ML13351A488: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Agenda for TSTF /NRC Quarterly Meeting January 9, 2014 Room O-16B4 9:00 a.m. - 4:00 p.m. | {{#Wiki_filter:Agenda for TSTF /NRC Quarterly Meeting January 9, 2014 Room O-16B4 9:00 a.m. - 4:00 p.m. | ||
I. Administrative (9:00 a.m. - 9:15 a.m.) (NRC) A. Introductions B. Agenda Review | I. | ||
B. Status of the TSTF-501 Model Safety Evaluation Revision (NRC) C. Status of Industry Response to the Draft NoA Supplement for TSTF-493, "Clarify Application of Setpoint Methodology for LSSS Functions" (TSTF) BREAK IV. Active Traveler Review Status (10:45 a.m. - 12:00 p.m.) | Administrative (9:00 a.m. - 9:15 a.m.) (NRC) | ||
: 2. TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation 3. TSTF-529, Rev. 1, Clarify Use and Application Rules 4. TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 5. TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373 6. TSTF-540, Rev. 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) 7. TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed 8. TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control 9. TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal B. TSTF Traveler Review Priority (TSTF) | A. Introductions B. Agenda Review C. Other Administrative Issues II. | ||
LUNCH V. Technical Issues (1:00 p.m. - 3:30 p.m.) A. TSTF Response to NRC Position on Pressure Boundary Leakage (TSTF) | Process Issues (9:15 a.m. - 9:30 a.m.) | ||
B. Timely Corrective Actions related to WCAP-17308 and diesel generator frequency and voltage (TSTF) C. NRC Review of WCAP-17661 to Correct Non-Conservative TS (TSTF) D. Status of Issuance of IMC-0326, Operability and Functionality Guidance (NRC) | A. Delay of TSTF Traveler Reviews Due to Redirection of NRC Resources to Mitigating Strategies Directorate (All) | ||
E. Status of Revision of EGM 11-03, BWR OPDRVs (NRC) VI. Future Planning (3:30 p.m. - 3:45 p.m.) A. Future Traveler submittals (TSTF) | B. Other Process Issues III. Issues with Previously Approved Travelers (9:30 a.m. - 10:30 a.m.) | ||
A. Discussion of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (TSTF) | |||
B. Status of the TSTF-501 Model Safety Evaluation Revision (NRC) | |||
C. Status of Industry Response to the Draft NoA Supplement for TSTF-493, "Clarify Application of Setpoint Methodology for LSSS Functions" (TSTF) | |||
BREAK IV. Active Traveler Review Status (10:45 a.m. - 12:00 p.m.) | |||
A. Discuss Status of All Travelers Currently Under NRC Staff Review (All) | |||
: 1. | |||
TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046) | |||
: 2. | |||
TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation | |||
: 3. | |||
TSTF-529, Rev. 1, Clarify Use and Application Rules | |||
: 4. | |||
TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 | |||
: 5. | |||
TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373 | |||
: 6. | |||
TSTF-540, Rev. 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) | |||
: 7. | |||
TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed | |||
: 8. | |||
TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control | |||
: 9. | |||
TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal B. TSTF Traveler Review Priority (TSTF) | |||
LUNCH V. | |||
Technical Issues (1:00 p.m. - 3:30 p.m.) | |||
A. TSTF Response to NRC Position on Pressure Boundary Leakage (TSTF) | |||
B. Timely Corrective Actions related to WCAP-17308 and diesel generator frequency and voltage (TSTF) | |||
C. NRC Review of WCAP-17661 to Correct Non-Conservative TS (TSTF) | |||
D. Status of Issuance of IMC-0326, Operability and Functionality Guidance (NRC) | |||
E. Status of Revision of EGM 11-03, BWR OPDRVs (NRC) | |||
VI. Future Planning (3:30 p.m. - 3:45 p.m.) | |||
A. Future Traveler submittals (TSTF) | |||
B. Next Meeting (All) | |||
VII. Designated Time for Public Comments VIII. Closing Remarks (All) | |||
IX. Adjourn (4:00 p.m.)}} | IX. Adjourn (4:00 p.m.)}} | ||
Latest revision as of 00:15, 11 January 2025
| ML13351A488 | |
| Person / Time | |
|---|---|
| Site: | Technical Specifications Task Force |
| Issue date: | 12/24/2013 |
| From: | Michelle Honcharik Licensing Processes Branch (DPR) |
| To: | |
| Honcharik M | |
| Shared Package | |
| ML13351A485 | List: |
| References | |
| Download: ML13351A488 (2) | |
Text
Agenda for TSTF /NRC Quarterly Meeting January 9, 2014 Room O-16B4 9:00 a.m. - 4:00 p.m.
I.
Administrative (9:00 a.m. - 9:15 a.m.) (NRC)
A. Introductions B. Agenda Review C. Other Administrative Issues II.
Process Issues (9:15 a.m. - 9:30 a.m.)
A. Delay of TSTF Traveler Reviews Due to Redirection of NRC Resources to Mitigating Strategies Directorate (All)
B. Other Process Issues III. Issues with Previously Approved Travelers (9:30 a.m. - 10:30 a.m.)
A. Discussion of NRC Concerns with TSTF-471, TSTF-286, and TSTF-51 (TSTF)
B. Status of the TSTF-501 Model Safety Evaluation Revision (NRC)
C. Status of Industry Response to the Draft NoA Supplement for TSTF-493, "Clarify Application of Setpoint Methodology for LSSS Functions" (TSTF)
BREAK IV. Active Traveler Review Status (10:45 a.m. - 12:00 p.m.)
A. Discuss Status of All Travelers Currently Under NRC Staff Review (All)
- 1.
TSTF-454, Rev. 2, Extend PCIV Completion Times (NEDC-33046)
- 2.
TSTF-523, Rev. 2, Generic Letter 2008-01, Managing Gas Accumulation
- 3.
TSTF-529, Rev. 1, Clarify Use and Application Rules
- 4.
TSTF-531, Rev. 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2
- 5.
TSTF-537, Rev. 0, Increase CIV Completion Time; Update of TSTF-373
- 6.
TSTF-540, Rev. 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6)
- 7.
TSTF-541, Rev. 0, Add Exceptions to Surveillance Requirements When the Safety Function is Being Performed
- 8.
TSTF-542, Rev. 0, Reactor Pressure Vessel Water Inventory Control
- 9.
TSTF-545, Rev. 0, TS Inservice Testing (IST) Program Removal B. TSTF Traveler Review Priority (TSTF)
LUNCH V.
Technical Issues (1:00 p.m. - 3:30 p.m.)
A. TSTF Response to NRC Position on Pressure Boundary Leakage (TSTF)
B. Timely Corrective Actions related to WCAP-17308 and diesel generator frequency and voltage (TSTF)
C. NRC Review of WCAP-17661 to Correct Non-Conservative TS (TSTF)
D. Status of Issuance of IMC-0326, Operability and Functionality Guidance (NRC)
E. Status of Revision of EGM 11-03, BWR OPDRVs (NRC)
VI. Future Planning (3:30 p.m. - 3:45 p.m.)
A. Future Traveler submittals (TSTF)
B. Next Meeting (All)
VII. Designated Time for Public Comments VIII. Closing Remarks (All)
IX. Adjourn (4:00 p.m.)