ML113190778: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 2: | Line 2: | ||
| number = ML113190778 | | number = ML113190778 | ||
| issue date = 04/14/1982 | | issue date = 04/14/1982 | ||
| title = Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis | | title = Forwards Public Version of Revision 2 to Emergency Response Plan Implementing Procedure A.2-404, Emergency Sampling & Analysis | ||
| author name = Mayer L | | author name = Mayer L | ||
| author affiliation = Northern States Power Co | | author affiliation = Northern States Power Co | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:/0 | {{#Wiki_filter:/0 Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No. | ||
Northern States Power Company | 50-263 License No. | ||
Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 | DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES cU0ce ( | ||
A& 9) | |||
) | |||
Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures. | |||
These revisions include the following procedures: | These revisions include the following procedures: | ||
List of Current Procedures | List of Current Procedures (Dated 3/23/82) | ||
A.2-404 Emergency Sampling and Analysis | A.2-404 Emergency Sampling and Analysis (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10) | ||
NRC Resident Inspector (w/o attachment) | NRC Resident Inspector (w/o attachment) | ||
G Charnoff (w/o attachment) | G Charnoff (w/o attachment) | ||
APR 1 | APR 1 logt 8205070059 820428 PDR ADOCK 05000263 F | ||
PDR D | |||
;;W, 0 | |||
F"}} | |||
Latest revision as of 22:14, 12 January 2025
| ML113190778 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/14/1982 |
| From: | Mayer L Northern States Power Co |
| To: | NRC/OI/RGN-III/FO |
| Shared Package | |
| ML113190777 | List: |
| References | |
| NUDOCS 8205070059 | |
| Download: ML113190778 (1) | |
Text
/0 Northern States Power Company 414 Nicollet Mall Minneapolis. Minnesota 55401 Telephone (612) 330-5500 April 14, 1982 Regional Administrator Region III U S Nuclear Regulatory 799 Roosevelt Road Glen Ellyn,.IL 60137 MONTICELLO NUCLEAR GENERATING PLANT Docket No.
50-263 License No.
DPR-22 EMERGENCY RESPONSE PLAN IMPLEMENTING PROCEDURES cU0ce (
A& 9)
)
Furnished with this letter are three copies of revisions to the Monticello Plant Emergency Plan Implementing Procedures.
These revisions include the following procedures:
List of Current Procedures (Dated 3/23/82)
A.2-404 Emergency Sampling and Analysis (Pages 1 through 23) REV 2 L 0 Mayer, PE Manager of Nuclear Support Services LOM/GDH/bp Encls cc Director of NRR (10)
NRC Resident Inspector (w/o attachment)
G Charnoff (w/o attachment)
APR 1 logt 8205070059 820428 PDR ADOCK 05000263 F
PDR D
- W, 0
F"