{{#Wiki_filter:Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)
{{#Wiki_filter:SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: 2012 SRO Admin 5 Revision Number: 03 Date: 03/04/2012 Developed By:
Page 1 of 11 Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)
Instructor                           Date Validated By:
JPM Number: 2012 SRO Admin 5 Revision Number:
SME or Instructor                         Date Reviewed By:
03 Date:
Operations Representative                     Date Approved By:
03/04/2012 Developed By:
Training Department                         Date SRO Admin 5.doc              SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor Date Validated By:
Page 1 of 11
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date  


2012 SRO Admin 5 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________    1. Task description and number, JPM description and number are identified.
: 1.
________    2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
: 2.
________    4. Initial setup conditions are identified.
Knowledge and Abilities (K/A) references are included.
________    5. Initiating cue (and terminating cue if required) are properly identified.
: 3.
________    6. Task standards identified and verified by SME review.
Performance location specified. (in-plant, control room, simulator, or other)
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 4.
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure                       Rev:
: 5.
Procedure                       Rev:
Initiating cue (and terminating cue if required) are properly identified.
Procedure                       Rev:
: 6.
________    9. Verify cues both verbal and visual are free of conflict.
Task standards identified and verified by SME review.
________    10. Verify performance time is accurate
: 7.
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 8.
SME / Instructor                                 Date SME / Instructor                                 Date SME / Instructor                                 Date SRO Admin 5.doc                  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Verify the procedure(s) referenced by this JPM reflects the current revision:
Page 2 of 11
Procedure Rev:
Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date  


2012 SRO Admin 5 - Rev 03 Revision Record (Summary)
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11 Revision Record (Summary)
Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.
Revision 01, JPM revised to update format and procedure revisions.
Revision 01, JPM revised to update format and procedure revisions.
Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.
Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.
Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.
Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.  
SRO Admin 5.doc                  SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 3 of 11


2012 SRO Admin 5 - Rev 03 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:
* A blank EP-MW-114-100-F01 (NARS form)
* A blank EP-MW-114-100-F01 (NARS form)
* A blank EP-AA-111-F06 (Quad Cities Plant Based PAR Flowchart)
* A blank EP-AA-111-F06 (Quad Cities Plant Based PAR Flowchart)
* Full-sized Hot EAL Boards
* Full-sized Hot EAL Boards
* All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1 NARS form completed as follows:
* All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1 Utility Message 1 State Message N/A NARS form completed as follows:
Utility Message 1                   State Message N/A Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified: Time = T0 -60 minutes Date = today EAL# = FS1 Block #4. Accident Terminated: Time:=N/A, Date:=N/A Block #5. Release Status       = None Block #6. Type of Release = N/A Block #7. Wind Direction       = 232 degrees Block #8. Wind Speed:           Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]
Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified:
Time = T0 -60 minutes Date = today EAL# = FS1 Block #4. Accident Terminated: Time:=N/A, Date:=N/A Block #5. Release Status  
= None Block #6. Type of Release  
= N/A Block #7. Wind Direction  
= 232 degrees Block #8. Wind Speed:
Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]
Approved by [provide SM signature]
Approved by [provide SM signature]
Block #11 Transmitted By [provide name] Phone Number [309-227-2210]
Block #11 Transmitted By [provide name] Phone Number [309-227-2210]
Time/Date T0 -50 minutes/Today Block #12 Received By [provide name] Organization =
Time/Date T0 -50 minutes/Today Block #12 Received By [provide name] Organization =
IEMA, Time/Date: T0 -50 minutes/Today Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date T0 -48 minutes/Today SRO Admin 5.doc                      SRRS: 3D.105 (when utilized for operator initial or continuing training)
IEMA, Time/Date: T0 -50 minutes/Today Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date T0 -48 minutes/Today  
Page 4 of 11


2012 SRO Admin 5 - Rev 03 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 11 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)
50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)
All plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.
All Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.
Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.
plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.
T0 is the current time. T0 is _______
T0 is the current time. T0 is _______
The CURRENT plant conditions are as follows:
The CURRENT plant conditions are as follows:
Line 80: Line 97:
Provide examinee with:
Provide examinee with:
* A copy of EP-MW-114-100-F01 Nuclear Accident Reporting System (NARS)
* A copy of EP-MW-114-100-F01 Nuclear Accident Reporting System (NARS)
Utility Message #1 form completely filled out as a Site Area Emergency Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Utility Message #1 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
form completely filled out as a Site Area Emergency
Page 5 of 11


2012 SRO Admin 5 - Rev 03 Information For Evaluators Use:
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11 Information For Evaluators Use:
UNSAT requires written comments on respective step.
UNSAT requires written comments on respective step.
* Denotes critical steps.
* Denotes critical steps.
Line 91: Line 108:
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 11


2012 SRO Admin 5 - Rev 03 JPM Start Time:
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP               ELEMENT                             STANDARD                       SAT    UNSAT Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.
Page 7 of 11 JPM Start Time:
    *      *Declares a General               Recognizes that the conditions             ___    ___      ___
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.  
Emergency.*                      for FG1 are met due to Drywell radiation and Drywell pressure.
*Declares a General Emergency.*
Recognizes that the conditions for FG1 are met due to Drywell radiation and Drywell pressure.
(Loss of RCS, Fuel Clad, and Potential Loss of Containment)
(Loss of RCS, Fuel Clad, and Potential Loss of Containment)
EVALUATOR: Record the actual time that candidate makes classification _________
EVALUATOR: Record the actual time that candidate makes classification _________
This completes the FIRST of two time-critical requirements (classification < 15 minutes) and starts the SECOND (notifications < 14 minutes)
This completes the FIRST of two time-critical requirements (classification < 15 minutes) and starts the SECOND (notifications < 14 minutes)
EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.
EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.
NARS       Fills out Utility Message         Records Utility Message #2.               ___    ___      ___
NARS form Fills out Utility Message Number.
form       Number.
Records Utility Message #2.
NARS        Fills out State Message           Records N/A for State Message             ___    ___      ___
NARS form Fills out State Message Number.
form        Number.                          Number.
Records N/A for State Message Number.
Block #1   Fills out block #1 information   Records [B] Drill/Exercise in             ___    ___      ___
Block #1 Fills out block #1 information regarding Status.
regarding Status.                block #1.
Records [B] Drill/Exercise in block #1.  
*Block #2   *Fills out block #2 information Records [F] Quad Cities in                   ___    ___      ___
*Block #2 *Fills out block #2 information regarding Station.*
regarding Station.*            block #2.
Records [F] Quad Cities in block #2.  
*Block #3   *Fills out block #3 information Records [D] General                         ___    ___      ___
*Block #3 *Fills out block #3 information regarding onsite condition.*
regarding onsite condition.*    Emergency.
Records [D] General Emergency.  
*Block #4   *Fills out block #4 information Records Accident Classification              ___    ___      ___
*Block #4 *Fills out block #4 information regarding Accident Classified  
regarding Accident Classified as
& Accident Terminated.*
            & Accident Terminated.*         Time= Classification time Date= todays date EAL=FG1 Records N/A for Accident Terminated in Time and Date space.
Records Accident Classification as Time= Classification time Date= todays date EAL=FG1 Records N/A for Accident Terminated in Time and Date space.
Block #5   Fills out block #5 information Records [A] None.                             ___    ___      ___
Block #5 Fills out block #5 information regarding Release Status.
regarding Release Status.
Records [A] None.  
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 11


2012 SRO Admin 5 - Rev 03 Comment STEP               ELEMENT                             STANDARD                       SAT    UNSAT Number Block #6   Fills out block #6 information   Records [A] N/A.                          ___    ___      ___
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
regarding Type of Release.
Page 8 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number Block #6 Fills out block #6 information regarding Type of Release.
Records [A] N/A.
EVALUATOR: Candidate may take information from initial conditions, which state meteorological conditions have not changed OR they may look up the data on the station computer.
EVALUATOR: Candidate may take information from initial conditions, which state meteorological conditions have not changed OR they may look up the data on the station computer.
IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour.
IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour.  
*Block #7   *Fills out block #7 information Records 232 degrees.                        ___    ___      ___
*Block #7 *Fills out block #7 information regarding Wind Direction.*
regarding Wind Direction.*
Records 232 degrees.
*Block #8   *Fills out block #8 information Records [A] Meters/Sec = 2.46               ___    ___      ___
*Block #8 *Fills out block #8 information regarding Wind Speed.*
regarding Wind Speed.*          and     [B] Miles/Hr = 5.51.
Records [A] Meters/Sec = 2.46 and [B] Miles/Hr = 5.51.
EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply:
EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply:
NO.
NO.
Refers to EP-AA-111-F-06,         Obtains and uses EP-AA-111-                ___    ___      ___
Refers to EP-AA-111-F-06, Quad Cities Plant Based PAR Flow Chart, to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.
Quad Cities Plant Based         F-06, to determine loss of fuel PAR Flow Chart, to              clad barrier, loss of RCS barrier, determine loss of fuel clad       and a potential loss of barrier, loss of RCS barrier,     containment exists.
Obtains and uses EP-AA-111-F-06, to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.
and a potential loss of containment exists.
EVALUATOR: The candidate should utilize EP-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.  
EVALUATOR: The candidate should utilize EP-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.
*Block #9 Fills out block #9 information regarding Recommended Actions.
*Block #9   Fills out block #9               Utilizes EP-AA-111 F-06 Quad               ___    ___      ___
Utilizes EP-AA-111 F-06 Quad Cities Plant Based PAR Flowchart and determines PARS of Evacuate 2 Mile Radius & 5 Miles Downwind
information regarding            Cities Plant Based PAR Recommended Actions.            Flowchart and determines PARS of Evacuate 2 Mile Radius & 5 Miles Downwind
[D] Illinois sub-areas 1,2
[D] Illinois sub-areas 1,2
[E] Iowa sub-areas 1,2,5 Block #10   Fills out block #10               Records NONE.                              ___    ___      ___
[E] Iowa sub-areas 1,2,5 Block #10 Fills out block #10 information regarding Additional Information.
information regarding Additional Information.
Records NONE.
NARS       Submits NARS form for             Submits NARS form for                     ___    ___      ___
NARS form Submits NARS form for verification.
form        verification.                    verification.
Submits NARS form for verification.  
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 11


2012 SRO Admin 5 - Rev 03 Comment STEP               ELEMENT                           STANDARD                       SAT    UNSAT Number CUE:       When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
NARS       Signs on the Approved By       Submits NARS form for                      ___    ___      ___
Page 9 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE:
form      line and submits NARS form     transmittal for transmittal.
When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.
CUE:       When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form.
NARS form Signs on the Approved By line and submits NARS form for transmittal.
Submits NARS form for transmittal CUE:
When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form.
Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.
Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.
JPM Stop Time:
JPM Stop Time:  
SRO Admin 5.doc                SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 11


2012 SRO Admin 5 - Rev 03 JPM  
2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Job
==Title:==
EO RO SRO FS STA/IA SRO Cert JPM
==Title:==
Classify Event and Determine Protective Action Recommendations (PARS)
JPM Number:
2012 SRO Admin 5 Revision Number:
Task Number and


