ENS 57488: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 24: Line 24:
The actuation was not initiated in response to actual plant conditions or parameters and was not a manual initiation. Therefore, in accordance with 10 CFR 50.73(a)(l), this telephone notification is provided within 60 days after discovery of the event instead of submitting a written licensee event report.
The actuation was not initiated in response to actual plant conditions or parameters and was not a manual initiation. Therefore, in accordance with 10 CFR 50.73(a)(l), this telephone notification is provided within 60 days after discovery of the event instead of submitting a written licensee event report.
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250108en.html#en57488
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20250110en.html#en57488
}}{{unit info
}}{{unit info
| Unit = 2
| Unit = 2

Latest revision as of 07:20, 10 January 2025

ENS 57488 +/-
Where
Eaver Valley
Pennsylvania (NRC Region 1)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1415.43 h58.976 days <br />8.425 weeks <br />1.939 months <br />)
Opened: Nate Falkenstein
13:07 Jan 7, 2025
NRC Officer: Josue Ramirez
Last Updated: Jan 7, 2025
57488 - NRC Website