| title = Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects Ref NRC Bulletin 88-008.
| title = Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects Ref NRC Bulletin 88-008
| author name = Anderson E
| author name = Anderson E
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:i           ATTACHMENT 1 NUCLEAR ENERGY SERVICES MATERIALS, CODES and INSPECTIONS SECTION 700 Universe Blvd.
{{#Wiki_filter:i ATTACHMENT 1 NUCLEAR ENERGY SERVICES MATERIALS, CODES and INSPECTIONS SECTION 700 Universe Blvd.
Juno Beach,   Florida FINAL REPORT   OF INSERVICE INSPECTION NONDESTRUCTZVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88 08 PREPARED BY:
Juno Beach, Florida FINAL REPORT OF INSERVICE INSPECTION NONDESTRUCTZVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~
FLORIDA POWER AND LIGHT COMPANY FOR TURKEY POINT- NUCLEAR POWER PLANT UNIT NO ~ 4 P+0 ~ BOX 3088 FLORIDA CITY'LORIDA 33034 COMMERCIAL SERVICE DATE! PTN-4         7 SEPTEMBER 1973 NRC DOCKET NUMBER:             50-251 DOCUMENT NUMBER:                MCI-PTN-004-88-08   REV. 0 PREPARED   BY'I ENGINEER       C&P
88 08 PREPARED BY:
:~aa     &
FLORIDA POWER AND LIGHT COMPANY FOR TURKEY POINT-NUCLEAR POWER PLANT UNIT NO ~
REVIEWED BY:
4 P+0 ~
P   VI 0   CODES &
BOX 3088 FLORIDA CITY'LORIDA 33034 COMMERCIAL SERVICE DATE! PTN-4 7
DATE'   ~   ~7 PRO          OUP APPROVED  BY'ATE:
SEPTEMBER 1973 NRC DOCKET NUMBER:
                &
DOCUMENT NUMBER:
A ER MATERIALS, CODES INSPECTIONS SECTION C~905ii0029 890504 0 pap" ADOCK OOC>2 C>
50-251 MCI-PTN-004-88-08 REV.
9                   PDC
0 PREPARED BY'I ENGINEER C&P
:~aa REVIEWED BY:
P VI 0 PRO CODES OUP DATE'
~ ~7 APPROVEDBY'ATE:
A ER MATERIALS, CODES
& INSPECTIONS SECTION C~905ii0029 890504 pap" ADOCK C>
OOC>2 0
9 PDC


FINAL REPORT OF ZNSERVZCE INSP CTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS TITLE PAGE/COVER SHEET TABLE OF CONTENTS RECORD OF   REVISION ABSTRACT ABBREVIATIONS
FINAL REPORT OF ZNSERVZCE INSP CTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS TITLE PAGE/COVER SHEET TABLE OF CONTENTS RECORD OF REVISION ABSTRACT ABBREVIATIONS


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
1.1 PROGRAM APPLICABILITY 1.2 INSPECTION INTERVAL 1.3 INSPECTION PERIODS 1 '
APPLICABLE DOCUMENTS 1.5 APPLICABLE CODE EDITIONS AND ADDENDA 2.0 ENGINEERING RECOMMENDATIONS 2.1 CHARGING PUMP TO PRESSURIZER AUXILIARYSPRAY LINE 2.2 CHARGING PUMP TO "C" HOT LEG 3.0 ABSTRACT OF EXAMINATIONS PERFORMED 3.1 APPLICABLE AREAS 3 ~ 1 ~ 1 AUXILIARYSPRAY LINE 3.1.2 CHARGING LINE


1.1 PROGRAM  APPLICABILITY 1.2 INSPECTION INTERVAL 1.3 INSPECTION  PERIODS 1' APPLICABLE DOCUMENTS 1.5 APPLICABLE  CODE  EDITIONS AND ADDENDA 2.0  ENGINEERING RECOMMENDATIONS 2.1 CHARGING PUMP TO PRESSURIZER AUXILIARY SPRAY LINE 2.2 CHARGING PUMP TO    "C" HOT LEG 3.0  ABSTRACT OF EXAMINATIONS PERFORMED 3.1 APPLICABLE  AREAS 3 ~ 1~1 AUXILIARY SPRAY LINE 3.1.2  CHARGING LINE
~
~
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPXNG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 3.2 LIQUID PENETRANT EXAMINATIONS 3.3 ULTRASON1'C EXAMINATIONS 4.0 ABSTRACT OF CONDITIONS NOTED 4.1 AUXILIARYSPRAY LINE 4.1.1 2"-RC-1410-33 4.1.2 2"-RC-1410-34 4. 2 CHARGXNG LINE 4
2 1
3it CH 1401 32 4.2.2 ELBOW BASE METAL 4
2 3
3't-CH-1401-33 4'.4 PXPE BASE METAL 4.2.5 3"-CH-1401-34 4.2.6 ELBOW BASE METAL 4.2.7 3"-CH-1401-35 4.2.8 PIPE BASE METAL 4.2.9 3it CH 1401 36 4 '.10 ELBOW BASE METAL 4
2 11 3"-CH-1401-37 5
~ 0 CORRECTIVE ACTIONS TAKEN AND/OR RECOMMENDED


              ~
FINAL REPORT OF INSERVZCE ZNSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 6.0 EVALUATION CRITERIA F 1 CLASS 1
FINAL REPORT
6.1.1 ACCEPTANCE STANDARDS FOR CLASS 1
                                            ~
7.0 INSERVICE INSPECTION
OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPXNG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 3.2 LIQUID      PENETRANT EXAMINATIONS 3.3  ULTRASON1'C EXAMINATIONS 4.0  ABSTRACT OF CONDITIONS NOTED 4.1 AUXILIARY SPRAY LINE 4.1.1    2"-RC-1410-33 4.1.2    2"-RC-1410-34 4 . 2 CHARGXNG    LINE 4  2  1  3it CH 1401 32 4.2.2    ELBOW BASE METAL 4  2  3  3't-CH-1401-33 4 '.4    PXPE BASE METAL 4.2.5    3"-CH-1401-34 4.2.6    ELBOW BASE METAL 4.2.7    3"-CH-1401-35 4.2.8    PIPE BASE METAL 4.2.9    3it CH 1401 36 4 '.10  ELBOW BASE METAL 4 2 11  3"-CH-1401-37 5 ~ 0 CORRECTIVE ACTIONS TAKEN AND/OR RECOMMENDED
 
FINAL REPORT OF INSERVZCE ZNSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 6.0 EVALUATION CRITERIA F 1 CLASS 1 6.1.1 ACCEPTANCE STANDARDS FOR CLASS 1 7.0 INSERVICE   INSPECTION  


==SUMMARY==
==SUMMARY==
TABLES
TABLES


==7.1 DESCRIPTION==
==7.1 DESCRIPTION==
OF TABLES 7.1.1  
OF TABLES 7.1.1


==SUMMARY==
==SUMMARY==
PLAN TABLES EXPLANATIONS 8.0 RECORDS 8.1 GENERAL 8.2 INSERVICE INSPECTION  
PLAN TABLES EXPLANATIONS 8.0 RECORDS 8.1 GENERAL 8.2 INSERVICE INSPECTION


==SUMMARY==
==SUMMARY==
REPORTS APPENDICES A REFERENCE DRAWINGS B PERSONNEL CERTIFICAT10NS C ULTRASONIC EQUIPMENT D ULTRASONIC TRANSDUCERS E ULTRASONIC COUPLANT F THERMOMETERS G LIQUID PENETRANT MATERIALS H EXAMINATION PROCEDURES I ULTRASONIC CALIBRATION BLOCKS J LIQUID PENETRANT DOCUMENTATION DATA PACKAGES K ULTRASONIC DOCUMENTATION DATA PACKAGES L ENGINEERING RECOMMENDATIONS DOCUMENT SEGPT-SSAD-7814 M NRC BULLETIN 88-08 THERMAL STRESSES     IN PIPING   CONNECTED TO REACTOR COOLANT SYSTEMS
REPORTS APPENDICES A
REFERENCE DRAWINGS B
PERSONNEL CERTIFICAT10NS C
ULTRASONIC EQUIPMENT D
ULTRASONIC TRANSDUCERS E
ULTRASONIC COUPLANT F
THERMOMETERS G
LIQUID PENETRANT MATERIALS H
EXAMINATION PROCEDURES I
ULTRASONIC CALIBRATION BLOCKS J
LIQUID PENETRANT DOCUMENTATION DATA PACKAGES K
ULTRASONIC DOCUMENTATION DATA PACKAGES L
ENGINEERING RECOMMENDATIONS DOCUMENT SEGPT-SSAD-7814 M
NRC BULLETIN 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS


FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL. STRESS EFFECTS REFERENCE NRC BULLETIN NO>> 88-08 RECORD OF REVISION REVISION NUMBER DESCRIPTION OF REVISION REASON FOR THE CHANGE DATE REVISED APPROVALS


FOR POTENTIAL THERMAL. STRESS EFFECTS REFERENCE NRC BULLETIN NO>> 88-08 RECORD OF REVISION REVISION    DESCRIPTION OF REVISION      DATE  APPROVALS NUMBER    REASON FOR THE CHANGE        REVISED
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 ABBREVIATIONS LISTED BELOW ARE THE ABBREVIATIONS UTILIZED IN THIS DOCUMENT:
ASME B&PV C&P CH FP&L ISI JNS MCI NDE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE CODES AND PROGRAMS GROUP CHARGING FLORIDA POWER AND LIGHT COMPANY INSERVICE INSPECTION JUNO NUCLEAR ENERGY SERVICES MATERIALS, CODES AND INSPECTIONS SECTION NONDESTRUCTIVE EXAMINATION NRC NUCLEAR REGULATORY COMMISSION PTN-4 RCS RC TURKEY POINT PLANT UNIT NO.
4 MAIN REACTOR COOLANT SYSTEM REACTOR COOLANT


FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 ABBREVIATIONS LISTED    BELOW    ARE  THE  ABBREVIATIONS    UTILIZED IN THIS DOCUMENT:
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 ABSTRACT This document describes the Inservice Inspection results of Nondestructive Examinations performed during the 1988 refueling outage which began on 17 September 1988.
ASME        AMERICAN SOCIETY OF MECHANICAL ENGINEERS B&PV        BOILER AND PRESSURE VESSEL CODE C&P        CODES AND PROGRAMS GROUP CH          CHARGING FP&L        FLORIDA POWER AND LIGHT COMPANY ISI        INSERVICE INSPECTION JNS        JUNO NUCLEAR ENERGY  SERVICES MCI        MATERIALS, CODES AND INSPECTIONS SECTION NDE        NONDESTRUCTIVE EXAMINATION NRC        NUCLEAR REGULATORY COMMISSION PTN-4      TURKEY POINT PLANT UNIT NO. 4 RCS        MAIN REACTOR COOLANT SYSTEM RC        REACTOR COOLANT
This document addresses the nondestructive examinations performed, conditions noted and corrective measures recommended or taken as required by ASME Section XI 1980 Edition through the Winter 1981 Addenda, IWA-6220.
 
This document addresses NRC ACTION ITEM 2
FINAL REPORT  OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~     88-08 ABSTRACT This document describes     the Inservice Inspection results of Nondestructive     Examinations performed during the 1988 refueling outage which       began   on 17 September     1988. This document addresses the nondestructive examinations performed, conditions noted and corrective measures recommended or taken as required by ASME Section XI 1980 Edition through the Winter 1981 Addenda,   IWA-6220.
and the reporting requirements as identified in item 4 of the Action Requested by the Nuclear Regulatory Commission.
This document addresses     NRC ACTION     ITEM 2 and   the reporting requirements   as identified in item   4   of the Action Requested by the Nuclear Regulatory Commission.
This report documents the examination activity performed on Florida Power and Light Company Turkey Point Nuclear Power Plant Unit No. 4.
This report documents     the examination     activity performed on Florida Power and Light       Company   Turkey Point Nuclear Power Plant Unit No. 4.


NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08
NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
1.1 PROGRAM APPLICABILITY This Report details the Florida Power
& Light Company's results of Inservice Inspection, Nondestructive examinations performed at the Turkey Point Nuclear Power Plant, Unit No. 4.
1.1.1 The operating License for Turkey Point Unit no.
4 was issued on April 10 1973, and Florida Power and Light Company is the owner of record.
1.2 INSPECTION INTERVALS The Second Inservice inspection Interval became effective on April 15, 1984 and ends on April 14, 1994.
1.3 INSPECTION PERIODS The Inspection Interval is divided into three successive inspection periods as defined by Program "B".
Period START END April 15, 1984 April 15, 1987 April 15, 1987 April 15, 1991 3
April 15, 1991 April 14, 1994 1.4 APPLICABLE DOCUMENTS II The Nondestructive examination Program performed during this activity was developed after giving due consideration to the following documents:
ASME BOILER AND PRESSURE VESSEL CODE p SECTION XIg 1 98 0 EDITION THROUGH THE WINTER 1981 ADDENDA, "RULES FOR INSERVICE INSPECTION OF NUCLEAR POWER PLANT COMPONENTS"


1.1  PROGRAM    APPLICABILITY This      Report    details the      Florida Power & Light Company's    results of Inservice Inspection, Nondestructive examinations performed at the Turkey Point Nuclear Power Plant, Unit No. 4.
NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 U.
1.1.1 The operating License for Turkey Point Unit no. 4 was issued on April 10 1973, and Florida Power and Light Company is the owner of record.
S.
1.2 INSPECTION INTERVALS The Second Inservice inspection Interval became      effective on April 15, 1984 and ends on April 14, 1994.
NUCLEAR REGULATORY BULLETIN 88-08 TITLED "THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMSn DATED.
1.3 INSPECTION      PERIODS The  Inspection Interval is divided into three successive inspection periods as defined by Program "B".
JUNE 22~
Period              START                  END April  15, 1984    April  15, 1987 April  15, 1987    April  15, 1991 3            April  15, 1991    April  14, 1994 1.4 APPLICABLEII DOCUMENTS The  Nondestructive examination Program performed during this    activity was developed after giving due consideration to the following documents:
1988~
ASME      BOILER AND PRESSURE VESSEL CODE p SECTION  XI g 1 98 0 EDITION THROUGH THE WINTER 1981 ADDENDA, "RULES FOR INSERVICE INSPECTION OF NUCLEAR POWER PLANT COMPONENTS"
SUPPLEMENT 1
 