Operators Name:                                      Job Title:      EO          RO      SRO          FS STA/IA              SRO Cert JPM Title:         Classify Event and Determine Protective Action Recommendations (PARS)
==Title:==
JPM Number:        2012 SRO Admin 5                                Revision Number: 03 Task Number and Title:
03 S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.
S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.
S-EP-P02 (Freq: LIC=A) (ILT-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP-AA-111.
S-EP-P02 (Freq: LIC=A) (ILT-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP-AA-111.
K/A Number and Importance:         K/A:   2.4.44 Rating:           4.4 Suggested Testing Environment: Simulator Alternate Path:     Yes     No   SRO Only:     Yes       No       Time Critical:         Yes       No Reference(s): EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment:         Simulator       Control Room               In-Plant           Other Testing Method:         Simulate       Perform Estimated Time to Complete: 15 minutes to classify Actual Time Used:                         minutes 14 minutes to notify Actual Time Used:                        minutes EVALUATION  
K/A Number and Importance:
K/A:
2.4.44 Rating:
4.4 Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 15 minutes to classify Actual Time Used:
minutes 14 EVALUATION  


==SUMMARY==
==SUMMARY==
:
minutes to notify Actual Time Used:
Were all the Critical Elements performed satisfactorily?               Yes                   No The operators performance was evaluated against standards contained within this JPM and has been determined to be:               Satisfactory         Unsatisfactory Comments:
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                       (Print)
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                               Date:
Satisfactory Unsatisfactory Comments:
SRO Admin 5.doc                    SRRS: 3D.105 (when utilized for operator initial or continuing training)
Evaluators Name:
Page 10 of 11
(Print)
Evaluators Signature:
Date:  


SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.
Line 184: Line 219:
o There has been NO Change in release status, or meteorological data since message #1 was sent.
o There has been NO Change in release status, or meteorological data since message #1 was sent.
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:
THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:
IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.
IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.  
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number: 00 Date:03/04/2012 Developed By:
SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor                             Date Validated By:
Page 1 of 10 Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number:
SME or Instructor                           Date Reviewed By:
2012 SRO Admin 4 Revision Number:
Operations Representative                         Date Approved By:
00 Date:
Training Department                         Date SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
03/04/2012 Developed By:
Page 1 of 10
Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date  


2012 SRO Admin 4 - Rev 00 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________      1. Task description and number, JPM description and number are identified.
: 1.
________      2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________      3. Performance location specified. (in-plant, control room, simulator, or other)
: 2.
________      4. Initial setup conditions are identified.
Knowledge and Abilities (K/A) references are included.
________      5. Initiating cue (and terminating cue if required) are properly identified.
: 3.
________      6. Task standards identified and verified by SME review.
Performance location specified. (in-plant, control room, simulator, or other)
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 4.
________      8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure                         Rev:
: 5.
Procedure                         Rev:
Initiating cue (and terminating cue if required) are properly identified.
Procedure                         Rev:
: 6.
________      9. Verify cues both verbal and visual are free of conflict.
Task standards identified and verified by SME review.
________      10. Verify performance time is accurate
: 7.
________      11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 8.
SME / Instructor                                     Date SME / Instructor                                     Date SME / Instructor                                     Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Verify the procedure(s) referenced by this JPM reflects the current revision:
Page 2 of 10
Procedure Rev:
Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date  


2012 SRO Admin 4 - Rev 00 Revision Record (Summary)
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00,      This JPM was developed new for the 2012 ILT NRC Exam.
Page 3 of 10 Revision Record (Summary)
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00, This JPM was developed new for the 2012 ILT NRC Exam.
Page 3 of 10


2012 SRO Admin 4 - Rev 00 SIMULATOR SETUP INSTRUCTIONS
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. Simulator setup is not applicable.
: 1. Simulator setup is not applicable.
: 2. Evaluator, be prepared to fill in a time for 10 minutes ago on the candidates copy of the Initial Conditions.
: 2. Evaluator, be prepared to fill in a time for 10 minutes ago on the candidates copy of the Initial Conditions.
: 3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.
: 3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10


2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
The following annunciators were received 10 minutes ago, at:_______
The following annunciators were received 10 minutes ago, at:_______
* 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
* 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
Line 245: Line 291:
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


2012 SRO Admin 4 - Rev 00 JPM Start Time:
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                 ELEMENT                           STANDARD                 SAT      UNSAT Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.
Page 6 of 10 JPM Start Time:
    *        *Recognize that the Initial         Service Water Rad Monitor Conditions render the Service       declared inoperable Water Rad Monitor inoperable*
STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.  
*ODCM       *Identify the correct               Collect and analyze grab        ___      ___      ___
*Recognize that the Initial Conditions render the Service Water Rad Monitor inoperable*
Condition    REQUIRED ACTION and                 samples for beta or gamma C        COMPLETION TIME per C.1:             activity at an LLD 1E-07 Action C.1                                        &#xb5;Ci/ml once per 12 hours Collect and analyze grab or                                            identified.
Service Water Rad Monitor declared inoperable  
samples for beta or gamma QCOS activity at an LLD 1E-07 Step G.1.a
*ODCM Condition C
              &#xb5;Ci/ml Once per 12 hours*
Action C.1 or QCOS Step G.1.a
*ODCM       *Identify the correct               Restore the Service Water        ___      ___      ___
*Identify the correct REQUIRED ACTION and COMPLETION TIME per C.1:
Condition    REQUIRED ACTION and                 Rad Monitor to OPERABLE C        COMPLETION TIME per C.2:             status within 30 days Action C.2                                        identified.
Collect and analyze grab samples for beta or gamma activity at an LLD 1E-07  
Restore the Service Water Rad or Monitor to OPERABLE status QCOS Step G.1.b    within 30 days*
&#xb5;Ci/ml Once per 12 hours*
CUE       When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number: IR 3456789 QCOS    Record the following                   Unit: 1, Date and Time and      ___      ___      ___
Collect and analyze grab samples for beta or gamma activity at an LLD 1E-07  
1700-04  information on Attachment A:           IR # 3456789 recorded on Step H.1.a Unit: 1                                 QCOS 1700-04 Attachment A
&#xb5;Ci/ml once per 12 hours identified.
Date:
*ODCM Condition C
Action C.2 or QCOS Step G.1.b
*Identify the correct REQUIRED ACTION and COMPLETION TIME per C.2:
Restore the Service Water Rad Monitor to OPERABLE status within 30 days*
Restore the Service Water Rad Monitor to OPERABLE status within 30 days identified.
CUE When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number:
QCOS 1700-04 Step H.1.a IR 3456789 Record the following information on Attachment A:
Unit: 1 Date:
Time:
Time:
IR #: 3456789 G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
IR #: 3456789 Unit: 1, Date and Time and IR # 3456789 recorded on QCOS 1700-04 Attachment A
Page 6 of 10


2012 SRO Admin 4 - Rev 00 Comment STEP                 ELEMENT                           STANDARD                 SAT      UNSAT Number QCOS     Record the following                    Instrument and the Date          ___      ___      ___
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
1700-04   information on Attachment A:            and Time it was declared Step H.1.b Instrument: 2251-887 or               inoperable recorded on Service Water Radiation               QCOS 1700-04 Attachment A.
Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCOS 1700-04 Step H.1.b Record the following information on Attachment A:
Monitor Date and Time declared Inop:
Instrument: 2251-887 or Service Water Radiation Monitor Date and Time declared Inop:
QCOS       Record the following                Reason for inoperability        ___      ___      ___
Instrument and the Date and Time it was declared inoperable recorded on QCOS 1700-04 Attachment A.
1700-04     information on Attachment A:        recorded on QCOS 1700-04 Step H.1.c                                         Attachment A.
QCOS 1700-04 Step H.1.c Record the following information on Attachment A:
Reason for inoperability:
Reason for inoperability:
(Loss of power or equivalent)
(Loss of power or equivalent)
QCOS     Record the following                   Date and time 30 days from       ___      ___      ___
Reason for inoperability recorded on QCOS 1700-04 Attachment A.
1700-04  information on Attachment A:            the time that instrument was Step H.1.d Date and time 30 days from             declared inoperable the time that instrument was           recorded on QCOS 1700-04 Attachment A.
QCOS 1700-04 Step H.1.d Record the following information on Attachment A:
declared inoperable.
Date and time 30 days from the time that instrument was declared inoperable.
Date and time 30 days from the time that instrument was declared inoperable recorded on QCOS 1700-04 Attachment A.
EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.
EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.
Provide the following technician name: Lee Williams
Provide the following technician name: Lee Williams
* QCOS       *Notify Chemistry to perform         Chemistry notified to            ___      ___      ___
* QCOS 1700-04 Step H.2
1700-04      LCO requirements per CY-QC-         perform LCO requirements Step H.2    130-650, and record on               per CY-QC-130-650.
*Notify Chemistry to perform LCO requirements per CY-QC-130-650, and record on attachment A.
attachment A.
* Chemistry notified to perform LCO requirements per CY-QC-130-650.
* Date and time of notification and Person notified recorded on QCOS 1700-04 Attachment A.
Date and time of notification and Person notified recorded on QCOS 1700-04 Attachment A.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 10


2012 SRO Admin 4 - Rev 00 Comment STEP                 ELEMENT                           STANDARD                 SAT      UNSAT Number CUE       ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review.
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
QCOS       Review Outage Report actions         Unit Supervisor signature       ___      ___      ___
Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review.
1700-04      for accuracy.                        signed off on QCOS 1700-Step H.3                                          04 Attachment A, Step H.3 and submitted to Shift Manager for review.
QCOS 1700-04 Step H.3 Review Outage Report actions for accuracy.
CUE       If not already addressed, ask the candidate the following question:
Unit Supervisor signature signed off on QCOS 1700-04 Attachment A, Step H.3 and submitted to Shift Manager for review.
CUE If not already addressed, ask the candidate the following question:
What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?
What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?
ODCM       Identify the correct REQUIRED       Condition G reporting            ___      ___      ___
ODCM Condition G
Condition    ACTION for CONDITION G:             requirement identified.
or QCOS 1700-04 Step F.2 Identify the correct REQUIRED ACTION for CONDITION G:
G        Explain why the inoperability or        was not corrected in a timely QCOS        manner in the next Radioactive 1700-04      Effluent Release Report.
Explain why the inoperability was not corrected in a timely manner in the next Radioactive Effluent Release Report.
Step F.2 CUE       Inform the candidate that the JPM is complete.
Condition G reporting requirement identified.
JPM Stop Time:
CUE Inform the candidate that the JPM is complete.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Stop Time:  
Page 8 of 10


2012 SRO Admin 4 - Rev 00 JPM  
2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Job


Operators Name:                                            Job Title:         EO         RO     SRO       FS STA/IA           SRO Cert JPM Title: Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4                     Revision Number: 00 Task Number and Title:       S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.
==Title:==
K/A Number and Importance:                   K/A: 2.3.15               Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
EO RO SRO FS STA/IA SRO Cert JPM
Suggested Testing Environment:               Simulator/Classroom Alternate Path:     Yes     No SRO Only:           Yes         No       Time Critical:     Yes     No Reference(s):
 
CY-QC-170-301, Rev 10,Offsite Dose Control Manual (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, Service Water Effluent Gross Activity Radiation Monitor Outage Report CY-QC-130-650, Rev. 11, Inoperable Chemistry Instruments LCO Requirements QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILURE Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 15 minutes                    Actual Time Used:                  minutes EVALUATION  
==Title:==
Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number:
00 Task Number and
 
==Title:==
S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.
K/A Number and Importance:
K/A: 2.3.15 Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.
Suggested Testing Environment:
Simulator/Classroom Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s):
CY-QC-170-301, Rev 10,Offsite Dose Control Manual (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, Service Water Effluent Gross Activity Radiation Monitor Outage Report CY-QC-130-650, Rev. 11, Inoperable Chemistry Instruments LCO Requirements QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILURE Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 15 EVALUATION  


==SUMMARY==
==SUMMARY==
:
minutes Actual Time Used:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Evaluators Name:
Page 9 of 10
(Print)
Evaluators Signature:
Date:  


2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.
Line 325: Line 394:
* Identify the Required Actions.
* Identify the Required Actions.
* Complete the necessary paperwork.
* Complete the necessary paperwork.
* Complete the necessary notifications.
* Complete the necessary notifications.  


Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number: 2012 SRO Admin 3 Revision Number: 03 Date: 03/04/2012 Developed By:
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor                             Date Validated By:
Page 1 of 9 Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number:
SME or Instructor                           Date Reviewed By:
2012 SRO Admin 3 Revision Number:
Operations Representative                         Date Approved By:
03 Date:
Training Department                         Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
03/04/2012 Developed By:
Page 1 of 9
Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date  


2012 SRO Admin 3 - Rev 03 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________    1. Task description and number, JPM description and number are identified.
: 1. Task description and number, JPM description and number are identified.
________    2. Knowledge and Abilities (K/A) references are included.
: 2. Knowledge and Abilities (K/A) references are included.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
: 3. Performance location specified. (in-plant, control room, simulator, or other)
________    4. Initial setup conditions are identified.
: 4. Initial setup conditions are identified.
________    5. Initiating cue (and terminating cue if required) are properly identified.
: 5. Initiating cue (and terminating cue if required) are properly identified.
________    6. Task standards identified and verified by SME review.
: 6. Task standards identified and verified by SME review.
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
: 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure                                             Rev:
Procedure Rev:
Procedure                                             Rev:
Procedure Rev:
Procedure                                             Rev:
Procedure Rev:
________    9. Verify cues both verbal and visual are free of conflict.
: 9. Verify cues both verbal and visual are free of conflict.
________    10. Verify performance time is accurate
: 10. Verify performance time is accurate
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor                                       Date SME / Instructor                                       Date SME / Instructor                                       Date SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
SME / Instructor Date SME / Instructor Date SME / Instructor Date  
Page 2 of 9


2012 SRO Admin 3 - Rev 03 Revision Record (Summary)
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 02,   This version was used on the NRC Exam for ILT Class 07-01.
Page 3 of 9 Revision Record (Summary)
Revision 03. This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 02, This version was used on the NRC Exam for ILT Class 07-01.
Page 3 of 9
Revision 03.
This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam  


2012 SRO Admin 3 - Rev 03 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: 1. Manual Setup: Prepare QCOS 0005-08 Rev 28 completed with the following information D.1.a             Partial for Step H1 only           H.1.l.(1) (a-g)             N/A D.1.b             Signed, date Today                H.1.l.(2).(a)               Initialed Time: 30 min ago                  H.1.l.(2).(b)               Initialed D.2               1                               H.1.l.(2).(c)              Both Initialed H.1.a.            3                                H.1.l.(2).(d)               Initialed H.1.a.(1) & (2)   Initialed                         H.1.l.(2).(e)               Initialed H.1.a.(3)         N/A                              H.1.l.(2).(f)               OOS H.1.b.           Initialed                          H.1.l.(3) (a-g)             N/A H.1.c.(1)        N/A                             H.1.l.(4) (a-f)             All steps N/A H.1.c.(2)        Initialed                          H.1.m.(1) (a-f)             Initialed H.1.d            Initialed                         H.1.m.(2) (a-h)             N/A H.1.e.(1) & (2)  Initialed                          H.1.m.(3) (a-g)             N/A H.1.f            Initialed                          H.1.m.(4) (a-i)             N/A H.1.g            Initialed                          H.2 (all steps lined)       N/A H.1.h.(1)        Initialed                          H.3 (all steps lined)       N/A H.1.h.(2)        N/A                             H.4.a                       N/A checked H.1.i.            Initialed                                                      Comments None H.1.j.(1) & (2)  Initialed                          H.4.b                       Signed Joe Barker H.1.k            Initialed                                                      Date: Today Attachments D & E N/A
Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.
: 2. Prepare QCOS 0005-08 Rev 28, page 10 completed with the following information H.1.l(3)                 Marked N/A H.1.l(4)(b) and (d)       Not initialed and 4450 VAC written in column to the right of the line H.1.l(4)                 All other steps initialed by JB
: 1. Manual Setup: Prepare QCOS 0005-08 Rev 28 completed with the following information D.1.a Partial for Step H1 only D.1.b Signed, date Today Time: 30 min ago D.2 1
: 3. This completes the setup for this JPM.
H.1.a.
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
3 H.1.a.(1) & (2)
Page 4 of 9
Initialed H.1.a.(3)
N/A H.1.b.
Initialed H.1.c.(1)
N/A H.1.c.(2)
Initialed H.1.d Initialed H.1.e.(1) & (2)
Initialed H.1.f Initialed H.1.g Initialed H.1.h.(1)
Initialed H.1.h.(2)
N/A H.1.i.
Initialed H.1.j.(1) & (2)
Initialed H.1.k Initialed H.1.l.(1) (a-g)
N/A H.1.l.(2).(a)
Initialed H.1.l.(2).(b)
Initialed H.1.l.(2).(c)
Both Initialed H.1.l.(2).(d)
Initialed H.1.l.(2).(e)
Initialed H.1.l.(2).(f)
OOS H.1.l.(3) (a-g)
N/A H.1.l.(4) (a-f)
All steps N/A H.1.m.(1) (a-f)
Initialed H.1.m.(2) (a-h)
N/A H.1.m.(3) (a-g)
N/A H.1.m.(4) (a-i)
N/A H.2 (all steps lined) N/A H.3 (all steps lined) N/A H.4.a N/A checked Comments None H.4.b Signed Joe Barker Date: Today Attachments D & E N/A
: 2. Prepare QCOS 0005-08 Rev 28, page 10 completed with the following information H.1.l(3)
Marked N/A H.1.l(4)(b) and (d)
Not initialed and 4450 VAC written in column to the right of the line H.1.l(4)
All other steps initialed by JB
: 3. This completes the setup for this JPM.  


2012 SRO Admin 3 - Rev 03 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.
Tech Spec 3.8.1 Condition B was entered.
Tech Spec 3.8.1 Condition B was entered.
Line 379: Line 481:
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 9


2012 SRO Admin 3 - Rev 03 JPM Start Time:
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment SAT   UNSAT   Number STEP              ELEMENT                                STANDARD Reviews the completed               Attention to detail used in                 ___  ___      ___
Page 6 of 9 JPM Start Time:
surveillance and identifies          reviewing Tech Spec required the following problems:              surveillances.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Reviews the completed surveillance and identifies the following problems:
Attention to detail used in reviewing Tech Spec required surveillances.
EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.
EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.
CUE: When candidate notices that the Bus 23-1 and 13-1 TIE breaker is marked OOS and inquires as to its actual status; inform the candidate that it was just taken OOS for EMs to repair the breaker.
CUE: When candidate notices that the Bus 23-1 and 13-1 TIE breaker is marked OOS and inquires as to its actual status; inform the candidate that it was just taken OOS for EMs to repair the breaker.  
*H.1.l.   *H.1.l recognized as not             ONE of the sections H.1.l.(1)                ___  ___      ___
*H.1.l.  
satisfied.
*H.1.l recognized as not satisfied.
* through (4) MUST be satisfied.
* H.1.l.(2).f Bus 23-1 and 13-1 TIE GCB is recorded as OOS.
H.1.l.(2).f Bus 23-1 and 13-1 TIE GCB is recorded as OOS.
and H.1.l.(4) marked N/A ONE of the sections H.1.l.(1) through (4) MUST be satisfied.
and H.1.l.(4) marked N/A CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)
CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)
IF the candidate directs the ANSO to re-perform the step, then provide the prepared page 9 of QCOS 0005-08.
IF the candidate directs the ANSO to re-perform the step, then provide the prepared page 9 of QCOS 0005-08.
IF the candidate re-performs H.1.l.(4) line-by-line, then provide the following information:
IF the candidate re-performs H.1.l.(4) line-by-line, then provide the following information:
* H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed?               YES
* H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed? YES
* H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC?                           4450 VAC
* H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC? 4450 VAC
* H.1.l(4)c Busses 24 AND 24-1 TIE GCBs capable of being closed?
* H.1.l(4)c Busses 24 AND 24-1 TIE GCBs capable of being closed?
YES for both
YES for both
* H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC?                         4450 VAC
* H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC? 4450 VAC
* H.1.l(4)e Bus 14-1 AND 24-1 TIE GCB capable of being closed?           YES
* H.1.l(4)e Bus 14-1 AND 24-1 TIE GCB capable of being closed? YES
* H.1.l(4)f Bus 24-1 AND 14-1 TIE GCB capable of being closed?           YES EVALUATOR NOTE: If the candidate declares that QCOS 0005-08 is unsatisfactory as presented, the next step will be Not Applicable.
* H.1.l(4)f Bus 24-1 AND 14-1 TIE GCB capable of being closed? YES EVALUATOR NOTE: If the candidate declares that QCOS 0005-08 is unsatisfactory as presented, the next step will be Not Applicable.  
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 9


2012 SRO Admin 3 - Rev 03 Comment SAT   UNSAT   Number STEP              ELEMENT                                STANDARD
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
*H.1.l(4)   Obtains information required        Procedure acceptance criteria                ___  ___      ___
Page 7 of 9 STEP ELEMENT SAT STANDARD UNSAT Comment Number  
(b) & (d)   to complete section H.1.l.(4)       not met due to voltage on the Unit 2 4160 Busses is too high.
*H.1.l(4)
            *Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high.
(b) & (d)
* EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: The Unit 2 Unit Supervisor will address any corrective actions.
Obtains information required to complete section H.1.l.(4)  
*Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high.
* Procedure acceptance criteria not met due to voltage on the Unit 2 4160 Busses is too high.
EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: The Unit 2 Unit Supervisor will address any corrective actions.
Continue your review.
Continue your review.
CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.
CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.  
*H.1.l     *Identify the applicable Tech       Identifies the following:                    ___  ___      ___
*H.1.l  
Spec CONDITION T.S. 3.8.1 Cond A for one T.S. 3.8.1 Cond A for one           Offsite Line Inop; 7 Day LCO Offsite Line Inop T.S. 3.8.1 Cond D for one T.S. 3.8.1 Cond D for one           Offsite Line and one DG Inop; Offsite Line and one DG            12 hour LCO Inop
*Identify the applicable Tech Spec CONDITION T.S. 3.8.1 Cond A for one Offsite Line Inop T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop
* H.4         Identify that Step H.4 (for a       Step H.4 revised to reflect that            ___  ___      ___
* Identifies the following:
Satisfactory Surveillance) is       surveillance was NOT incorrectly filled out and         Satisfactory should NOT be marked N/A.
T.S. 3.8.1 Cond A for one Offsite Line Inop; 7 Day LCO T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop; 12 hour LCO H.4 Identify that Step H.4 (for a Satisfactory Surveillance) is incorrectly filled out and should NOT be marked N/A.
EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23-1 AND 13-1 TIE GCB is Out-Of Service and the Voltages on Busses 24 and 24-1 are too high.
Step H.4 revised to reflect that surveillance was NOT Satisfactory EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23-1 AND 13-1 TIE GCB is Out-Of Service and the Voltages on Busses 24 and 24-1 are too high.
H.5         Identify that Step H.5 should       Step H.5 filled out as UNSAT.             ___  ___      ___
H.5 Identify that Step H.5 should be filled out as UNSAT.
be filled out as UNSAT.
Step H.5 filled out as UNSAT.
CUE: Inform the candidate that the JPM is complete JPM Stop Time:
CUE: Inform the candidate that the JPM is complete JPM Stop Time:  
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
 
