{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257  February 11, 2013 Mr. William R. Gideon Vice President  
[[Issue date::February 11, 2013]]
Progress Energy  
 
H. B. Robinson Steam Electric Plant, Unit 2  
Mr. William Vice President Progress Energy H. B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Rd Hartsville, SC 29550
3581 West Entrance Rd  
 
Hartsville, SC 29550 SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000261/2013301
  OPERATOR INITIAL EXAMINATION 05000261/2013301  
 
==Dear Mr. Gideon:==
Dear Mr. Gideon: In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior  
In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is scheduled to be administered during the week July 29, 2013. The written examination is scheduled to be administered the week of August 5, 2013. The on-site preparatory week is scheduled for the week of July 8, 2013.
Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is scheduled to be administered during the week July 29, 2013. The written examination is scheduled to be administered the week of August 5, 2013. The on-site preparatory week is scheduled for the week of July 8, 2013.  
 
As agreed during the telephone conversation meeting, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
As agreed during the telephone conversation meeting, your staff will prepare both the operating  
 
test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 15, 2013. Mr. Baldwin will provide a written examination outline to your staff by February 8, 2013. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by June 14, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
 
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 15, 2013. Mr. Baldwin will provide a written examination outline to your staff by February 8, 2013. The operating test, written examination, and the supporting reference  
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
materials identified in Attachment 3 to ES-201 will be due by June 14, 2013. Pursuant to Title  
 
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
representative of the facility licensee shall approve the outline, examination, and test before  
 
they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.  
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in  
 
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
W. Gideon 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and  
 
to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
 
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver  
Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23  
requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
 
cc: (See Page 4) Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average  
 
500 hours per response, including the time for reviewing instructions, gathering and maintaining  
Sincerely,/RA/ Mark E. Franke, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23  
the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including  
 
suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information  
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,  
Washington, DC 20503.  
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
enclosures will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
W. Gideon 3  Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely,
      /RA/ Mark E. Franke, Chief  
Operations Branch 2  
Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23  
cc: (See Page 4)  
W. Gideon 3  Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely,
      /RA/ Mark E. Franke, Chief  
Operations Branch 2  
Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23  
cc: (See Page 4)  
cc: (See Page 4)  
 
 
 
xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:_________________________  xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RA RA      NAME BALDWIN FRANKE      DATE 2/11/2013 2/11/2013 2/      /2013 2/      /2013 2/      /2013 2/      /2013 2/      /2013 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\ROBINSON EXAMINATIONS\INITIAL EXAM - 2013-301\ROBINSON 2103-301 INITIAL EXAM 120 DAY LETTER (RSB).DOCX 
 
W. Gideon 4  cc: Division of Radiological Health
TN Dept. of Environment & Conservation 401 Church Street Nashville, TN  37243-1532
Donald W. Barker
Manager, Nuclear Oversight
H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
J. W. (Bill) Pitesa
Senior Vice President Nuclear Operations Duke Energy Corporation
Electronic Mail Distribution
Lara S. Nichols Deputy General Counsel Duke Energy Corporation
Electronic Mail Distribution
M. Christopher Nolan
Director - Regulatory Affairs General Office Duke Energy Corporation
Electronic Mail Distribution
Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant
Electronic Mail Distribution
Richard Keith Holbrook
Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Sandra Threatt, Manager
Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management
Department of Health and Environmental 
Control
Electronic Mail Distribution
Sharon Wheeler Manager, Support Services
H B Robinson Steam Electric Plant
Electronic Mail Distribution  Brian C. McCabe
Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy
Electronic Mail Distribution
Richard Hightower
Supervisor Licensing/Regulatory Programs Progress Energy
Electronic Mail Distribution
Joseph W. Donahue Vice President Nuclear Oversight
Progress Energy
Electronic Mail Distribution
David T. Conley Senior Counsel
Legal Department
Progress Energy
Electronic Mail Distribution
John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge
2300 N. Street, NW
Washington, DC  20037-1128
Richard Haynes Director, Division of Waste Management
Bureau of Land and Waste Management
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution  Thomas Cosgrove
Plant General Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy Electronic Mail Distribution 
Donna B. Alexander
Manager, Nuclear Regulatory Affairs
(interim)
Progress Energy Electronic Mail Distribution 
(cc cont'd - See Page 5)
W. Gideon 5  (cc cont'd) Robert P. Gruber
Executive Director Public Staff - NCUC 4326 Mail Service Center
Raleigh, NC  27699-4326
W. Lee Cox, III
Section Chief Radiation Protection Section N.C. Department of Environmental
Commerce & Natural Resources
Electronic Mail Distribution
Greg Kilpatrick Operations Manager
H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution  Mark Yeager
Division of Radioactive Waste Mgmt.
S.C. Department of Health and
Environmental Control
Electronic Mail Distribution  Public Service Commission
State of South Carolina
P.O. Box 11649
Columbia, SC  29211  Chairman
North Carolina Utilities Commission
Electronic Mail Distribution
Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2
Progress Energy
Electronic Mail Distribution
Senior Resident Inspector U.S. Nuclear Regulatory Commission
H. B. Robinson Steam Electric Plant
2112 Old Camden Rd
Hartsville, SC  29550
 
