=Text=
=Text=
{{#Wiki_filter:I ACCELERATED D? TRIBUTION DEMONST                                     TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
{{#Wiki_filter:I ACCELERATED D? TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 03070208 DOC.DATE: 91/02/28 NOTARIZED: NO DOCKET 9 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 ubli 05000530 ACCESSION NBR:91 FACIL:STN-50-52 STN-50-530 Palo Verde Nuclear Station, Unxt 3, Arz.zona P
ACCESSION NBR:91 03070208               DOC.DATE:   91/02/28   NOTARIZED: NO         DOCKET FACIL:STN-50-52 9 Palo Verde Nuclear Station, Unit 2, Arizona Publi                 05000529 STN-50-530 Palo Verde Nuclear Station, Unxt 3, Arz.zona P ubli                05000530 AUTH. NAME             AUTHOR AFFILIATION CONWAY,W.F.           Arizona Public Service Co. (formerly Arizona Nuclear Power RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
I


==SUBJECT:==
==SUBJECT:==
Forwards fitness-for-duty semiannual performance rept for Jul-Dec 1990.                                                                     D DISTRIBUTION CODE: A021D TITLE: "Semiannual Fitness COPIES RECEIVED:LTR for                  J ENCL 7     SIZE:
Forwards fitness-for-duty semiannual performance rept for Jul-Dec 1990.
Duty Program Performance Rept/Data'0CFR26.7 NOTES:Standardized       plant.                                                     05000529 Standardized plant.                                                           05000530 A
D DISTRIBUTION CODE:
RECXPIENT               COPIES            RECIPIENT          COPIES            D ID CODE/NAME             LTTR ENCL       ID  CODE/NAME      LTTR ENCL PD5 LA                        1     1     PD5 PD                1     1           D TRAMMELL,C                    1     1     THOMPSON,M            1     1 INTERNAL: ACRS                            1     1     NRRJ+X@S/ SGB         1    1
A021D COPIES RECEIVED:LTR J ENCL 7 SIZE:
          , NUDOCS-ABSTRACT              1    1      RK~ILE         01     1     1 RGN5      .      02        1     1 EXTERNAL: NRC PDR                          1     1     NSIC                  1   1 NOTES                                      1     1 D
TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data'0CFR26.7 NOTES:Standardized plant.
05000529 Standardized plant.
05000530 A
RECXPIENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS
, NUDOCS-ABSTRACT RGN5 02 EXTERNAL: NRC PDR NOTES COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRRJ+X@S/
SGB RK~ILE 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
D D
NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
NOTE TO ALL"RIDS" RECIPIENTS D
TOTAL NUMBER OF COPXES REQUIRED: LTTR                 12   ENCL   12
D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPXES REQUIRED:
LTTR 12 ENCL 12


  ~
~
4 ~
4
~
,I
,I


Arizona Public Service Company P.O. BOX 53999 ~ PHOENIX, ARIZONA 85072-3999 WILLIAMF. CONWAY                                                   161-03782-NFC/MEP/KLMC EXECUTIVEVICEPRESIDENT NUCLEAR February 28, 1991 Docket Nos.       STN   50-528/529/530 Document Control Desk U. S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D. C.           20555
Arizona Public Service Company P.O. BOX 53999
 
~
==Dear  Sirs:==
PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03782-NFC/MEP/KLMC February 28, 1991 Docket Nos.
STN 50-528/529/530 Document Control Desk U.
S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.
C.
20555


==Dear Sirs:==
==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2 and 3 Fitness-for-Duty Semiannual Performance Report File:   91-056-026 Pursuant to 10         CFR   26.71(d), the attachment to this             letter provides the Arizona Public Service           (APS) Fitness-for-Duty Semiannual               Performance Report for the period of July         1990 through December 1990.
Units 1, 2 and 3
If you have       any questions       concerning this matter, contact Michael E. Powell at (602) 340-4981.
Fitness-for-Duty Semiannual Performance Report File: 91-056-026 Pursuant to 10 CFR 26.71(d),
Sincerely, WFC/MEP/KLMC Attachment cc:     J. B. Martin L: L. Bush D. H. Coe     .
the attachment to this letter provides the Arizona Public Service (APS) Fitness-for-Duty Semiannual Performance Report for the period of July 1990 through December 1990.
A. C. Gehr A. H,. Gutterman 9103070208"910228 PDR       ADOCK 05000528 .-- PDR
If you have any questions concerning this matter, contact Michael E. Powell at (602) 340-4981.
Sincerely, WFC/MEP/KLMC Attachment cc:
J.
B. Martin L: L. Bush D. H.
Coe A. C. Gehr A.
H,. Gutterman 9103070208"910228 PDR ADOCK 05000528
.-- PDR


4
4
() ~ q i, ~
() ~ q i,~


Attachment ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUAL PERFORMANCE REPORT July   1990 through December 1990 INTRODUCTION APS'ear-end statistics       have continued to demonstrate that the Fitness-for-Duty Program has been successful   in maintaining a drug-free work place. During 1990, APS performed 4,151 random drug and alcohol tests.         This yields a testing rate of 116 percent for the average population with unescorted access.             APS credits a major portion of its success   to an extensive communicati.on and training program.
Attachment ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUAL PERFORMANCE REPORT July 1990 through December 1990 INTRODUCTION APS'ear-end statistics have continued to demonstrate that the Fitness-for-Duty Program has been successful in maintaining a drug-free work place.
The cooperation between APS and its contractor companies                 has contributed significantly to the success of the program.
During 1990, APS performed 4,151 random drug and alcohol tests.
ANALYSIS OF PROGRAM RESULTS We have performed a   statistical     breakdown of the confirmed positive drug     test results by type of test         and type of drug involved.         The results of   this statistical breakdown are as follows:
This yields a testing rate of 116 percent for the average population with unescorted access.
APS credits a
major portion of its success to an extensive communicati.on and training program.
The cooperation between APS and its contractor companies has contributed significantly to the success of the program.
ANALYSIS OF PROGRAM RESULTS We have performed a statistical breakdown of the confirmed positive drug test results by type of test and type of drug involved.
The results of this statistical breakdown are as follows:
Pre-Badge Testing:
Pre-Badge Testing:
Marijuana Cocaine Alcohol Total               7 confirmed positive test results Comments:   A total of   980 individuals were pre-badge tested. Of the seven persons with     positive test results, one was an APS employee, and the other     six were contractor employees. The positive rate for this reporting period (0.7%) is significantly lower than the previous reporting period (1.1%).
Marijuana Cocaine Alcohol Total 7 confirmed positive test results Comments:
A total of 980 individuals were pre-badge tested.
Of the seven persons with positive test results, one was an APS employee, and the other six were contractor employees.
The positive rate for this reporting period (0.7%) is significantly lower than the previous reporting period (1.1%).
For-Cause Testing:
For-Cause Testing:
Alcohol Marijuana Total               3 confirmed positive test results Comments:   APS   tested 11 individuals for-cause during this reporting period.         The   causes   involved behavioral observations, allegations and suspected adulteration of urine specimens, Two positive alcohol test results involved APS employees, and the positive marijuana drug test result was from a contractor employee.
Alcohol Marijuana Total 3 confirmed positive test results Comments:
APS tested 11 individuals for-cause during this reporting period.
The causes involved behavioral observations, allegations and suspected adulteration of urine specimens, Two positive alcohol test results involved APS employees, and the positive marijuana drug test result was from a contractor employee.


FFD Program Semiannual Performance Report July 1990 through December 1990 Page Two Random Testing:
FFD Program Semiannual Performance Report July 1990 through December 1990 Page Two Random Testing:
Cocaine Amphetamine~
Cocaine Amphetamine~
ij Mar uana~
Marijuana~
Total               10 conEirmed positive test results
Total 10 conEirmed positive test results
* One individual tested positive for both   amphetamine and marijuana.
* One individual tested positive for both amphetamine and marijuana.
Comments:   2,109 individuals were tested during this reporting period which yielded an annualized testing rate oE 124 percent. Of the nine individuals testing positive, four were APS employees, and Eive were contractor employees.       Eight out of the nine tested positive on their first random test, and one individual tested positive aEter the second random test (one month after the Eirst test).     This one individual tested positive for cocaine. In comparison with the statistics from the previous reporting period, marijuana and amphetamine positives increased by four and two respectively, with one individual testing positive for both amphetamine and marijuana.
Comments:
2,109 individuals were tested during this reporting period which yielded an annualized testing rate oE 124 percent.
Of the nine individuals testing positive, four were APS employees, and Eive were contractor employees.
Eight out of the nine tested positive on their first random test, and one individual tested positive aEter the second random test (one month after the Eirst test).
This one individual tested positive for cocaine.
In comparison with the statistics from the previous reporting period, marijuana and amphetamine positives increased by four and two respectively, with one individual testing positive for both amphetamine and marijuana.
Post Accident Testing:
Post Accident Testing:
One test was performed   during this reporting period; the test result   was negative.
One test was performed during this reporting period; the test result was negative.
Follow-Up Testing:
Follow-Up Testing:
Under the APS follow-up testing program, a total of 43 tests were conducted during this reporting period. All test results were negative. At the end of this reporting period, ten individuals were under the follow-up testing program based on the results of the "suitable inquiry." OE those ten individuals, four were APS employees, and six were contractor employees.
Under the APS follow-up testing program, a total of 43 tests were conducted during this reporting period.
All test results were negative.
At the end of this reporting period, ten individuals were under the follow-up testing program based on the results of the "suitable inquiry."
OE those ten individuals, four were APS employees, and six were contractor employees.
Other Testing:
Other Testing:
During this reporting period, APS tested 40 individuals whose previously granted unescorted access had expired for various reasons and who, therefore, were no longer subject to random testing.         As soon as the requirement to retest prior to re-establishment oE unescorted access was recognized, the individuals were tested.     None of the individuals tested positive.
During this reporting period, APS tested 40 individuals whose previously granted unescorted access had expired for various reasons and
: who, therefore, were no longer subject to random testing.
As soon as the requirement to retest prior to re-establishment oE unescorted access was recognized, the individuals were tested.
None of the individuals tested positive.


t r
t r
H
H


FFD Program Semiannual Performance Report July   1990 through December 1990 Page Three In each case of a confirmed positive drug test result the individual's site access was   revoked. APS employees testing positive for illegal drugs were discharged from employment. APS employees who had a single occurrence of a positive test for alcohol received a disciplinary suspension, evaluation and treatment prior to reinstatement.
FFD Program Semiannual Performance Report July 1990 through December 1990 Page Three In each case of a confirmed positive drug test result the individual's site access was revoked.
Any individual   who had a single positive drug test   may be eligible to reapply for access   after three years.
APS employees testing positive for illegal drugs were discharged from employment.
PROGRAM   REVIEW'ABORATORY PERFORMANCE A Quality Assurance (QA) audit was conducted in October 1990. A consulting group was utilized to provide technical support to the audit group. Results from the audit indicated that APS has a comprehensive Fitness-for-Duty Program which meets the requirements of 10 CFR Part 26. Many of the recommendations that were made during the audit have been incorporated into the program.
APS employees who had a single occurrence of a positive test for alcohol received a disciplinary suspension, evaluation and treatment prior to reinstatement.
In December 1990 the Nuclear Regulatory Commission conducted an inspection of the APS   Fitness-for-Duty Program. The NRC, as documented in Inspection Report 50-528/90-49, identified one non-cited violation as a result of their inspection activities.
Any individual who had a single positive drug test may be eligible to reapply for access after three years.
There were two occurrences where performance test specimens (certified by the supplier to be positive) were reported as negative from our Department of Health and Human Services (DHHS) certified laboratories.       An investigation was conducted regarding these occurrences, and       it was determined that the certified blind specimens deteriorated during the shipping and handling process from the vendor to APS. The DHHS laboratories properly reported the results.     The supplier stated the specimens deterioration may have been attributed to the "absorption of the drug to the container." The Medical Review Officer (MRO) reviewed the shipping and handling process and determined         it did not contribute to the absorption problem. The MRO also determined that the containers used by APS did not contribute to the situation. As a result of these two occurrences, APS has secured another vendor to provide quality-controlled performance test specimens.
PROGRAM REVIEW'ABORATORY PERFORMANCE A Quality Assurance (QA) audit was conducted in October 1990.
A consulting group was utilized to provide technical support to the audit group.
Results from the audit indicated that APS has a comprehensive Fitness-for-Duty Program which meets the requirements of 10 CFR Part 26.
Many of the recommendations that were made during the audit have been incorporated into the program.
In December 1990 the Nuclear Regulatory Commission conducted an inspection of the APS Fitness-for-Duty Program.
The
: NRC, as documented in Inspection Report 50-528/90-49, identified one non-cited violation as a result of their inspection activities.
There were two occurrences where performance test specimens (certified by the supplier to be positive) were reported as negative from our Department of Health and Human Services (DHHS) certified laboratories.
An investigation was conducted regarding these occurrences, and it was determined that the certified blind specimens deteriorated during the shipping and handling process from the vendor to APS.
The DHHS laboratories properly reported the results.
The supplier stated the specimens deterioration may have been attributed to the "absorption of the drug to the container."
The Medical Review Officer (MRO) reviewed the shipping and handling process and determined it did not contribute to the absorption problem.
The MRO also determined that the containers used by APS did not contribute to the situation.
As a result of these two occurrences, APS has secured another vendor to provide quality-controlled performance test specimens.
During the reporting period, APS had no other performance problems in connection with blind performance specimens sent to any of the off-site laboratories.
During the reporting period, APS had no other performance problems in connection with blind performance specimens sent to any of the off-site laboratories.
In December 1990, a specimen was     lost by one of the DHHS-certified laboratories.
In December
The specimen was one-half of a       split specimen submitted to the DHHS-certified laboratory as part of an appeals     process. The remainder of the specimen, which had been   retained by the first DHHS-certified laboratory, was then analyzed       for the appeal.     Thus, there were no adverse consequences arising from the         lost specimen. APS'nvestigation of this event is continuing.
: 1990, a specimen was lost by one of the DHHS-certified laboratories.
The specimen was one-half of a split specimen submitted to the DHHS-certified laboratory as part of an appeals process.
The remainder of the specimen, which had been retained by the first DHHS-certified laboratory, was then analyzed for the appeal.
: Thus, there were no adverse consequences arising from the lost specimen.
APS'nvestigation of this event is continuing.