DATED JUNE 24~
NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 U. S. NUCLEAR REGULATORY BULLETIN 88-08 TITLED "THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMSn     DATED. JUNE 22~ 1988~ SUPPLEMENT 1 DATED JUNE 24~ 1988 AND SUPPLEMENT 2 DATED AUGUST 4g
1988 AND SUPPLEMENT 2
            . 1988 TURKEY POINT UNITS 3 AND 4 (NRC BULLETIN 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEM)
DATED AUGUST 4g
ENGINEERING DOCUMENT FOR THE IDENTIFICATION OF UNISOLABLE PIPING AND DETERMINATION OF INSPECTION LOCATIONS ~ DOCUMENT NO SE&PT SSAD 78 1 4 ~ DATED AUGUST 1988
. 1988 TURKEY POINT UNITS 3
: 1. 5 APPLICABLE     CODE EDITIONS AND ADDENDA As     required by Title 10 of the Code of Federal Regulations. paragraph 55a (g) (4) Inservice Inspections requirements applicable to nondestructive examination at Turkey Point Unit 4 are based on the rules set forth in the 1980 Edition of Section XI through the Winter 1981 Addenda,     hereafter referred to as the Code.
AND 4 (NRC BULLETIN 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEM)
2.0 ENGINEERING RECOMMENDATIONS Following is the engineering recommendations of areas were NONDESTRUCTIVE EXAMINATIONS were       identified for potential thermal stress effects as described in NRC Bulletin 88-08.
ENGINEERING DOCUMENT FOR THE IDENTIFICATION OF UNISOLABLE PIPING AND DETERMINATION OF INSPECTION LOCATIONS ~
The   components       subject to examination were determined to include portions of the following lines:
DOCUMENT NO SE&PT SSAD 78 1 4 ~
2.1 CHARGING PUMP TO PRESSURIZER AUXILIARY SPRAY LINE The 2 inch weld on the 4" x 4" x 2" reducing tee at the Main Spray Line connection             was   recommended for examination as identified on isometric drawing 004-A29, and also, the weld at the outlet of valve 4-313.
DATED AUGUST 1988
2 2 CHARGING PUMP TO ttC" HOT LEG All welds     from the third to fourth elbow down stream of check valve 4-312B (4 weld locations) and base metal of the fourth elbow downstream of check valve 4-312B as identified on isometric drawing 004-A39.
: 1. 5 APPLICABLE CODE EDITIONS AND ADDENDA As required by Title 10 of the Code of Federal Regulations.
paragraph 55a (g)
(4) Inservice Inspections requirements applicable to nondestructive examination at Turkey Point Unit 4 are based on the rules set forth in the 1980 Edition of Section XI through the Winter 1981
: Addenda, hereafter referred to as the Code.
2.0 ENGINEERING RECOMMENDATIONS Following is the engineering recommendations of areas were NONDESTRUCTIVE EXAMINATIONS were identified for potential thermal stress effects as described in NRC Bulletin 88-08.
The components subject to examination were determined to include portions of the following lines:
2.1 CHARGING PUMP TO PRESSURIZER AUXILIARYSPRAY LINE The 2 inch weld on the 4" x 4" x 2" reducing tee at the Main Spray Line connection was recommended for examination as identified on isometric drawing 004-A29, and also, the weld at the outlet of valve 4-313.
2 2
CHARGING PUMP TO ttC" HOT LEG All welds from the third to fourth elbow down stream of check valve 4-312B (4 weld locations) and base metal of the fourth elbow downstream of check valve 4-312B as identified on isometric drawing 004-A39.


FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.0 ABSTRACT OF EXAMINATIONS PERFORMED 3 ' APPLICABLE AREAS Based on   the recommendations identified above the following items were scheduled for nondestructive examination.
FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.0 ABSTRACT OF EXAMINATIONS PERFORMED 3 '
3.1.1 AUXILIARY SPRAY LINE     DRAWING 004-A29 ZONE     IDENTIFICATION     DESCRIPTION   EXAM METHOD 035     2"-RC-1410-33   VLV 4-313 PIPE   UT & PT 035     2"-RC-1410-34   PIPE RED. TEE     UT & PT 3.1.2 CHARGING LINE LOOP C DRAWING   004-A39 ZONE     IDENTIFICATION     DESCRIPTION   EXAM METHOD 045     3"-CH-1401-32     PIPE  ELBOW    UT & PT V
APPLICABLE AREAS Based on the recommendations identified above the following items were scheduled for nondestructive examination.
ELBOW             BASE METAL      UT & PT 3n-CH-1401-33     ELBOW  PIPE     UT & PT PIPE              BASE METAL      UT & PT 3"-CH-1401-34     PIPE  ELBOW    UT & PT ELBOW             BASE METAL      UT & PT 3't-CH-1401-35   ELBOW  PIPE     UT & PT PIPE              BASE METAL      UT & PT 3"-CH-1401-36     PIPE  ELBOW     UT & PT ELBOW            BASE METAL      UT & PT 3"-CH-1401-37     ELBOW PIPE     UT & PT 10
3.1.1 AUXILIARYSPRAY LINE DRAWING 004-A29 ZONE IDENTIFICATION DESCRIPTION EXAM METHOD 035 2"-RC-1410-33 VLV 4-313 PIPE UT
& PT 035 2"-RC-1410-34 PIPE RED.
TEE UT
& PT 3.1.2 CHARGING LINE LOOP C DRAWING 004-A39 ZONE IDENTIFICATION DESCRIPTION EXAM METHOD 045 3"-CH-1401-32 V
ELBOW 3n-CH-1401-33 PIPE 3"-CH-1401-34 ELBOW 3't-CH-1401-35 PIPE 3"-CH-1401-36 ELBOW 3"-CH-1401-37 PIPE ELBOW BASE METAL ELBOW PIPE BASE METAL PIPE ELBOW BASE METAL ELBOW PIPE BASE METAL PIPE ELBOW BASE METAL ELBOW PIPE UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT UT
& PT 10


FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF .
FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.2 LIQUID PENETRANT EXAMINATIONS The Liquid Penetrant examinations performed were conducted in accordance with FP&L NDE procedure 3.3. This procedure complies with the ASME Code.
UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.2 LIQUID   PENETRANT EXAMINATIONS The     Liquid Penetrant examinations performed were conducted in accordance with FP&L NDE procedure 3.3. This procedure complies with the ASME Code. The examinations performed were required by Table IWB-2500-1 and FP&L intends to utilize the examination records for ASME Code credit and are part of the Inservice Inspection Program.
The examinations performed were required by Table IWB-2500-1 and FP&L intends to utilize the examination records for ASME Code credit and are part of the Inservice Inspection Program.
3.3 ULTRASONIC
3.3 ULTRASONIC EXAMINATIONS
          \
\\
EXAMINATIONS The ultrasonic examinations   were not required by the ASME Code Tables IWB-2500-1 due to the size being 2" and     3".
The ultrasonic examinations were not required by the ASME Code Tables IWB-2500-1 due to the size being 2" and 3".
The supplemental       examinations were conducted       in accordance with standard piping techniques for the         3" charging system. For the 2" Auxiliary Spray system a     new NDE procedure     and a new calibration block had to       be fabricated for the examination of socket weld areas.
The supplemental examinations were conducted in accordance with standard piping techniques for the 3"
The procedure and calibration block were       qualified and demonstrated to the satisfaction of the Authorized Nuclear Inservice Inspector on January 26, 1989.
charging system.
For the 2" Auxiliary Spray system a
new NDE procedure and a
new calibration block had to be fabricated for the examination of socket weld areas.
The procedure and calibration block were qualified and demonstrated to the satisfaction of the Authorized Nuclear Inservice Inspector on January 26, 1989.


NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~       88-08 4.0 ABSTRACT OF CONDITIONS NOTED Described below by component           is a summary of conditions noted during the Unit No. 4 examination             activity:
NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 4.0 ABSTRACT OF CONDITIONS NOTED Described below by component is a summary of conditions noted during the Unit No.
4.1 AUXILIARY SPRAY LINE 4 ~ 1 ~ 1 ZONE 035 ~ 2 RC 14 10 33 f VLV 4 3 13       PIPE A liquid penetrant and ultrasonic examination using a 45 and 70 degree         search unit. ONE (1) indication recorded with a amplitude recorded to be less than 204 DAC, determined to be probable beam redirection.
4 examination activity:
4.1.2     ZONE 035( 2"-RC-1410-34, PIPE RED. TEE:
4.1 AUXILIARYSPRAY LINE 4 ~ 1 ~ 1 ZONE 035 ~
A liquid penetrant and ultrasonic examination using a 45 and 70 degree           search     unit. NO RECORDABLE INDICATIONS NOTED 4.2   CHARGING LINE LOOP C 4.2.1     ZONE 045 f 3   CH 1401 32 PIPE g        ELBOW A liquid penetrant     and ultrasonic examination 'using a 45   and 60 degree         search   unit. NO RECORDABLE INDICATIONS NOTED 4.2.2     ZONE 045, ELBOW BASE METAL:
2 RC 14 10 33 f VLV 4 3 13 PIPE A liquid penetrant and ultrasonic examination using a 45 and 70 degree search unit.
A liquid penetrant     and ultrasonic examination using a 45   and   60 degree     search   unit. NO RECORDABLE INDICATIONS NOTED 4.2.3     ZONE 045     3it CH 1401   33'LBOW       PIPE A liquid penetrant and ultrasonic examination using a 45 and 60 degree search unit. Two (2) GEOMETRIC INDICATIONS were noted and determined to be caused by root geometry.
ONE (1) indication recorded with a
4~2~4    ZONE 045, PIPE     BASE METAL:
amplitude recorded to be less than 204 DAC, determined to be probable beam redirection.
A liquid penetrant and=-ultrasonic examination using a 45   and 60 degree search unit. NO RECORDABLE 4.2.5    ZONE 045   3n-CH-1401-34, PIPE       ELBOW A liquid penetrant     and ultrasonic examination using a 45 and   60 degree search       unit. Two (2) GEOMETRIC INDICATIONS were noted and         determined to be caused by root geometry.
4.1.2 ZONE 035( 2"-RC-1410-34, PIPE RED.
TEE:
A liquid penetrant and ultrasonic examination using a
45 and 70 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2 CHARGING LINE LOOP C
4.2.1 ZONE 045 f 3
CH 1401 32 g PIPE ELBOW A liquid penetrant and ultrasonic examination 'using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2.2 ZONE 045, ELBOW BASE METAL:
A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2.3 4 ~ 2 ~ 4 4.2.5 ZONE 045 3it CH 1401 33'LBOW PIPE A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
Two (2)
GEOMETRIC INDICATIONS were noted and determined to be caused by root geometry.
ZONE 045, PIPE BASE METAL:
A liquid penetrant and=-ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE ZONE 045 3n-CH-1401-34, PIPE ELBOW A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
Two (2)
GEOMETRIC INDICATIONS were noted and determined to be caused by root geometry.
12
12


