{{#Wiki_filter:NUREG-1021, R 9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __
-Plant Systems Outline Form ES-301-2 Facility:         Davis Besse Date of Examination:
Exam Level: RO SRO(I) SRO(U)
__6/15/15 thru 6/26/15
Operating Test No.: __ DB NRC 2015__
__ Exam Level: RO   SRO(I)     SRO(U)         Operating Test No.:
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
__ DB NRC 2015__ Control Room Systems
System / JPM Title Type Code*
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
(JPM New)         N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp                       (JPM 017) D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
(JPM New)
)        (JPM New)       N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path  
N, A, S 1
- Trip Reactor)
S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)
(JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
D, S 2
)          (JPM New)
S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017) D, S 6 S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048) D, S 7 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
(JPM New)
)          (JPM 162)
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)
D, A, S, L 8 In-Plant Systems
(JPM 020)
@ (3 for RO); (3 for SRO
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)
-I); (3 or 2 for SRO
(JPM New)
-U) P1 - (004) / Perform Att
N, A, S, EN 5
. 5 of Control Room Evacuation
S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)
 
D, S 6
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R 2 P2 - (0 64) / Restore EDG to supply 4160 Essential Bus
S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048)
 
D, S 7
DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528 , IA Malfunctions           (JPM 078) D, E 8 @ All RO and SRO control room (and in
S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
(JPM 162)
*Type Codes Criteria for RO
D, A, S, L 8
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3     / / > 1 (control room system)
D, E, R 2
(randomly selected)}}
P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)
D, E 6
P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)
D, E 8
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1}}

Latest revision as of 09:23, 10 January 2025

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 RO Systems Outline
ML15231A837
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A837 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U)

Operating Test No.: __ DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New)

N, A, S 1

S2 - (004) / Recover from Letdown Isolation on High Temp (JPM 017)

D, S 2

S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)

(JPM New)

N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)

(JPM 020)

D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)

(JPM New)

N, A, S, EN 5

S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)

D, S 6

S7 - (016) / Exchange RC Flow Inputs from RPS Ch1 to RPS Ch2 (JPM 048)

D, S 7

S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)

(JPM 162)

D, A, S, L 8

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)

D, E, R 2

P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)

D, E 6

P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)

D, E 8

All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1