{{#Wiki_filter:AMER1CAN -ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.       1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NUREG-0737, ITEM   II.F.1.6   TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
{{#Wiki_filter:AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos. 50-315 and 50-316 License Nos.
DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555


==Dear Mr. Denton:==
==Dear Mr. Denton:==
 
In our letter No. AEP:NRC:0631A, dated September 29,
In our letter No. AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 Our 3.etter included a statement to the
: 1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.
                            ~
However, by way of his {{letter dated|date=February 3, 1983|text=February 3, 1983, letter}} to Mr.
effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737. However, by way of his February 3, 1983, letter to Mr.
John E. Dolan, Mr. William O. Miller requested the remittance of
John E. Dolan, Mr. William O. Miller requested the remittance of $ 4,400 to cover the NRC review expenses.
$4,400 to cover the NRC review expenses.
We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal. Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
We wish to bring to your attention that on February 15,
Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S .required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6. Mr.
: 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.
Eisenhut.'s letter again requests that the T/S changes be submittal.
Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.
consolidated'nto one The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public. By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment. Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by   NUREG-0737.
Carl Walske of the Atomic Industrial Forum, dated January 28,
: 1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.
Mr.
Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.
The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.
By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.
Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.


This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Nil n P. exich Assistant Vice President Nuclear Engineering MPA/md cc: John E. Dolan   - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman
Very truly yours, Nil n P.
exich Assistant Vice President Nuclear Engineering MPA/md cc:
John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman


A ~
A
    "l
~
  'I
"l
'I
(}}
(}}

Latest revision as of 13:43, 7 January 2025

Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
ML17334A462
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323
Download: ML17334A462 (3)


Text

AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York, ¹Y. 10004 (212) 440-9000 February 25, 1983 AEP:NRC:0631B Donald C. Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos. 50-315 and 50-316 License Nos.

DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

In our letter No. AEP:NRC:0631A, dated September 29,

1982, we submitted proposed Appendix A Technical Specification (T/S) changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS) into service to satisfy the requirements of NUREG-0737, Item II.F.1.6 ~ Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.

However, by way of his February 3, 1983, letter to Mr.

John E. Dolan, Mr. William O. Miller requested the remittance of

$4,400 to cover the NRC review expenses.

We wish to bring to your attention that on February 15,

1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.

Furthermore, a draft Generic Letter transmitted by Mr. Darrell G. Eisenhut to Mr.

Carl Walske of the Atomic Industrial Forum, dated January 28,

1983, requests submittal of the T/S.required "for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.

Mr.

Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.

The early implementation of. Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.

By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.

Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.

This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, Nil n P.

exich Assistant Vice President Nuclear Engineering MPA/md cc:

John E. Dolan - Columbus R. S. Hunter R. W. Jurgensen W. G. Smith, Jr. - Bridgman R. C. Callen G. Charnoff W. 0. ?Q.lier NRC NRC Resident Inspector at Cook Plant - Bridgman