ML113190778: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML113190778
| number = ML113190778
| issue date = 04/14/1982
| issue date = 04/14/1982
| title = Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis.
| title = Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis
| author name = Mayer L
| author name = Mayer L
| author affiliation = Northern States Power Co
| author affiliation = Northern States Power Co
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:/0                       ;;W, 0
{{#Wiki_filter:/0 Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No.
Northern States Power Company F"                                                    414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road                                 cU0ce(        A&9)            )
50-263 License No.
Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263   License No. DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures.
DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES cU0ce (
A& 9)
)
Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures.
These revisions include the following procedures:
These revisions include the following procedures:
List of Current Procedures       (Dated 3/23/82)
List of Current Procedures (Dated 3/23/82)
A.2-404 Emergency Sampling and Analysis             (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10)
A.2-404 Emergency Sampling and Analysis (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10)
NRC Resident Inspector (w/o attachment)
NRC Resident Inspector (w/o attachment)
G Charnoff (w/o attachment)
G Charnoff (w/o attachment)
APR 1               logt 8205070059 820428 PDR ADOCK 05000263 F           . PDR D}}
APR 1 logt 8205070059 820428 PDR ADOCK 05000263 F
PDR D
;;W, 0
F"}}

Latest revision as of 22:14, 12 January 2025

Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis
ML113190778
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 04/14/1982
From: Mayer L
Northern States Power Co
To:
NRC/OI/RGN-III/FO
Shared Package
ML113190777 List:
References
NUDOCS 8205070059
Download: ML113190778 (1)


Text

/0 Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No.

50-263 License No.

DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES cU0ce (

A& 9)

)

Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures.

These revisions include the following procedures:

List of Current Procedures (Dated 3/23/82)

A.2-404 Emergency Sampling and Analysis (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10)

NRC Resident Inspector (w/o attachment)

G Charnoff (w/o attachment)

APR 1 logt 8205070059 820428 PDR ADOCK 05000263 F

PDR D

W, 0

F"