Christos Kamilaris Manager, Support Services
H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
John W. Flitter
Director of Electric & Gas Regulation
South Carolina Office of Regulatory Staff Electronic Mail Distribution 
  Letter to William R. Gideon from Mark E. Franke dated February 11, 2013. 
SUBJECT: H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED    OPERATOR INITIAL EXAMINATION 05000261/2013301 
Distribution: RIDSNRRDIRS
PUBLIC
RidsNrrPMRobinson Resource   


xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME BALDWIN FRANKE DATE 2/11/2013 2/11/2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\ROBINSON EXAMINATIONS\INITIAL EXAM - 2013-301\ROBINSON 2103-301 INITIAL EXAM 120 DAY LETTER (RSB).DOCX cc: Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532
Donald W. Barker Manager, Nuclear Oversight H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
J. W. (Bill) Pitesa Senior Vice President Nuclear Operations Duke Energy Corporation Electronic Mail Distribution
Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution
M. Christopher Nolan Director - Regulatory Affairs General Office Duke Energy Corporation Electronic Mail Distribution
Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Richard Keith Holbrook Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution
Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Sharon Wheeler Manager, Support Services H B Robinson Steam Electric Plant Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution
Richard Hightower Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)
Progress Energy Electronic Mail Distribution
(cc cont'd - See Page 5) (cc cont'd) Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326
W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Mark Yeager Division of Radioactive Waste Mgmt.
S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution
Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550
Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution
John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution Letter to William from Mark E. Franke dated February 11, 2013.
SUBJECT: H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000261/2013301 Distribution: RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource
}}
}}

Revision as of 07:19, 28 March 2018

H. B. Robinson Steam Electric Plant - Notification of Licensed Operator Initial Examination 05000261/2013301
ML13045A843
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/11/2013
From: Franke M E
Division of Reactor Safety II
To: Gideon W R
Progress Energy Co
References
Download: ML13045A843 (7)


See also: IR 05000261/2013301

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 11, 2013 Mr. William R. Gideon Vice President

Progress Energy

H. B. Robinson Steam Electric Plant, Unit 2

3581 West Entrance Rd

Hartsville, SC 29550 SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000261/2013301

Dear Mr. Gideon: In a telephone conversation on January 30, 2013, between Mr. Jeffery L. Smith, Senior

Operations Instructor, and Mr. Richard S. Baldwin, Chief Examiner, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The operating test is scheduled to be administered during the week July 29, 2013. The written examination is scheduled to be administered the week of August 5, 2013. The on-site preparatory week is scheduled for the week of July 8, 2013.

As agreed during the telephone conversation meeting, your staff will prepare both the operating

test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by May 15, 2013. Mr. Baldwin will provide a written examination outline to your staff by February 8, 2013. The operating test, written examination, and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by June 14, 2013. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

W. Gideon 2 In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on February 28, 2013. The public reporting burden for this collection of information is estimated to average

500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining

the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

W. Gideon 3 Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely,

/RA/ Mark E. Franke, Chief

Operations Branch 2

Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23

cc: (See Page 4)

W. Gideon 3 Thank you for your cooperation in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov). Sincerely,

/RA/ Mark E. Franke, Chief

Operations Branch 2

Division of Reactor Safety Docket No.: 50-261 License No.: DPR-23

cc: (See Page 4)

xG PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE xG NON-SENSITIVE ADAMS: xG Yes ACCESSION NUMBER:_________________________ xG SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME BALDWIN FRANKE DATE 2/11/2013 2/11/2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 2/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLEXAMS\ROBINSON EXAMINATIONS\INITIAL EXAM - 2013-301\ROBINSON 2103-301 INITIAL EXAM 120 DAY LETTER (RSB).DOCX

W. Gideon 4 cc: Division of Radiological Health

TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532

Donald W. Barker

Manager, Nuclear Oversight

H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

J. W. (Bill) Pitesa

Senior Vice President Nuclear Operations Duke Energy Corporation

Electronic Mail Distribution

Lara S. Nichols Deputy General Counsel Duke Energy Corporation

Electronic Mail Distribution

M. Christopher Nolan

Director - Regulatory Affairs General Office Duke Energy Corporation

Electronic Mail Distribution

Mike Glover Director Site Operations H. B. Robinson Steam Electric Plant

Electronic Mail Distribution

Richard Keith Holbrook

Operations Manager H. B. Robinson Steam Electric Plant Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management

Department of Health and Environmental

Control

Electronic Mail Distribution

Sharon Wheeler Manager, Support Services

H B Robinson Steam Electric Plant

Electronic Mail Distribution Brian C. McCabe

Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy

Electronic Mail Distribution

Richard Hightower

Supervisor Licensing/Regulatory Programs Progress Energy

Electronic Mail Distribution

Joseph W. Donahue Vice President Nuclear Oversight

Progress Energy

Electronic Mail Distribution

David T. Conley Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge

2300 N. Street, NW

Washington, DC 20037-1128

Richard Haynes Director, Division of Waste Management

Bureau of Land and Waste Management

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution Thomas Cosgrove

Plant General Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy Electronic Mail Distribution

(cc cont'd - See Page 5)

W. Gideon 5 (cc cont'd) Robert P. Gruber

Executive Director Public Staff - NCUC 4326 Mail Service Center

Raleigh, NC 27699-4326

W. Lee Cox, III

Section Chief Radiation Protection Section N.C. Department of Environmental

Commerce & Natural Resources

Electronic Mail Distribution

Greg Kilpatrick Operations Manager

H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution Mark Yeager

Division of Radioactive Waste Mgmt.

S.C. Department of Health and

Environmental Control

Electronic Mail Distribution Public Service Commission

State of South Carolina

P.O. Box 11649

Columbia, SC 29211 Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2

Progress Energy

Electronic Mail Distribution

Senior Resident Inspector U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

Christos Kamilaris Manager, Support Services

H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution

John W. Flitter

Director of Electric & Gas Regulation

South Carolina Office of Regulatory Staff Electronic Mail Distribution

Letter to William R. Gideon from Mark E. Franke dated February 11, 2013.

SUBJECT: H. B. ROBINSON STEAM ELECTRIS PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000261/2013301