Page 7 of 9
2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 9 Operators Name:
Job
 
==Title:==
EO RO SRO FS STA/IA SRO Cert JPM
 
==Title:==
Review Electrical Distribution Surveillance JPM Number:
2012 SRO Admin 3 Revision Number:
Task Number and


2012 SRO Admin 3 - Rev 03 Operators Name:                                          Job Title:         EO        RO    SRO      FS STA/IA          SRO Cert JPM Title:    Review Electrical Distribution Surveillance JPM Number:        2012 SRO Admin 3                                      Revision Number: 03 Task Number and Title:
==Title:==
SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.
03 SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.
K/A Number and Importance:         K/A: 2.2.40               Rating:           SRO 4.7 Ability to apply Technical Specifications for a system.
K/A Number and Importance:
Suggested Testing Environment: Simulator or Classroom Alternate Path:     Yes     No SRO Only:             Yes         No       Time Critical:     Yes     No Reference(s): QCOS 0005-08, Rev. 28 Actual Testing Environment:         Simulator           Control Room               In-Plant     Other Testing Method:         Simulate         Perform Estimated Time to Complete: 20 minutes                   Actual Time Used:                 minutes EVALUATION  
K/A: 2.2.40 Rating:
SRO 4.7 Ability to apply Technical Specifications for a system.
Suggested Testing Environment: Simulator or Classroom Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): QCOS 0005-08, Rev. 28 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used:
minutes EVALUATION  


==SUMMARY==
==SUMMARY==
:
Were all the Critical Elements performed satisfactorily?
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Name:                                                             (Print)
Satisfactory Unsatisfactory Comments:
Evaluators Signature:                                                     Date:
Evaluators Name:
SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
(Print)
Page 8 of 9
Evaluators Signature:
Date:  


INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.
Line 440: Line 561:
Tech Spec 3.8.1 Condition B was entered.
Tech Spec 3.8.1 Condition B was entered.
The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.
The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.
INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.
INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.  


Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number: 01 Date: 03/04/2012 Developed By:
SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor                             Date Validated By:
Page 1 of 8 Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number:
SME or Instructor                           Date Reviewed By:
01 Date:
Operations Representative                         Date Approved By:
03/04/2012 Developed By:
Training Department                         Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor Date Validated By:
Page 1 of 8
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date  


2012 SRO Admin 2 - Rev 01 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
2012 SRO Admin 2 - Rev 01 SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________    1. Task description and number, JPM description and number are identified.
: 1.
________    2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________    3. Performance location specified. (in-plant, control room, simulator, or other)
: 2.
________    4. Initial setup conditions are identified.
Knowledge and Abilities (K/A) references are included.
________    5. Initiating cue (and terminating cue if required) are properly identified.
: 3.
________    6. Task standards identified and verified by SME review.
Performance location specified. (in-plant, control room, simulator, or other)
________    7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 4.
________    8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure                         Rev:
: 5.
Procedure                         Rev:
Initiating cue (and terminating cue if required) are properly identified.
Procedure                         Rev:
: 6.
________    9. Verify cues both verbal and visual are free of conflict.
Task standards identified and verified by SME review.
________    10. Verify performance time is accurate
: 7.
________    11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________    12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 8.
SME / Instructor                                     Date SME / Instructor                                     Date SME / Instructor                                     Date SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Verify the procedure(s) referenced by this JPM reflects the current revision:
Page 2 of 8
Procedure Rev:
Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date  


2012 SRO Admin 2 - Rev 01 Revision Record (Summary)
2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 00,       This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES-301 and Appendix C. It was modeled after a JPM from the 2006 ILT Exam at Dresden.
Page 3 of 8 Revision Record (Summary)
Revision 01,       JPM updated for 2012 ILT NRC Exam.
Revision 00, This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES-301 and Appendix C. It was modeled after a JPM from the 2006 ILT Exam at Dresden.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 01, JPM updated for 2012 ILT NRC Exam.  
Page 3 of 8


2012 SRO Admin 2 - Rev 01 SETUP INSTRUCTIONS
2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8 SETUP INSTRUCTIONS
: 1. This JPM may be administered in any setting with the necessary procedures available.
: 1. This JPM may be administered in any setting with the necessary procedures available.
: 2. Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
: 2. Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
: 3. In the Hours on Shift table:
: 3. In the Hours on Shift table:
* Enter 4 shifts of 8 hours as a Unit Supervisor.
* Enter 4 shifts of 8 hours as a Unit Supervisor.
* Enter 1 shift of 8 hours as the WEC supervisor.
* Enter 1 shift of 8 hours as the WEC supervisor.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 8


2012 SRO Admin 2 - Rev 01 INITIAL CONDITIONS You are the Shift Manager.
2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8 INITIAL CONDITIONS You are the Shift Manager.
An SRO is in the process of license reactivation.
An SRO is in the process of license reactivation.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
Line 497: Line 629:
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 8


2012 SRO Admin 2 - Rev 01 JPM Start Time:
2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                 ELEMENT                               STANDARD                   SAT      UNSAT Number Review OP-AA-105-                     Reviews OP-AA-105-102,                 ___      ___      ___
Page 6 of 8 JPM Start Time:
102, Attachment 2.                    Attachment 2.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Review OP-AA-105-102, Attachment 2.
        *Check that Hours on                   Notes that 8 hours listed in the       ___      ___      ___
Reviews OP-AA-105-102,.  
Shift are applicable for              Hours on Shift are for WEC license reactivation                  Supervisor which does not AND                                    count toward the required 40 that licensee has the required        hours AND determines that 40 hours.*                            licensee has ONLY 32 hours toward the required 40 hours.
*Check that Hours on Shift are applicable for license reactivation AND that licensee has the required 40 hours.*
        *Check that the required Plant         Notes that the Date and Active         ___      ___      ___
Notes that 8 hours listed in the Hours on Shift are for WEC Supervisor which does not count toward the required 40 hours AND determines that licensee has ONLY 32 hours toward the required 40 hours.  
Tour has been completed.*              License Signature for the required Plant Tour are missing on the Shift Position Log.
*Check that the required Plant Tour has been completed.*
Returns OP-AA-105-102                 OP-AA-105-102 Attachment 2             ___      ___      ___
Notes that the Date and Active License Signature for the required Plant Tour are missing on the Shift Position Log.
Attachment 2 without signing.          returned without signing Licensees license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.
Returns OP-AA-105-102 without signing.
OP-AA-105-102 Attachment 2 returned without signing Licensees license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.
NOTE: The JPM is complete.
NOTE: The JPM is complete.
JPM Stop Time:
JPM Stop Time:  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 8


2012 SRO Admin 2 - Rev 01 JPM  
2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 8 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Job
==Title:==
EO RO SRO FS STA/IA SRO Cert JPM
==Title:==
Reactivation of SRO License JPM Number:
2012 SRO Admin 2 Revision Number:
Task Number and


Operators Name:                                            Job Title:         EO        RO    SRO      FS STA/IA          SRO Cert JPM Title:      Reactivation of SRO License JPM Number:        2012 SRO Admin 2                                      Revision Number: 01 Task Number and Title:
==Title:==
SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102.
01 SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102.
K/A Number and Importance:           K/A: 2.1.4               Rating:           SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment: Classroom Alternate Path:     Yes     No               SRO Only:         Yes             No Time Critical:       Yes     No Reference(s):         OP-AA-105-102, Rev. 09, NRC Active License Maintenance Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 10 minutes                    Actual Time Used:                  minutes EVALUATION  
K/A Number and Importance:
K/A: 2.1.4 Rating:
SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment: Classroom Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s):
OP-AA-105-102, Rev. 09, NRC Active License Maintenance Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 10 EVALUATION  


==SUMMARY==
==SUMMARY==
:
minutes Actual Time Used:
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory     Unsatisfactory Comments:
minutes Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
Evaluators Signature:                                                       Date:
Satisfactory Unsatisfactory Comments:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Evaluators Name:
Page 7 of 8
(Print)
Evaluators Signature:
Date:  


SRRS: 3D.105 (when utilized for operator initial or continuing training)
INITIAL CONDITIONS You are the Shift Manager.
INITIAL CONDITIONS You are the Shift Manager.
An SRO is in the process of license reactivation.
An SRO is in the process of license reactivation.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.
INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.
INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.
Approve if acceptable or, if not, identify any discrepancies.
Approve if acceptable or, if not, identify any discrepancies.  
SRRS: 3D.105 (when utilized for operator initial or continuing training)


Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number: 02 Date: 03/04/2012 Developed By:
SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor                             Date Validated By:
Page 1 of 10 Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number:
SME or Instructor                           Date Reviewed By:
02 Date:
Operations Representative                       Date Approved By:
03/04/2012 Developed By:
Training Department                           Date SRO Admin 1.doc      SRRS: 3D.105 (when utilized for operator initial or continuing training)
Instructor Date Validated By:
Page 1 of 10
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date  


2012 SRO Admin 1 - Rev 02 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:
All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
Prior to JPM usage, revalidate JPM using steps 8 through 12 below.
________      1. Task description and number, JPM description and number are identified.
: 1.
________      2. Knowledge and Abilities (K/A) references are included.
Task description and number, JPM description and number are identified.
________      3. Performance location specified. (in-plant, control room, simulator, or other)
: 2.
________      4. Initial setup conditions are identified.
Knowledge and Abilities (K/A) references are included.
________      5. Initiating cue (and terminating cue if required) are properly identified.
: 3.
________      6. Task standards identified and verified by SME review.
Performance location specified. (in-plant, control room, simulator, or other)
________      7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
: 4.
________      8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Initial setup conditions are identified.
Procedure                         Rev:
: 5.
Procedure                         Rev:
Initiating cue (and terminating cue if required) are properly identified.
Procedure                         Rev:
: 6.
________      9. Verify cues both verbal and visual are free of conflict.
Task standards identified and verified by SME review.
________      10. Verify performance time is accurate
: 7.
________      11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
________      12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
: 8.
SME / Instructor                                     Date SME / Instructor                                     Date SME / Instructor                                     Date G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Verify the procedure(s) referenced by this JPM reflects the current revision:
Page 2 of 10
Procedure Rev:
Procedure Rev:
Procedure Rev:
: 9.
Verify cues both verbal and visual are free of conflict.
: 10. Verify performance time is accurate
: 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
: 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date  


2012 SRO Admin 1 - Rev 02 Revision Record (Summary)
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 01,     This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.
Page 3 of 10 Revision Record (Summary)
Revision 02,     This JPM updated for 2012 ILT NRC Exam.
Revision 01, This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Revision 02, This JPM updated for 2012 ILT NRC Exam.  
Page 3 of 10


2012 SRO Admin 1 - Rev 02 SIMULATOR SETUP INSTRUCTIONS
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
: 1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
* OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
* OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
* QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
* QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
: 2. Verify the following for this JPM setup:
: 2. Verify the following for this JPM setup:
* A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows:
* A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows
: 1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
: 1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
: 2) Fill out Section I INITIATOR of the Fire Protection Permit as follows:
: 2) Fill out Section I INITIATOR of the Fire Protection Permit as follows:
Initiator: IMD Supervisor                   Station: Quad             Unit: 01 Name: K. Arney                               Phone: X 2667             Dept/Co: IMD/Exelon Sch. Start Date: current                     Bldg: TB                 EPN#: 1-4141-109 Sch. End Date: current + 1                   Elev: 611                 Door #: N/A AR/WR/OOS#: 1081 11-01                       Row/Col: E/14             Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.
Initiator: IMD Supervisor Station: Quad Unit: 01 Name: K. Arney Phone: X 2667 Dept/Co: IMD/Exelon Sch. Start Date: current Bldg: TB EPN#: 1-4141-109 Sch. End Date: current + 1 Elev: 611 Door #: N/A AR/WR/OOS#: 1081 11-01 Row/Col: E/14 Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.
Impairment
Impairment


Line 585: Line 747:
Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.
Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.
: 3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
: 3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
: a. Fire Zone(s): 8.2.7.c   / For Barriers: Check the Functional box.
: a.
: b. Technical Requirement Manual? Check the Yes box and write in QCAP 1500-01
Fire Zone(s): 8.2.7.c / For Barriers: Check the Functional box.
: c. Mark None in the Fire Watch Required: block and N/A below.
: b.
: d. For Additional Compensatory Measures: Check the NO box and N/A the Required? line.
Technical Requirement Manual? Check the Yes box and write in QCAP 1500-01
: e. Fire Detector Operability Check Required? Check the Yes box.
: c.
: f. NEIL Notification Required? Check the NO box.
Mark None in the Fire Watch Required: block and N/A below.
: g. Fire Marshal Instructions: Return to operable status in 14 days
: d.
: h. Restoration/Testing Requirements: Completion of Work Package.
For Additional Compensatory Measures: Check the NO box and N/A the Required? line.
: i. Sign and date as Fire Marshal for Authorization Block.
: e.
: 3. This completes the setup for this JPM.
Fire Detector Operability Check Required? Check the Yes box.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
: f.
Page 4 of 10
NEIL Notification Required? Check the NO box.
: g.
Fire Marshal Instructions: Return to operable status in 14 days
: h.
Restoration/Testing Requirements: Completion of Work Package.
: i.
Sign and date as Fire Marshal for Authorization Block.
: 3. This completes the setup for this JPM.  


2012 SRO Admin 1 - Rev 02 INITIAL CONDITIONS
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
-        You are the Work Execution Center Senior Reactor Operator.
Page 5 of 10 INITIAL CONDITIONS You are the Work Execution Center Senior Reactor Operator.
-        An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
EVALUATOR: Provide candidate with a copy of fire permit 1121, OP-MW-201-007, .
EVALUATOR: Provide candidate with a copy of fire permit 1121, OP-MW-201-007,.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
Information For Evaluators Use:
Line 611: Line 780:
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
The timeclock starts when the candidate acknowledges the initiating cue.  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 5 of 10


2012 SRO Admin 1 - Rev 02 JPM Start Time:
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Comment STEP                   ELEMENT                             STANDARD                   SAT      UNSAT Number Obtains Procedures.               Obtains a copy of OP-MW-201-           ___      ___      ___
Page 6 of 10 JPM Start Time:
007, QCAP 1500-01, QCOA 4100-11 as necessary.
STEP ELEMENT SAT STANDARD UNSAT Comment Number Obtains Procedures.
Obtains a copy of OP-MW-201-007, QCAP 1500-01, QCOA 4100-11 as necessary.
EVALUATOR: The candidate may perform the following steps in any order.
EVALUATOR: The candidate may perform the following steps in any order.
Reviews Fire Permit.               Reviews Fire Permit to                 ___      ___      ___
Reviews Fire Permit.
determine what is being impaired. Determines that one detector will be disconnected.
Reviews Fire Permit to determine what is being impaired. Determines that one detector will be disconnected.
QCAP         Determines effect of               Reviews QCAP 1500-01 Att. A           ___      ___      ___
QCAP 1500-01 Att. A page 3 Determines effect of disconnecting detectors.
1500-01      disconnecting detectors.          page 3 and determines that one Att. A                                        detector, if removed, will make page 3                                          the detection system inoperable (all 6 are required).
Reviews QCAP 1500-01 Att. A page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).
EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.
EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.
The following errors are built into the permit:
The following errors are built into the permit:
Line 628: Line 796:
* None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
* None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
* NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)
* NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).
The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 6 of 10


2012 SRO Admin 1 - Rev 02 Comment STEP                   ELEMENT                             STANDARD                   SAT      UNSAT Number QCAP         Determines consequence of         Reviews QCAP 1500-01 Att. C           ___      ___      ___
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
1500-01      making the detection system        page 2 (or determines info from Att. C      inoperable.                        QCAP 1500-01 Att. A page 3) page 2                                          and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).
Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCAP 1500-01 Att. C page 2 Determines consequence of making the detection system inoperable.
QCAP        *Determines hourly fire            Reviews QCAP 1500-01 step              ___      ___      ___
Reviews QCAP 1500-01 Att. C page 2 (or determines info from QCAP 1500-01 Att. A page 3) and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).
1500-01      watch established within one      D.1.c.(2) and D.2.c.(2) and
QCAP 1500-01  
*D.1.c.(2)   hour.*                            determines an hourly fire watch
*D.1.c.(2)  
*D.2.c.(2)                                       must be conducted if this permit is approved.
*D.2.c.(2)  
QCAP       *Determines backup                Reviews step D.2.c.(4) and            ___      ___      ___
*Determines hourly fire watch established within one hour.*
1500-01      suppression required within       determines backup suppression
Reviews QCAP 1500-01 step D.1.c.(2) and D.2.c.(2) and determines an hourly fire watch must be conducted if this permit is approved.
*D.2.c.(4)   one hour.*                        will also be required.
QCAP 1500-01
*D.2.c.(4)  
*Determines backup suppression required within one hour.*
Reviews step D.2.c.(4) and determines backup suppression will also be required.
(page 65 of 93)
(page 65 of 93)
OP-MW-       Determines that the Fire           Recognizes the N/A is not            ___      ___      ___
OP-MW-201-007 Attach. 1 Determines that the Fire Watch Performed By field must be filled in IMD or other appropriate department.
201-007      Watch Performed By field           correct for this field.
Recognizes the N/A is not correct for this field.
Attach. 1    must be filled in IMD or other appropriate department.
NOTE: The candidate may choose to correct the provided impairment. This is acceptable.  
NOTE: The candidate may choose to correct the provided impairment. This is acceptable.
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 7 of 10


2012 SRO Admin 1 - Rev 02 Comment STEP                   ELEMENT                             STANDARD                   SAT      UNSAT Number Reviews the permit for             The candidate reviews the              ___      ___      ___
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
accuracy and Notifies the         permit for accuracy in Evaluator of his conclusions.     accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW
Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number Reviews the permit for accuracy and Notifies the Evaluator of his conclusions.
The candidate reviews the permit for accuracy in accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW
* None is marked in the Fire Watch Required:
* None is marked in the Fire Watch Required:
block (should be marked hourly with performed by marked as IMD).
block (should be marked hourly with performed by marked as IMD).
Line 656: Line 823:
EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.
EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.
NOTE: The JPM is complete.
NOTE: The JPM is complete.
JPM Stop Time:
JPM Stop Time:  
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 8 of 10


2012 SRO Admin 1 - Rev 02 JPM  
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 9 of 10 JPM  


==SUMMARY==
==SUMMARY==
Operators Name:
Job


Operators Name:                                            Job Title:         EO         RO     SRO       FS STA/IA           SRO Cert JPM Title:         Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:         2012 SRO Admin 1                                     Revision Number: 02 Task Number and Title:
==Title:==
4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:           K/A: 2.1.25               Rating:           SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.
EO RO SRO FS STA/IA SRO Cert JPM
Suggested Testing Environment: Simulator Alternate Path:       Yes     No     SRO Only:       Yes         No       Time Critical:     Yes     No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:           Simulator           Control Room               In-Plant     Other Testing Method:           Simulate       Perform Estimated Time to Complete: 12.5 minutes                  Actual Time Used:                  minutes EVALUATION  
 
==Title:==
Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:
2012 SRO Admin 1 Revision Number:
Task Number and
 
==Title:==
02 4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:
K/A:
2.1.25 Rating:
SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.
Suggested Testing Environment: Simulator Alternate Path:
Yes No SRO Only:
Yes No Time Critical:
Yes No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:
Simulator Control Room In-Plant Other Testing Method:
Simulate Perform Estimated Time to Complete: 12.5 EVALUATION  


==SUMMARY==
==SUMMARY==
:
minutes Actual Time Used:
The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.
minutes The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.
Were all the Critical Elements performed satisfactorily?                     Yes               No The operators performance was evaluated against standards contained within this JPM and has been determined to be:                     Satisfactory       Unsatisfactory Comments:
Were all the Critical Elements performed satisfactorily?
Evaluators Name:                                                             (Print)
Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Satisfactory Unsatisfactory Comments:
Page 9 of 10
Evaluators Name:
(Print)  


2012 SRO Admin 1 - Rev 02 Evaluators Signature:                                                      Date:
2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
G:\DRSIII\License Examinations\2012\Quad Cities\Proposed\SRO ADMIN JPMs\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 10 Evaluators Signature:
Page 10 of 10
Date:


INITIAL CONDITIONS
SRRS: 3D.105 (when utilized for operator initial or continuing training)
-    You are the Work Execution Center Senior Reactor Operator.
INITIAL CONDITIONS You are the Work Execution Center Senior Reactor Operator.
-    An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.
INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.}}
SRRS: 3D.105 (when utilized for operator initial or continuing training)}}

Latest revision as of 03:16, 12 January 2025

2012 Quad Cities Nuclear Power Station Initial License Examination SRO Admin JPMs
ML12083A183
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 05/04/2012
From:
Exelon Nuclear
To:
NRC/RGN-III
Shared Package
ML11354A187 List:
References
Download: ML12083A183 (49)


Text

SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 11 Exelon Nuclear Job Performance Measure Classify Event and Determine Protective Action Recommendations (PARS)

JPM Number: 2012 SRO Admin 5 Revision Number:

03 Date:

03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 11 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 11 Revision Record (Summary)

Revision 00, This JPM is being developed for SRO testing during the Annual License Operator Requal cycle.

