| issue date = 06/11/2015
| issue date = 06/11/2015
| title = Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000382/2015007) and Request for Information
| title = Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000382/2015007) and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX  76011-4511 June 11, 2015  
{{#Wiki_filter:UNITED STATES  
NUCLEAR REGULATORY COMMISSION  
REGION IV  
1600 E. LAMAR BLVD  
ARLINGTON, TX  76011-4511  
June 11, 2015  
   
   
   
   
Mr. Michael R. Chisum  
Mr. Michael R. Chisum  
Site Vice President Entergy Operations, Inc.  
Site Vice President  
Entergy Operations, Inc.  
17265 River Road  
17265 River Road  
Killona, LA  70057-0751  
Killona, LA  70057-0751  
   
   
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF  
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATION
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND  
S INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION  
PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND  
REQUEST FOR INFORMATION  
   
   
Dear Mr. Chisum:   
Dear Mr. Chisum:   
 
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Waterford Steam Electric Station, Unit 3, from August 10-28, 2015.  The inspection will consist of three reactor inspectors from the NRC's Region IV office for two  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant  
modifications at your Waterford Steam Electric Station, Unit 3, from August 10-28, 2015.  The  
inspection will consist of three reactor inspectors from the NRCs Region IV office for two  
weeks.  The inspection will be conducted in accordance with the NRC Inspection  
weeks.  The inspection will be conducted in accordance with the NRC Inspection  
Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications."    
Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant  
 
Modifications.   
Experience has shown that this inspection is resource intensive for both the NRC inspectors
and your staff.  In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection. 
Please note that the documents are requested to be provided by August 3, 2015.  Upon review
of these documents, the inspectors will select additional documentation for review upon arrival. 
It is important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection. 
   
   
Experience has shown that this
We have discussed the schedule for these inspection activities with your staff and understand  
inspection is resource intens
ive for both the NRC inspectors and your staff.  In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.  Please note that the documents are requested to
be provided by August 3, 2015.  Upon review of these documents, the inspectors will select additional documentation for review upon arrival.  It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. 
We have discussed the schedule for these inspection activities with your staff and understand  
that our regulatory contact for this inspection will be Leia Milste of your licensing organization.  If  
that our regulatory contact for this inspection will be Leia Milste of your licensing organization.  If  
there are any questions about this inspection or the material requested, please contact the lead  
there are any questions about this inspection or the material requested, please contact the lead  
inspector, Megan Williams, by telephone at 817-200-1076 or by e-mail at  
inspector, Megan Williams, by telephone at 817-200-1076 or by e-mail at  
megan.williams@nrc.gov.   
megan.williams@nrc.gov.   
  This letter does not contain new or amended information collection requirements subject to the  
   
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995. (44 U.S.C. 3501 et seq.)  Existing information collection  
Paperwork Reduction Act of 1995. (44 U.S.C. 3501 et seq.)  Existing information collection  
requirements were approved by the Offi
requirements were approved by the Office of Management and Budget, Control  
ce of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control  
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
number.  
respond to, a request for information or an information collection requirement unless the  
M. Chisum  - 2 -  
requesting document displays a currently valid Office of Management and Budget control  
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
number.  
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). 
 
Sincerely, 
M. Chisum   
/RA/
- 2 -  
   
   
  Thomas R. Farnholtz, Chief Engineering Branch 1  
   
 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document
system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room). 
Sincerely,
/RA/
Thomas R. Farnholtz, Chief  
Engineering Branch 1  
Division of Reactor Safety  
Division of Reactor Safety  
   
   
Docket:  50-382 License:  NPF-38
   
   
Enclosure:  Evaluations of Changes, Tests, and Experiments   
Docket:  50-382
License:  NPF-38
Enclosure:   
Evaluations of Changes, Tests, and Experiments   
and Permanent Plant Modifications Inspection   
and Permanent Plant Modifications Inspection   
Request for Information  
Request for Information  
Line 71: Line 101:
Electronic Distribution to Waterford Steam Electric   
Electronic Distribution to Waterford Steam Electric   
Station, Unit 3  
Station, Unit 3  
 
  - 1 - Enclosure  
 
- 1 -  
Enclosure  
Request for Information  
Request for Information  
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications  
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications  
Inspection Waterford Steam Electric Station, Unit 3  
Inspection  
 
Waterford Steam Electric Station, Unit 3  
Inspection Report:  05000382/2015007  
 
Inspection Dates:  August 10-28, 2015  
Inspection Report:   
05000382/2015007  
Inspection Dates:  
   
August 10-28, 2015  
Inspection Procedure:
IP 71111.17T, Evaluations of Changes, Tests, and Experiments
and Permanent Plant Modifications
Lead Inspector:
Megan Williams, Reactor Inspector
Information Requested for the In-Office Preparation Week
   
