulas provided in NUREG-1307, Revision 14, "Report on Waste Burial Charges," utilizing the waste burial adjustment factors for Generic Low-Level Waste (LLW) Disposal Site and Direct Disposal with Vendors. Bureau of Labor Statistics indices for the end of the 2010 calendar year were taken from the sources referenced by NUREG-1 307.

The calculated estimates for the end of calendar year (CY) 2010 are provided in Table 1 below.

Table 1. Decommissioning Cost Estimates for end of CY 2010 BFN 3

609.1 1827.3 SQN 2

467 934 WBN 1

467 467

2. The amount accumulated in the TVA decommissioning fund at the end of the calendar year 2010 for the items included in 10 CFR 50.75(b) and (c):

TVA's decommissioning fund balances at the end of CY 2010 are provided below in Table 2.

Table 2. Decommissionii F.7

-1F75 V

BFN, Unit 1 164.95 BFN, Unit 2 157.71 BFN, Unit 3 142.01 SQN, Unit 1 227.45 SQN, Unit 2 216.43 WBN, Unit 1 105.79

U.S. Nuclear Regulatory Commission Page 3 March 31, 2011 Note that these fund balances are all in excess of the 2010 fund balances required for each plant based on the updated TVA plan provided in Enclosure 1 and discussed under item 3, below.

3. A schedule of the annual amounts remaining to be collected for items in 10 CFR 50.75(b) and (c):

By letter dated March 31, 2009 (Reference 1), TVA reported that due to a downturn which resulted in lower market valuations for many investments held in TVA's decommissioning trust fund, the decommissioning trust fund balances for TVA's BFN, SQN, and WBN were below Nuclear Regulatory Commission (NRC) minimum required amounts. Subsequently, by letter dated September 4, 2009 (Reference 2), TVA provided NRC with the details of a plan which utilized an external sinking fund approach to provide decommissioning funding assurance for each nuclear unit at the end of its respective term of licensed operation. The NRC staff reviewed TVA's plan and determined that it provides reasonable assurance of adequate decommissioning funding at the time permanent termination of operations is expected (Reference 3). to this letter provides TVA's updated plan for providing decommissioning funding for each of its operating nuclear reactors based on the cost estimates at the end of CY 2010. This plan constitutes the schedule of the annual amounts remaining for items in 10 CFR 50.75(b) and (c). TVA will continue to follow the plan reflected in Enclosure 1, as updated.

TVA discussed the updated plan. provided in Enclosure 1 with the NRC during a conference call on March 23, 2011. During that call, the NRC requested that TVA recalculate the plan provided in Enclosure 1 using actual fund balances for each of the units at the end of CY 2010. For information only, Enclosure 2 provides the results of this recalculation.

4. The assumptions used regarding rates of escalation in decommissioning costs, rates of earnings on decommissioning funds, and rates of other factors used in funding projections:

The assumed escalation in decommissioning costs is 4 percent.

TVA assumed a projected annual real rate of return on decommissioning funds of 5 percent, as authorized by the TVA Board of Directors, TVA's rate-making authority.

5. Any contracts upon which the licensee is relying pursuant to 10 CFR 50.75(e)(1)(v):

None.

U.S. Nuclear Regulatory Commission Page 4 March 31, 2011

6. Any modifications occurring to a licensee's current method of providing financial assurance since the last submitted report:

None.

7. Any material changes to trust agreements.

None.

If you have any questions concerning this matter, please contact Josh Perrel at 423-751-7737.

Respectfully, R. M. rc

Enclosures:

1.

Updated Projected Decommissioning Funding Levels for TVA Operating Units

2.

Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances cc:

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Senior Resident Inspector - Sequoyah Nuclear Plant NRC Senior Resident Inspector-Watts Bar Nuclear Plant

ENCLOSURE I Updated Projected Decommissioning Funding Levels for TVA Operating Units Real BFNI 12-20-20339, BFN2 6-28-2034..,..

BFN31"7-2-2036 SQNI 9-17-2020, j

SQN29ý16-202i i

. J WBN1.11-9,2035..

Return Annual Projected

Annua, Prjected Annual Projected Annual Prjected Annual Poected Ana" Projected 5.0%

Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Year Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044

$2.0

$2.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$107.4

$114.8

$122.7

$132.0

$141.7

$152.0

$162.7

$174.0

$185.8

$198.2

$211.3

$224.9

$239.3

$254.4

$270.3

$286.9

$304.4

$322.8

$342.0

$362.3

$383.5

$405.8

$429.3

$453.9

$479.7

$506.1

$2.1

$2.2

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$3.1

$102;7:%

$109.9

$117.6

$126.6

$136.A

$146.0

$156.5

$167.4

$178.9

$191.0

$203.7

$217.0

$231.0

$245.6

$261.0

$277.2

$294.2

$312.0

$330.8

$350.4

$371.1

$392.8

$415.6

$439.5

$464.6

$490.9

$506.1

$1.9

$2.0

_$2;o.6

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$2.8

$92.5

$99.0

$105.9

$122.4

$131.3

$140.7

$150.5

$160.8

$171.6

$182.9

$194.9

$207.4

$220.5

$234.3

$248.8

$264.0

$280.0

$296.8

$314.4

$332.9

$352.3

$372.7

$394.1

$416.6

$440.2

$465.0

$491.0

$506.1

$4.5

$4.7

$8.9

$8.9

$8.9

$8.9

$8.9

$8.9

$8.9

$8.9

$8.9

$148.1

$160.0

$172.7

$208.7

$228.0

$248.3

$269.6

$292.0

$315.5

$340.2

$366.1

$388.0

$4.0

$4.30i:

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$8.0

$140.9

$152.0

$163.9 1 11:9

$180.0

$197.0

$214.8

$233.5

$253.2

$273.8

$295.4

$318.2

$342.0

$367.1

$388.0

$79.0

$467.0 Fractional Yr.

Additional 3.5 yrs.

Eamings Credit

$79.0 Fractional Yr.

$1.4

$1.5

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$2.6

$467.0

$467.0 Additional 3.5 yrs.

Earnings Credit

$467.0

$6W.9

$73.8

$78.9

$92.3

$99.5

$107.1

$115.0

$123.4

$132.1

$141.3

$151.0

$161.1

$171.7

$182.9

$194.6

$206.9

$219.9

$233.4

$247.7

$262.7

$278.4

$294.9

$312.2

$330.4

$349.5

$369.6

$388.0

$79.0

$467.0 Fractional Yr.

Additional 3.5 yrs.

Earnings Credit Fractional Yr.

Fractional Yr.

$103.0 Additional 3.5 yrs.

Eaminqs Credit Fractional Yr.

$609.1

$609.1

$103.0 I-

$609.1

$609.1 Additional 3.5 yrs.

Eaminas Credit

$103.0

$609.1

$609.1 Additional 3.5 yrs.

Earnings Credit

$467.0{

Total

$609.1

$609.1

$609.1

$467.0

$467.0

$467.0 ALL DOLLARS IN MILLIONS

ENCLOSURE 2 Projected Decommissioning Funding Levels for TVA Operating Units Using End of Calendar Year 2010 Fund Balances Real I*,

'BFN11220-2033" BFN2 6-28-2034 BFN3 7-292036 SQNi 9-172020 *

,!N2,9-1542021 WBNI11--92035 Return Annual Projected Annual - IProjected Annual JProjected Annual Projected Annual Projected Annual TProjected 5.0%

Annual I Funding Fund Annual I Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Annual Funding Fund Year Diabursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance Balance Disbursement Assurance 4 Balance Disbursement AssuranceI Balance 2010 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$0.0

$165.0

$173.3

$181.9

$191.0

$200.6

$210.6

$221.1

$232.2

$243.8

$256.0

$268.8

$282.2

$296.3

$311.1

$326.7

$343.0

$360.2

$378.2

$397.1

$416.9

$437.8

$459.7

$482.7

$506.1

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$b.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$0.2

$165.8

$174.3

$183.3

$192.7

$202.5

$212.9

$223.7

$235.2

$247.1

$259.7

$272.9

$286.8

$301.4

$316.7

$332.7

$349.6

$367.3

$385.9

$405.4

$425.9

$447.4

$470.0

$493.7

$506.1

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$0.3

$14oP.C

$149.4

$157.1

$165.2

$173.7

$182.7

$192.1

$202.0

$212.3

$223.2

$234.6

$246.6

$259.2

$272.4

$286.3

$300.9

$316.2

$332.3

$349.2

$366.9

$385.5

$405.0

$425.6

$447.1

$469.7

$493.5

$506.1

$1.8

$1.8

$1.8

$1.8

$1.8

$1.8

$1.8

$1.8

$1.8

$1.8

-$227.5.

$240.6

$254.5

$269.0

$284.3

$300.3

$317.2

$334.9

$353.4

$372.9

$388.0

$79.0

$467.0

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6

$1.6 s.

$216.4

$228.9

$242.0

$255.7

$270.1

$285.3

$301.2

$317.9

$335.4

$353.9

$373.2

$388.0 Fractional Yr.

Additional 3.5 yrs.

Earnings Credit

$467.0 Fractional Yr.

Additional 3.5 y Earnings Credit

$467.0 r*

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$0.7

$105.8..

$111.8

$118.0

$124.6

$131.5

$138.8

$146.4

$154.4

$162.8

$171.6

$180.9

$190.6

$200.8

$211.5

$222.8

$234.6

$247.0

$260.0

$273.7

$288.1

$303.1

$319.0

$335.6

$353.1

$371.4

$388.0

$79.0

$467.0 Fractional Yr. L I

Fractional Yr.

Additional 3.5 yrs.

Eaminas Credit Fractional Yr.

$103.0 v

Additional 3.5 yrs.

Earnings Credit Fractional Yr.

$609.1

$609.1

$103.0

$609.1

$609.1 Additional 3.5 yrs.

Eaminas Credit

$103;0

$609.1

$609.1 Additional 3.5 yrs.

Earnings Credit

$79.0

$467.0

$467.0 Total

$609.1

$609.1

$609.1

$467.0

$467.0

$467.0 ALL DOLLARS IN MILLIONS