ML17285A788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML17285A788
| number = ML17285A788
| issue date = 09/30/1989
| issue date = 09/30/1989
| title = Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2.W/891009 Ltr
| title = Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2
| author name = Hutchinson L, Powers C
| author name = Hutchinson L, Powers C
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:gC CELZ RATED          Dl SBUT]ON           DEMO?i                   SYSTEM STRIDOR REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:gC CELZRATED DlSBUT]ON DEMO?i STRIDOR SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8910190082 FACIL:50-397    WPPSS DOC.DATE:               OTARIZED: NO Nuclear Project, Unzt 2, Washington Public       Powe DOCKET 05000397 I
ACCESSION NBR:8910190082 DOC.DATE:
AUTH. NAME           AUTHOR AFFILIATION HUTCHINSON,L.B. Washington Public Power Supply System POWERS,C.M.         Washington Public Power Supply System RECIP.NAME           RECIPIENT AFFILIATION
OTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unzt 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHINSON,L.B.
Washington Public Power Supply System POWERS,C.M.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly o     e   'ng rept for Sept 1989   for WPPS 2 Nuclear Plant. 891009   tr.
Monthly o e
DISTRIBUTION CODE: IE24D       COPIES RECEIVED:LTR       .ENCL     SIZE:
'ng rept for Sept 1989 for WPPS 2 Nuclear Plant.
TITLE: Monthly Operating Report (per Tech         Specks NOTES RECIPIENT           COPIES          RECIPIENT          COPIES ID  CODE/NAME        LTTR ENCL' ID CODE/NAME       LTTR ENCL PD5 LA                   3    3      PD5 PD                1    1 SAMWORTH,R                     1 INTERNAL: ACRS                     10  10      AEOD/DOA              1    1 AEOD/DSP/TPAB             1    1      IRM TECH ADV          2    2 NRR/DLPQ/PEB 10           1    1      NRR/DOEA/EAB 11        1    1
891009 tr.
              /~DQJ PB 10           1    1      NUDOCS-ABSTRACT        1    1 REG FILE         01      1    1      RGN5                  1    1 EXTERNAL: EG&G SIMPSON, F           1   1     LPDR                   1     1 NRC PDR                  1   1     NSIC                  1     1 NOIR 'IO ALL 'RIBS" KMIPZERIS PIZASE HELP US TO REDUCE %ASTEl CGKIRCZ 'IHE DOCUMENI'ONSOL DESK RjON Pl-37 (EXT. 20079) KO EIJMZNATB %SR NAME ERCH DIPI%GMTZGN LISTS MR DCKXlMEHIS VXJ KH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR'2D9 ENCL               29
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR
.ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10
/~DQJ PB 10 REG FILE 01 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3
3 '
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 NOIR 'IO ALL 'RIBS" KMIPZERIS PIZASE HELP US TO REDUCE %ASTEl CGKIRCZ 'IHE DOCUMENI'ONSOL DESK RjON Pl-37 (EXT. 20079)
KO EIJMZNATB %SR NAME ERCH DIPI%GMTZGN LISTS MR DCKXlMEHIS VXJ KH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR'2D9 ENCL 29


WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99362 Docket No. 50-397 October. 9; 1989 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968
~ 3000 George Washington Way
~ Richland, Washington 99362 Docket No. 50-397 October. 9; 1989 U.S.
Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555


==Dear. Sir,==
==Dear. Sir,==
:
==SUBJECT:==
==SUBJECT:==
NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, September 1989 as required by our Technical Specifications 6.9.1.6.
NUCLEAR PLANT NO.
2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, September 1989 as required by our Technical Specifications 6.9.1.6.
Very Truly Yours; gag.~
Very Truly Yours; gag.~
C. M. Powers (M/D 927M)
C.
WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr. J. B. Martin               NRC  Region  V Mr. C. J. Bosted             NRC Site Representative       (901A)
M. Powers (M/D 927M)
Ms. Dottie Sherman          ANI; Farmington     CT Mr. J. T. Wheelock            INPO Mr.. W. H. Lovelace          NRC, Washington D.C.
WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr.
8510iVOOe2 SV0WSO PDR     ADOCK 05000397 R                       PDC
Mr.
Ms.
Mr.
Mr..
J.
B. Martin C. J.
Bosted Dottie Sherman J.
T. Wheelock W.
H. Lovelace NRC Region V
NRC Site Representative (901A)
ANI; Farmington CT INPO NRC, Washington D.C.
8510iVOOe2 SV0WSO PDR ADOCK 05000397 R
PDC


0   ~ ~
0
~
~
E
E


                                                                                                              ~ ~
~
DOCKET NO. 50-0'lIT NAl lE DATE   10/1/89 WIT St lUTDOl'(NS     / REDUCTIONS                       COlfPLETED l3Y   LB HUTCHISON DEPOT PERIOD     SEPT     19 898                                                                         TELEPI lONE                 -2 6 mcnth,    year FI5.   ~n     Xiii colin~ ~880H T>~TilLo     iZClK          t  t  I          fl'ntt 89-12 9/21/89 F         29       A     2                     HC         HT EXCH-D       PLANT WAS MANUALLY SHUTDOWN BECAUSE OF RAPIDLY INCREASING CONDUCTIVITY DUE TO CONDENSER TUBE .
~
IN-LEAKAGE. TWO DAMAGED TUBES WERE PLUGGED AND PLANT REMAINED DOWN FOR REPAIR OF STEAM EXTRACTION LINES.
DOCKET NO.
89-13   9/22/89   S   167.16     A                           HJ         PIP EXX-E       PLANT REMAINED DOWN FOR REPAIR/REPL'ACEMENT OF TWO FAILED STEAM EXTRACTION LINE EXPANSION:-
0'lIT NAllE DATE 50-10/1/89 WIT St lUTDOl'(NS / REDUCTIONS COlfPLETED l3Y LB HUTCHISON DEPOT PERIOD SEPT 19 898
BELLOWS AND CONDENSER BAFFLE REPAIR.     AFTER COMPLETION OF..-"REPAIR TO ALL DAMAGED COMPONENTS, THE PLANT WAS RETURNED TO SERVICE.
: mcnth, year TELEPI lONE
SOf'MY     WNP-2 INCURRED 1 FORCED OUTAGE WHICH WAS EXTENDED FOR REPAIR OF RELATED COMPONENTS.
-2 6
TYPE                                                       t lETl lOO            SYSTEM & COhlPOhEHT F-Forced     A-Equip Failure            F-Admin       l-manual                    Exhibit F & H S- ched      0-hlaint or Test   ~     .G-Oper Error  2-manual      Scratch      Instructions for C-Refuel.ing               H-Other        3-Auto Scram                Preparation D-Regulatory Res triction                 4-Continued                        Entry Sheet ol'ata E-Operator Training                       9 Ilnducod Load            Licensee Event Report
FI5.
                & License Examination                 9-Other                     (LiER) File (NUAEG-0161)
~n Xiii colin~
~880H T>~TilLo 89-12 9/21/89 F
29 A
2 iZClK t
t I fl'ntt HC HT EXCH-D PLANT WAS MANUALLY SHUTDOWN BECAUSE OF RAPIDLY INCREASING CONDUCTIVITY DUE TO CONDENSER TUBE.
IN-LEAKAGE.
TWO DAMAGED TUBES WERE PLUGGED AND PLANT REMAINED DOWN FOR REPAIR OF STEAM EXTRACTION LINES.
89-13 9/22/89 S
167.16 A
HJ PIP EXX-E PLANT REMAINED DOWN FOR REPAIR/REPL'ACEMENT OF TWO FAILED STEAM EXTRACTION LINE EXPANSION:-
BELLOWS AND CONDENSER BAFFLE REPAIR.
AFTER COMPLETION OF..-"REPAIR TO ALL DAMAGED COMPONENTS, THE PLANT WAS RETURNED TO SERVICE.
SOf'MY WNP-2 INCURRED 1 FORCED OUTAGE WHICH WAS EXTENDED FOR REPAIR OF RELATED COMPONENTS.
TYPE F-Forced S-ched F-Admin
.G-Oper Error H-Other A-Equip Failure 0-hlaint or Test
~
C-Refuel.ing D-Regulatory Res triction E-Operator Training
& License Examination t lETllOO l-manual 2-manual Scratch 3-Auto Scram 4-Continued 9 Ilnducod Load 9-Other SYSTEM & COhlPOhEHT Exhibit F & H Instructions for Preparation ol'ata Entry Sheet Licensee Event Report (LiER) File (NUAEG-0161)