   
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications"
The following information should be sent to the Region IV office in hard copy or electronic  
Lead Inspector:  Megan Williams, Reactor Inspector
format (preferred) by August 3, 2015, to the attention of Megan Williams.  We request that you  
 
Information Requested for the In-Office Preparation Week
 
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by August 3, 2015, to the attention of Megan Williams.  We request that you  
categorize the documents in your response with the numbered list below.  If only hard copies of  
categorize the documents in your response with the numbered list below.  If only hard copies of  
the requested documents are available or if the electronic format is too large, please inform the  
the requested documents are available or if the electronic format is too large, please inform the  
lead inspector and provide the documents on the first day of the onsite inspection.  Also, the  
lead inspector and provide the documents on the first day of the onsite inspection.  Also, the  
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks.  We ask that the specific items requested be available and ready for review on the first day of inspection.  If you have any questions regarding this information request, please contact the lead inspector as soon as  
inspectors will select specific items from the information requested below and request from your  
staff additional documents needed during the onsite inspection weeks.  We ask that the specific  
items requested be available and ready for review on the first day of inspection.  If you have any  
questions regarding this information request, please contact the lead inspector as soon as  
possible.  
possible.  
1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since
the last triennial modification inspection that did not result in an evaluation. 
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial
modification inspection that did not result in an application for license amendment. 
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59
screenings and evaluations since the last triennial modification inspection. 
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,
including qualification dates. 
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or
evaluations, including qualification dates. 
7. Procedure(s) for implementing permanent plant modifications. 


  1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 
   
  2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation. 
   
  3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment. 
   
  4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection. 
   
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 
   
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 
- 2 -  
  7. Procedure(s) for implementing permanent plant modifications.   
   
    - 2 -  8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.   
8. A list with descriptions of all permanent plant modifications since the last triennial  
  9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.   
modification inspection.   
  10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.   
   
  Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can  
9. A list with descriptions of all corrective action documents related to permanent plant  
modifications since the last triennial modification inspection.   
   
10. Current revisions of the Technical Specifications and Bases and the Updated Final  
Safety Analysis Report.   
   
Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can  
determine the safety and/or risk significance of the screenings, evaluations, and modifications.   
determine the safety and/or risk significance of the screenings, evaluations, and modifications.   
   
   
Note:  For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications.   
Note:  For this inspection, permanent plant modifications include permanent plant changes,  
 
design changes, set point changes, procedure changes, equivalency evaluations, suitability  
analyses, calculations, and commercial grade dedications.   
Inspector Contact Information:
Megan Williams
Ron Kopriva 
Wayne Sifre 
Reactor Inspector
Reactor Inspector
Reactor Inspector
817-200-1076 
817-200-1104 
   
   
817-200-1193 
megan.williams@nrc.gov
ron.kopriva@nrc.gov 
wayne.sifre@nrc.gov 
   
   
Inspector Contact Information:
   
   
Megan Williams  Ron Kopriva    Wayne Sifre 
Reactor Inspector  Reactor Inspector  Reactor Inspector
817-200-1076  817-200-1104  817-200-1193 
megan.williams@nrc.gov ron.kopriva@nrc.gov  wayne.sifre@nrc.gov 
 
Mailing Address:   
Mailing Address:   
   
   
U.S. NRC, Region IV  
U.S. NRC, Region IV  
Attn:  Megan Williams 1600 East Lamar Blvd.  
Attn:  Megan Williams  
1600 East Lamar Blvd.  
Arlington, TX 76011-4125  
Arlington, TX 76011-4125  


  ML15162A965
SUNSI Review
By:  MJW
ADAMS: 
Yes      No
Sensitive 
Non-Sensitive
Non-Publicly Available 
Publicly Available
Keyword
NRC-002
OFFICE
DRS/EB1/RI:
   
   
   
   
 
C:
NAME
MWilliams
   
   
   
   
 
TFarnholtz
SIGNATURE
/RA/ email
   
   
 
/RA/
DATE
6/10/15
6/11/15


  ML15162A965  SUNSI Review By:  MJW ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI:  C: NAME MWilliams  TFarnholtz SIGNATURE /RA/ email  /RA/ DATE 6/10/15  6/11/15
   
   
  Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
PERMANENT PLANT MODIFICATION
S INSPECTION (05000382/2015007) AND REQUEST FOR INFORMATION
   
   
Distribution
Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015
Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF
EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND
PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND
REQUEST FOR INFORMATION
Distribution  
Regional Administrator (Marc.Dapas@nrc.gov)  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
DRP Director (Troy.Pruett@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov)  Senior Resident Inspector (Frances.Ramirez@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
 