1 r
1 r
    ,)
,)


FFD Program Semiannual Performance Report July 1990 through December 1990 Page Four
FFD Program Semiannual Performance Report July 1990 through December 1990 Page Four


==SUMMARY==
==SUMMARY==
OF PROGRAM CHANGES Changes   to the existing Fitness-for-Duty Program have been made and are planned which, we believe, will improve the overall effectiveness of the program.
OF PROGRAM CHANGES Changes to the existing Fitness-for-Duty Program have been made and are planned
: which, we believe, will improve the overall effectiveness of the program.
Completed Actions:
Completed Actions:
: l. APS instituted a revised chain of custody form which utilizes bar coding, thus helping reduce the potential for human error with data entry at our DHHS-certified laboratories.
l.
APS distributed to personnel   a new brochure which addresses   our Employee Assistance and   Fitness-for-Duty Programs.
APS instituted a revised chain of custody form which utilizes bar coding, thus helping reduce the potential for human error with data entry at our DHHS-certified laboratories.
APS distributed to personnel a new brochure which addresses our Employee Assistance and Fitness-for-Duty Programs.
The Fitness-for-Duty Department was restructured to incorporate the Employee Assistance Program and a newly developed fitness-for-duty auditing function.
The Fitness-for-Duty Department was restructured to incorporate the Employee Assistance Program and a newly developed fitness-for-duty auditing function.
These organizational changes have improved the overall effectiveness of the program.
These organizational changes have improved the overall effectiveness of the program.
The   Fitness-for-Duty Collection Building was remodeled to enhance the professionalism of the department and to improve the process flow. In addition, new storage and security equipment has been installed.
The Fitness-for-Duty Collection Building was remodeled to enhance the professionalism of the department and to improve the process flow.
In an effort to increase the awareness of a, drug-free work place, the Fitness-for-Duty Department is distributing drug-free buttons to those personnel who have undergone a drug and alcohol test. The response to these buttons has been extremely favorable.
In
The Fitness-for-Duty staff reviewed many of the forms used in the collection process   and revised the forms, as necessary,       to enhance the program effectiveness.
: addition, new storage and security equipment has been installed.
: 7. Enhanced training classes were held for supervisory personnel to provide them with specific guidance and instruction on the process of notifying employees of random drug and alcohol testing.
In an effort to increase the awareness of a, drug-free work place, the Fitness-for-Duty Department is distributing drug-free buttons to those personnel who have undergone a drug and alcohol test.
The response to these buttons has been extremely favorable.
The Fitness-for-Duty staff reviewed many of the forms used in the collection process and revised the
: forms, as necessary, to enhance the program effectiveness.
7.
Enhanced training classes were held for supervisory personnel to provide them with specific guidance and instruction on the process of notifying employees of random drug and alcohol testing.
Planned Actions:
Planned Actions:
To reduce   the impact on licensed operator shift manning and on overall site productivity,   a collection facility inside the protected area will be constructed and   is anticipated to be complete by June 1991.
To reduce the impact on licensed operator shift manning and on overall site productivity, a collection facility inside the protected area will be constructed and is anticipated to be complete by June 1991.
In an effort to continue to enhance the Fitness-for-Duty Program and to adopt the pending proposed changes to the regulation, APS will continue to review and revise its procedures to incorporate appropriate changes.
In an effort to continue to enhance the Fitness-for-Duty Program and to adopt the pending proposed changes to the regulation, APS will continue to review and revise its procedures to incorporate appropriate changes.