tl ~
tl
~
I
I


DOCKET NO.     50-397 UNIT     WNP-2 DATE     10/1/89 COMPLETED BY       LB HUTCHISON TELEPHONE     (509)377-2486 flONTH DAY AVERAGE   DAILY POWER LEVEL                       DAY AVERAGE    DAILY  POWER  LEVEL (MwE-Net)                                ~             (MwE-Net) 745                                17.                  1062
DOCKET NO.
: 2.               757                                18.                  1062 759                                                      1050
50-397 UNIT WNP-2 DATE 10/1/89 flONTH DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 745 17.
: 3.                                                  19.
COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL
: 4.               755                                20.                    944
~
: 5.               716                                21.                    673
(MwE-Net) 1062 2.
: 6.                747                                22.
3.
: 7.                750                                23.
4.
: 8.                746~                              24.
5.
: 9.                747                                25.
6.
: 10.                950                                26.
7.
1014                                27.
8.
1058                                28.
9.
10.
12.
12.
1061                                29.
13.
13.
1067                                30.                  550 14.
14.
1045                                31.
15.
15.
1002 16.
16.
INSTRUCTIONS On  this form,  list    the average daily unit power level in MWe-Net for each day in the reporting month.      Compute to the nearest whole megawatt.
757 759 755 716 747 750 746~
These  figures will    be used to plot a gr aph for each reporting month.              Note that when maximum    dependable    capacity  is  used  for  the  net  electrical    rating  of the unit, there may be      occasions  when  the  daily  average    power  level  exceeds  the  100%
747 950 1014 1058 1061 1067 1045 1002 18.
line (or the restricted power          level  line). In  such  cases,. the  average    daily unit power output sheet should be footnoted to explain the apparent anomaly.
19.
 
20.
      ~   '
'      >    ~
OPERATING DATA REPORT WNP-2 Ol-Oct-89 1 ~      DOCKET:  50-397 2        REPORTING PERIOD:        Sep-89          OUTAGE +  ON-LINE  HOURS      720
: 3.       UTILITY CONTACT:                  LEONARD HUTCHISON    (509) 377-2486
: 4.        LICENSED THERMAL POWER (MWt):                                            3323
: 5.        NAMEPLATE RATING (GROSS MWe):                                          1200.9
: 6.        DESIGN ELECTRICAL RATING (NET MWe):                                      1100
: 7.       MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):                                1140
: 8.        MAXIMUM DEPENDABLE CAPACITY (NET MWe):                                  109'5 9        IF  CHANGES OCCUR ABOVE SINCE LAST REPORTs    GIVE REASONS 10 ~      POWER TO WHICH RESTRICTEDs    IF ANY (NET MWe):
: 11.      REASONS FOR RESTRICTIONSs  IF  ANY:
MONTH        YEAR    CUMULATIVE
: 12.      REPORT PERIOD HOURS                                720      6551    42055.2
: 13.      HOURS REACTOR CRITICAL                          537 5      4648.7    30866.3
: 14.      RX RESERVE SHTDWN HRS                              0.0        0.0      340.4
: 15.      HRS GENERATOR ON LINE                            523.8      4474.4    29638.9 16  'NIT        RESERVE SHUTDOWN HOURS                      0.0 1451765 0.0 12259391 381.7 81370596
: 17.      GROSS THERMAL ENERGY (MWH) 18-      GROSS ELECTRICAL ENERGY (MWH)                  481010    4033680  27067180
: 19.      NET ELECTRICAL ENERGY (MWH)                    460308    3857783  26026091 20.
21.
21.
22.
22.
UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAPACITY FACTOR (MDC NET) 72.8/
23.
24.
25.
26.
27.
28.
29.
30.
31.
1062 1050 944 673 550 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
These figures will be used to plot a gr aph for each reporting month.
Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%
line (or the restricted power level line).
In such cases,.
the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
 
