ML17272A894: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) StriderTol Bot change |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/21/1980 | | issue date = 03/21/1980 | ||
| title = Forwards Final Deficiency Rept Re Pipe Whip Restraint Problems | | title = Forwards Final Deficiency Rept Re Pipe Whip Restraint Problems | ||
| author name = | | author name = Renberger D | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | ||
| addressee name = | | addressee name = Engelken R | ||
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) | | addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) | ||
| docket = 05000397 | | docket = 05000397 | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:DISTRIBUTION CODE: 8019S COPIES RECEIVED:LTR g ENCL 9 SIZE: TITLE: Construction Deficiency Report (10CFR50.55E') | {{#Wiki_filter:DISTRIBUTION CODE: | ||
Pen-5 8'Q./9-TZ-~NOTES.PN RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM P7-/pit/Cg 1 1 15 BC 4~~A"f 1 1 20 LA g~g+y'1 21 AD~mg 1 1 INTERNAL: 1 1 1 1 1 1 1 1 1 1 1 1 02 NRC PDR 1 2 2 07 EDO L STAFF 1 1 09 DEPY DIR=OPS 1 1 11 STANDRDS DEV 1 1 1 16 AO FOR ENGR 1 1 1 17 AD REAC SFTY 1 1 1 23 OELD 1 1 AO/S I TE TECH 1.1 1 DIRECTOR DSE 1 1 1 HANAUERgS~1 1 1'MATL ENG BR 1 1 1 POWER SYS BR 1 1 0 08 MPA 10 QAB 13F IELD COOR/IE" 17 AD PLANT SYS 22 DIR OPM AD/ | 8019S COPIES RECEIVED:LTR g ENCL 9 SIZE: | ||
NO DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P~NAME RECIPIENT AFFILIATION ENGELKENpR | TITLE: Construction Deficiency Report (10CFR50.55E') | ||
~li, Region 5~San Francisco~ | Pen - | ||
Office of the Director | 5 8'Q. | ||
/9-TZ- | |||
~ | |||
NOTES. PN RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION: | |||
14 PM P7 -/pit/Cg 1 | |||
1 15 BC 4 ~~ A"f 1 | |||
1 20 LA g~g +y' 1 | |||
21 AD ~mg 1 | |||
1 INTERNAL: | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
02 NRC PDR 1 | |||
2 2 | |||
07 EDO L STAFF 1 | |||
1 09 DEPY DIR= OPS 1 | |||
1 11 STANDRDS DEV 1 | |||
1 1 | |||
16 AO FOR ENGR 1 | |||
1 1 | |||
17 AD REAC SFTY 1 | |||
1 1 | |||
23 OELD 1 | |||
1 AO/S I TE TECH 1 | |||
.1 1 | |||
DIRECTOR DSE 1 | |||
1 1 | |||
HANAUERgS ~ | |||
1 1 | |||
1 | |||
'MATL ENG BR 1 | |||
1 1 | |||
POWER SYS BR 1 | |||
1 0 | |||
08 MPA 10 QAB 13F IELD COOR/IE" 17 AD PLANT SYS 22 DIR OPM AD/RCI/IK AEOD GEOSC IENCES BR IKC SYS BR MECH ENG BR STRUCT ENG BR RKGULATO INFORMATION DISTRIBUTION TEN (RIOS) r 41~ | |||
ACCESSION NBR:8004020302 DOC ~ DATE; 80/03/21 NOTARIZED: | |||
NO DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P ~ NAME RECIPIENT AFFILIATION ENGELKENpR ~ li, Region 5~ | |||
San Francisco~ | |||
Office of the Director | |||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards final deficiency rept re pipe whip restraint problems.EXTERNAL: 03 LPDR 20 ACRS 1 1 ib 16 04 NSIC Apg~3]pe gb TOTAL NUMBER OF COPIES REQUIRED~LTTR~ENCL r II> | Forwards final deficiency rept re pipe whip restraint problems. | ||
=~Washington Public Power Supply System A JOINT OPERATING AGENCY P.O.BOX 966 3000 GSO, WASHINGTON WAS RICHLAND.WASHINCSON 9935?RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr.R.H.Engelken, Director Nucl ear Regul atory Commission Region V Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N.Cal.ifornia Boulevard Walnut Creek, California 94596 | EXTERNAL: 03 LPDR 20 ACRS 1 | ||
1 ib 16 04 NSIC Apg | |||
~ | |||
3 ]pe gb TOTAL NUMBER OF COPIES REQUIRED ~ | |||
LTTR ~ | |||
ENCL | |||
r II> | |||
= ~ | |||
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 966 3000 GSO, WASHINGTON WAS RICHLAND. WASHINCSON 9935? | |||
RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr. R. | |||
H. Engelken, Director Nucl ear Regul atory Commission Region V | |||
Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N. Cal.ifornia Boulevard Walnut Creek, California 94596 | |||
==Subject:== | ==Subject:== | ||
'PPSS NUCLEAR PROJECT NO. | |||
2 DOCKET NUMBER 50-397, CPPR-93 CORRECTIVE ACTION PROGRAM FOR RESOLUTION OF PIPE WHIP RESTRAINT PROBLEMS, REPORTABLE DEFICIENCY 10CFR50.55 e | |||
==Reference:== | ==Reference:== | ||
1) | |||
Letter G02-79-226, DL Renberger to RH Engelken, dated 12/10/79 2) | |||
Letter G02-80-28, DL Renberger to RH Engelken, dated 2/1/80 3) | |||
NRC Letter, RH Engelken to NO Strand, dated 2/8/80 | |||
1) | ==Dear Mr. Engelken:== | ||
Reference | |||