Revision 01, JPM revised to update format and procedure revisions.

Revision 02, JPM revised to update NARS Form information and references. The Initiating Cue was revised to more closely model a current JPM.

Revision 03, This revision updates the revision used in the 2011 ILT Cert Exam for use on the 2012 ILT NRC Exam.

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 11 SIMULATOR SETUP INSTRUCTIONS If JPM is NOT administered in the Simulator, then provide the following:

  • Full-sized Hot EAL Boards
  • All Emergency Plan procedures as found in the simulator Provide examinee with Utility Message #1 Utility Message 1 State Message N/A NARS form completed as follows:

Block #1. Status = Drill/Exercise Block #2. Station = Quad Cities Block #3. Onsite Condition = Site Area Emergency Block #4. Accident Classified:

Time = T0 -60 minutes Date = today EAL# = FS1 Block #4. Accident Terminated: Time:=N/A, Date:=N/A Block #5. Release Status

= None Block #6. Type of Release

= N/A Block #7. Wind Direction

= 232 degrees Block #8. Wind Speed:

Meters/Sec = 2.46 Miles/Hr = 5.51 Block #9. Recommended Actions = None Block #10. Additional Information = None Verified with [provide signature]

Approved by [provide SM signature]

Block #11 Transmitted By [provide name] Phone Number [309-227-2210]

Time/Date T0 -50 minutes/Today Block #12 Received By [provide name] Organization =

IEMA, Time/Date: T0 -50 minutes/Today Initial and Final blocks checked for Quad Cities NARS Code 43 Initial Roll Call complete block on back Time/Date T0 -48 minutes/Today

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 11 INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.

The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.

50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)

All Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.

plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.

T0 is the current time. T0 is _______

The CURRENT plant conditions are as follows:

o Drywell pressure is 3 psig and rising.

o RPV pressure is 700 psig and lowering at approximately 10 psig/min.

o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.

o There has been NO Change in release status, or meteorological data since message #1 was sent.

THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:

IF a change is NOT required, THEN explain what plant changes would require a change.

(Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.

Provide examinee with:

Utility Message #1 Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

form completely filled out as a Site Area Emergency

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 11 Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 11 JPM Start Time:

STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR: The following step (Classification) must be completed within 15 minutes from the JPM start time.

  • Declares a General Emergency.*

Recognizes that the conditions for FG1 are met due to Drywell radiation and Drywell pressure.

(Loss of RCS, Fuel Clad, and Potential Loss of Containment)

EVALUATOR: Record the actual time that candidate makes classification _________

This completes the FIRST of two time-critical requirements (classification < 15 minutes) and starts the SECOND (notifications < 14 minutes)

EVALUATOR: The following step (NARs completion) must be completed within 14 minutes from the time of Classification.

NARS form Fills out Utility Message Number.

Records Utility Message #2.

NARS form Fills out State Message Number.

Records N/A for State Message Number.

Block #1 Fills out block #1 information regarding Status.

Records [B] Drill/Exercise in block #1.

  • Block #2 *Fills out block #2 information regarding Station.*

Records [F] Quad Cities in block #2.

  • Block #3 *Fills out block #3 information regarding onsite condition.*

Records [D] General Emergency.

  • Block #4 *Fills out block #4 information regarding Accident Classified

& Accident Terminated.*

Records Accident Classification as Time= Classification time Date= todays date EAL=FG1 Records N/A for Accident Terminated in Time and Date space.

Block #5 Fills out block #5 information regarding Release Status.

Records [A] None.

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number Block #6 Fills out block #6 information regarding Type of Release.

Records [A] N/A.

EVALUATOR: Candidate may take information from initial conditions, which state meteorological conditions have not changed OR they may look up the data on the station computer.

IF the candidate chooses to look up computer data, THEN AFTER locate the proper data in PPDS, give them the following cue: Wind Direction is 232 degrees with speed of 2.46 meters per second/5.51 miles per hour.

  • Block #7 *Fills out block #7 information regarding Wind Direction.*

Records 232 degrees.

  • Block #8 *Fills out block #8 information regarding Wind Speed.*

Records [A] Meters/Sec = 2.46 and [B] Miles/Hr = 5.51.

EVALUATOR: IF the candidate asks if Containment Venting is in progress, THEN reply:

NO.

Refers to EP-AA-111-F-06, Quad Cities Plant Based PAR Flow Chart, to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.

Obtains and uses EP-AA-111-F-06, to determine loss of fuel clad barrier, loss of RCS barrier, and a potential loss of containment exists.

EVALUATOR: The candidate should utilize EP-AA-1006 to determine the loss of fuel clad and RCS, and potential loss of containment.

  • Block #9 Fills out block #9 information regarding Recommended Actions.

Utilizes EP-AA-111 F-06 Quad Cities Plant Based PAR Flowchart and determines PARS of Evacuate 2 Mile Radius & 5 Miles Downwind

[D] Illinois sub-areas 1,2

[E] Iowa sub-areas 1,2,5 Block #10 Fills out block #10 information regarding Additional Information.

Records NONE.

NARS form Submits NARS form for verification.

Submits NARS form for verification.

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 11 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE:

When candidate submits the NARS form for verification, sign the form on the Verified With line, state that the verification is complete, and return the form to the candidate.

NARS form Signs on the Approved By line and submits NARS form for transmittal.

Submits NARS form for transmittal CUE:

When candidate submits the NARS form for transmittal, inform the candidate that you will direct the other Unit Supervisor to transmit the NARS form.

Inform the candidate that the JPM is complete EVALUATOR: The candidate must have submitted form filled out for transmittal no later than 14 minutes after classification of the event.

JPM Stop Time:

2012 SRO Admin 5 - Rev 03 SRO Admin 5.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 11 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Classify Event and Determine Protective Action Recommendations (PARS)

JPM Number:

2012 SRO Admin 5 Revision Number:

Task Number and

Title:

03 S-EP-P01 (Freq: LIC=A) (ILT-MP) Given an event, classify the event and activate the Emergency Response organization in accordance with EP-AA-111 and EP-AA-112.

S-EP-P02 (Freq: LIC=A) (ILT-MP) Given an event, determine the public Protective Action Recommendation in accordance with EP-AA-111.

K/A Number and Importance:

K/A:

2.4.44 Rating:

4.4 Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): EP-AA-111-F-06 Rev D, QUAD CITIES PLANT BASED PAR FLOWCHART EP-AA-112-100-F-01 Rev. N, SHIFT EMERGENCY DIRECTOR CHECKLIST EP-AA-1006, Rev. 31, RADIOLOGICAL EMERGENCY PLAN ANNEX FOR QUAD CITIES STATION EP-MW-114-100 Rev. 11, MIDWEST REGION OFFSITE NOTIFICATIONS EP-MW-114-100-F-01, Rev. F, NUCLEAR ACCIDENT REPORTING SYSTEM (NARS) FORM Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 15 minutes to classify Actual Time Used:

minutes 14 EVALUATION

SUMMARY

minutes to notify Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS Unit 1 was operating at 100% rated power when a transient occurred that caused an automatic scram.

The Emergency Plan was activated and a Site Area Emergency (FS1) was classified 60 minutes ago due to high Drywell radiation of 2500 R/hr.

50 minutes ago Transmission of NARS (Utility Message #1) was completed (see attached)

All plant personnel have been notified of the classification level, reason for the classification, and the TSC and OSC have been activated.

Another SRO has performed Emergency Response Organization (ERO), Emergency Notification System (ENS), and Emergency Response Data System (ERDS) activations and the (NARS) notification.

T0 is the current time. T0 is _______

The CURRENT plant conditions are as follows:

o Drywell pressure is 3 psig and rising.

o RPV pressure is 700 psig and lowering at approximately 10 psig/min.

o The Low Flow Feed Reg valve is opening to maintain RPV water level at 30 inches.

o There has been NO Change in release status, or meteorological data since message #1 was sent.

THIS IS AN EXERCISE THIS JPM IS TIME CRITICAL INITIATING CUE As the Shift Emergency Director, determine if a change in Emergency Classification is required AND:

IF a change is NOT required, THEN explain what plant changes would require a change. (Consider ONLY the fission product barrier series EALs) OR IF a change in classification IS required, THEN prepare the necessary form(s) that would allow another SRO to complete the required State and Local notifications.

SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10 Exelon Nuclear Job Performance Measure Determine ODCM Compensatory Measures JPM Number:

2012 SRO Admin 4 Revision Number:

00 Date:

03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10 Revision Record (Summary)

Revision 00, This JPM was developed new for the 2012 ILT NRC Exam.

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. Simulator setup is not applicable.
2. Evaluator, be prepared to fill in a time for 10 minutes ago on the candidates copy of the Initial Conditions.
3. Be prepared to provide a blank Service Water Rad Monitor Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.

The following annunciators were received 10 minutes ago, at:_______

  • 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
  • 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
  • The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
  • The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.

The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.

INITIATING CUE For this situation:

  • Identify the Required Actions.
  • Complete the necessary paperwork.
  • Complete the necessary notifications.

(Be prepared to provide a blank Outage Report, QCOS 1700- 04, AFTER the candidate has obtained a copy for himself/herself.)

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM. Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10 JPM Start Time:

STEP ELEMENT SAT STANDARD UNSAT Comment Number EVALUATOR NOTE: The necessary compensatory actions are found in either the Offsite Dose Calculation Manual (ODCM) Section 12.2.1, or in the Outage Report for the Service Water Radiation Monitor, QCOS 1700-04.

  • Recognize that the Initial Conditions render the Service Water Rad Monitor inoperable*

Service Water Rad Monitor declared inoperable

  • ODCM Condition C

Action C.1 or QCOS Step G.1.a

  • Identify the correct REQUIRED ACTION and COMPLETION TIME per C.1:

Collect and analyze grab samples for beta or gamma activity at an LLD 1E-07

µCi/ml Once per 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />s*

Collect and analyze grab samples for beta or gamma activity at an LLD 1E-07

µCi/ml once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> identified.

  • ODCM Condition C

Action C.2 or QCOS Step G.1.b

  • Identify the correct REQUIRED ACTION and COMPLETION TIME per C.2:

Restore the Service Water Rad Monitor to OPERABLE status within 30 days*

Restore the Service Water Rad Monitor to OPERABLE status within 30 days identified.

CUE When the need to submit an IR is addressed, inform the candidate that ANSO has submitted one. Provide the following IR Number:

QCOS 1700-04 Step H.1.a IR 3456789 Record the following information on Attachment A:

Unit: 1 Date:

Time:

IR #: 3456789 Unit: 1, Date and Time and IR # 3456789 recorded on QCOS 1700-04 Attachment A

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCOS 1700-04 Step H.1.b Record the following information on Attachment A:

Instrument: 2251-887 or Service Water Radiation Monitor Date and Time declared Inop:

Instrument and the Date and Time it was declared inoperable recorded on QCOS 1700-04 Attachment A.

