ML17250A540: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATORY r | {{#Wiki_filter:REGULATORY r | ||
ACCESSION NBR: 8009090513 | "ORMATION DISTRIBUTION SYS "M (RIDS) | ||
ACCESSION NBR: 8009090513 DOC ~ DATE: 80/09/03 NOTARIZED: | |||
Ginna Nuclear Pl ant | NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Pl ant P Unit ii Rochester G | ||
REC IP ~ iVAME | 05000244 AUTH INANE AUTHOR AFFIL'IATION HHITEE L. D ~ | ||
Rochester Gas L Electric Corp. | |||
REC IP ~ iVAME RECIPIENT AFFILIATION CRUTCHFIELDPD ~ | |||
Operating Reactors Branch 5 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Responds | Responds to NRC 800811 request for info. re generic review of degraded grid,voltage.All low-voltagegi25 volt ac Class IE buses are supplied from either uniterruptable power soUrce or regulated 480/125-volt transformers'ISTRIBUTION CODE: | ||
A DIBS COPIES RECEIYED:LiTR g'NCL Q SIZE I TITLE: Onsi te Emer gency Power Systems NOTES:1 copy:SEP Sect. | |||
Ldr. | |||
05000244 RECIPIENT ID CODE/NAME ACTION: | |||
TOTAL NUMBER | CRUTCHF-IELD 04 INTERNAL: AEOD ISC SYS BR 09 MPA 18 OELD 17 OR BR 12 G FILE 01 COPIES Lfl'TR EN L | ||
7 RECIPIENT ID CODE/NAME'EN ISSUES BR13 ILE 06 NRC PDR 02 OP EX EVALl BR11, POHER SYS BR 14 COPIES LTTR ENCL'XTERNAL: | |||
ACRS NSIC 16 05 16 1 | |||
LPDR 03 | |||
~EF'e tgao o | |||
TOTAL NUMBER OP COPIES REQUIRED: | |||
LTTR Pf ENCL; gj/ | |||
0 a | 0 a | ||
4 | 'P 4 | ||
e | |||
> I 4 | |||
I 4 | F st "fs'' | ||
F st "fs'' | I tg f | ||
tg | II C | ||
I "zw L | |||
"zw L | |||
n | n | ||
[f | |||
'V | |||
~ | |||
( | |||
lg | lg | ||
'1\\ | |||
II II | II II | ||
~/ //IIIIIII/l/III I/I/IIIIIII | |||
. >'igjje IIIIIIIII 5;'IIII//8 | |||
. | /I/I/I///IIII ROCHESTER GAS AND ELECTRIC CORPORATION o | ||
89 EAST AVENUE, ROCHESTER, N,Y. 14649 LEON D. WHITE, JR. | |||
VICE PRESIOCNT TCI.CPHONC ARCA COOC 7ld 546-2700 September 3, | |||
1980 Office of Nuclear Reactor Regulation Attention: | |||
Mr. Dennis.M. Crutchfield, Chief Operating Reactors Branch No. | |||
5 U. | |||
S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 | |||
==Subject:== | ==Subject:== | ||
Degraded Grid Voltage, Generic Review | Degraded Grid Voltage, Generic Review | ||
==Dear Mr. | ==Dear Mr. Crutchfield:== | ||
In response to your August 11, 1980 request for additional information the following is provided for your use in completing your generic study. | In response to your August 11, 1980 request for additional information the following is provided for your use in completing your generic study. | ||
All low-volta'ge, 125 volt, AC Class IE buses at. Ginna Station are supplied from either an uninterruptable power source (UPS) or from regulated 480/125 volt transformers. | All low-volta'ge, 125 volt, AC Class IE buses at. Ginna Station are supplied from either an uninterruptable power source (UPS) or from regulated 480/125 volt transformers. | ||
Thus these 125V IE buses are not susceptible to variations in offsite source voltage levels. | |||
In this way the reguirements of GDC-13 are met. | |||
The instrumentation and/or controls supplied by these IE buses will perform over their anticipated ranges during the offsite voltage ranges established in our December 6, | |||
1979 report. | |||
For this | |||
: reason, the 125 volt Class busses were not modeled in the Ginna interactive load flow program and no calculations were performed on this system. | |||
Sincerely, L. D. Whi e, Jr. | Sincerely, L. D. Whi e, Jr. | ||
POI5 5 | POI5 5/o SI909OSS PL J | ||
t\ | t\\ | ||
t | t | ||
'I}} | |||
Latest revision as of 11:56, 8 January 2025
| ML17250A540 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 09/03/1980 |
| From: | White L ROCHESTER GAS & ELECTRIC CORP. |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| TASK-08-01.A, TASK-8-1.A, TASK-RR NUDOCS 8009090513 | |
| Download: ML17250A540 (4) | |
Text
REGULATORY r
"ORMATION DISTRIBUTION SYS "M (RIDS)
ACCESSION NBR: 8009090513 DOC ~ DATE: 80/09/03 NOTARIZED:
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Pl ant P Unit ii Rochester G
05000244 AUTH INANE AUTHOR AFFIL'IATION HHITEE L. D ~
Rochester Gas L Electric Corp.
REC IP ~ iVAME RECIPIENT AFFILIATION CRUTCHFIELDPD ~
Operating Reactors Branch 5
SUBJECT:
Responds to NRC 800811 request for info. re generic review of degraded grid,voltage.All low-voltagegi25 volt ac Class IE buses are supplied from either uniterruptable power soUrce or regulated 480/125-volt transformers'ISTRIBUTION CODE:
A DIBS COPIES RECEIYED:LiTR g'NCL Q SIZE I TITLE: Onsi te Emer gency Power Systems NOTES:1 copy:SEP Sect.
Ldr.
05000244 RECIPIENT ID CODE/NAME ACTION:
CRUTCHF-IELD 04 INTERNAL: AEOD ISC SYS BR 09 MPA 18 OELD 17 OR BR 12 G FILE 01 COPIES Lfl'TR EN L
7 RECIPIENT ID CODE/NAME'EN ISSUES BR13 ILE 06 NRC PDR 02 OP EX EVALl BR11, POHER SYS BR 14 COPIES LTTR ENCL'XTERNAL:
LPDR 03
~EF'e tgao o
TOTAL NUMBER OP COPIES REQUIRED:
LTTR Pf ENCL; gj/
0 a
'P 4
e
> I 4
F st "fs
I tg f
II C
I "zw L
n
[f
'V
~
(
lg
'1\\
II II
~/ //IIIIIII/l/III I/I/IIIIIII
. >'igjje IIIIIIIII 5;'IIII//8
/I/I/I///IIII ROCHESTER GAS AND ELECTRIC CORPORATION o
89 EAST AVENUE, ROCHESTER, N,Y. 14649 LEON D. WHITE, JR.
VICE PRESIOCNT TCI.CPHONC ARCA COOC 7ld 546-2700 September 3,
1980 Office of Nuclear Reactor Regulation Attention:
Mr. Dennis.M. Crutchfield, Chief Operating Reactors Branch No.
5 U.
S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Degraded Grid Voltage, Generic Review
Dear Mr. Crutchfield:
In response to your August 11, 1980 request for additional information the following is provided for your use in completing your generic study.
All low-volta'ge, 125 volt, AC Class IE buses at. Ginna Station are supplied from either an uninterruptable power source (UPS) or from regulated 480/125 volt transformers.
Thus these 125V IE buses are not susceptible to variations in offsite source voltage levels.
In this way the reguirements of GDC-13 are met.
The instrumentation and/or controls supplied by these IE buses will perform over their anticipated ranges during the offsite voltage ranges established in our December 6,
1979 report.
For this
- reason, the 125 volt Class busses were not modeled in the Ginna interactive load flow program and no calculations were performed on this system.
Sincerely, L. D. Whi e, Jr.
POI5 5/o SI909OSS PL J
t\\
t
'I