I I
I I
Line 104: Line 182:
f
f


FFD Program Semiannual Performance Report July 1990 through December 1990 Page Five CONCLUSION The second six months of our program showed significant progress towards achieving a drug-free work place. Of the 4,151 random drug and alcohol tests conducted in 1990, APS experienced a positive rate of 0.3 percent.               APS'ffective communication program contributes to the success of our Fitness-for-Duty Program which was confirmed by our QA audit and the NRC inspection, both, occurring within this semiannual reporting period.
FFD Program Semiannual Performance Report July 1990 through December 1990 Page Five CONCLUSION The second six months of our program showed significant progress towards achieving a drug-free work place.
REPORTABLE EVENTS Events reported by phone to   NRC:   1 Total Summary   of Event: On September 28, 1990, at 0742 hours, an APS supervisory individual tested positive for alcohol.         The individual submitted to the test after other supervisory personnel smelled the odor of alcohol on the employee's breath. An investigation was conducted by Security Investigations       Investigator and Fitness-for-Duty Supervisor which determined the individual had consumed the alcohol the evening prior to the test. As a result of the testing, the individual's site access to Palo Verde was suspended. While personnel action was being =considered, the individual resigned.
Of the 4,151 random drug and alcohol tests conducted in
: 1990, APS experienced a
positive rate of 0.3 percent.
APS'ffective communication program contributes to the success of our Fitness-for-Duty Program which was confirmed by our QA audit and the NRC inspection, both, occurring within this semiannual reporting period.
REPORTABLE EVENTS Events reported by phone to NRC:
1 Total Summary of Event:
On September 28,
: 1990, at 0742
: hours, an APS supervisory individual tested positive for alcohol.
The individual submitted to the test after other supervisory personnel smelled the odor of alcohol on the employee's breath.
An investigation was conducted by Security Investigations Investigator and Fitness-for-Duty Supervisor which determined the individual had consumed the alcohol the evening prior to the test.
As a result of the testing, the individual's site access to Palo Verde was suspended.
While personnel action was being =considered, the individual resigned.


L 1
L 1
1 t
1
1
'l 1
'l I
I l
l
t


Fitness for Duty Program Perfoxmance Data Personnel Subject to 10CFR 26 Arizona Public Service                                                                 December 31, 1990 Company                                                                             6 Months Ending Palo Verde Nuclear Generating Station (PVNGS)
Fitness for Duty Program Perfoxmance Data Personnel Subject to 10CFR 26 Arizona Public Service Company Palo Verde Nuclear Generating Station (PVNGS)
Location David Heler, Fitness         for   Duty Supervisor                                                 (602)393-7465 Contact  Mama                                                                  Phono tincludo atoa coda)
Location December 31, 1990 6 Months Ending David Heler, Fitness for Duty Supervisor Contact Mama (602)393-7465 Phono tincludo atoa coda)
Cutoffs: Screen/ConQrmation(ng/ml)       ~ AppendizAto 10CFR26 Marijuana     20/15     Amphetamine         300! 300               Benzodiazepines       300/300 Cocaine       300 150     MethamphetamineslOOQ'300                   Barbiturates         300 /300 OPiates       30q 300     Phencyclidine       25/25                 Alcohol (% of BAC)         / . 04'Fo Long Term                    Short Term Testing Results                         Licensee Employees                                    Contractor                  Contractor Personnel                    Personnel Average Number with             2,411               g'4(%>7;.C;. 7!4774~4 77( gg@<c.,)4,s         N/A                         991 Unescorted Access
Cutoffs: Screen/ConQrmation(ng/ml)
                                                            &#xb9;
~ AppendizAto 10CFR26 Marijuana 20/15 Amphetamine 300! 300 Benzodiazepines 300/300 Cocaine 300 150 MethamphetamineslOOQ'300 Barbiturates 300 /300 OPiates 30q 300 Phencyclidine 25/25 Alcohol (% ofBAC)
                              &#xb9;             &#xb9;       Referred             Access                           &#xb9;             &#xb9; Categories              Tested       Positive      to EAP            Restored        Tested      Positive        Tested      Positive Pre-badging               187                                                             N/A           N/A           793 10                                                             N/A           N/A For cause Post accident                             0                                               N/A           N/A '                         0 Randont                 1,570                                                             N/A          N/A          539 7 7OS7@4~&#xc3;77
/. 04'Fo Testing Results Average Number with Unescorted Access 2,411 Licensee Employees g'4(%>7;.C;. 7!4774~4 77(gg@<c.,)4,s Long Term Contractor Personnel N/A Short Term Contractor Personnel 991 Categories
                                                                        " ~ '%% '%4 Follow-up                    29                                                            N/A           N/A             14           0
&#xb9; Tested
                                                  +~a.'4556sN&
&#xb9; Positive
22             0                                               N/A           N/A                           0 Other 1,819           .7                                               N/A           N/A         1,365           12 Total
&#xb9; Referred to EAP Access Restored Tested
&#xb9; Positive
&#xb9; Tested Positive Pre-badging 187 N/A N/A 793 For cause 10 N/A N/A Post accident 0
N/A N/A '
0 Randont Follow-up 1,570 29
+~a.'4556sN&
7 7OS7@4~&#xc3;77
~ '%% '%4 N/A N/A N/A N/A 539 14 0
Other 22 0
N/A N/A 0
Total 1,819
.7 N/A N/A 1,365 12


h, h(
h, h(
Line 127: Line 228:
)
)


