{{#Wiki_filter:I An EDISON INTERNATIONAL Company May 11, 2017 ATIN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 | |||
==Subject:== | |||
Docket Nos. 50-206, 50-361, 50-362 and 72-41 Mark Morgan Regulatory Affairs 10 CFR 50.36a 2016 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3 and Independent Spent Fuel Storage Installation | |||
==Dear Sir or Madam:== | |||
As required by San Onofre Nuclear Generating Station (SONGS) Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.3 and SONGS Units 2 and 3 Permanently Defueled TS Section 5. 7.1.2, Southern California Edison (SCE) is submitting the 2016 Annual Radiological Environmental Operating Report (AREOR) for SONGS Units 1, 2 and 3. | |||
The AREOR covers the operation of SONGS during January 1, 2016 through December 31, 2016 and includes summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program (REMP). | |||
In addition, the AREOR includes the results for direct radiation monitoring near the Independent Spent Fuel Storage Installation. | |||
This letter does not contain any commitments. | |||
If you have any questions or require additional information, please contact me at (949) 368-67 45. | |||
Sincerely, | |||
==Enclosure:== | |||
2016 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report P.O. Box 128 San Clemente, CA 92672 | |||
Document Control Desk cc: | |||
K. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, San Onofre Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI R. K Lupo, California Department of Public Health May 11, 2017 | |||
Enclosure 2016 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report}} | |||
Latest revision as of 21:43, 8 January 2025
| ML17135A360 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/11/2017 |
| From: | Morgan M Southern California Edison Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17135A363 | List: |
| References | |
| Download: ML17135A360 (3) | |
Text
I An EDISON INTERNATIONAL Company May 11, 2017 ATIN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Subject:
Docket Nos. 50-206, 50-361, 50-362 and 72-41 Mark Morgan Regulatory Affairs 10 CFR 50.36a 2016 Annual Radiological Environmental Operating Report San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3 and Independent Spent Fuel Storage Installation
Dear Sir or Madam:
As required by San Onofre Nuclear Generating Station (SONGS) Unit 1 Permanently Defueled Technical Specification (TS) Section D6.9.1.3 and SONGS Units 2 and 3 Permanently Defueled TS Section 5. 7.1.2, Southern California Edison (SCE) is submitting the 2016 Annual Radiological Environmental Operating Report (AREOR) for SONGS Units 1, 2 and 3.
The AREOR covers the operation of SONGS during January 1, 2016 through December 31, 2016 and includes summaries, interpretations, and analyses of trends of the results of the Radiological Environmental Monitoring Program (REMP).
In addition, the AREOR includes the results for direct radiation monitoring near the Independent Spent Fuel Storage Installation.
This letter does not contain any commitments.
If you have any questions or require additional information, please contact me at (949) 368-67 45.
Sincerely,
Enclosure:
2016 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report P.O. Box 128 San Clemente, CA 92672
Document Control Desk cc:
K. Kennedy, Regional Administrator, NRC Region IV M. G. Vaaler, NRC Project Manager, San Onofre Units 1, 2 and 3 W. C. Allen, NRC Project Manager, SONGS ISFSI R. K Lupo, California Department of Public Health May 11, 2017
Enclosure 2016 San Onofre Nuclear Generating Station Annual Radiological Environmental Operating Report