DOCKET NO:       50-316 UNIT NAME:      D. C. Cook Unit 2 COMPLETED BY:  T. R. Stephens TELEPHONE:      (616) 465-5901 DATE:          August 4, 1989 PAGE:            1 of 1 MAJOR SAFETY-RELATED MAINTENANCE JUNE   1989 2-IC-1     Replaced bistable 1 TB-412 for G/H turbine runback/
I
\\
4 DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.
C.
Cook Unit 2 T. R. Stephens (616) 465-5901 August 4, 1989 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE JUNE 1989 2-IC-1 Replaced bistable 1 TB-412 for G/H turbine runback/
block rod withdrawal.
block rod withdrawal.
2-IC-2     Replaced indication.
2-IC-2 Replaced I/I 2-NTR-230B for wide range temperature indication.
I/I 2-NTR-230B for wide range temperature 8908i50i77 890804 050003i6 PDR ADOCK
8908i50i77 890804 PDR ADOCK 050003i6 R
  !        R                PDC
PDC


DOCKET NO:       50-316 UNIT NAME:      D. C. Cook Unit 2 COMPLETED BY:    T. R. Stephens TELEPHONE:      (616) 465-5901 DATE:            July 10, 1989 PAGE:            1 of 1   (revised)
DOCKET NO:
MONTHLY OPERATING   ACTIVITIES   JUNE   1989 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power. The unit was shut down June 11, 1989, for containment.
UNIT NAME:
leak inspection and lower containment ventilation unit air and waterside inspection and cleaning. The lower containment ventilation units were cleaned, and valve 2-SI-158-Ll was repaired. The unit entered Mode 5 for replacement of the rod position coil stack for
COMPLETED BY:
                                                                          )
TELEPHONE:
CBC Rod H-14. The unit was brought critical at 1302 on June 24', 1989, with parallel to the system at 1832 on June 24, 1989. 100% RTP was achieved June 25, 1989.
DATE:
Gross electrical generation for the   month of June was 414510 MWH.
PAGE:
DETAILS 6/10/89   1800       Commenced power reduction from 100:   RTP.
50-316 D.
6/11/89    0356      Unit removed from parallel.
C.
0357      RCS entered Mode 2.
Cook Unit 2 T. R. Stephens (616) 465-5901 July 10, 1989 1 of 1 (revised)
0414      RCS entered Mode 3.
MONTHLY OPERATING ACTIVITIES JUNE 1989 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.
6/12/89    1011      RCS entered Mode 4.
The unit was shut down June 11, 1989, for containment.
2102      RCS entered Mode 5.
leak inspection and lower containment ventilation unit air and waterside inspection and cleaning.
6/17/89    0443      RCS entered Mode 4.
The lower containment ventilation units were cleaned, and valve 2-SI-158-Ll was repaired.
6/18/89    0523      RCS entered Mode 3.
The
6/24/89    1302      Reactor is critical.
)
1832      Unit paralleled.
unit entered Mode 5 for replacement of the rod position coil stack for CBC Rod H-14.
6/25/89    1622      Reactor achieved   100% RTP.
The unit was brought critical at 1302 on June 24',
: 1989, with parallel to the system at 1832 on June 24, 1989.
100%
RTP was achieved June 25, 1989.
Gross electrical generation for the month of June was 414510 MWH.
DETAILS 6/10/89 1800 6/11/89 0356 0357 0414 6/12/89 1011 2102 6/17/89 0443 6/18/89 0523 6/24/89 1302 1832 6/25/89 1622 Commenced power reduction from 100: RTP.
Unit removed from parallel.
RCS entered Mode 2.
RCS entered Mode 3.
RCS entered Mode 4.
RCS entered Mode 5.
RCS entered Mode 4.
RCS entered Mode 3.
Reactor is critical.
Unit paralleled.
Reactor achieved 100% RTP.


DOCKET NO:       50-316 UNIT NAME:      D. C. Cook Unit 2 COMPLETED BY:    T. R. Stephens TELEPHONE:      (616) 465-5901 DATE:            July 10, 1989 PAGE:            1 of 1 (revised)
DOCKET NO:
MAJOR SAFETY-RELATED MAINTENANCE JUNE   1989 Replaced bistable   1 TB-412 G/H   for turbine runback/
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-316 D.
C.
Cook Unit 2
T. R. Stephens (616) 465-5901 July 10, 1989 1 of 1 (revised)
MAJOR SAFETY-RELATED MAINTENANCE JUNE 1989 Replaced bistable 1 TB-412 G/H for turbine runback/
block rod withdrawal.
block rod withdrawal.
Replaced bistable   2 FB-416B the low   coolant flow reactor trip bistable.
Replaced bistable 2 FB-416B the low coolant flow reactor trip bistable.
Repaired valve 2-SI-158-L1.
Repaired valve 2-SI-158-L1.
Replaced rod   position coil stack for   CBC Rod H-14.}}
Replaced rod position coil stack for CBC Rod H-14.}}

Latest revision as of 13:33, 7 January 2025

Corrected Monthly Operating Rept for Jun 1989 for DC Cook Unit 2 Re Monthly Operating Activities & Major safety- Related Maint
ML17334B319
Person / Time
Site: Cook 
Issue date: 06/30/1989
From: Stephens T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17325B259 List:
References
NUDOCS 8908150177
Download: ML17334B319 (3)


Text

~

I

\\

4 DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.

C.

Cook Unit 2 T. R. Stephens (616) 465-5901 August 4, 1989 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE JUNE 1989 2-IC-1 Replaced bistable 1 TB-412 for G/H turbine runback/

block rod withdrawal.

2-IC-2 Replaced I/I 2-NTR-230B for wide range temperature indication.

8908i50i77 890804 PDR ADOCK 050003i6 R

PDC

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.

C.

Cook Unit 2 T. R. Stephens (616) 465-5901 July 10, 1989 1 of 1 (revised)

MONTHLY OPERATING ACTIVITIES JUNE 1989 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.

The unit was shut down June 11, 1989, for containment.

leak inspection and lower containment ventilation unit air and waterside inspection and cleaning.

The lower containment ventilation units were cleaned, and valve 2-SI-158-Ll was repaired.

The

)

unit entered Mode 5 for replacement of the rod position coil stack for CBC Rod H-14.

The unit was brought critical at 1302 on June 24',

1989, with parallel to the system at 1832 on June 24, 1989.

100%

RTP was achieved June 25, 1989.

Gross electrical generation for the month of June was 414510 MWH.

DETAILS 6/10/89 1800 6/11/89 0356 0357 0414 6/12/89 1011 2102 6/17/89 0443 6/18/89 0523 6/24/89 1302 1832 6/25/89 1622 Commenced power reduction from 100: RTP.

Unit removed from parallel.

RCS entered Mode 2.

RCS entered Mode 3.

RCS entered Mode 4.

RCS entered Mode 5.

RCS entered Mode 4.

RCS entered Mode 3.

Reactor is critical.

Unit paralleled.

Reactor achieved 100% RTP.

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.

C.

Cook Unit 2

T. R. Stephens (616) 465-5901 July 10, 1989 1 of 1 (revised)

MAJOR SAFETY-RELATED MAINTENANCE JUNE 1989 Replaced bistable 1 TB-412 G/H for turbine runback/

block rod withdrawal.

Replaced bistable 2 FB-416B the low coolant flow reactor trip bistable.

Repaired valve 2-SI-158-L1.

Replaced rod position coil stack for CBC Rod H-14.