Random Testing Program Results Individuals Tested   1989           1990                 1991            1992 1993 I Positive I Tested            2,042     2,109
Random Testing Program Results
% Positive                      0.2X      0.4X Graph of Yo Positive Confirmed Positive Tests for Specific Substances Marijuana                         14+       8" Cocaine 0           0 Opiates Amphetamines                                 3M 0           0 Phencyclidine Alcohol Benzodiazepines             0           0 0           0 Barbiturates
% Positive Graph of Yo Positive ITested Individuals Tested IPositive 1989 1990 2,042 0.2X 2,109 0.4X 1991 1992 1993 Confirmed Positive Tests for Specific Substances Marijuana 14+
8" Cocaine Opiates 0
0 Amphetamines Phencyclidine 0
0 3M Alcohol Benzodiazepines 0
0 Barbiturates 0
0


i1 b
i1 b


~ ~ w ~
~
Note: The results for specific substances reported with the "/" indicate, on the left, the number of tests which would have been reported as positive using the NRC cut-off level, while the number on the right indicates the positive results using the APS cut-off level.
~
* APS uses different cut-off levels than the NRC for several drugs. If the NRC screening cut-off level (100 ng/ml) for marijuana had been used in the testing program instead of the APS cut-off level (20 ng/ml), four individuals would not have tested positive for marijuana.
w
        **    One   individual tested positive for two substances,         marijuana and amphetamine,   a result from random testing.
~
Note:
The results for specific substances reported with the "/" indicate, on the left, the number of tests which would have been reported as positive using the NRC cut-off level, while the number on the right indicates the positive results using the APS cut-off level.
APS uses different cut-off levels than the NRC for several drugs.
If the NRC screening cut-off level (100 ng/ml) for marijuana had been used in the testing program instead of the APS cut-off level (20 ng/ml),
four individuals would not have tested positive for marijuana.
One individual tested positive for two substances, marijuana and amphetamine, a result from random testing.


t 7
t 7
~ A}}
~ A}}

Latest revision as of 02:12, 8 January 2025

Forwards fitness-for-duty Semiannual Performance Rept for Jul-Dec 1990
ML17305B380
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/28/1991
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
161-03782-WFC-M, 161-3782-WFC-M, NUDOCS 9103070208
Download: ML17305B380 (19)


Text

I ACCELERATED D? TRIBUTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) 03070208 DOC.DATE: 91/02/28 NOTARIZED: NO DOCKET 9 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 ubli 05000530 ACCESSION NBR:91 FACIL:STN-50-52 STN-50-530 Palo Verde Nuclear Station, Unxt 3, Arz.zona P

AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

I

SUBJECT:

Forwards fitness-for-duty semiannual performance rept for Jul-Dec 1990.

D DISTRIBUTION CODE:

A021D COPIES RECEIVED:LTR J ENCL 7 SIZE:

TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data'0CFR26.7 NOTES:Standardized plant.

05000529 Standardized plant.

05000530 A

RECXPIENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS

, NUDOCS-ABSTRACT RGN5 02 EXTERNAL: NRC PDR NOTES COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRRJ+X@S/

SGB RK~ILE 01 NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS D

D PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPXES REQUIRED:

LTTR 12 ENCL 12

~

4

~

,I

Arizona Public Service Company P.O. BOX 53999

~

PHOENIX, ARIZONA85072-3999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 161-03782-NFC/MEP/KLMC February 28, 1991 Docket Nos.

STN 50-528/529/530 Document Control Desk U.

S. Nuclear Regulatory Commission Mail Station Pl-37 Washington, D.

C.

20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3

Fitness-for-Duty Semiannual Performance Report File: 91-056-026 Pursuant to 10 CFR 26.71(d),

the attachment to this letter provides the Arizona Public Service (APS) Fitness-for-Duty Semiannual Performance Report for the period of July 1990 through December 1990.

If you have any questions concerning this matter, contact Michael E. Powell at (602) 340-4981.

Sincerely, WFC/MEP/KLMC Attachment cc:

J.

B. Martin L: L. Bush D. H.

Coe A. C. Gehr A.

H,. Gutterman 9103070208"910228 PDR ADOCK 05000528

.-- PDR

4

() ~ q i,~

Attachment ARIZONA PUBLIC SERVICE COMPANY FITNESS-FOR-DUTY PROGRAM SEMIANNUAL PERFORMANCE REPORT July 1990 through December 1990 INTRODUCTION APS'ear-end statistics have continued to demonstrate that the Fitness-for-Duty Program has been successful in maintaining a drug-free work place.

During 1990, APS performed 4,151 random drug and alcohol tests.

This yields a testing rate of 116 percent for the average population with unescorted access.

APS credits a

major portion of its success to an extensive communicati.on and training program.

The cooperation between APS and its contractor companies has contributed significantly to the success of the program.

ANALYSIS OF PROGRAM RESULTS We have performed a statistical breakdown of the confirmed positive drug test results by type of test and type of drug involved.

