| issue date = 02/25/1983
| issue date = 02/25/1983
| title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
| title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP.
| author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AMER1CAN-ELECTRIC POMfERServiceCorporation 2Broadway, NewYork,¹Y.10004(212)440-9000February25,1983AEP:NRC:0631B DonaldC.CookNuclearPlantUnitNos.1and2DocketNos.50-315and50-316LicenseNos.DPR-58andDPR-74NUREG-0737, ITEMII.F.1.6TECHNICAL SPECIFICATIOVi FEESPURSUANTTO10CFR170Mr.HaroldR.Denton,DirectorOfficeofNuclearReactorRegulation U.S.NuclearRegulatory Commission Washington, D.C.20555
{{#Wiki_filter:AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==DearMr.Denton:==
==Dear Mr. Denton:==
InourletterNo.AEP:NRC:0631A, datedSeptember 29,1982,wesubmitted proposedAppendixATechnical Specification (T/S)changesrequiredforplacingthenewPost-Accident Containment HydrogenMonitoring System(PACRiS)intoservicetosatisfytherequirements ofNUREG-0737, ItemII.F.1.6~Our3.etterincludedastatement totheeffectthatthepaymentforthesechangeswouldbemadeaspartofthefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.
In our letter No. AEP:NRC:0631A, dated September 29,
However,bywayofhisFebruary3,1983,lettertoMr.JohnE.Dolan,Mr.WilliamO.Millerrequested theremittance of$4,400tocovertheNRCreviewexpenses.
: 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
Wewishtobringtoyourattention thatonFebruary15,1983,wereceivedGenericLetter82-16whichrequeststhesubmittal ofthirteenNUREG-0737-required T/Sconsolidated intoonesubmittal.
However, by way of his {{letter dated|date=February 3, 1983|text=February 3, 1983, letter}} to Mr.
Furthermore, adraftGenericLettertransmitted byMr.DarrellG.EisenhuttoMr.CarlWalskeoftheAtomicIndustrial Forum,datedJanuary28,1983,requestssubmittal oftheT/S.required "fortheimplementation ofei'ghteen NUREG-0737 items,oneofwhichisitemII.F.1.6.
John E. Dolan, Mr. William O. Miller requested the remittance of
Mr.Eisenhut.'s letteragainrequeststhattheT/Schangesbeconsolidated'nto onesubmittal.
$4,400 to cover the NRC review expenses.
Theearlyimplementation of.ItemZI.F.1.6attheCookPlant,reflectsI&i%Co'sconcernforthesafeoperation oftheplantandthesafetyofthepublic.Byrequesting paymentforthisT/Schangeseparately, theNRCisfinancially penali"ing usfortheearlyimplementation ofrequiredsafetyequipment.
We wish to bring to your attention that on February 15,
Consequently, werequestthatthepaymentfortheNUREG-0737, ItemZI.F.1.6T/SbemadepartofthesinglefeetobeleviedfortheissuanceoftheT/SchangesrequiredbyNUREG-0737.
: 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Thisdocumenthasbeenpreparedfollowing Corporate Procedures whichincorporate areasonable setofcontrolstoensureitsaccuracyandcompleteness priortosignature bytheundersigned.
Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
Verytrulyyours,NilnP.exichAssistant VicePresident NuclearEngineering MPA/mdcc:JohnE.Dolan-ColumbusR.S.HunterR.W.Jurgensen W.G.Smith,Jr.-BridgmanR.C.CallenG.CharnoffW.0.?Q.lier-NRCNRCResidentInspector atCookPlant-Bridgman A~"l'I(}}
Carl Walske of the Atomic Industrial Forum, dated January 28,
: 1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.
Mr.
Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.
By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.
 
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P.
exich Assistant Vice President Nuclear Engineering MPA/md cc:
John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman
 
A
~
"l
'I
(}}

Latest revision as of 13:43, 7 January 2025

Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
ML17334A462
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323
Download: ML17334A462 (3)


Text

AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

In our letter No. AEP:NRC:0631A, dated September 29,

1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.

However, by way of his February 3, 1983, letter to Mr.

John E. Dolan, Mr. William O. Miller requested the remittance of

$4,400 to cover the NRC review expenses.

We wish to bring to your attention that on February 15,

1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.

Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.

Carl Walske of the Atomic Industrial Forum, dated January 28,

1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.

Mr.

Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.

The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.

By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.

Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.

This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, Nil n P.

exich Assistant Vice President Nuclear Engineering MPA/md cc:

John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman