ML17252A900: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NKA57 (~0°')(1 0~7052A,';9) 0 06/~/73 2 ICS I DC C NYt< | {{#Wiki_filter:\\.,JI NKA57 | ||
(~0°')(1 0~7052A,';9) 0 06/~/73 2 ICS I DC C NYt< | |||
: 6. 6* .,. ' | ,38 FR DC NEWYORK NY | ||
WE | ,~, 06-08 61~P EDT S JA.ES P OREILLY DIR EGULATO Y OPERATIONS REGION t US ATO IC ENE GY COMMSISSION 970 BROAD ST NEWARK NJ 07102 REI t DIAN POINT UNIT | ||
#2 -FACILITY OPERATING LICENSE OPR-20 IN ACCORDANCE ITH THE REQUIREMENTS OF TECHNICAL SPECIFICATION | |||
: 6. 6 *.,. ' | |||
WE ISH TO INFORM YOU OF AN ABNORMAL OCCURRENCE, | |||
{A*O* 3 ) | {A*O* 3 ) | ||
WHICH TOOK PLCE ON JUNE 7 ,973* | WHICH TOOK PLCE ON JUNE 7,973* | ||
CXJRING THE COURSE OF PERFORMING PERIODIC TESTS ANO CALBBRATION CHECKS RELATING TO REACTOR COOLANT FLOW AS REQUIRED BY THE FACLLYTY TECHNICAL SPEFICICATTONS, IT WAS DETERMI~D THAT THE FLOW TRIP SETTINGS WERE SLIGHTLY BELOW THOSE SPECIFIED TN SPECIFICATION 2.3~1, AT THE TIME OF THE OCCURENCE, THE REACTOR WAS CRITICAL AT ZERO P OWER FOR ZERO POWER PHYSICS | |||
CXJRING THE COURSE OF PERFORMING PERIODIC TESTS ANO CALBBRATION CHECKS RELATING TO REACTOR COOLANT FLOW AS REQUIRED BY THE | : TESTING, TN ACCORDANCE WITH THE REQUIREMENTS OF TECHN!CAL SPECTFTCATTON 6,2, NOTIFICATION OF THE CHAIRMAN OF THE NUCLEAR FACILITIES AFETY COMMITTEE HAS TAKEN PLACE. | ||
R A FASANO OF YOUR OFFICE WAS ALSO NOTIFIED BY TELEPHONE ON JUNE g 1973 OF THE OCCURRENCE Y MR JOHN M MAKE | |||
FACLLYTY TECHNICAL SPEFICICATTONS, IT WAS DETERMI~D THAT THE FLOW TRIP SETTINGS WERE SLIGHTLY BELOW THOSE SPECIFIED TN SPECIFICATION 2.3~1, AT THE TIME OF THE OCCURENCE, THE REACTOR WAS CRITICAL AT ZERO P OWER FOR ZERO POWER PHYSICS TESTING, TN ACCORDANCE WITH THE REQUIREMENTS OF TECHN!CAL SPECTFTCATTON 6,2, NOTIFICATION OF THE CHAIRMAN OF THE NUCLEAR FACILITIES AFETY COMMITTEE HAS TAKEN PLACE. | : ACE, CHIEF ENGINEER, UNIT NO 2 Sf' 1201 IR5-60) r | ||
R A FASANO OF YOUR OFFICE WAS ALSO NOTIFIED BY TELEPHONE ON JUNE g 1973 OF THE OCCURRENCE Y MR JOHN M MAKE ACE, CHIEF | \\.. | ||
~ E ARE CURRENTLY INVESTIGATING THE CAUSE OF THE OCCURRENCE ANO THE RESULTS OF OUR INVESTIGATION A D CORRECTIVE ACTION TAKEN WILL E SUBMITTED IN THE REQUIRED TEN DAY REPORT TO THE DIRECTOR OF LICENSING WILLIA~ E CALOWELL-CON EDISON CO 4 IRVI G PLACE NY NY,0003 TELEX NB | |||
,2 7339 SF-1201 (RMIJ) | |||
) | |||
~ - - ___.._ ______ | |||
J | |||
J | ,}} | ||
Latest revision as of 11:27, 8 January 2025
| ML17252A900 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/08/1973 |
| From: | Caldwell W Con Edison, Consolidated Edison Co of New York |
| To: | O'Reilly J US Atomic Energy Commission (AEC) |
| References | |
| Download: ML17252A900 (2) | |
Text
\\.,JI NKA57
(~0°')(1 0~7052A,';9) 0 06/~/73 2 ICS I DC C NYt<
,38 FR DC NEWYORK NY
,~, 06-08 61~P EDT S JA.ES P OREILLY DIR EGULATO Y OPERATIONS REGION t US ATO IC ENE GY COMMSISSION 970 BROAD ST NEWARK NJ 07102 REI t DIAN POINT UNIT
- 2 -FACILITY OPERATING LICENSE OPR-20 IN ACCORDANCE ITH THE REQUIREMENTS OF TECHNICAL SPECIFICATION
- 6. 6 *.,. '
WE ISH TO INFORM YOU OF AN ABNORMAL OCCURRENCE,
{A*O* 3 )
WHICH TOOK PLCE ON JUNE 7,973*
CXJRING THE COURSE OF PERFORMING PERIODIC TESTS ANO CALBBRATION CHECKS RELATING TO REACTOR COOLANT FLOW AS REQUIRED BY THE FACLLYTY TECHNICAL SPEFICICATTONS, IT WAS DETERMI~D THAT THE FLOW TRIP SETTINGS WERE SLIGHTLY BELOW THOSE SPECIFIED TN SPECIFICATION 2.3~1, AT THE TIME OF THE OCCURENCE, THE REACTOR WAS CRITICAL AT ZERO P OWER FOR ZERO POWER PHYSICS
- TESTING, TN ACCORDANCE WITH THE REQUIREMENTS OF TECHN!CAL SPECTFTCATTON 6,2, NOTIFICATION OF THE CHAIRMAN OF THE NUCLEAR FACILITIES AFETY COMMITTEE HAS TAKEN PLACE.
R A FASANO OF YOUR OFFICE WAS ALSO NOTIFIED BY TELEPHONE ON JUNE g 1973 OF THE OCCURRENCE Y MR JOHN M MAKE
- ACE, CHIEF ENGINEER, UNIT NO 2 Sf' 1201 IR5-60) r
\\..
~ E ARE CURRENTLY INVESTIGATING THE CAUSE OF THE OCCURRENCE ANO THE RESULTS OF OUR INVESTIGATION A D CORRECTIVE ACTION TAKEN WILL E SUBMITTED IN THE REQUIRED TEN DAY REPORT TO THE DIRECTOR OF LICENSING WILLIA~ E CALOWELL-CON EDISON CO 4 IRVI G PLACE NY NY,0003 TELEX NB