ML15231A840: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 9: Line 9:
| docket = 05000346
| docket = 05000346
| license number =  
| license number =  
| contact person = Reeser D W
| contact person = Reeser D
| package number = ML15217A099
| package number = ML15217A099
| document type = License-Operator, Part 55 Examination Related Material
| document type = License-Operator, Part 55 Examination Related Material
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __
-Plant Systems Outline Form ES-301-2 Facility:         Davis Besse Date of Examination:
Exam Level: RO SRO(I) SRO(U)
__6/15/15 thru 6/26/15
Operating Test No.: __DB NRC 2015__
__ Exam Level: RO   SRO(I)     SRO(U)           Operating Test No.:
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)
__DB NRC 2015__ Control Room Systems
System / JPM Title Type Code*
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
                      (JPM New)         N, A, S 1   S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
(JPM New)
)        (JPM New)       N, A, S, L 4P     S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
N, A, S 1
)          (JPM New)
S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)
N, A, S, EN 5             In-Plant Systems
(JPM New)
@ (3 for RO); (3 for SRO
N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)
-I); (3 or 2 for SRO
(JPM New)
-U) P1 - (004) / Perform Att
N, A, S, EN 5
. 5 of Control Room Evacuation
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
 
P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)
DB-OP-02508, CTRM Evacuation (JPM 048) D, E, R 2 P2 - (0 64) / Restore EDG to supply 4160 Essential Bus
D, E, R 2
 
P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)
DB-OP-02538, Loss of D2P and DBP (JPM 079) D, E 6     @ All RO and SRO control room (and in
D, E 6
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.  
*Type Codes Criteria for RO
*Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1}}
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3     / / > 1 (control room system)
    (randomly selected)}}

Latest revision as of 09:23, 10 January 2025

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Srou Systems Outline
ML15231A840
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D
Shared Package
ML15217A099 List:
References
Download: ML15231A840 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:__6/15/15 thru 6/26/15 __

Exam Level: RO SRO(I) SRO(U)

Operating Test No.: __DB NRC 2015__

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)

System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New)

N, A, S 1

S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open)

(JPM New)

N, A, S, L 4P S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)

(JPM New)

N, A, S, EN 5

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

P1 - (004) / Perform Att. 5 of Control Room Evacuation DB-OP-02508, CTRM Evacuation (JPM 048)

D, E, R 2

P2 - (064) / Restore EDG to supply 4160 Essential Bus DB-OP-02538, Loss of D2P and DBP (JPM 079)

D, E 6

All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 9 / 8 / 4 1 / 1 / 1 1 / 1 / > 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3/ 3 / 2 (randomly selected) 1 / 1 / 1