DRS Deputy Director (Jeff.Clark@nrc.gov)   
Senior Resident Inspector (Frances.Ramirez@nrc.gov)  
Resident Inspector (Chris.Speer@nrc.gov)  
Resident Inspector (Chris.Speer@nrc.gov)  
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)  
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)  
 
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)  
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov)  
Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)  
Project Engineer, DRP/D (Brian.Parks@nrc.gov)  
Project Engineer, DRP/D (Jan.Tice@nrc.gov)  
Project Engineer, DRP/D (Jan.Tice@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Project Manager (Michael.Orenak@nrc.gov)  
Project Manager (Michael.Orenak@nrc.gov)  
Team Leader, DRS/TSS (Don.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
Team Leader, DRS/TSS (Don.Allen@nrc.gov)  
 
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Regional Counsel (Karla.Fuller@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)  
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 10:56, 10 January 2025

Notification of Evaluations of Changes, Tests, and Experiments, and Permanent Plant Modifications Inspection (05000382/2015007) and Request for Information
ML15162A965
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/11/2015
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Chisum M
Entergy Operations
M. Williams
References
IR 2015007
Download: ML15162A965 (6)


See also: IR 05000382/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

June 11, 2015

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND

REQUEST FOR INFORMATION

Dear Mr. Chisum:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant

modifications at your Waterford Steam Electric Station, Unit 3, from August 10-28, 2015. The

inspection will consist of three reactor inspectors from the NRCs Region IV office for two

weeks. The inspection will be conducted in accordance with the NRC Inspection

Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant

Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by August 3, 2015. Upon review

of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Leia Milste of your licensing organization. If

there are any questions about this inspection or the material requested, please contact the lead

inspector, Megan Williams, by telephone at 817-200-1076 or by e-mail at

megan.williams@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995. (44 U.S.C. 3501 et seq.) Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

M. Chisum

- 2 -

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRC's document

system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-382

License: NPF-38

Enclosure:

Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications Inspection

Request for Information

Electronic Distribution to Waterford Steam Electric

Station, Unit 3

- 1 -

Enclosure

Request for Information

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications

Inspection

Waterford Steam Electric Station, Unit 3

Inspection Report: 05000382/2015007

Inspection Dates:

August 10-28, 2015

Inspection Procedure:

IP 71111.17T, Evaluations of Changes, Tests, and Experiments

and Permanent Plant Modifications

Lead Inspector:

Megan Williams, Reactor Inspector

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or electronic

format (preferred) by August 3, 2015, to the attention of Megan Williams. We request that you

categorize the documents in your response with the numbered list below. If only hard copies of

the requested documents are available or if the electronic format is too large, please inform the

lead inspector and provide the documents on the first day of the onsite inspection. Also, the

inspectors will select specific items from the information requested below and request from your

staff additional documents needed during the onsite inspection weeks. We ask that the specific

items requested be available and ready for review on the first day of inspection. If you have any

questions regarding this information request, please contact the lead inspector as soon as

possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.

2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since

the last triennial modification inspection that did not result in an evaluation.

3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial

modification inspection that did not result in an application for license amendment.

4. A list with descriptions of all corrective action documents related to 10 CFR 50.59

screenings and evaluations since the last triennial modification inspection.

5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations,

including qualification dates.

6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or

evaluations, including qualification dates.

7. Procedure(s) for implementing permanent plant modifications.

- 2 -

8. A list with descriptions of all permanent plant modifications since the last triennial

modification inspection.

9. A list with descriptions of all corrective action documents related to permanent plant

modifications since the last triennial modification inspection.

10. Current revisions of the Technical Specifications and Bases and the Updated Final

Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can

determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes,

design changes, set point changes, procedure changes, equivalency evaluations, suitability

analyses, calculations, and commercial grade dedications.

Inspector Contact Information:

Megan Williams

Ron Kopriva

Wayne Sifre

Reactor Inspector

Reactor Inspector

Reactor Inspector

817-200-1076

817-200-1104

817-200-1193

megan.williams@nrc.gov

ron.kopriva@nrc.gov

wayne.sifre@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Megan Williams

1600 East Lamar Blvd.

Arlington, TX 76011-4125

ML15162A965

SUNSI Review

By: MJW

ADAMS:

Yes No

Sensitive

Non-Sensitive

Non-Publicly Available

Publicly Available

Keyword

NRC-002

OFFICE

DRS/EB1/RI:

C:

NAME

MWilliams

TFarnholtz

SIGNATURE

/RA/ email

/RA/

DATE

6/10/15

6/11/15

Letter to Michael Chisum from Thomas Farnholtz dated June 11, 2015

SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NOTIFICATION OF

EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND

PERMANENT PLANT MODIFICATIONS INSPECTION (05000382/2015007) AND

REQUEST FOR INFORMATION

Distribution

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.Orenak@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)