Informs That NRC Would Like to Send Contractor,Bnwl,W/ Representative of Risk Applications Branch to Visit Site on 920902 for Insp
ML13302B858
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/31/1992
From: Fields M
Office of Nuclear Reactor Regulation
To: Guiles E, Ray H
SAN DIEGO GAS & ELECTRIC CO., SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML13302B859 List:
References
NUDOCS 9208050169
Download: ML13302B858 (3)


Text

July 31, 1992

.Docket Nos. 50-361 Mr. Harold B. Ray Mr. Edwin A. Guiles Senior Vice President Vice President Southern California Edison Co.

Engineering and Operations Irvine Operations Center San Diego Gas & Electric Co.

23 Parker StreetStreet 23~~0 Ashke Street

'92 13 P5:*

Irvine, California 92718 San Diego, California 92112 Gentlemen:

SUBJECT:

RISK-BASED INSPECTION GUIDE SITE VISIT This is in reference to the development of a Risk-based Inspection Guide (RIG) to be published as a NUREG report under the NRC's Technical Assistance Program with National Laboratories.

This RIG is intended to provide useful guidance for NRC inspection activities.

The purpose of this letter is to inform you that we would like to send our contractor, Pacific Northwest Laboratories along with a representative of the Risk Application Branch, NRR, to visit the San Onofre site on September 2, 1992. The visiting contractor and NRR representative will accompany the.

resident inspector in a system walkdown and verify the accuracy of the information. During this visit, we would be available to meet with your staff and receive comments from you regarding RIG in order to reflect your plant status accurately.

However, we would like to clarify that your participation during the visit will be strictly voluntary. We are enclosing a draft copy of the RIG for San Onofre, Units 2 and 3. If you would like to participate during the visit, please let me know at (301) 504-1380.

.Your cooperation in this matter is appreciated.

Sincerely, Original signed by:

Mel B. Fields, Project Manager Project Directorate V Division of Reactor Projects III, IV, V Office of Nuclear Reactor Regulation

Enclosure:

Draft RIG cc w/enclosure:

rk A See next page 0

DISTRIBUTION:

Docket File NRC & Local PORs PDV Reading File BBoger MVirgilio TQuay DFoster MFields

OGC, 15B18 ACRS(10),

P315 PDV Plant File RZimmerman, RV OFC PDV/LA PDV/PM PDVA/D

NAME, DFoster MFi#E TQua DATE

/92 7 /0/9215/31/92 OFFICIAL RECORD COPY DOCUMENT NAME: SO23RIG.LTR f9208050169..20731 O

1. ~

~

7 6

Vt~ REG STATE 0

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 July 31, 1992 Docket Nos. 50-361 and 50-362 Mr. Harold B. Ray Mr. Edwin A. Guiles Senior Vice President Vice President Southern California Edison Co.

Engineering and Operations Irvine Operations Center San Diego Gas & Electric Co.

23 Parker Street 101 Ash Street Irvine, California 92718 San Diego, California 92112 Gentlemen:

SUBJECT:

RISK-BASED INSPECTION GUIDE SITE VISIT This is in reference to the development of a Risk-based Inspection Guide (RIG) to be published as a NUREG report under the NRC's Technical Assistance Program with National Laboratories. This RIG is intended to provide useful guidance for NRC inspection activities.

The purpose of this letter is to inform you that we would like to send our contractor, Pacific Northwest Laboratories along with a representative of the Risk Application Branch, NRR, to visit the San Onofre site on September 2, 1992. The visiting contractor and NRR representative will accompany the resident inspector in a system walkdown and verify the accuracy of the information. During-this visit, we would be available to meet with your staff and receive comments from you regarding RIG in order to reflect your plant status accurately.

However, we would like to clarify that your participation during the visit will be strictly voluntary. We are enclosing a draft copy of the RIG for San Onofre, Units 2 and 3. If you would like to participate during the visit, please let me know at (301) 504-1380.

Your cooperation in this matter is appreciated.

Sincerely, Mel B. Fields, Project Manager Project Directorate V Division of Reactor Projects III, IV, V Office of Nuclear Reactor Regulation

Enclosure:

Draft RIG cc w/enclosure:

See next page

Messrs. Ray and Guiles San Onofre Nuclear Generating Southern California Edison Company Station, Unit Nos. 2 and 3 cc:

James A. Beoletto, Esq.

Mr. Richard-J. Kosiba, Project Manager Southern California Edison Company Bechtel Power Corporation Irvine Operations Center 12440 E. Imperial Highway 23 Parker Street Norwalk, California 90650 Irvine, California 92718 Mr. Robert G. Lacy Chairman, Board of Supervisors.

Manager, Nuclear Department County of San Diego San Diego Gas & Electric Company 1600 Pacific Highway, Room 335 P. 0. Box 1831 San Diego, California 92101 San Diego, California 92112 Alan R. Watts, Esq.

Mr. Hank Kocol Rourke & Woodruff Radiologic Health Branch 701 S. Parker St. No. 7000 State Department of Health Services Orange, California 92668-4702 Post Office Box 942732 Sacremento, California 94234 Mr.. Sherwin Harris Resource Project Manager Public Utilities Department City of Riverside Resident Inspector/San Onofre NPS 3900 Main Street c/o U.S. Nuclear Regulatory Commission Riverside, California 92522 Post Office Box 4329 San Clemente, California 92674 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering Nuclear Power Mayor 12300 Twinbrook Parkway, Suite 330 City of San Clemente Rockville, Maryland 20852 100 Avenida Presidio San Clemente, California 92672 Mr. Howard J. Wong Regional Administrator, Region V U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 Walnut Creek, California 94596 Mr. Don J. Womeldorf Chief, Environmental Management Branch California Department of Health Services 714 P Street, Room 616 Sacramento, California 95814