ML12083A003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/04/2012
| issue date = 04/04/2012
| title = Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473)
| title = Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473)
| author name = Brown E A
| author name = Brown E
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000259
| docket = 05000259
| license number = DPR-033
| license number = DPR-033
| contact person = Brown E A
| contact person = Brown E
| case reference number = TAC ME3775
| case reference number = TAC ME3775
| document type = Letter, Proprietary Information Review
| document type = Letter, Proprietary Information Review
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 April 4, 2012 Mr. Joseph W. Shea Corporate Manager -Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 BROWNS FERRY NUCLEAR PLANT, UNIT 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR AREVA FUEL TRANSITION DOCUMENTS (TAC NO. ME3775)(TS-473)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2012 Mr. Joseph W. Shea Corporate Manager - Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  
 
==SUBJECT:==
BROWNS FERRY NUCLEAR PLANT, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR AREVA FUEL TRANSITION DOCUMENTS (TAC NO. ME3775)(TS-473)  


==Dear Mr. Shea:==
==Dear Mr. Shea:==
By letter dated April 16, 2010, you submitted an affidavit dated April 8, 2010, executed by Edward D. Schrull of General Electric-Hitachi Nuclear Energy Americas LLC (GEH). It was requested that the information contained in NEDC-32484P, Supplement 1, "Browns Ferry Nuclear Plant Unit 1 Supplementary Report Regarding ECCS-LOCA Additional Single Failure Evaluation at Current Licensed Thermal Power," Revision 0, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room. The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies. Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
By {{letter dated|date=April 16, 2010|text=letter dated April 16, 2010}}, you submitted an affidavit dated April 8, 2010, executed by Edward D. Schrull of General Electric-Hitachi Nuclear Energy Americas LLC (GEH). It was requested that the information contained in NEDC-32484P, Supplement 1, "Browns Ferry Nuclear Plant Unit 1 Supplementary Report Regarding ECCS-LOCA Additional Single Failure Evaluation at Current Licensed Thermal Power," Revision 0, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
J. -2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
: a.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
: b.
Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.  
 
J. Shea
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I can be reached at 301-415-2315.
If you have any questions regarding this matter, I can be reached at 301-415-2315.
Sincerely, IRA! Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Wilmington, NC Additional distribution via Listserv
Sincerely, IRA!
-2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 cc:
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional distribution via Listserv  
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
 
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
J.Shea
- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I can be reached at 301-415-2315.
If you have any questions regarding this matter, I can be reached at 301-415-2315.
Sincerely, IRA! Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Wilmington, NC Additional distribution via Listserv OISTRIBUTION:
Sincerely, IRA!
PUBLIC LPLII-2 RtF RidsNrrDorlLpl2-2 RidsNrrPMBrownsFerry RidsOgcRp RidsNrrLABClayton RidsRgn2MailCenier RidsNrrDssSnpb RidsNrrDssS rxb RidsAcrsAcnw_MailCTR ADAMS Accession No.: ML 12083A003 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME EBrown BClayton (KGoldstein for) DBroaddus (FSaba for) DATE 03/26/12 03/23/12 04/04/12 Ii OFFICIAL RECORD COpy I}}
Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 cc:
Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional distribution via Listserv OISTRIBUTION:
PUBLIC LPLII-2 RtF RidsNrrDorlLpl2-2 RidsNrrPMBrownsFerry RidsOgcRp RidsNrrLABClayton RidsRgn2MailCenier RidsNrrDssSnpb RidsNrrDssSrxb RidsAcrsAcnw_MailCTR ADAMS Accession No.: ML12083A003 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME EBrown BClayton (KGoldstein for)
DBroaddus (FSaba for)
DATE 03/26/12 03/23/12 04/04/12 Ii OFFICIAL RECORD COpy I}}

Latest revision as of 03:17, 12 January 2025

Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473)
ML12083A003
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 04/04/2012
From: Ellen Brown
Plant Licensing Branch II
To: James Shea
Tennessee Valley Authority
Brown E
References
TAC ME3775
Download: ML12083A003 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 4, 2012 Mr. Joseph W. Shea Corporate Manager - Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNIT 1 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR AREVA FUEL TRANSITION DOCUMENTS (TAC NO. ME3775)(TS-473)

Dear Mr. Shea:

By letter dated April 16, 2010, you submitted an affidavit dated April 8, 2010, executed by Edward D. Schrull of General Electric-Hitachi Nuclear Energy Americas LLC (GEH). It was requested that the information contained in NEDC-32484P, Supplement 1, "Browns Ferry Nuclear Plant Unit 1 Supplementary Report Regarding ECCS-LOCA Additional Single Failure Evaluation at Current Licensed Thermal Power," Revision 0, be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390.

A nonproprietary copy of this document has been placed in the U.S. Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a.

Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over GEH and/or other companies.

b.

Information that, if used by a competitor, would reduce their expenditure of resources or improve their competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

The NRC staff has reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version(s) of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

J. Shea

- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I can be reached at 301-415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 cc:

Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional distribution via Listserv

J.Shea

- 2 Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the conSUltants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I can be reached at 301-415-2315.

Sincerely, IRA!

Eva A. Brown, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-259 cc:

Edward D. Schrull Vice President Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC 3901 Castle Hayne Road Wilmington, NC 28401 Additional distribution via Listserv OISTRIBUTION:

PUBLIC LPLII-2 RtF RidsNrrDorlLpl2-2 RidsNrrPMBrownsFerry RidsOgcRp RidsNrrLABClayton RidsRgn2MailCenier RidsNrrDssSnpb RidsNrrDssSrxb RidsAcrsAcnw_MailCTR ADAMS Accession No.: ML12083A003 OFFICE LPL2-2/PM LPL2-2/LA LPL2-2/BC NAME EBrown BClayton (KGoldstein for)

DBroaddus (FSaba for)

DATE 03/26/12 03/23/12 04/04/12 Ii OFFICIAL RECORD COpy I