: 1) responded to NRC concerns associated with the Pipe Whip Restraint Corrective Action Program and was established as an interim 50.55(e) report in a-telephone conversation with D. Haist of Region V. | |||
Reference | |||
: 2) letter provided more detailed information on the Pipe Whip Restraint Corrective Action Program. | |||
Reference | |||
: 3) concurred with our plans for corrective action. | |||
This letter constitutes our final report under the provisions of | |||
\\ | |||
80040@0 ~c m | |||
RH Engelken Nuclear Regulato~ | |||
Commission March Page | |||
: Two, 50.55(e) on the corrective action for the Pipe Whip Restraints, The status is attached. | |||
Please contact us if you have any questions. | |||
Very truly yours, DLR/JEL/ln | Very truly yours, DLR/JEL/ln | ||
==Attachment:== | ==Attachment:== | ||
As stated 0, L.. RENBERCiER Assistant Director Technology cc: | |||
As stated 0, L..RENBERCiER Assistant Director Technology cc: JM Blas-88R, NY HR Canter-BSR, NY Spike Ford, NUS JR Lewis-BPA, Ri,chland | JM Blas - 88R, NY HR Canter - BSR, NY Spike Ford, NUS JR Lewis - BPA, Ri,chland V | ||
Stello - Office of Inspection 8 Enforcement, Washington, D.C. | |||
JJ Verderber - B8R, NY}} | |||
Latest revision as of 08:57, 8 January 2025
| ML17272A894 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/21/1980 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17272A895 | List: |
| References | |
| GO2-80-74, NUDOCS 8004020302 | |
| Download: ML17272A894 (4) | |
Text
DISTRIBUTION CODE:
8019S COPIES RECEIVED:LTR g ENCL 9 SIZE:
TITLE: Construction Deficiency Report (10CFR50.55E')
Pen -
5 8'Q.
/9-TZ-
~
NOTES. PN RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LJTR ENCL ID CODE/NAME LTTR ENCL ACTION:
14 PM P7 -/pit/Cg 1
1 15 BC 4 ~~ A"f 1
1 20 LA g~g +y' 1
21 AD ~mg 1
1 INTERNAL:
1 1
1 1
1 1
1 1
1 1
1 1
02 NRC PDR 1
2 2
07 EDO L STAFF 1
1 09 DEPY DIR= OPS 1
1 11 STANDRDS DEV 1
1 1
16 AO FOR ENGR 1
1 1
17 AD REAC SFTY 1
1 1
23 OELD 1
1 AO/S I TE TECH 1
.1 1
DIRECTOR DSE 1
1 1
HANAUERgS ~
1 1
1
'MATL ENG BR 1
1 1
POWER SYS BR 1
1 0
08 MPA 10 QAB 13F IELD COOR/IE" 17 AD PLANT SYS 22 DIR OPM AD/RCI/IK AEOD GEOSC IENCES BR IKC SYS BR MECH ENG BR STRUCT ENG BR RKGULATO INFORMATION DISTRIBUTION TEN (RIOS) r 41~
ACCESSION NBR:8004020302 DOC ~ DATE; 80/03/21 NOTARIZED:
NO DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2i Nashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<D.L, washington Public Power Supply System REC I P ~ NAME RECIPIENT AFFILIATION ENGELKENpR ~ li, Region 5~
San Francisco~
Office of the Director
SUBJECT:
Forwards final deficiency rept re pipe whip restraint problems.
EXTERNAL: 03 LPDR 20 ACRS 1
1 ib 16 04 NSIC Apg
~
3 ]pe gb TOTAL NUMBER OF COPIES REQUIRED ~
LTTR ~
ENCL
r II>
= ~
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. BOX 966 3000 GSO, WASHINGTON WAS RICHLAND. WASHINCSON 9935?
RHONt (5091 375 5000 March 21, 1980 G02-80-74 Mr. R.
H. Engelken, Director Nucl ear Regul atory Commission Region V
Office of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1990 N. Cal.ifornia Boulevard Walnut Creek, California 94596
Subject:
'PPSS NUCLEAR PROJECT NO.
2 DOCKET NUMBER 50-397, CPPR-93 CORRECTIVE ACTION PROGRAM FOR RESOLUTION OF PIPE WHIP RESTRAINT PROBLEMS, REPORTABLE DEFICIENCY 10CFR50.55 e
Reference:
1)
Letter G02-79-226, DL Renberger to RH Engelken, dated 12/10/79 2)
Letter G02-80-28, DL Renberger to RH Engelken, dated 2/1/80 3)
NRC Letter, RH Engelken to NO Strand, dated 2/8/80
Dear Mr. Engelken:
Reference
- 1) responded to NRC concerns associated with the Pipe Whip Restraint Corrective Action Program and was established as an interim 50.55(e) report in a-telephone conversation with D. Haist of Region V.
Reference
- 2) letter provided more detailed information on the Pipe Whip Restraint Corrective Action Program.
Reference
- 3) concurred with our plans for corrective action.
This letter constitutes our final report under the provisions of
\\
80040@0 ~c m
RH Engelken Nuclear Regulato~
Commission March Page
- Two, 50.55(e) on the corrective action for the Pipe Whip Restraints, The status is attached.
Please contact us if you have any questions.
Very truly yours, DLR/JEL/ln
Attachment:
As stated 0, L.. RENBERCiER Assistant Director Technology cc:
JM Blas - 88R, NY HR Canter - BSR, NY Spike Ford, NUS JR Lewis - BPA, Ri,chland V
Stello - Office of Inspection 8 Enforcement, Washington, D.C.
JJ Verderber - B8R, NY