QCOS 1700-04 Step H.1.c Record the following information on Attachment A:

Reason for inoperability:

(Loss of power or equivalent)

Reason for inoperability recorded on QCOS 1700-04 Attachment A.

QCOS 1700-04 Step H.1.d Record the following information on Attachment A:

Date and time 30 days from the time that instrument was declared inoperable.

Date and time 30 days from the time that instrument was declared inoperable recorded on QCOS 1700-04 Attachment A.

EVALUATOR ROLE PLAY: As Chemistry Tech as necessary to acknowledge the directive in the next step.

Provide the following technician name: Lee Williams

  • QCOS 1700-04 Step H.2
  • Notify Chemistry to perform LCO requirements per CY-QC-130-650, and record on attachment A.
  • Chemistry notified to perform LCO requirements per CY-QC-130-650.

Date and time of notification and Person notified recorded on QCOS 1700-04 Attachment A.

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number CUE ROLE PLAY SHIFT MANAGER as necessary to accept Attachment A for review.

QCOS 1700-04 Step H.3 Review Outage Report actions for accuracy.

Unit Supervisor signature signed off on QCOS 1700-04 Attachment A, Step H.3 and submitted to Shift Manager for review.

CUE If not already addressed, ask the candidate the following question:

What actions, if any, would be necessary if the Service Water Rad Monitor is not returned to service within 30 days?

ODCM Condition G

or QCOS 1700-04 Step F.2 Identify the correct REQUIRED ACTION for CONDITION G:

Explain why the inoperability was not corrected in a timely manner in the next Radioactive Effluent Release Report.

Condition G reporting requirement identified.

CUE Inform the candidate that the JPM is complete.

JPM Stop Time:

2012 SRO Admin 4 - Rev 00 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 4.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Determine ODCM Compensatory Measures JPM Number: 2012 SRO Admin 4 Revision Number:

00 Task Number and

Title:

S-1701-K41 Given Process Radiation Monitoring System operability status OR key parameter indications, various plant conditions and a copy of the Offsite Dose Calculation Manual (ODCM), DETERMINE if ODCM operability requirements are met and required actions, if any.

K/A Number and Importance:

K/A: 2.3.15 Rating: SRO 3.1 Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, personnel monitoring equipment, etc.

Suggested Testing Environment:

Simulator/Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

CY-QC-170-301, Rev 10,Offsite Dose Control Manual (ODCM) Section 12.2.1 QCOS 1700-04 Rev. 13, Service Water Effluent Gross Activity Radiation Monitor Outage Report CY-QC-130-650, Rev. 11, Inoperable Chemistry Instruments LCO Requirements QCAN 901-3 H-1, Rev. 9, LIQUID PROCESS RAD MONITOR FAILURE Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 15 EVALUATION

SUMMARY

minutes Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

2012 SRO Admin 4 - Rev 00 INITIAL CONDITIONS You are the Unit 1 Unit Supervisor today.

The following annunciators were received 10 minutes ago, at:_______

  • 901-3 G-1, LIQUID PROCESS RAD MON HI RADIATION
  • 901-3 H-1, LIQUID PROCESS RAD MON FAILURE The ANSO has since reported the following:
  • The Service Water Rad Monitor indicates downscale on recorder 1-1705-12, Process Liquid Monitor, on Panel 901-2.
  • The FAIL light is lit on the SPING Terminal on Panel 912-4 associated with SPING Channel 11-01.

The EO has just reported that breaker MCC 17-1-1 Ckt 25 is tripped and will not reset.

INITIATING CUE For this situation:

  • Identify the Required Actions.
  • Complete the necessary paperwork.
  • Complete the necessary notifications.

SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 9 Exelon Nuclear Job Performance Measure Review Electrical Distribution Surveillance JPM Number:

2012 SRO Admin 3 Revision Number:

03 Date:

03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 9 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 and 12 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9. Verify cues both verbal and visual are free of conflict.
10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 9 Revision Record (Summary)

Revision 02, This version was used on the NRC Exam for ILT Class 07-01.

Revision 03.

This version updated the existing (5 year old) JPM for the 2012 ILT NRC Exam

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 9 SIMULATOR SETUP INSTRUCTIONS This is an Administrative JPM and can be performed in any location where the candidate is expected to have access to the necessary procedures. It may be, but does not need to be complete in the Simulator.

1. Manual Setup: Prepare QCOS 0005-08 Rev 28 completed with the following information D.1.a Partial for Step H1 only D.1.b Signed, date Today Time: 30 min ago D.2 1

H.1.a.

3 H.1.a.(1) & (2)

Initialed H.1.a.(3)

N/A H.1.b.

Initialed H.1.c.(1)

N/A H.1.c.(2)

Initialed H.1.d Initialed H.1.e.(1) & (2)

Initialed H.1.f Initialed H.1.g Initialed H.1.h.(1)

Initialed H.1.h.(2)

N/A H.1.i.

Initialed H.1.j.(1) & (2)

Initialed H.1.k Initialed H.1.l.(1) (a-g)

N/A H.1.l.(2).(a)

Initialed H.1.l.(2).(b)

Initialed H.1.l.(2).(c)

Both Initialed H.1.l.(2).(d)

Initialed H.1.l.(2).(e)

Initialed H.1.l.(2).(f)

OOS H.1.l.(3) (a-g)

N/A H.1.l.(4) (a-f)

All steps N/A H.1.m.(1) (a-f)

Initialed H.1.m.(2) (a-h)

N/A H.1.m.(3) (a-g)

N/A H.1.m.(4) (a-i)

N/A H.2 (all steps lined) N/A H.3 (all steps lined) N/A H.4.a N/A checked Comments None H.4.b Signed Joe Barker Date: Today Attachments D & E N/A

2. Prepare QCOS 0005-08 Rev 28, page 10 completed with the following information H.1.l(3)

Marked N/A H.1.l(4)(b) and (d)

Not initialed and 4450 VAC written in column to the right of the line H.1.l(4)

All other steps initialed by JB

3. This completes the setup for this JPM.

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 9 INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.

You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.

Tech Spec 3.8.1 Condition B was entered.

The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.

INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.

Provide the examinee: A completed surveillance, QCOS 0005-08, with the information recorded as indicated in the setup.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 9 JPM Start Time:

STEP ELEMENT SAT STANDARD UNSAT Comment Number Reviews the completed surveillance and identifies the following problems:

Attention to detail used in reviewing Tech Spec required surveillances.

EVALUATOR NOTE: If asked, there are NO 345 KV Lines OOS, T12 Load Tap Changer is in AUTO with a TAP setting of 9 and NO notification has been received that Predicted Post Unit Trip Switchyard voltage will be low.

CUE: When candidate notices that the Bus 23-1 and 13-1 TIE breaker is marked OOS and inquires as to its actual status; inform the candidate that it was just taken OOS for EMs to repair the breaker.

  • H.1.l.
  • H.1.l recognized as not satisfied.
  • H.1.l.(2).f Bus 23-1 and 13-1 TIE GCB is recorded as OOS.

and H.1.l.(4) marked N/A ONE of the sections H.1.l.(1) through (4) MUST be satisfied.

CUE: When candidate recognizes that H.1.l.(4) is marked N/A, he / she may direct the U1 ANSO to complete section H.1.l.(4)

IF the candidate directs the ANSO to re-perform the step, then provide the prepared page 9 of QCOS 0005-08.

IF the candidate re-performs H.1.l.(4) line-by-line, then provide the following information:

  • H.1.l(4)a XFMR 22 TO BUS 24 GCB capable of being closed? YES
  • H.1.l(4)b Bus 24 voltage 4000 to 4400 VAC? 4450 VAC
  • H.1.l(4)c Busses 24 AND 24-1 TIE GCBs capable of being closed?

YES for both

  • H.1.l(4)d Bus 24-1 voltage 4000 to 4400 VAC? 4450 VAC
  • H.1.l(4)e Bus 14-1 AND 24-1 TIE GCB capable of being closed? YES
  • H.1.l(4)f Bus 24-1 AND 14-1 TIE GCB capable of being closed? YES EVALUATOR NOTE: If the candidate declares that QCOS 0005-08 is unsatisfactory as presented, the next step will be Not Applicable.

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 9 STEP ELEMENT SAT STANDARD UNSAT Comment Number

  • H.1.l(4)

(b) & (d)

Obtains information required to complete section H.1.l.(4)

  • Recognizes that Unit 1 does not meet the acceptance criteria of the surveillance because the voltage on the Unit 2 4160 Busses is too high.
  • Procedure acceptance criteria not met due to voltage on the Unit 2 4160 Busses is too high.

EVALUATOR NOTE: If candidate addresses taking corrective actions due to the high voltage, state: The Unit 2 Unit Supervisor will address any corrective actions.

Continue your review.

CUE: If not already stated, ask the candidate to identify the applicable Tech Spec CONDITION.

  • H.1.l
  • Identify the applicable Tech Spec CONDITION T.S. 3.8.1 Cond A for one Offsite Line Inop T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop
  • Identifies the following:

T.S. 3.8.1 Cond A for one Offsite Line Inop; 7 Day LCO T.S. 3.8.1 Cond D for one Offsite Line and one DG Inop; 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> LCO H.4 Identify that Step H.4 (for a Satisfactory Surveillance) is incorrectly filled out and should NOT be marked N/A.

Step H.4 revised to reflect that surveillance was NOT Satisfactory EVALUATOR NOTE: For Step H.5, Description of Deficiencies, the BUS 23-1 AND 13-1 TIE GCB is Out-Of Service and the Voltages on Busses 24 and 24-1 are too high.

H.5 Identify that Step H.5 should be filled out as UNSAT.

Step H.5 filled out as UNSAT.

CUE: Inform the candidate that the JPM is complete JPM Stop Time:

2012 SRO Admin 3 - Rev 03 SRO Admin 3.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 9 Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review Electrical Distribution Surveillance JPM Number:

2012 SRO Admin 3 Revision Number:

Task Number and

Title:

03 SR-6500-K32 Given 4KV / 480 VAC Distribution System operability status OR key parameters indications, various plant conditions and a copy of Tech Specs, DETERMINE Tech Spec compliance and required actions, if any.

K/A Number and Importance:

K/A: 2.2.40 Rating:

SRO 4.7 Ability to apply Technical Specifications for a system.

Suggested Testing Environment: Simulator or Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): QCOS 0005-08, Rev. 28 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 20 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

INITIAL CONDITIONS Unit 1 and Unit 2 are operating at 100% power.

You are the Unit 1 Supervisor 30 minutes ago, the Unit 1 Emergency Diesel Generator was declared inoperable when it tripped during testing.

Tech Spec 3.8.1 Condition B was entered.

The U1 ANSO was ordered to perform QCOS 0005-08, partial for step H.1 The Unit 2 Unit Supervisor is addressing Unit 2 required actions, if any The U1 ANSO has completed QCOS 0005-08 step H.1.

INITIATING CUE Review QCOS 0005-08 and inform the Shift Manager when the review is complete.

SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 8 Exelon Nuclear Job Performance Measure Reactivation of SRO License JPM Number: 2012 SRO Admin 2 Revision Number:

01 Date:

03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

2012 SRO Admin 2 - Rev 01 SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 8 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 8 Revision Record (Summary)

Revision 00, This JPM was developed new for the 2011 ILT Cert Exam IAW guidelines established in NUREG 1021 Rev 9 Supplement 1, ES-301 and Appendix C. It was modeled after a JPM from the 2006 ILT Exam at Dresden.

Revision 01, JPM updated for 2012 ILT NRC Exam.

2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 8 SETUP INSTRUCTIONS

1. This JPM may be administered in any setting with the necessary procedures available.
2. Fill out OP-AA-105-102, Attachment 2 up to but not including Shift Manager Approval for a fictitious SRO License holder.
3. In the Hours on Shift table:
  • Enter 4 shifts of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as a Unit Supervisor.
  • Enter 1 shift of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> as the WEC supervisor.

2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 8 INITIAL CONDITIONS You are the Shift Manager.

An SRO is in the process of license reactivation.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.

INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.

Approve if acceptable or, if not, identify any discrepancies.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 8 JPM Start Time:

STEP ELEMENT SAT STANDARD UNSAT Comment Number Review OP-AA-105-102, Attachment 2.

Reviews OP-AA-105-102,.

  • Check that Hours on Shift are applicable for license reactivation AND that licensee has the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.*

Notes that 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> listed in the Hours on Shift are for WEC Supervisor which does not count toward the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> AND determines that licensee has ONLY 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> toward the required 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br />.

  • Check that the required Plant Tour has been completed.*

Notes that the Date and Active License Signature for the required Plant Tour are missing on the Shift Position Log.

Returns OP-AA-105-102 without signing.

OP-AA-105-102 Attachment 2 returned without signing Licensees license CANNOT be reactivated due to insufficient hours on shift and because a Plant Tour has not been completed.

NOTE: The JPM is complete.

JPM Stop Time:

2012 SRO Admin 2 - Rev 01 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 2.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 8 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Reactivation of SRO License JPM Number:

2012 SRO Admin 2 Revision Number:

Task Number and

Title:

01 SRL-OPS-K7 Describe the requirements to reactivate and inactive license per OP-AA 105-102.

K/A Number and Importance:

K/A: 2.1.4 Rating:

SRO 3.8 Knowledge of individual licensed operator responsibilities related to shift staffing, such as medical requirements, no-solo operation, maintenance of active license status, 10CFR55, etc Suggested Testing Environment: Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

OP-AA-105-102, Rev. 09, NRC Active License Maintenance Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 10 EVALUATION

SUMMARY

minutes Actual Time Used:

minutes Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name:

(Print)

Evaluators Signature:

Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the Shift Manager.

An SRO is in the process of license reactivation.

OP-AA-105-102, Attachment 2, Reactivation of License Log, is filled out up to the point Shift Manager review for the licensee.

INITIATING CUE Perform the Shift Manager review of OP-AA-105-102, Attachment 2 for the licensee.

Approve if acceptable or, if not, identify any discrepancies.

SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 1 of 10 Exelon Nuclear Job Performance Measure Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number: 2012 SRO Admin 1 Revision Number:

02 Date:

03/04/2012 Developed By:

Instructor Date Validated By:

SME or Instructor Date Reviewed By:

Operations Representative Date Approved By:

Training Department Date

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 2 of 10 JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE:

All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 8 through 12 below.

1.

Task description and number, JPM description and number are identified.

2.

Knowledge and Abilities (K/A) references are included.

3.

Performance location specified. (in-plant, control room, simulator, or other)

4.

Initial setup conditions are identified.

5.

Initiating cue (and terminating cue if required) are properly identified.

6.

Task standards identified and verified by SME review.

7.

Critical steps meet the criteria for critical steps and are identified with an asterisk (*).

8.

Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure Rev:

Procedure Rev:

Procedure Rev:

9.

Verify cues both verbal and visual are free of conflict.

10. Verify performance time is accurate
11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:

SME / Instructor Date SME / Instructor Date SME / Instructor Date

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 3 of 10 Revision Record (Summary)

Revision 01, This is a LORT Bank JPM (AD-SRO-6) that was used on the 2011 ILT NRC License Exam. Updated Fire Permit information.

Revision 02, This JPM updated for 2012 ILT NRC Exam.

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 4 of 10 SIMULATOR SETUP INSTRUCTIONS

1. NOTE: This JPM may be conducted in any appropriate setting; i.e., simulator, classroom, Control Room, provided that the following procedures are available to the candidate:
  • OP-MW-201-007, FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL
  • QCAP 1500-01, ADMINISTRATIVE REQUIREMENTS FOR FIRE PROTECTION
2. Verify the following for this JPM setup:
  • A current revision of OP-MW-201-007 Attachment 1 Fire Protection Impairment Permit is filled out as follows
1) One detector, (1-4141-109), that makes a detection system inoperable (ref. QCAP 1500-01 Attachment A) and the detection system in turn makes the suppression system inoperable (ref. QCAP 1500-01 Attachment C).
2) Fill out Section I INITIATOR of the Fire Protection Permit as follows:

Initiator: IMD Supervisor Station: Quad Unit: 01 Name: K. Arney Phone: X 2667 Dept/Co: IMD/Exelon Sch. Start Date: current Bldg: TB EPN#: 1-4141-109 Sch. End Date: current + 1 Elev: 611 Door #: N/A AR/WR/OOS#: 1081 11-01 Row/Col: E/14 Det. Zone: N/A Pent #: N/A Do NOT check the Structural fireproofing OR Wall Penetration boxes.

Impairment

Description:

Disconnect and test Turbine Oil Reservoir smoke detector 1-4141-109 per surveillance per surveillance procedure and reconnect.

3) Fill out section II. FIRE MARSHAL REVIEW of the Fire Protection Impairment Permit as follows:
a.

Fire Zone(s): 8.2.7.c / For Barriers: Check the Functional box.

b.

Technical Requirement Manual? Check the Yes box and write in QCAP 1500-01

c.

Mark None in the Fire Watch Required: block and N/A below.

d.

For Additional Compensatory Measures: Check the NO box and N/A the Required? line.

e.

Fire Detector Operability Check Required? Check the Yes box.

f.

NEIL Notification Required? Check the NO box.

g.

Fire Marshal Instructions: Return to operable status in 14 days

h.

Restoration/Testing Requirements: Completion of Work Package.

i.

Sign and date as Fire Marshal for Authorization Block.

3. This completes the setup for this JPM.

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 5 of 10 INITIAL CONDITIONS You are the Work Execution Center Senior Reactor Operator.

An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.

EVALUATOR: Provide candidate with a copy of fire permit 1121, OP-MW-201-007,.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.
  • Denotes critical elements of a critical step.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 6 of 10 JPM Start Time:

STEP ELEMENT SAT STANDARD UNSAT Comment Number Obtains Procedures.

Obtains a copy of OP-MW-201-007, QCAP 1500-01, QCOA 4100-11 as necessary.

EVALUATOR: The candidate may perform the following steps in any order.

Reviews Fire Permit.

Reviews Fire Permit to determine what is being impaired. Determines that one detector will be disconnected.

QCAP 1500-01 Att. A page 3 Determines effect of disconnecting detectors.

Reviews QCAP 1500-01 Att. A page 3 and determines that one detector, if removed, will make the detection system inoperable (all 6 are required).

EVALUATOR: If the candidate states he/she cannot approve the permit because of errors, prompt him/her to explain all of the errors on the permit for you.

The following errors are built into the permit:

The Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW as follows:

  • None is marked in the Fire Watch Required: block (should be marked hourly with performed by marked as IMD).
  • NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)

The one detector that was chosen to make a detection system inoperable (ref. QCAP 1500-01 Attachment A page 3), and the detection system in turn makes the deluge suppression system inoperable (ref. QCAP 1500-01 Attachment C page 2).

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 7 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number QCAP 1500-01 Att. C page 2 Determines consequence of making the detection system inoperable.

Reviews QCAP 1500-01 Att. C page 2 (or determines info from QCAP 1500-01 Att. A page 3) and determines that making the detection system inoperable makes the suppression system inoperable per step D.2.a.(1)(c).

QCAP 1500-01

  • D.1.c.(2)
  • D.2.c.(2)

Reviews QCAP 1500-01 step D.1.c.(2) and D.2.c.(2) and determines an hourly fire watch must be conducted if this permit is approved.

QCAP 1500-01

  • D.2.c.(4)
  • Determines backup suppression required within one hour.*

Reviews step D.2.c.(4) and determines backup suppression will also be required.

(page 65 of 93)

OP-MW-201-007 Attach. 1 Determines that the Fire Watch Performed By field must be filled in IMD or other appropriate department.

Recognizes the N/A is not correct for this field.

NOTE: The candidate may choose to correct the provided impairment. This is acceptable.

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 8 of 10 STEP ELEMENT SAT STANDARD UNSAT Comment Number Reviews the permit for accuracy and Notifies the Evaluator of his conclusions.

The candidate reviews the permit for accuracy in accordance with OP-MW-201-007 FIRE PROTECTION SYSTEM IMPAIRMENT CONTROL step 4.4 and determines the fire impairment permit cannot be approved as written because the Fire Protection Permit was filled out improperly in section II. FIRE MARSHAL REVIEW

block (should be marked hourly with performed by marked as IMD).

  • NO is checked in the box for Additional Compensatory Measures (should be marked YES and a Description of the additional Compensatory Measures should be included i.e., backup suppression established or verified.)

EVALUATOR: After the candidate explains why he/she cannot approve the fire permit as written, as the IM Supervisor requesting the permit that you will rewrite the permit and bring it back for approval on the next shift.

NOTE: The JPM is complete.

JPM Stop Time:

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 9 of 10 JPM

SUMMARY

Operators Name:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Review a Fire Impairment Permit Requiring Compensatory Actions JPM Number:

2012 SRO Admin 1 Revision Number:

Task Number and

Title:

02 4100.016 Complete / review / approve Fire Protection Impairment Permits and Fire Watch Waivers K/A Number and Importance:

K/A:

2.1.25 Rating:

SRO 4.2 Ability to interpret reference materials such as graphs, curves, tables, etc.

Suggested Testing Environment: Simulator Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s): QCAP 1500-01, Administrative Requirements For Fire Protection, Rev. 30 OP-MW-201-007, Fire Protection System Impairment Control, Rev. 7 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete: 12.5 EVALUATION

SUMMARY

minutes Actual Time Used:

minutes The task is successfully completed when the examinee identifies that the fire permit requires an hourly fire watch and backup suppression.

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory Comments:

Evaluators Name:

(Print)

2012 SRO Admin 1 - Rev 02 G:\\DRSIII\\License Examinations\\2012\\Quad Cities\\Proposed\\SRO ADMIN JPMs\\SRO Admin 1.doc SRRS: 3D.105 (when utilized for operator initial or continuing training)

Page 10 of 10 Evaluators Signature:

Date:

SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the Work Execution Center Senior Reactor Operator.

An Instrument Maintenance Supervisor has submitted a fire permit to allow testing of smoke detectors in the Unit 1 Turbine Oil Reservoir area. The work will continue into the next shift.

INITIATING CUE Review Fire Protection Impairment Permit 1121. Approve the permit OR explain the reason(s) why you cannot.