The results of this statistical breakdown are as follows:

Pre-Badge Testing:

Marijuana Cocaine Alcohol Total 7 confirmed positive test results Comments:

A total of 980 individuals were pre-badge tested.

Of the seven persons with positive test results, one was an APS employee, and the other six were contractor employees.

The positive rate for this reporting period (0.7%) is significantly lower than the previous reporting period (1.1%).

For-Cause Testing:

Alcohol Marijuana Total 3 confirmed positive test results Comments:

APS tested 11 individuals for-cause during this reporting period.

The causes involved behavioral observations, allegations and suspected adulteration of urine specimens, Two positive alcohol test results involved APS employees, and the positive marijuana drug test result was from a contractor employee.

FFD Program Semiannual Performance Report July 1990 through December 1990 Page Two Random Testing:

Cocaine Amphetamine~

Marijuana~

Total 10 conEirmed positive test results

  • One individual tested positive for both amphetamine and marijuana.

Comments:

2,109 individuals were tested during this reporting period which yielded an annualized testing rate oE 124 percent.

Of the nine individuals testing positive, four were APS employees, and Eive were contractor employees.

Eight out of the nine tested positive on their first random test, and one individual tested positive aEter the second random test (one month after the Eirst test).

This one individual tested positive for cocaine.

In comparison with the statistics from the previous reporting period, marijuana and amphetamine positives increased by four and two respectively, with one individual testing positive for both amphetamine and marijuana.

Post Accident Testing:

One test was performed during this reporting period; the test result was negative.

Follow-Up Testing:

Under the APS follow-up testing program, a total of 43 tests were conducted during this reporting period.

All test results were negative.

At the end of this reporting period, ten individuals were under the follow-up testing program based on the results of the "suitable inquiry."

OE those ten individuals, four were APS employees, and six were contractor employees.

Other Testing:

During this reporting period, APS tested 40 individuals whose previously granted unescorted access had expired for various reasons and

who, therefore, were no longer subject to random testing.

As soon as the requirement to retest prior to re-establishment oE unescorted access was recognized, the individuals were tested.

None of the individuals tested positive.

t r

H

FFD Program Semiannual Performance Report July 1990 through December 1990 Page Three In each case of a confirmed positive drug test result the individual's site access was revoked.

APS employees testing positive for illegal drugs were discharged from employment.

APS employees who had a single occurrence of a positive test for alcohol received a disciplinary suspension, evaluation and treatment prior to reinstatement.

Any individual who had a single positive drug test may be eligible to reapply for access after three years.

PROGRAM REVIEW'ABORATORY PERFORMANCE A Quality Assurance (QA) audit was conducted in October 1990.

A consulting group was utilized to provide technical support to the audit group.

Results from the audit indicated that APS has a comprehensive Fitness-for-Duty Program which meets the requirements of 10 CFR Part 26.

Many of the recommendations that were made during the audit have been incorporated into the program.

In December 1990 the Nuclear Regulatory Commission conducted an inspection of the APS Fitness-for-Duty Program.

The

NRC, as documented in Inspection Report 50-528/90-49, identified one non-cited violation as a result of their inspection activities.

There were two occurrences where performance test specimens (certified by the supplier to be positive) were reported as negative from our Department of Health and Human Services (DHHS) certified laboratories.

An investigation was conducted regarding these occurrences, and it was determined that the certified blind specimens deteriorated during the shipping and handling process from the vendor to APS.

The DHHS laboratories properly reported the results.

The supplier stated the specimens deterioration may have been attributed to the "absorption of the drug to the container."

The Medical Review Officer (MRO) reviewed the shipping and handling process and determined it did not contribute to the absorption problem.

The MRO also determined that the containers used by APS did not contribute to the situation.

As a result of these two occurrences, APS has secured another vendor to provide quality-controlled performance test specimens.

During the reporting period, APS had no other performance problems in connection with blind performance specimens sent to any of the off-site laboratories.

In December

1990, a specimen was lost by one of the DHHS-certified laboratories.

The specimen was one-half of a split specimen submitted to the DHHS-certified laboratory as part of an appeals process.

The remainder of the specimen, which had been retained by the first DHHS-certified laboratory, was then analyzed for the appeal.

Thus, there were no adverse consequences arising from the lost specimen.

APS'nvestigation of this event is continuing.

1 r

,)

FFD Program Semiannual Performance Report July 1990 through December 1990 Page Four

SUMMARY

OF PROGRAM CHANGES Changes to the existing Fitness-for-Duty Program have been made and are planned

which, we believe, will improve the overall effectiveness of the program.

Completed Actions:

l.

APS instituted a revised chain of custody form which utilizes bar coding, thus helping reduce the potential for human error with data entry at our DHHS-certified laboratories.

