MONTHYEARML1010904882010-04-16016 April 2010 Requested Significance Determination Documents for Fire Protection Program Project stage: Request ML1013401882010-06-0808 June 2010 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition, Areva Fuel Mechanical Design Report Project stage: Withholding Request Acceptance ML1013802442010-06-0808 June 2010 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition, Thermal-Hydraulic Design Report Project stage: Withholding Request Acceptance ML1025202302010-09-24024 September 2010 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition, GE14 Fuel Thermal Mechanical Information Project stage: Withholding Request Acceptance ML1025203012010-11-0404 November 2010 Letter Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1, Areva Fuel Transition, Unit 1 Cycle 9 Reload Safety Analysis for 105% Original Licensed Thermal Power Project stage: Withholding Request Acceptance ML1101805852011-01-24024 January 2011 Request for Additonal Information Regarding Amendment Request to Transition to Areva Fuel Project stage: Other ML1105900542011-02-23023 February 2011 Response to NRC Request for Additional Information Regarding Amendment Request to Transition to Areva Fuel Project stage: Response to RAI ML11095A0732011-03-28028 March 2011 Request for Additional Information Regarding a Request to Transition to Areva Fuel Project stage: RAI ML11136A1872011-04-26026 April 2011 NRR E-mail Capture - Audit Results Summary Report Supporting TAC ME3775 - BF1 Areva Fuel Transition and Related BF2/3 Request Project stage: Other ML11137A1992011-05-12012 May 2011 Response to NRC Request for Additional Information Regarding to Transition to Areva Fuel Project stage: Response to RAI ML11159A0412011-06-0707 June 2011 NRR E-mail Capture - Audit Results Summary Report Supporting TAC ME3775 - BF1 Areva Fuel Transition and Related BF2/3 Request Project stage: Other ML11234A0042011-08-23023 August 2011 Request for Additional Information Regarding Technical Specification TS-473, Areva Fuel Transition Project stage: RAI 05000260/LER-2011-001, For Browns Ferry Nuclear Plant, Unit 2 Regarding Core Spray Relay Found in Incorrect Position2011-10-0707 October 2011 For Browns Ferry Nuclear Plant, Unit 2 Regarding Core Spray Relay Found in Incorrect Position Project stage: Request ML11286A1072011-10-0707 October 2011 Response to NRC Request for Additional Information Regarding Amendment Request to Transition to Areva Fuel Project stage: Response to RAI ML12018A3762012-01-23023 January 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473) Project stage: Withholding Request Acceptance ML1208300592012-04-0404 April 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775) (TS-473) Project stage: Withholding Request Acceptance ML12083A0012012-04-0404 April 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473) Project stage: Withholding Request Acceptance ML12083A0032012-04-0404 April 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473) Project stage: Withholding Request Acceptance ML12083A0142012-04-0404 April 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (GEH-Harrison) (TAC No. ME3775) (TS-473) Project stage: Withholding Request Acceptance ML12100A1032012-04-11011 April 2012 Audit Report Regarding Tennessee Valley Authority Browns Ferry, Unit 1 Areva Fuel Transition Emergency Core Cooling System Evaluation Model Application (TAC No. ME3775) (Np) Project stage: Other ML12108A2482012-04-17017 April 2012 Request for Withholding Information from Public Disclosure for Areva Fuel Transition Documents (TAC No. ME3775)(TS-473) Project stage: Withholding Request Acceptance ML12114A0042012-04-18018 April 2012 Supplement to License Amendment Request to Transition to Areva Fuel Project stage: Supplement ML12129A1492012-07-0303 July 2012 Issuance of Amendment Regarding the Transition to Areva Fuel (TAC No. ME3775) (TS-473) Project stage: Approval ML13010A0162013-01-0404 January 2013 CFR 50.46 30-Day Report Project stage: Other 2011-05-12
[Table View] |
Text
Security Sensitive Information Withhold from Public Disclosure in Accordance with 10 CFR 2.390.
Tennessee Valley Authority 1101 Market Street, LP 3R Chattanooga, Tennessee 37402-2801 R. M. Krich Vice President Nuclear Licensing April 16, 2010 10 CFR 50.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 NRC Docket Nos. 50-259, 50-260, and 50-296
Subject:
Requested Significance Determination Documents for Brown Ferry Nuclear Plant's Fire Protection Program In a public meeting conducted on February 22, 2010, between Tennessee Valley Authority (TVA) and the NRC, discussions were held regarding three preliminary Greater than Green findings involving the Browns Ferry Nuclear Plant (BFN) Fire Protection Program.
In that meeting, TVA committed to provide additional technical information to the NRC for their review.
Subsequent to the February 22, 2010, meeting, the additional technical information documents relating to the significance determination process evaluations conducted by TVA were provided to the NRC. On March 30, 2010, in a telephone call among Rebecca Nease (NRC), McKenzie Thomas (NRC) and James Emens (TVA), the NRC representatives requested that TVA submit selected documents.
That documents requested include:
(1) Analysis of the Operator Safe Shutdown Instruction (SSI) Entry for BFN Fire Significance Determination Process (SDP),
(2) Fire SDP Scenario Sheets, (3) Fire SDP Binning, and (4) Apparent Violation (AV) 3 Appendix M Significance Determination Process Using Qualitative Criteria.
Security Sensitive Information Withhold from Public Disclosure in Accordance with 10 CFR 2.390.
0 Security Sensitive Information Classification does not apply to this page when separated from the Enclosure.
printed on recycled paper
Security Sensitive Information Withhold from Public Disclosure in Accordance with 10 CFR 2.390.
U.S. Nuclear Regulatory Commission Page 2 April 16, 2010 The enclosure provides the requested documents.
There are no regulatory commitments in this response. If you have any questions relating to this matter, please contact James Emens at (256) 729-7874.
Respectfully, R. M. Krich
Enclosure:
Requested Significance Determination Documents cc (w/ Enclosure):