ML17291A622: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[GO2-95-014, Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10]]
| number = ML17291A622
| issue date = 01/25/1995
| title = Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to Colr 94-10
| author name = PARRISH J V
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000397
| license number =
| contact person =
| document report number = GO2-95-014, GO2-95-14, NUDOCS 9502010195
| package number = ML17291A623
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 3
}}
 
=Text=
{{#Wiki_filter:P RIGRITY 1 (ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9502010195 DOC.DATE: 95/01/25 NOTARIZED:
NO DOCKET I-FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION PARRISH,J.V.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
 
==SUBJECT:==
Forwards"Cycle 10 COLR." Informs that committee has reviewed&approved Rev 1 to COLR 94-10.DISTRIBUTION CODE'OOID COPIES RECEIVED'LTR ENCL l SIZE+TITLE: OR Submittal:
General Distribution NOTES P 0 RECIPIENT ID CODE/NAME PD4-2 LA CLIFFORD,J INTERNAL: ACRS NRR/DRCH/HI CB NRR/DSSA/SRXB OGC/HDS3 COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 PD4-2 PD 1 1 6 6 Z E=CENTER-01 1 1 NRR/DSSA/SPLB 1 1 NUDOCS-ABSTRACT 1 0 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D 0 C i U, N NOTE TO ALL RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!CONTACI THE DOCUhIENT CONTROL DESK, ROOhI Pl-37 (EXT.504-2083)TO ELIhIINATE YOUR iAhIE FROh!DISTRIBUTION LISTS I:OR DOCL'hIEN'I'S YOU DON"I'LED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 16 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352-0968
~(509)372-5000 Docket No.50-397 Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555 January 25, 1995 G02-95-014 Gentlemen:
 
==Subject:==
NUCLEAR PLANT WNP-2, OPERATING LICENSE NPF-21, CYCLE 10 CORE OPERATING LIMITS REPORT (COLR)
 
==References:==
 
Letter G02-94-158, dated July 11, 1994, JV Parrish (SS)to NRC,"Cycle 10 Core Operating Limits Report (COLR)" In accordance with the requirements of WNP-2 Technical Specification 6.9.3.4, the Supply System is submitting Revision 1 to COLR 94-10.Revision 0 to COLR 94-10 was submitted to the NRC in the referenced letter.The WNP-2 Plant Operating Committee has reviewed and approved Revision 1 to COLR 94-10.Revision 1 to COLR 94-10 incorporates the re-evaluated Minimum Critical Power Ratio (MCPR)limits associated with the recirculation flow increase transient.
Previous flow dependent MCPR limits provided in Revision 0 assumed both recirculation loops would run-up simultaneously.
The revised analysis recognizes that only a single pump run-up is credible.Should you have any questions or desire additional information, please call me or D.A.Swank at (509)377-4563..V.Parrish (Mail Drop 1023)Vice-President, Nuclear Operations JMP Attachment CC: ".>005'J LJ Callan, NRC-RIV JW Clifford, NRC KE Perkins, Jr., NRC-RIV, Walnut Creek Field Office NS Reynolds, Winston&Strawn NRC Sr.Resident Inspector (Mail Drop 927N)DL Williams, BPA (Mail Drop 399)ADOCK 05000597 oiOi95 950i25 PDR AD PD P ,o(
g 1 V C l I}}

Latest revision as of 04:47, 8 January 2025