ML13045A843: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13045A843
| number = ML13045A843
| issue date = 02/11/2013
| issue date = 02/11/2013
| title = H. B. Robinson Steam Electric Plant - Notification of Licensed Operator Initial Examination 05000261/2013301
| title = Notification of Licensed Operator Initial Examination 05000261/2013301
| author name = Franke M E
| author name = Franke M
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Gideon W R
| addressee name = Gideon W
| addressee affiliation = Progress Energy Co
| addressee affiliation = Progress Energy Co
| docket = 05000261
| docket = 05000261
Line 13: Line 13:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000261/2013301]]
See also: [[see also::IR 05000261/2013301]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES
[[Issue date::February 11, 2013]]
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA  30303-1257
February 11, 2013
Mr. William R. Gideon
Vice President
Progress Energy
H. B. Robinson Steam Electric Plant, Unit 2
3581 West Entrance Rd
Hartsville, SC  29550
SUBJECT:  
H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED 
OPERATOR INITIAL EXAMINATION 05000261/2013301
Dear Mr. Gideon:  
In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior
Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made
for the administration of licensing examinations at H. B. Robinson Steam Electric Plant.  The
operating test is scheduled to be administered during the week July 29, 2013.  The written
examination is scheduled to be administered the week of August 5, 2013.  The on-site
preparatory week is scheduled for the week of July 8, 2013.
As agreed during the telephone conversation meeting, your staff will prepare both the operating
test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-
1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear
Regulatory Commission (NRC) regional office will discuss with your staff any changes that
might be necessary before the examinations are administered.  Your staff has also agreed to
make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by May 15, 2013.  Mr. Baldwin will provide a written examination outline to your staff by
February 8, 2013.  The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by June 14, 2013.  Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval.  All materials shall be complete and
ready-to-use. 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


Mr. William Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550
W. Gideon
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date.  If the applications are not
received at least 30 days before the examination date, a postponement may be necessary. 
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on February
28, 2013.  The public reporting burden for this collection of information is estimated to average
500 hours per response, including the time for reviewing instructions, gathering and maintaining
the data needed, writing the examinations, and completing and reviewing the collection of
information.  Send comments on any aspect of this collection of information, including
suggestions for reducing the burden, to the Information and Records Management Branch (T-6
F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet
electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).


SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000261/2013301
W. Gideon
3
Thank you for your cooperation in this matter.  Mr. Smith has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:  
Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Sincerely,
/RA/
Mark E. Franke, Chief
Operations Branch 2
Division of Reactor Safety
Docket No.:  50-261
License No.: DPR-23
cc: (See Page 4)


==Dear Mr. Gideon:==
In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is scheduled to be administered during the week July 29, 2013. The written examination is scheduled to be administered the week of August 5, 2013. The on-site preparatory week is scheduled for the week of July 8, 2013.


As agreed during the telephone conversation meeting, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
_________________________
xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
RA
RA
NAME
BALDWIN
FRANKE
DATE
2/11/2013
2/11/2013
2/      /2013
2/      /2013
2/      /2013
2/      /2013
2/      /2013
E-MAIL COPY?
    YES
NO   
  YES
NO      YES
NO   
  YES
NO   
  YES
NO      YES
NO   
  YES
NO   


To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 15, 2013. Mr. Baldwin will provide a written examination outline to your staff by February 8, 2013. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by June 14, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
W. Gideon
4
cc:
Division of Radiological Health
TN Dept. of Environment & Conservation
401 Church Street
Nashville, TN  37243-1532
Donald W. Barker
Manager, Nuclear Oversight
H. B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
J. W. (Bill) Pitesa
Senior Vice President
Nuclear Operations
Duke Energy Corporation
Electronic Mail Distribution
Lara S. Nichols
Deputy General Counsel
Duke Energy Corporation
Electronic Mail Distribution
M. Christopher Nolan
Director - Regulatory Affairs
General Office
Duke Energy Corporation
Electronic Mail Distribution
Mike Glover
Director Site Operations
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Richard Keith Holbrook
Operations Manager
H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Sandra Threatt, Manager
Nuclear Response and Emergency
Environmental Surveillance
Bureau of Land and Waste Management
Department of Health and Environmental 
Control
Electronic Mail Distribution
Sharon Wheeler
Manager, Support Services
H B Robinson Steam Electric Plant
Electronic Mail Distribution
Brian C. McCabe
Manager, Nuclear Oversight
Shearon Harris Nuclear Power Plant
Progress Energy
Electronic Mail Distribution
Richard Hightower
Supervisor
Licensing/Regulatory Programs
Progress Energy
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy
Electronic Mail Distribution
David T. Conley
Senior Counsel
Legal Department
Progress Energy
Electronic Mail Distribution
John H. O'Neill, Jr.  
Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC  20037-1128
Richard Haynes
Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and  
Environmental Control
Electronic Mail Distribution
Thomas Cosgrove
Plant General Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Donna B. Alexander
Manager, Nuclear Regulatory Affairs
(interim)
Progress Energy
Electronic Mail Distribution
(cc contd - See Page 5)


We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
W. Gideon
5
(cc contd)
Robert P. Gruber
Executive Director
Public Staff - NCUC
4326 Mail Service Center
Raleigh, NC  27699-4326
W. Lee Cox, III
Section Chief
Radiation Protection Section
N.C. Department of Environmental
Commerce & Natural Resources
Electronic Mail Distribution
Greg Kilpatrick
Operations Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Mark Yeager
Division of Radioactive Waste Mgmt.
S.C. Department of Health and  
Environmental Control
Electronic Mail Distribution
Public Service Commission
State of South Carolina
P.O. Box 11649
Columbia, SC  29211
Chairman
North Carolina Utilities Commission
Electronic Mail Distribution
Henry Curry
Training Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
H. B. Robinson Steam Electric Plant
2112 Old Camden Rd
Hartsville, SC  29550
Christos Kamilaris
Manager, Support Services
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
John W. Flitter
Director of Electric & Gas Regulation
South Carolina Office of Regulatory Staff
Electronic Mail Distribution


Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
Letter to William R. Gideon from Mark E. Franke dated February 11, 2013.  
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
SUBJECT:  
 
H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
 
Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23
OPERATOR INITIAL EXAMINATION 05000261/2013301  
 
cc: (See Page 4) Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Distribution:  
 
RIDSNRRDIRS  
Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23
PUBLIC  
 
RidsNrrPMRobinson Resource
cc: (See Page 4)
 
xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME BALDWIN FRANKE DATE 2/11/2013 2/11/2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\ROBINSON EXAMINATIONS\INITIAL EXAM - 2013-301\ROBINSON 2103-301 INITIAL EXAM 120 DAY LETTER (RSB).DOCX cc: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
 
Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
 
J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution
 
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
 
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
 
Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant Electronic Mail Distribution
 
Richard Keith Holbrook Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution
 
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Sharon Wheeler Manager, Support Services H B Robinson Steam Electric Plant Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
 
Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution
 
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution
 
(cc cont'd - See Page 5) (cc cont'd) Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
 
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt.
 
S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution
 
Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550
 
Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
 
John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution Letter to William from Mark E. Franke dated February 11, 2013.
 
SUBJECT: H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000261/2013301 Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource
}}
}}

Latest revision as of 11:03, 11 January 2025

Notification of Licensed Operator Initial Examination 05000261/2013301
ML13045A843
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/11/2013
From: Mark Franke
Division of Reactor Safety II
To: William Gideon
Progress Energy Co
References
Download: ML13045A843 (7)


See also: IR 05000261/2013301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

February 11, 2013

Mr. William R. Gideon

Vice President

Progress Energy

H. B. Robinson Steam Electric Plant, Unit 2

3581 West Entrance Rd

Hartsville, SC 29550

SUBJECT:

H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2013301

Dear Mr. Gideon:

In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior

Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made

for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The

operating test is scheduled to be administered during the week July 29, 2013. The written

examination is scheduled to be administered the week of August 5, 2013. The on-site

preparatory week is scheduled for the week of July 8, 2013.

As agreed during the telephone conversation meeting, your staff will prepare both the operating

test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-

1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear

Regulatory Commission (NRC) regional office will discuss with your staff any changes that

might be necessary before the examinations are administered. Your staff has also agreed to

make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by May 15, 2013. Mr. Baldwin will provide a written examination outline to your staff by

February 8, 2013. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 14, 2013. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

W. Gideon

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on February

28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining

the data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6

F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm.adams.html (the Public Electronic Reading Room).

W. Gideon

3

Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:

Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).

Sincerely,

/RA/

Mark E. Franke, Chief

Operations Branch 2

Division of Reactor Safety

Docket No.: 50-261

License No.: DPR-23

cc: (See Page 4)

_________________________

xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RA

RA

NAME

BALDWIN

FRANKE

DATE

2/11/2013

2/11/2013

2/ /2013

2/ /2013

2/ /2013

2/ /2013

2/ /2013

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

W. Gideon

4

cc:

Division of Radiological Health

TN Dept. of Environment & Conservation

401 Church Street

Nashville, TN 37243-1532

Donald W. Barker

Manager, Nuclear Oversight

H. B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

J. W. (Bill) Pitesa

Senior Vice President

Nuclear Operations

Duke Energy Corporation

Electronic Mail Distribution

Lara S. Nichols

Deputy General Counsel

Duke Energy Corporation

Electronic Mail Distribution

M. Christopher Nolan

Director - Regulatory Affairs

General Office

Duke Energy Corporation

Electronic Mail Distribution

Mike Glover

Director Site Operations

H. B. Robinson Steam Electric Plant

Electronic Mail Distribution

Richard Keith Holbrook

Operations Manager

H. B. Robinson Steam Electric Plant

Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency

Environmental Surveillance

Bureau of Land and Waste Management

Department of Health and Environmental

Control

Electronic Mail Distribution

Sharon Wheeler

Manager, Support Services

H B Robinson Steam Electric Plant

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Oversight

Shearon Harris Nuclear Power Plant

Progress Energy

Electronic Mail Distribution

Richard Hightower

Supervisor

Licensing/Regulatory Programs

Progress Energy

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

Electronic Mail Distribution

David T. Conley

Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Richard Haynes

Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Thomas Cosgrove

Plant General Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy

Electronic Mail Distribution

(cc contd - See Page 5)

W. Gideon

5

(cc contd)

Robert P. Gruber

Executive Director

Public Staff - NCUC

4326 Mail Service Center

Raleigh, NC 27699-4326

W. Lee Cox, III

Section Chief

Radiation Protection Section

N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Greg Kilpatrick

Operations Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Mark Yeager

Division of Radioactive Waste Mgmt.

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution

Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211

Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Henry Curry

Training Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

Christos Kamilaris

Manager, Support Services

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

John W. Flitter

Director of Electric & Gas Regulation

South Carolina Office of Regulatory Staff

Electronic Mail Distribution

Letter to William R. Gideon from Mark E. Franke dated February 11, 2013.

SUBJECT:

H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2013301

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMRobinson Resource