APS distributed to personnel a new brochure which addresses our Employee Assistance and Fitness-for-Duty Programs.

The Fitness-for-Duty Department was restructured to incorporate the Employee Assistance Program and a newly developed fitness-for-duty auditing function.

These organizational changes have improved the overall effectiveness of the program.

The Fitness-for-Duty Collection Building was remodeled to enhance the professionalism of the department and to improve the process flow.

In

addition, new storage and security equipment has been installed.

In an effort to increase the awareness of a, drug-free work place, the Fitness-for-Duty Department is distributing drug-free buttons to those personnel who have undergone a drug and alcohol test.

The response to these buttons has been extremely favorable.

The Fitness-for-Duty staff reviewed many of the forms used in the collection process and revised the

forms, as necessary, to enhance the program effectiveness.

7.

Enhanced training classes were held for supervisory personnel to provide them with specific guidance and instruction on the process of notifying employees of random drug and alcohol testing.

Planned Actions:

To reduce the impact on licensed operator shift manning and on overall site productivity, a collection facility inside the protected area will be constructed and is anticipated to be complete by June 1991.

In an effort to continue to enhance the Fitness-for-Duty Program and to adopt the pending proposed changes to the regulation, APS will continue to review and revise its procedures to incorporate appropriate changes.

I I

(

f

FFD Program Semiannual Performance Report July 1990 through December 1990 Page Five CONCLUSION The second six months of our program showed significant progress towards achieving a drug-free work place.

Of the 4,151 random drug and alcohol tests conducted in

1990, APS experienced a

positive rate of 0.3 percent.

APS'ffective communication program contributes to the success of our Fitness-for-Duty Program which was confirmed by our QA audit and the NRC inspection, both, occurring within this semiannual reporting period.

REPORTABLE EVENTS Events reported by phone to NRC:

1 Total Summary of Event:

On September 28,

1990, at 0742
hours, an APS supervisory individual tested positive for alcohol.

The individual submitted to the test after other supervisory personnel smelled the odor of alcohol on the employee's breath.

An investigation was conducted by Security Investigations Investigator and Fitness-for-Duty Supervisor which determined the individual had consumed the alcohol the evening prior to the test.

As a result of the testing, the individual's site access to Palo Verde was suspended.

While personnel action was being =considered, the individual resigned.

L 1

1 t

1

'l I

l

Fitness for Duty Program Perfoxmance Data Personnel Subject to 10CFR 26 Arizona Public Service Company Palo Verde Nuclear Generating Station (PVNGS)

Location December 31, 1990 6 Months Ending David Heler, Fitness for Duty Supervisor Contact Mama (602)393-7465 Phono tincludo atoa coda)

Cutoffs: Screen/ConQrmation(ng/ml)

~ AppendizAto 10CFR26 Marijuana 20/15 Amphetamine 300! 300 Benzodiazepines 300/300 Cocaine 300 150 MethamphetamineslOOQ'300 Barbiturates 300 /300 OPiates 30q 300 Phencyclidine 25/25 Alcohol (% ofBAC)

/. 04'Fo Testing Results Average Number with Unescorted Access 2,411 Licensee Employees g'4(%>7;.C;. 7!4774~4 77(gg@<c.,)4,s Long Term Contractor Personnel N/A Short Term Contractor Personnel 991 Categories

¹ Tested

¹ Positive

¹ Referred to EAP Access Restored Tested

¹ Positive

¹ Tested Positive Pre-badging 187 N/A N/A 793 For cause 10 N/A N/A Post accident 0

N/A N/A '

0 Randont Follow-up 1,570 29

+~a.'4556sN&

7 7OS7@4~Ã77

~ '%% '%4 N/A N/A N/A N/A 539 14 0

Other 22 0

N/A N/A 0

Total 1,819

.7 N/A N/A 1,365 12

h, h(

I lI f

i I

)

Random Testing Program Results

% Positive Graph of Yo Positive ITested Individuals Tested IPositive 1989 1990 2,042 0.2X 2,109 0.4X 1991 1992 1993 Confirmed Positive Tests for Specific Substances Marijuana 14+

8" Cocaine Opiates 0

0 Amphetamines Phencyclidine 0

0 3M Alcohol Benzodiazepines 0

0 Barbiturates 0

0

i1 b

~

~

w

~

Note:

The results for specific substances reported with the "/" indicate, on the left, the number of tests which would have been reported as positive using the NRC cut-off level, while the number on the right indicates the positive results using the APS cut-off level.

APS uses different cut-off levels than the NRC for several drugs.

If the NRC screening cut-off level (100 ng/ml) for marijuana had been used in the testing program instead of the APS cut-off level (20 ng/ml),

four individuals would not have tested positive for marijuana.

One individual tested positive for two substances, marijuana and amphetamine, a result from random testing.

t 7

~ A