| number = ML16053A437
| number = ML16053A437
| issue date = 02/22/2016
| issue date = 02/22/2016
| title = 2016/02/22 NRR E-mail Capture - NRC Staff'S LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
| title = NRR E-mail Capture - NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
| author name = Klett A L
| author name = Klett A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Guth M
| addressee name = Guth M
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Klett, Audrey Sent: Monday, February 22, 2016 3:04 PM To:'Mitch.Guth@fpl.com' Cc:'Hanek, Olga' (Olga.Hanek@fpl.
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:
com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Cz aya, Paul (Paul.Czaya@fpl.com)
Klett, Audrey Sent:
Monday, February 22, 2016 3:04 PM To:
'Mitch.Guth@fpl.com' Cc:
'Hanek, Olga' (Olga.Hanek@fpl.com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)


==Subject:==
==Subject:==
NRC Staff's LIC-109 Acceptance Review Resu lts for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interv al (TAC Nos. MF7277 and MF7278; L-2016-006)Hi Mitch,
NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
 
Hi Mitch, By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Management System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Manageme nt System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.
 
If you have any questions, please call me at (301) 415-0489.
The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.  
 
If you have any questions, please call me at (301) 415-0489.  
 
Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489  
Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489  


Hearing Identifier: NRR_PMDA Email Number: 2669   Mail Envelope Properties   (Audrey.Klett@nrc.gov20160222150400)
Hearing Identifier:
NRR_PMDA Email Number:
2669 Mail Envelope Properties (Audrey.Klett@nrc.gov20160222150400)  


==Subject:==
==Subject:==
NRC Staff's LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006) Sent Date:   2/22/2016 3:04:02 PM Received Date: 2/22/2016 3:04:00 PM From:   Klett, Audrey Created By:   Audrey.Klett@nrc.gov Recipients:     "'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com> Tracking Status: None
NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com> Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Sent Date:
Tracking Status: None "'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com> Tracking Status: None  
2/22/2016 3:04:02 PM Received Date:
2/22/2016 3:04:00 PM From:
Klett, Audrey Created By:
Audrey.Klett@nrc.gov Recipients:  
"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>
Tracking Status: None  
"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com>
Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None  
"'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1615 2/22/2016 3:04:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:


Post Office:      Files    Size      Date & Time MESSAGE    1615      2/22/2016 3:04:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
1 NRR-PMDAPEm Resource From:
1 NRR-PMDAPEm Resource From: Klett, Audrey Sent: Monday, February 22, 2016 3:04 PM To:'Mitch.Guth@fpl.com' Cc:'Hanek, Olga' (Olga.Hanek@fpl.
Klett, Audrey Sent:
com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Cz aya, Paul (Paul.Czaya@fpl.com)
Monday, February 22, 2016 3:04 PM To:
'Mitch.Guth@fpl.com' Cc:
'Hanek, Olga' (Olga.Hanek@fpl.com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)


==Subject:==
==Subject:==
NRC Staff's LIC-109 Acceptance Review Resu lts for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interv al (TAC Nos. MF7277 and MF7278; L-2016-006)Hi Mitch,
NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
 
Hi Mitch, By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Management System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Manageme nt System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.
 
If you have any questions, please call me at (301) 415-0489.
The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.  
 
If you have any questions, please call me at (301) 415-0489.  
 
Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489  
Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489  


Hearing Identifier: NRR_PMDA Email Number: 2669   Mail Envelope Properties   (Audrey.Klett@nrc.gov20160222150400)
Hearing Identifier:
NRR_PMDA Email Number:
2669 Mail Envelope Properties (Audrey.Klett@nrc.gov20160222150400)  


==Subject:==
==Subject:==
NRC Staff's LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006) Sent Date:   2/22/2016 3:04:02 PM Received Date: 2/22/2016 3:04:00 PM From:   Klett, Audrey Created By:   Audrey.Klett@nrc.gov Recipients:     "'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com> Tracking Status: None
NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com> Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Sent Date:
Tracking Status: None "'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com> Tracking Status: None  
2/22/2016 3:04:02 PM Received Date:
 
2/22/2016 3:04:00 PM From:
Post Office:     Files     Size     Date & Time MESSAGE   1615     2/22/2016 3:04:00 PM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Klett, Audrey Created By:
Audrey.Klett@nrc.gov Recipients:  
"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>
Tracking Status: None  
"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com>
Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>
Tracking Status: None  
"'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1615 2/22/2016 3:04:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:}}

Latest revision as of 03:08, 10 January 2025

NRR E-mail Capture - NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)
ML16053A437
Person / Time
Site: Turkey Point  
Issue date: 02/22/2016
From: Audrey Klett
Plant Licensing Branch II
To: Guth M
Florida Power & Light Co
References
L-2016-006, MF7277, MF7278
Download: ML16053A437 (2)


Text

1 NRR-PMDAPEm Resource From:

Klett, Audrey Sent:

Monday, February 22, 2016 3:04 PM To:

'Mitch.Guth@fpl.com' Cc:

'Hanek, Olga' (Olga.Hanek@fpl.com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)

Hi Mitch, By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Management System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.

If you have any questions, please call me at (301) 415-0489.

Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489

Hearing Identifier:

NRR_PMDA Email Number:

2669 Mail Envelope Properties (Audrey.Klett@nrc.gov20160222150400)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)

Sent Date:

2/22/2016 3:04:02 PM Received Date:

2/22/2016 3:04:00 PM From:

Klett, Audrey Created By:

Audrey.Klett@nrc.gov Recipients:

"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>

Tracking Status: None

"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com>

Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>

Tracking Status: None

"'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1615 2/22/2016 3:04:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

1 NRR-PMDAPEm Resource From:

Klett, Audrey Sent:

Monday, February 22, 2016 3:04 PM To:

'Mitch.Guth@fpl.com' Cc:

'Hanek, Olga' (Olga.Hanek@fpl.com); 'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com); Czaya, Paul (Paul.Czaya@fpl.com)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)

Hi Mitch, By letter L-2016-006 dated January 14, 2016 (Agencywide Documents Access and Management System Accession No. ML16033A355), Florida Power & Light Company (the licensee) submitted Relief Request No. 4 for the fifth 10-year inservice inspection interval for Turkey Point Nuclear Generating Unit Nos. 3 and 4. The NRC performed an acceptance review of the submittal to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff reviewed the application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC needs additional information, the staff will notify you by separate correspondence.

If you have any questions, please call me at (301) 415-0489.

Audrey Klett Project Manager NRR/DORL/LPLII-2 301-415-0489

Hearing Identifier:

NRR_PMDA Email Number:

2669 Mail Envelope Properties (Audrey.Klett@nrc.gov20160222150400)

Subject:

NRC Staffs LIC-109 Acceptance Review Results for Turkey Point 3 & 4 Relief Request No. 4 for the 5th 10-Year ISI Interval (TAC Nos. MF7277 and MF7278; L-2016-006)

Sent Date:

2/22/2016 3:04:02 PM Received Date:

2/22/2016 3:04:00 PM From:

Klett, Audrey Created By:

Audrey.Klett@nrc.gov Recipients:

"'Hanek, Olga' (Olga.Hanek@fpl.com)" <Olga.Hanek@fpl.com>

Tracking Status: None

"'Mihalakea, Stavroula' (Stavroula.Mihalakea@fpl.com)" <Stavroula.Mihalakea@fpl.com>

Tracking Status: None "Czaya, Paul (Paul.Czaya@fpl.com)" <Paul.Czaya@fpl.com>

Tracking Status: None

"'Mitch.Guth@fpl.com'" <Mitch.Guth@fpl.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1615 2/22/2016 3:04:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: