ML16064A159: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML16064A159 | | number = ML16064A159 | ||
| issue date = 03/01/2016 | | issue date = 03/01/2016 | ||
| title = | | title = Post Exam Comments, Resolution, and Technical References (Folder 1) | ||
| author name = D'Antonio J | | author name = D'Antonio J | ||
| author affiliation = NRC/RGN-I/DRS/OB | | author affiliation = NRC/RGN-I/DRS/OB | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC Resolution of Facility Comment Facility Comment: Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03. NRC Resolution: | {{#Wiki_filter:NRC Resolution of Facility Comment Facility Comment: | ||
Facility comment accepted. | Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03. | ||
Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec. decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. | NRC Resolution: | ||
AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use. Robert Forst NRC Resolution of Facility Comment Facility Comment: Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03. NRC Resolution: | Facility comment accepted. Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide | ||
Facility comment accepted. | |||
Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec. decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. | Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec. | ||
AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use. Robert Forst}} | decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use. | ||
Robert Forst | |||
NRC Resolution of Facility Comment Facility Comment: | |||
Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03. | |||
NRC Resolution: | |||
Facility comment accepted. Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide | |||
Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec. | |||
decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use. | |||
Robert Forst}} | |||
Latest revision as of 02:31, 10 January 2025
| ML16064A159 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 03/01/2016 |
| From: | D'Antonio J Operations Branch I |
| To: | Exelon Generation Co |
| Shared Package | |
| ML15286A047 | List: |
| References | |
| TAC U01912 | |
| Download: ML16064A159 (2) | |
Text
NRC Resolution of Facility Comment Facility Comment:
Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03.
NRC Resolution:
Facility comment accepted. Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide
Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec.
decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use.
Robert Forst
NRC Resolution of Facility Comment Facility Comment:
Scenario SEG-6213E rev 001 event 3 is a bus 011 lockout. The correct Technical Specification call for this event is 3.03.
NRC Resolution:
Facility comment accepted. Review of facility electrical Technical Specification surveillance requirements shows a requirement that offsite power sources be able to power onsite busses to be considered operable. With a fault on the bus, no source can power the bus, all are considered inoperable, hence T.S. 3.0.3 is the correct call rather than 3.8.1.1 & 3.8.2.1 as listed in the scenario guide
Mr. Joe D' Antonio Joe this letter is to confirm that during the administration of the operating test for Limerick generating station between 1/19/2016 and 1/21/2016 SEG-6213E revOOl contained an error for the Tech. Spec.
decision for event 3 011 bus lockout. After review between Operations management, training management and the lead exam author it was agreed that Tech. Spec. 3.03 is the appropriate determination for this condition. AR 2543804-26 has been generated to ensure that SEG-6213E revOOl is revised to correct this error prior to future use.
Robert Forst