~
~
OPERATING DATA REPORT WNP-2 Ol-Oct-89 1 ~
DOCKET: 50-397 2
REPORTING PERIOD:
3.
UTILITY CONTACT:
Sep-89 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4.
LICENSED THERMAL POWER (MWt):
5.
NAMEPLATE RATING (GROSS MWe):
6.
DESIGN ELECTRICAL RATING (NET MWe):
7.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
8.
MAXIMUM DEPENDABLE CAPACITY (NET MWe):
3323 1200.9 1100 1140 109'5 9
IF CHANGES OCCUR ABOVE SINCE LAST REPORTs GIVE REASONS 10 ~
POWER TO WHICH RESTRICTEDs IF ANY (NET MWe):
11.
REASONS FOR RESTRICTIONSs IF ANY:
12.
REPORT PERIOD HOURS 13.
HOURS REACTOR CRITICAL 14.
RX RESERVE SHTDWN HRS 15.
HRS GENERATOR ON LINE 16'NIT RESERVE SHUTDOWN HOURS 17.
GROSS THERMAL ENERGY (MWH) 18-GROSS ELECTRICAL ENERGY (MWH) 19.
NET ELECTRICAL ENERGY (MWH) 20.
UNIT SERVICE FACTOR 21.
UNIT AVAILABILITYFACTOR 22.
UNIT CAPACITY FACTOR (MDC NET) 23.
UNIT CAPACITY FACTOR (DER NET) 24.
UNIT FORCED OUTAGE RATE 25.
FORCED OUTAGE HOURS MONTH 720 537 5
0.0 523.8 0.0 1451765 481010 460308 72.8/
72.8/
72.8/
58.4/
58.4/
58.1/
5.2/
29 0 YEAR CUMULATIVE 6551 42055.2 4648.7 30866.3 0.0 340.4 4474.4 29638.9 0.0 381.7 12259391 81370596 4033680 27067180 3857783 26026091 68.3/
70.5/
68.3/
68.3/
68.3/
71'/
53.8/
53.8/
71 '/
70.5/
56.5/
56.5/
: 23.      UNIT CAPACITY FACTOR (DER NET)                    58.1/      53.5/     56.3/
53.5/
: 24.      UNIT FORCED OUTAGE RATE                            5.2/      6 4/       9 2/
56.3/
: 25.      FORCED OUTAGE HOURS                              29 0      304.6     2996.2 26       SHUTDOWNS SCHEDULED OVER THE NEXT     6 MONTHS (TYPEsDATEsDURATION)
6 4/
9 2/
304.6 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEsDATEsDURATION)
NNE
NNE
: 27. IF       CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:


  ~ ~
~
~
'}}
'}}

Latest revision as of 05:53, 8 January 2025

Monthly Operating Rept for Sept 1989 for Washington Nuclear Plant Unit 2
ML17285A788
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1989
From: Hutchinson L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910190082
Download: ML17285A788 (8)


Text

gC CELZRATED DlSBUT]ON DEMO?i STRIDOR SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8910190082 DOC.DATE:

OTARIZED: NO DOCKET I FACIL:50-397 WPPSS Nuclear Project, Unzt 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHINSON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o e

'ng rept for Sept 1989 for WPPS 2 Nuclear Plant.

891009 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

.ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specks NOTES RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10

/~DQJ PB 10 REG FILE 01 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 '

1 10 10 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN5 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 NOIR 'IO ALL 'RIBS" KMIPZERIS PIZASE HELP US TO REDUCE %ASTEl CGKIRCZ 'IHE DOCUMENI'ONSOL DESK RjON Pl-37 (EXT. 20079)

KO EIJMZNATB %SR NAME ERCH DIPI%GMTZGN LISTS MR DCKXlMEHIS VXJ KH~T NEEDf TOTAL NUMBER OF COPIES REQUIRED: LTTR'2D9 ENCL 29

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968

~ 3000 George Washington Way

~ Richland, Washington 99362 Docket No. 50-397 October. 9; 1989 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear. Sir,

SUBJECT:

NUCLEAR PLANT NO.

2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for, September 1989 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours; gag.~

C.

M. Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr.

Mr.

Ms.

Mr.

Mr..

J.

B. Martin C. J.

Bosted Dottie Sherman J.

T. Wheelock W.

H. Lovelace NRC Region V

NRC Site Representative (901A)

ANI; Farmington CT INPO NRC, Washington D.C.

8510iVOOe2 SV0WSO PDR ADOCK 05000397 R

PDC

0

~

~

E

~

~

DOCKET NO.

0'lIT NAllE DATE 50-10/1/89 WIT St lUTDOl'(NS / REDUCTIONS COlfPLETED l3Y LB HUTCHISON DEPOT PERIOD SEPT 19 898

mcnth, year TELEPI lONE

-2 6

FI5.

~n Xiii colin~

~880H T>~TilLo 89-12 9/21/89 F

29 A

2 iZClK t

t I fl'ntt HC HT EXCH-D PLANT WAS MANUALLY SHUTDOWN BECAUSE OF RAPIDLY INCREASING CONDUCTIVITY DUE TO CONDENSER TUBE.

IN-LEAKAGE.

TWO DAMAGED TUBES WERE PLUGGED AND PLANT REMAINED DOWN FOR REPAIR OF STEAM EXTRACTION LINES.

89-13 9/22/89 S

167.16 A

HJ PIP EXX-E PLANT REMAINED DOWN FOR REPAIR/REPL'ACEMENT OF TWO FAILED STEAM EXTRACTION LINE EXPANSION:-

BELLOWS AND CONDENSER BAFFLE REPAIR.

AFTER COMPLETION OF..-"REPAIR TO ALL DAMAGED COMPONENTS, THE PLANT WAS RETURNED TO SERVICE.

SOf'MY WNP-2 INCURRED 1 FORCED OUTAGE WHICH WAS EXTENDED FOR REPAIR OF RELATED COMPONENTS.

TYPE F-Forced S-ched F-Admin

.G-Oper Error H-Other A-Equip Failure 0-hlaint or Test

~

C-Refuel.ing D-Regulatory Res triction E-Operator Training

& License Examination t lETllOO l-manual 2-manual Scratch 3-Auto Scram 4-Continued 9 Ilnducod Load 9-Other SYSTEM & COhlPOhEHT Exhibit F & H Instructions for Preparation ol'ata Entry Sheet Licensee Event Report (LiER) File (NUAEG-0161)

tl

~

I

DOCKET NO.

50-397 UNIT WNP-2 DATE 10/1/89 flONTH DAY AVERAGE DAILY POWER LEVEL (MwE-Net) 745 17.

COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POWER LEVEL

~

(MwE-Net) 1062 2.

3.

4.

5.

6.

7.

8.

9.

10.

12.

13.

14.

15.

16.

757 759 755 716 747 750 746~

747 950 1014 1058 1061 1067 1045 1002 18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

1062 1050 944 673 550 INSTRUCTIONS On this form, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a gr aph for each reporting month.

Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%

line (or the restricted power level line).

In such cases,.

the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~

~

OPERATING DATA REPORT WNP-2 Ol-Oct-89 1 ~

DOCKET: 50-397 2

REPORTING PERIOD:

3.

UTILITY CONTACT:

Sep-89 OUTAGE + ON-LINE HOURS LEONARD HUTCHISON (509) 377-2486 720 4.

LICENSED THERMAL POWER (MWt):

5.

NAMEPLATE RATING (GROSS MWe):

6.

DESIGN ELECTRICAL RATING (NET MWe):

7.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):

8.

MAXIMUM DEPENDABLE CAPACITY (NET MWe):

3323 1200.9 1100 1140 109'5 9

IF CHANGES OCCUR ABOVE SINCE LAST REPORTs GIVE REASONS 10 ~

POWER TO WHICH RESTRICTEDs IF ANY (NET MWe):

11.

REASONS FOR RESTRICTIONSs IF ANY:

12.

REPORT PERIOD HOURS 13.

HOURS REACTOR CRITICAL 14.

RX RESERVE SHTDWN HRS 15.

HRS GENERATOR ON LINE 16'NIT RESERVE SHUTDOWN HOURS 17.

GROSS THERMAL ENERGY (MWH) 18-GROSS ELECTRICAL ENERGY (MWH) 19.

NET ELECTRICAL ENERGY (MWH) 20.

UNIT SERVICE FACTOR 21.

UNIT AVAILABILITYFACTOR 22.

UNIT CAPACITY FACTOR (MDC NET) 23.

UNIT CAPACITY FACTOR (DER NET) 24.

UNIT FORCED OUTAGE RATE 25.

FORCED OUTAGE HOURS MONTH 720 537 5

0.0 523.8 0.0 1451765 481010 460308 72.8/

72.8/

58.4/

58.1/

5.2/

29 0 YEAR CUMULATIVE 6551 42055.2 4648.7 30866.3 0.0 340.4 4474.4 29638.9 0.0 381.7 12259391 81370596 4033680 27067180 3857783 26026091 68.3/

70.5/

68.3/

71'/

53.8/

56.5/

53.5/

56.3/

6 4/

9 2/

304.6 2996.2 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEsDATEsDURATION)

NNE

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~

~

'