ML16341B394: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML16341B394 | | number = ML16341B394 | ||
| issue date = 10/24/2016 | | issue date = 10/24/2016 | ||
| title = | | title = 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.8-5, Plan Elevation of Containment Detailing Location of Hydrogen Monitoring Sample Ports ESR-1&7 | ||
| author name = | | author name = | ||
| author affiliation = Indiana Michigan Power Co | | author affiliation = Indiana Michigan Power Co | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:DESCRIPTION | {{#Wiki_filter:DESCRIPTION TITLE REVISIONS DWG. NO. | ||
: 2. REFERENCE FSAR FIG. 5.5- 2A AMERICAN ELECTRIC POWER | NOTES: | ||
: 1. UNIT NO. 1 SHOWN (UNIT NO. 2 OPPOSITE HAND) | |||
COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN REVISED PER UCR 1077 REV. NO. | : 2. REFERENCE FSAR FIG. 5.5-2A AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN REVISED PER UCR 1077 REV. NO. | ||
17 Plan Elevation of Containment (Elevation - 650'-0") Detailing Location of Hydrogen Monitoring Sample Ports ESR-1 & 7 FSAR FIG. 7.8-5 SH 1 of 1 UNIT 1 Roof Elev. | |||
681'-11"}} | |||
Latest revision as of 18:13, 9 January 2025
| ML16341B394 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/24/2016 |
| From: | Indiana Michigan Power Co |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16336A263 | List:
|
| References | |
| AEP-NRC-2016-42 | |
| Download: ML16341B394 (1) | |
Text
DESCRIPTION TITLE REVISIONS DWG. NO.
NOTES:
- 1. UNIT NO. 1 SHOWN (UNIT NO. 2 OPPOSITE HAND)
- 2. REFERENCE FSAR FIG. 5.5-2A AMERICAN ELECTRIC POWER COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN REVISED PER UCR 1077 REV. NO.
17 Plan Elevation of Containment (Elevation - 650'-0") Detailing Location of Hydrogen Monitoring Sample Ports ESR-1 & 7 FSAR FIG. 7.8-5 SH 1 of 1 UNIT 1 Roof Elev.
681'-11"