FINAL REPORT OF INSERVICE INSP     TION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~     88-08 4.2.6   ZONE 045, ELBOW BASE METAL:
FINAL REPORT OF INSERVICE INSP TION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 4.2.6 ZONE 045, ELBOW BASE METAL:
A liquid penetrant   and ultrasonic examination using a 45   and   60 degree     search   unit. NO RECORDABLE INDICATIONS NOTED 4 ~ 2~7 ZONE 045 g 3 CH 1401 35 ~ ELBOW     PIPE A liquid penetrant   and ultrasonic examination   using a 45   and 60 degree       search   unit. NO RECORDABLE INDICATIONS NOTED 4.2;8   ZONE 045, PIPE   BASE METAL:
A liquid penetrant and ultrasonic examination using a
A liquid penetrant   and ultrasonic examination using a 45   and   60 degree     search   unit. NO RECORDABLE INDICATIONS NOTED 4~2~9   ZONE 045 g 3 CH 140 1 36 g PIPE   ELBOW A liquid penetrant   and ultrasonic examination   using a 45   and   60 degree     search   unit. NO RECORDABLE INDICATIONS NOTED 4.2.10 ZONE 045, ELBOW BASE METAL:
45 and 60 degree search unit.
A liquid penetrant   and ultrasonic examination using a 45   and   60 degree search unit. NO RECORDABLE INDICATIONS NOTED 4.2.11 ZONE 045   3n-CH-1401-37,   ELBOW   PIPE A liquid penetrant   and ultrasonic examination using a 45   and 60 degree       search   unit. NO RECORDABLE INDICATIONS NOTED 13
NO RECORDABLE INDICATIONS NOTED 4 ~ 2
~ 7 ZONE 045 g
3 CH 1401 35 ~
ELBOW PIPE A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2;8 ZONE 045, PIPE BASE METAL:
A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4 ~ 2 ~ 9 ZONE 045 g 3
CH 140 1 36 g PIPE ELBOW A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2.10 ZONE 045, ELBOW BASE METAL:
A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 4.2.11 ZONE 045 3n-CH-1401-37, ELBOW PIPE A liquid penetrant and ultrasonic examination using a
45 and 60 degree search unit.
NO RECORDABLE INDICATIONS NOTED 13


FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS
                'FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 5.0 CORRECTIVE ACTIONS TAKEN OR RECOMMENDED All indications     noted were evaluated in accordance with the requirements   of the ASME Boiler and Pressure Vessel Code, Section XI (were acceptance criteria exists). There were no indications that exceeded       the acceptance criteria of the ASME Code, IWB-3000.
'FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 5.0 CORRECTIVE ACTIONS TAKEN OR RECOMMENDED All indications noted were evaluated in accordance with the requirements of the ASME Boiler and Pressure Vessel
: Code, Section XI (were acceptance criteria exists).
There were no indications that exceeded the acceptance criteria of the ASME Code, IWB-3000.
14
14


FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTZAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 6.0 EVALUATION CRITERIA During Inservice Inspection, flaw indications are evaluated against the acceptance standards of       'he   ASME Code   as follows:
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTZAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 6.0 EVALUATION CRITERIA During Inservice Inspection, flaw indications are evaluated against the acceptance standards of 'he ASME Code as follows:
: 6. 1 CLASS 1 6.1.1 Acceptance standards for class   1 are as follows:
: 6. 1 CLASS 1
EXAMINATION   COMPONENTS OR PARTS EXAMINED   ACCEPTANCE CATEGORY                                     STANDARD DISSIMILAR AND SIMILAR METAL   IWB-3514 WELDS   IN PIPING 15
6.1.1 Acceptance standards for class 1 are as follows:
EXAMINATION COMPONENTS OR PARTS EXAMINED ACCEPTANCE CATEGORY STANDARD DISSIMILAR AND SIMILAR METAL IWB-3514 WELDS IN PIPING 15


                ~                               ~
~
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88 08 7.0 INSPECTION  
~
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~
88 08 7.0 INSPECTION  


==SUMMARY==
==SUMMARY==
Line 125: Line 231:


==7.1 DESCRIPTION==
==7.1 DESCRIPTION==
OF TABLES The TURKEY POINT PLANT UNIT 4       Inservice Inspection tables are summarized by code         categories and code item numbers and provides the         results of the FP&L examination activity that were performed on the Auxiliary Spray Line and the Charging Line.
OF TABLES The TURKEY POINT PLANT UNIT 4 Inservice Inspection tables are summarized by code categories and code item numbers and provides the results of the FP&L examination activity that were performed on the Auxiliary Spray Line and the Charging Line.
7.1.1  
7.1.1


==SUMMARY==
==SUMMARY==
PLAN TABLES The     final report tables     were developed based on systems       and components     which are subject     to examination and include such information as follows:
PLAN TABLES The final report tables were developed based on systems and components which are subject to examination and include such information as follows:
(1)   ZONE   NUMBER   Components   and   or systems are divided into zones. Each zone is further subdivided by the following categories:
(1)
(a) ASME Code Category (b) ASME Code Item Number (c) ZONE Identification Number (d) REFERENCE DRAWING IDENTIFICATION (e) LINE ITEM NUMBER administrative number used for computer identification purposes (f) Examination Area Identification identifies the item or area       to be examined (g) INSTRUCTIONS   special comments that may be required for a specific item (h) RESULTS divided into four areas:
ZONE NUMBER Components and or systems are divided into zones.
: 1. NOREC no recordable indications
Each zone is further subdivided by the following categories:
: 2. INSIG when indications were observed that were below the recording level
(a)
: 3. GEOM was applied when indications which have a amplitude equal to or greater than 1004 of the DAC curve, and have been documented to be geometric in nature
ASME Code Category (b)
: 4. OTHER are those indications evaluated to be other than insignificant or geometric (i) Examination Method to be used for the examination
ASME Code Item Number (c)
                  '(j)   NDE Examination Procedure     to be used for the examination 16
ZONE Identification Number (d)
REFERENCE DRAWING IDENTIFICATION (e)
LINE ITEM NUMBER administrative number used for computer identification purposes (f) Examination Area Identification identifies the item or area to be examined (g)
INSTRUCTIONS special comments that may be required for a specific item (h)
RESULTS divided into four areas:
1.
NOREC no recordable indications 2.
INSIG when indications were observed that were below the recording level 3.
GEOM was applied when indications which have a
amplitude equal to or greater than 1004 of the DAC curve, and have been documented to be geometric in nature 4.
OTHER are those indications evaluated to be other than insignificant or geometric (i) Examination Method to be used for the examination
'(j)
NDE Examination Procedure to be used for the examination 16


NDX 'CORPORATION ZSIC   ISI Data Management System FLORIDA POWER 4 LIGHT CO ~
NDX 'CORPORATION ZSIC ISI Data Management System FLORIDA POWER 4 LIGHT CO ~
TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVICE INSPECTION FINAL REPORT TABLES RESULTS FOR OUTAGE 1 (1988)g, SECOND PERIODS   SECOND INTERVAL
TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVICE INSPECTION FINAL REPORT TABLES RESULTS FOR OUTAGE 1 (1988)g, SECOND PERIODS SECOND INTERVAL


==SUMMARY==
==SUMMARY==
NUMBERS 111500 THROUGH   111600 March 20, 1989 REVISION   3
NUMBERS 111500 THROUGH 111600 March 20, 1989 REVISION 3


DATE: 03/20/89                                 TURKEY POINT NUCLEAR PLANT UNIT 4                               PAGE: 1 REOISION:        3                          INSERVICE INSPECTION FINAL REPORT TABLES OUtAGE 1   (1988), SECOND PERIOD, SECOND   INTERVAL CLASS 1 COHPOHEHTS AUXILIARY SPRAY LIHE N  I  0 ZONE NUHBER:   035                       ASHE                                   S  OHGT SEC. XI                               T   RSEH SUHHARY EXAHIHATI OH AREA                CATGY      EXAH                        A   E I 0 E REHARKS HUHBER  IDENT  IF I CATION              ITEN NO    HETHCO      PROCEDURE      T   C 0 H R *~CALIBRATIOH BLOCK~~
DATE:
R F   0     NO   004 A 111500 2"-RC-1410-33                   8 J        P'I        NDE 3.3 342    C  C        1-28.89 UT COHPLETE VALVE     (4-313) - TO   - PIPE e9.21     UT 45 AX   NDE 5.19 1         C 75 I 0 II                                  UT 70 AX   HDE 5.19-1         C
03/20/89 REOISION:
                                                                                            ~~UT.44 111600 2".RC.1410-34                   8-J       PT         HDE 3.3.341     C  C          1.28.89 UT CCHPLETE PIPE      TO - RED. TEE      89.21      UT 45 AX   HDE 5.19-1 75 '0"                                    UT 70 AX     HDE 5.19 1
3 AUXILIARY SPRAY LIHE TURKEY POINT NUCLEAR PLANT UNIT 4 INSERVICE INSPECTION FINAL REPORT TABLES OUtAGE 1 (1988),
                                                                                            *AQT 441*
SECOND PERIOD, SECOND INTERVAL CLASS 1
COHPOHEHTS PAGE:
1 ZONE NUHBER: 035 SUHHARY EXAHIHATI OH AREA HUHBER IDENT IFI CATION ASHE SEC. XI CATGY EXAH ITEN NO HETHCO PROCEDURE N I 0
S OHGT T
RSEH A
E I 0 E
REHARKS T
C 0 H R
*~CALIBRATIOH BLOCK~~
R F
0 NO 004 A
111500 2"-RC-1410-33 VALVE (4-313) -
TO - PIPE 75 I 0 II 8 J e9.21 P'I NDE 3.3 342 C
C UT 45 AX NDE 5.19 1
C UT 70 AX HDE 5.19-1 C
1-28.89 UT COHPLETE
~~UT.44 111600 2".RC.1410-34 PIPE TO - RED.
TEE 75 '0" 8-J 89.21 PT HDE 3.3.341 UT 45 AX HDE 5.19-1 UT 70 AX HDE 5.19 1
C C
1.28.89 UT CCHPLETE
*AQT 441*


rrDx coRpoRATIorr
rrDx coRpoRATIorr
~
~
rsrc   rsr bdcd rrdh890$ 0!lt sgstclll FLORIDA POWER fi LIGHT CO ~
rsrc rsr bdcd rrdh890$ 0!lt sgstclll FLORIDA POWER fi LIGHT CO ~
TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVZCE INSPECTION PZNAL REPORT TABLES RESULTS FOR OUTAGE 1         (1988) i SECOND PERIODi SECOND INTERVAL
TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVZCE INSPECTION PZNAL REPORT TABLES RESULTS FOR OUTAGE 1 (1988) i SECOND PERIODi SECOND INTERVAL


==SUMMARY==
==SUMMARY==
NUMBERS   154800 THROUGH 155300 March 20, 1989 REVISION   3
NUMBERS 154800 THROUGH 155300 March 20, 1989 REVISION 3


DATE:   03/20/89                                 TURKEY POINT NUCLEAR PLANT UNIT 4                                                     PAGE:        1 REVISION:          3                        IHSERVICE INSPECTION FIHAL REPORT TABLES OUTAGE 1   (1988), SECOND   PERI(X)l   SECOND   INTERVAL CLASS 1   COHPONEHTS CHARGE  LINE RHX TO COLD LEG      OOP C N  I  0 ZONE HUHBER:     045                     ASHE                                           S   OH   0T SEC. Xl                                      T   RSEH SUHHARY EXAHINATIOH AREA                  CATGY      EXAH                                A   E I 0 E   REHARKS HUHBER    IDEHTIFICATIOH                  ITEN NO  NETNOO      PROCEDURE              T   C G H R   *>>CALIBRATIOH BLOCK*t-REF. DMG. NO. OOC-A39 154800   3".CH-1401.32                   8-J       PT           NDE   3.3 288         C  C          10-19-88  PT COHPLETE:    10.24 88  UT PIPE        TO  -  ELBOM        89.21    UT 45 AX     HDE   5.4-25             C          C(WPLETE 23 I 9 II                                  UT 45 CIRC NDE     5.4 25             C 23'-9"                                    UT   60 AX   HDE   5.4-25             C t>>UT.CC>>t 15C850   ELBOM     (32.33)               8 J       PT           NDE   3.3.304         C  C          10-24-88  UT COHPLETE
DATE:
                                                                                  'T ELBOM.BASE HETAL                89.21          45 AX   HDE   5.4-25             C          10-19-88  PT COHPLETE 23'.9"                                    UT 45 CIRC HDE     5.4 25             C 23 I 9 II                                  UT 60 AX     HDE   5.4 25             C t*UT-44*>>
03/20/89 REVISION:
154900   3"-CH.1401-33                     8-J       PT           NDE 3.3.287         C   C         10.19.88   PT COHPLETE:   10.24 F 88 UT ELBOM - TO - PIPE                89.21    UT 45 AX      HDE  5.4-25                        COHPLETE: 2 IHDS.   (1) 45 AX, 30K DAC, 23 I 9ll                                  UT 45 CIRC NDE      5.4.25                        HL*3.7CCM, HM*1.27, HP>>1.85,DS:           (2) 60 23 I 9 I I                                UT  60 AX    HDE  5.4 25                        AXI 35K DAC, HL>>3. 7CCM, HM"-.95, HP>> . 75 ~
3 CHARGE LINE RHX TO COLD LEG OOP C
TURKEY POINT NUCLEAR PLANT UNIT 4 IHSERVICE INSPECTION FIHAL REPORT TABLES OUTAGE 1 (1988),
SECOND PERI(X)l SECOND INTERVAL CLASS 1
COHPONEHTS PAGE:
1 ZONE HUHBER: 045 SUHHARY EXAHINATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. Xl CATGY EXAH ITEN NO NETNOO PROCEDURE N I 0
S OH 0T T
RSEH A
E I 0 E
REHARKS T
C G H R
*>>CALIBRATIOHBLOCK*t-REF.
DMG. NO. OOC-A39 154800 3".CH-1401.32 PIPE TO -
ELBOM 23 I 9 II 23'-9" 8-J 89.21 PT NDE 3.3 288 UT 45 AX HDE 5.4-25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4-25 C
C C
C C
10-19-88 PT COHPLETE: 10.24 88 UT C(WPLETE t>>UT.CC>>t 15C850 ELBOM (32.33)
ELBOM.BASE HETAL 23'.9" 23 I 9 II 8 J 89.21 PT NDE 3.3.304
'T 45 AX HDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4 25 C
C C
C C
10-24-88 UT COHPLETE 10-19-88 PT COHPLETE t*UT-44*>>
154900 3"-CH.1401-33 ELBOM -
TO - PIPE 23 I 9ll 23 I 9 II 8-J 89.21 PT NDE 3.3.287 UT 45 AX HDE 5.4-25 UT 45 CIRC NDE 5.4.25 UT 60 AX HDE 5.4 25 C
C 10.19.88 PT COHPLETE: 10.24 F 88 UT COHPLETE: 2 IHDS. (1) 45 AX, 30K DAC, HL*3.7CCM, HM*1.27, HP>>1.85,DS:
(2) 60 AXI 35K DAC, HL>>3. 7CCM, HM"-.95, HP>>. 75 ~
DS:
DS:
                                                                                                      **MT 44tt 154950   PIPE (33.34)                     8 J       PT           HDE   3.3-281         C  C          10  19-M  PT COHPLETE:  10.24-88    UT PIPE BASE HETAL                  89.21    UT 45 AX     HDE   5.4-25             C          COHPLETE 23'"                                      UT 45 CIRC HDE     5.4 25             C 23 I 9 II                                  UT   60 AX   HDE   5.4.25             C
**MT 44tt 154950 PIPE (33.34)
                                                                                                      *>>O'I-44*>>
PIPE BASE HETAL 23'"
155000   3>>-CH-1401.34                   8 J       PT           NDE   3.3-286         C   C         10.19-88   PT CNPLETE:   10-24.M     UT PIPE        TO  -  ELBOM        89.21    UT 45 AX      NDE  5.4-25                        COHPLETE: 2 INDS,   (1) 45 AX, 30K DAC, 23'-9"                                    UT 45 CIRC HDE      5.4 25                        HL>>1.4CMI   HM 1.31, HP>>1.9, US:       (2) 60 23 I 9 II                                  UT 60 AX      HDE  5.4 25                        AX, 20K DAC, HL>>I.CCM, HM*,71, HP=.75, US:
23 I 9 II 8 J 89.21 PT HDE 3.3-281 UT 45 AX HDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4.25 C
t UT-44>>t 155050   ELBOM     (34.35)               8-J       PT           HDE   3o3 290         C  C          10  19.88  PT CNPLETE: 10 24 88 UT BASE HATERIAL                    89.21    UT 45 AX     NDE   5.4-25             C          COHPLETE 23'-9"                                    UT C5 CIRC HDE     5.4.25             C 23 I 9 II                                UT   60 AX   HDE   5.4-25             C t UT-44*>>
C C
C C
10 19-M PT COHPLETE: 10.24-88 UT COHPLETE
*>>O'I-44*>>
155000 3>>-CH-1401.34 PIPE TO -
ELBOM 23'-9" 23 I 9 II 8 J 89.21 PT NDE 3.3-286 UT 45 AX NDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4 25 C
C 10.19-88 PT CNPLETE: 10-24.M UT COHPLETE: 2 INDS, (1) 45 AX, 30K DAC, HL>>1.4CMI HM 1.31, HP>>1.9, US:
(2) 60 AX, 20K DAC, HL>>I.CCM, HM*,71, HP=.75, US:
t UT-44>>t 155050 ELBOM (34.35)
BASE HATERIAL 23'-9" 23 I 9 II 8-J 89.21 PT HDE 3o3 290 UT 45 AX NDE 5.4-25 UT C5 CIRC HDE 5.4.25 UT 60 AX HDE 5.4-25 C
C C
C C
10 19.88 PT CNPLETE:
10 24 88 UT COHPLETE t UT-44*>>


DATE:     03/20/89.                                   TURKEY POINT NUCLEAR PLANT UNIT 4                                               PAGE: 2 REV I SION:          3                            INSERVICE IHSPECTION FINAL REPORT TABLES OUTAGE 1   ( 1988) I SECOND PERIOD   I SECOND   INTERVAL CLASS 1 COHPOHEHTS CHARG    LIH    RHX TO COLD LE        LOOP C H I ZONE NUHBER:     045                         ASHE                                         S OH 0 SEC. Xl                                      T RSE   H SUHHARY EXAHI NATION AREA                    CATGY      EXAH                              A E I 0 E  REHARKS HUHBER      IDEHTIFICATION                    ITEH NO    HETHDO        PROCEDURE         T C G H R   ~~CALIBRATION BLOCKii REF   DlJG. NO. 004-A39 155100     3"-CH-1401.35                     8-J         PT           HDE   3.3-285       C  C        10-19 88  PT CCHPLETE:  10-24.88  UT ELSOM        TO - PIPE            89.21      UT C5 AX       NDE   5.4 25           C        COHPLETE 23 I 9ll                                      UT 45 CIRC NDE       5.4-25           C 23 I 9ll                                      UT   60 AX   NDE   5.4 25           C 155150     PIPE (35 36)                       SJ         PT             HDE 3.3.291       C  C        10.19.88  PT COHPLETE: 10-24-88  UT PIPE BASE HETAL                    8921,     UT45     AX   NDE54 25               C        COHPLETE 23 I 9 I I                                    UT 45 CIRC     NDE 5.4 25           C 23 I 9ll                                      UT   60 AX     HDE 5.4-25           C e UT-44~~
DATE:
155200     3".CH-1401-36                         J       PT             HDE 3.3.284       C  C          10.19.88  PT CCHPLETE: 10-2C-88  UT PIPE  . TO    ELBOM            89.21    UT 45 AX       HDE 5.4 25           C        COHPLETE 25'5' UT 45 CIRC NDE       5.4-25           C UT   60 AX     HDE 5.4-25           C 155250    ELBOM      (36-37)                    J      PT              NDE  3.3.289      C C         10 19-88 PT CCHPLETE:   10-24.88 UT BASE HATERIAL                       89.21     UT 45 AX       NDE 5.4-25           C        COHPLETE 25'5' UT 45 CIRC NDE       5.4 25           C UT   60 AX     HDE 5.4 25           C t UT-44~~
03/20/89.
155300   3"-CH-1C01-37                       8-J       PT             NDE   3.3.283       C  C        10.19.88  PT COHPLETE:  10-24-SS  UT ELSOM - TO - PIPE                  89.21    UT 45 AX       NDE   5.4-25           C        COHPLETE UT 45 CIRC NDE       5.4.25           C UT   60 AX   HDE   5.4.25           C 11@   44t*
REVISION:
3 CHARG LIH RHX TO COLD LE LOOP C
TURKEY POINT NUCLEAR PLANT UNIT 4 INSERVICE IHSPECTION FINAL REPORT TABLES OUTAGE 1 ( 1988) I SECOND PERIOD I SECOND INTERVAL CLASS 1
COHPOHEHTS PAGE:
2 ZONE NUHBER: 045 SUHHARY EXAHI NATION AREA HUHBER IDEHTIFICATION ASHE SEC. Xl CATGY EXAH ITEH NO HETHDO H I S
OH 0 T
RSE A
E I 0 PROCEDURE T
C G H H
E REHARKS R
~~CALIBRATION BLOCKii REF DlJG.
NO. 004-A39 155100 3"-CH-1401.35 ELSOM TO - PIPE 23 I 9ll 23 I 9ll 8-J 89.21 PT HDE 3.3-285 UT C5 AX NDE 5.4 25 UT 45 CIRC NDE 5.4-25 UT 60 AX NDE 5.4 25 C
C C
C C
10-19 88 PT CCHPLETE: 10-24.88 UT COHPLETE 155150 PIPE (35 36)
PIPE BASE HETAL 23 I 9 II 23 I 9ll SJ PT HDE 3.3.291
: 8921, UT45 AX NDE54 25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4-25 C
C C
C C
10.19.88 PT COHPLETE: 10-24-88 UT COHPLETE e UT-44~~
155200 3".CH-1401-36 PIPE.
TO ELBOM 25'5' J
89.21 PT HDE 3.3.284 UT 45 AX HDE 5.4 25 UT 45 CIRC NDE 5.4-25 UT 60 AX HDE 5.4-25 C
C C
C C
10.19.88 PT CCHPLETE: 10-2C-88 UT COHPLETE 155250 ELBOM (36-37)
BASE HATERIAL 25'5' J
89.21 PT NDE 3.3.289 UT 45 AX NDE 5.4-25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4 25 C
C C
C C
10 19-88 PT CCHPLETE: 10-24.88 UT COHPLETE t UT-44~~
155300 3"-CH-1C01-37 ELSOM -
TO - PIPE 8-J 89.21 PT NDE 3.3.283 UT 45 AX NDE 5.4-25 UT 45 CIRC NDE 5.4.25 UT 60 AX HDE 5.4.25 C
C C
C C
10.19.88 PT COHPLETE: 10-24-SS UT COHPLETE 11@ 44t*


                  ~
~
FINAL REPORT
~
                                                ~
FINAL REPORT OP ZNSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 8 '
OP ZNSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 8 ' RECORDS 8.1   GENERAL Records   of Inservice Inspections Plans, Outage schedules, Calibration standards, examination and test procedures, results of activities, final reports, certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code.
RECORDS 8.1 GENERAL Records of Inservice Inspections
8.2 INSERVICE INSPECTION SUGARY     REPORTS Ninety days (90) following 'the units return to service MCI shall forward a summary report (NIS-1) of the ISI activity to the Nuclear Regulatory Commission in accordance with IWA-6220.
: Plans, Outage schedules, Calibration standards, examination and test procedures, results of activities, final reports, certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code.
8.3 SPECIAL   REPORTS This report is prepared to meet the reporting action required by the bulletin and satisfy the FP&L requirements.
8.2 INSERVICE INSPECTION SUGARY REPORTS Ninety days (90) following'the units return to service MCI shall forward a summary report (NIS-1) of the ISI activity to the Nuclear Regulatory Commission in accordance with IWA-6220.
8.3 SPECIAL REPORTS This report is prepared to meet the reporting action required by the bulletin and satisfy the FP&L requirements.
17
17


t FINAL REPORT   OF ZNSERVZCE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS
t FINAL REPORT OF ZNSERVZCE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS
            ~
~
REFERENCE NRC BULLETIN NO ~ 88 08 APPENDIX A REFERENCE     DRAWINGS DRAWING NUMBER   REV. NO.           TITLE 004-A29                         2" AUXILIARY SPRAY LINE 004-A39                        3" CHARGING LINE 18
REFERENCE NRC BULLETIN NO ~
88 08 APPENDIX A REFERENCE DRAWINGS DRAWING NUMBER REV.
NO.
004-A29 004-A39 TITLE 2" AUXILIARYSPRAY LINE 3" CHARGING LINE 18


4 -RC-1404 4 PRESSURIZER SPRAY CONT. ON OWG. 004-A14 REDUCING TEE 920 O  NRC BULLETIN  88-08 lHERMAL SlRESSES OVe. 5614-r -782-S 3 -CH-1401     ~
4 -RC-1404 4
32        31 3 CHARGING CONT. ON OWG. 004-A39               WR-63-2                       30            WR-63-1 SR-922                                     WR-63-3 REO.                                                                                          O
PRESSURIZER SPRAY CONT. ON OWG. 004-A14 REDUCING TEE 3 -CH-1401
                                                                  '-311                                  229-0 SR-923-B 2 -RC-1410                                                                                 25                      II SR-927                                      2              SR-923-A 26 5
~
                                                                              "-'-'-'L~                                       27 28      ll SR-933 SR-932'
3 CHARGING CONT. ON OWG. 004-A39 REO.
                                    ~                                                                        22 II 21                                  2 -RC-1410 1
'-311 WR-63-2 SR-922 229-0 25 2 -RC-1410 5
779-C 13 10                                                                              SR-926 12                ~EL 24'-0 6                                                                      WR-39 15 BIO SHIELD WALL                              19 16              18                     779-8 17 779-A SR-93
SR-933~
                                                                              ~ER-930 MATERIAL SPECS                                        CODES dc PROGRAMS GROUP REFERENCE DRAWINGS                 PRESSURE   dc TEMPERAlURE STATS SIZE       SCH               TYPE                                   lURKEY POINT UNIT 4 5177-102-SK-P-875 REV. C               DESIGN PSIG:  2485      TEMP(F): 650                                        A376-lP316          TITLE:  2 AU)4 SPRAY UNE 2          160                            SMLS 5610-lE-4501 SHT. 1 OF I 5610-M-410-214 SHT. 3 OF 3         OPERATING PSIG: 2235        TEMP(F): 550                                                            DATE:26 SEPT 1988                ZONE: 35 5610-M-410-202 SHT. 2 OF 2                                                                                                                                           DRAWING NUMBER:
SR-932' SR-927
HYDROSTAllC PSIG: 2335         TEMP(F): 547                                                           REVISION  APPROVEO BY:
"-'-'-'L~
UT CAUBRAllON BLOCK:   N/A                           3                           004-A29
21 22 779-C 1
10 13
~EL 24'-0 WR-39 19 18 779-8 779-A
~ER-930 12 6
15 BIO SHIELD WALL 16 17 SR-93 920 O NRC BULLETIN 88-08 lHERMAL SlRESSES OVe. 5614-r -782-S 32 31 30 WR-63-1 WR-63-3 O
2 II SR-923-B SR-923-A ll 26 II 27 28 2 -RC-1410 SR-926 REFERENCE DRAWINGS PRESSURE dc TEMPERAlURE STATS MATERIAL SPECS SIZE SCH TYPE CODES dc PROGRAMS GROUP lURKEY POINT UNIT 4 5177-102-SK-P-875 REV. C 5610-lE-4501 SHT.
1 OF I 5610-M-410-214 SHT. 3 OF 3 5610-M-410-202 SHT. 2 OF 2 DESIGN PSIG: 2485 TEMP(F): 650 OPERATING PSIG: 2235 TEMP(F): 550 HYDROSTAllC PSIG: 2335 TEMP(F): 547 UT CAUBRAllON BLOCK: N/A DATE:26 SEPT 1988 REVISION APPROVEO BY:
3 2
160 A376-lP316 SMLS TITLE:
2 AU)4 SPRAY UNE ZONE: 35 DRAWING NUMBER:
004-A29


0    NRC BULLETIN 88-08 THERMAL STRESSES 5614-P-782-S BIO. SHIELD                4-VCH-5 WALL 15            16 WR-41 WR-41A 14                        17                                                                                        4-VCH-13 Q7 19          20                    24    25 I
14 I
I                                                                                                                  PASPMB'AL I                                                      21                                                          31 PIPE 29 -RCS-1408 26                  30                                    MAIN REACTOR   COOLANT 22 23                          4-312B 28                  Q      FLOW            CONT. ON DWG. 004-AB 29,                  Og BASE 4
I I
Q    BASE IIETAL ON ELBOW METAL ON 4-VCH-14                      PIPE 3 -CH-1402 ~                                          BASE METAL ON 3'HARGING                                             ELBOW CONT. ON 2"-RC-1410             DWG. 004-A40 2 AUX. SPRAY CONT. ON                                           3 -CH-1401 I      DWG. 004-A29 I
15 BIO. SHIELD 16 WALL 17 19 4-VCH-5 20 21 22 23 WR-41 24 25 NRC BULLETIN 88-08 0 THERMAL STRESSES 5614-P-782-S 26 30 28 4-312B Q
I                                7 I
FLOW WR-41A 4-VCH-13 PASPMB'AL 31 PIPE Q7 29 -RCS-1408 MAIN REACTOR COOLANT CONT. ON DWG. 004-AB HQIB 3 -RC-2501R-3 5177-102-SK-P-876 LOCATION:
I                            8 SR-944A                                    I 4-311 I                  6 ltj                          8A        5 L~     936 9
CONTAINMENT C
HQIB                                                                                                        SR-934 3 -RC-2501R-3                                                                  11 5177-102-SK-P-876 4-310A LOCATION:  CONTAINMENT C      LOOP HOT LEG                                                            12 E-2389-10-297                                                      ~SW-S43 E-2389-10-479 REFERENCE DRAWINGS                   PRESSURE   dc lEMPERAlURE STAlS                 SIZE MATERIAL SPECS SCH               TYPE               ~pg~               CODES dc PROGRAMS GROUP TURKEY PONT UNIT 4 A-376, TP316        TITLE:  3 CHARGING UNE 5177-102-SK-P-876   REV. C               DESIGN PSIG:  2485      TEMP(F): 650            3            160                            SMLS 5177-102-SK-P-875   REV. C 5610-TE-4501                         OPERATING PSIG:    2235      TEMP(F): 550                                                              DATE:26 SEPT. 1988                ZONF 45 5610-M-420-214   SHT. 3 OF 3                                                                                                               REVISION    APPROVED BY      DRAWING NUMBER:
LOOP HOT LEG E-2389-10-297 E-2389-10-479 SR-944A ltj I
E-2389-10-284                       HYDROSTAllC PSIG: 2335         TEMP(F): 547                                                                                                 004-A39 UT CAUBRATION BLOCK:                                 3       E. L ANDERSON
I I
I 3'HARGING CONT. ON DWG. 004-A40 2"-RC-1410 2
AUX. SPRAY CONT. ON DWG. 004-A29 I
7 I
8 I 4-311 8A 3 -CH-1401 6
5 L~ 936 9
SR-934 11 4-310A 12~SW-S43 29, 4-VCH-14 3 -CH-1402 ~
Og 4
Q BASE IIETAL ON ELBOW BASE METAL ON PIPE BASE METAL ON ELBOW REFERENCE DRAWINGS PRESSURE dc lEMPERAlURE STAlS MATERIAL SPECS SIZE SCH TYPE
~pg~
CODES dc PROGRAMS GROUP TURKEY PONT UNIT 4 5177-102-SK-P-876 REV. C 5177-102-SK-P-875 REV. C 5610-TE-4501 5610-M-420-214 SHT. 3 OF 3 E-2389-10-284 DESIGN PSIG: 2485 OPERATING PSIG: 2235 HYDROSTAllC PSIG: 2335 TEMP(F): 650 TEMP(F): 550 TEMP(F): 547 3
160 UT CAUBRATION BLOCK:
A-376, TP316 SMLS TITLE:
3 CHARGING UNE DATE:26 SEPT. 1988 REVISION APPROVED BY 3
E. L ANDERSON ZONF 45 DRAWING NUMBER:
004-A39


FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL'THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX B PERSONNEL CERTZFZCATIONS EXAMINERS NAME                   LEVEL    METHOD    EYE EXAM DATE BAKER, ROGER                       III         PT UT 10-11-88 BRI LEY g ROBERT                         UT/PT       11-10-87 DUBREUIL, RICHARD                III    UT/PT      ,
FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL'THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX B PERSONNEL CERTZFZCATIONS EXAMINERS NAME
4-13-88 LAFLEUR, RUSSEL                          UT/PT        6-27-88 LAKE, EDWARD                              UT/PT        5-23-88 MC  CABE, WILLIAM                              PT      6-30-88 NOWAKOWSKIg  DAN                        UT/PT        4-26-88 19
: BAKER, ROGER LEVEL III PT UT 10-11-88 METHOD EYE EXAM DATE BRILEY g ROBERT DUBREUIL, RICHARD LAFLEUR, RUSSEL LAKE, EDWARD MC CABE, WILLIAM NOWAKOWSKIg DAN III UT/PT UT/PT UT/PT UT/PT PT UT/PT 11-10-87
, 4-13-88 6-27-88 5-23-88 6-30-88 4-26-88 19


t FINAL REPORT OF INSERVZCE ZNSP NONDESTRUCTIVE EXAMINATIONS OF TZON UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX C EQUIPMENT CERTIPICATZONS ULTRASONIC EQUIPMENT SERIAL MANUFACTURER                    DESCRIPTION NUMBER 06446E SONIC MARK I         ULTRASONIC FLAW DETECTOR 784519  SONIC  MARK I          ULTRASONIC FLAW DETECTOR" 20
t FINAL REPORT OF INSERVZCE ZNSP TZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX C EQUIPMENT CERTIPICATZONS ULTRASONIC EQUIPMENT SERIAL NUMBER 06446E 784519 MANUFACTURER SONIC MARK I SONIC MARK I DESCRIPTION ULTRASONIC FLAW DETECTOR ULTRASONIC FLAW DETECTOR" 20


            ~
~
FINAL REPORT
~
                                            ~
FINAL REPORT OF INSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX D EQUIPMENT CERTZFZCATZONS ULTRASONIC SEARCH UNITS SERIAL NUMBER 021692 021729 AEROTECH
OF INSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX D EQUIPMENT CERTZFZCATZONS ULTRASONIC SEARCH UNITS SERIAL MANUFACTURER    SIZE      FREQUENCY  DESCRIPTION NUMBER 021692 AEROTECH     .25         2. 25   ROUND 021729  AEROTECH      .25         2.25     ROUND 21
.25 AEROTECH
.25
: 2. 25 2.25 ROUND ROUND MANUFACTURER SIZE FREQUENCY DESCRIPTION 21


t FINAL REPORT OF'ZNSERVICE ZNSP NONDESTRUCTIVE EXAMZNATZONS OF TZON UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~   88-08 APPENDIX E EQUIPMENT CERTZFZCATZONS ULTRASONIC COUPLANT BATCH MANUFACTURER         DESCRIPTION NUMBER 8764   ECHO LABS             ULTRAGEL II 8872  ECHO LABS            ULTRAGEL II 22
t FINAL REPORT OF'ZNSERVICE ZNSP TZON NONDESTRUCTIVE EXAMZNATZONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX E EQUIPMENT CERTZFZCATZONS ULTRASONIC COUPLANT BATCH NUMBER MANUFACTURER DESCRIPTION 8764 8872 ECHO LABS ECHO LABS ULTRAGEL II ULTRAGEL II 22


FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX F EQUIPMENT CERTIFZCATZONS SURFACE THERMOMETERS
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX F EQUIPMENT CERTIFZCATZONS SURFACE THERMOMETERS
'SERIAL MANUFACTURER         DESCRIPTION NUMBER 1191     PTC               SURFACE THERMOMETER 1197      PTC                SURFACE THERMOMETER 87-04    PTC                SURFACE THERMOMETER 23
'SERIAL NUMBER MANUFACTURER DESCRIPTION 1191 1197 87-04 PTC PTC PTC SURFACE THERMOMETER SURFACE THERMOMETER SURFACE THERMOMETER 23


              ~
~
FINAL REPORT
~
                                          ~
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS
OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS
, REFERENCE NRC BULLETIN NO ~
          , REFERENCE NRC BULLETIN NO ~ 88 08 APPENDIX G EQUIPMENT CERTZFICATZONS PENETRANT MATERIAL BATCH MANUFACTURER           DESCRIPTION NUMBER 87M025 MAGNAFLUX CLEANER     SKC-NF-ZC-7B 87L071 MAGNAFLUX PENETRANT   SKL-HF/S 88E035 MAGNAFLUX DEVELOPER   SKD-NF/ZP-9B 24
88 08 APPENDIX G EQUIPMENT CERTZFICATZONS PENETRANT MATERIAL BATCH NUMBER 87M025 87L071 88E035 MANUFACTURER DESCRIPTION MAGNAFLUX CLEANER SKC-NF-ZC-7B MAGNAFLUX PENETRANT SKL-HF/S MAGNAFLUX DEVELOPER SKD-NF/ZP-9B 24


FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08
FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08
                          'APPENDIX H EXAMINATION PROCEDURES PROCEDURE NUMBER     REVISION     FIELD     TITLE NUMBER       CHANGE NDE 3.3                2           N/A   LIQUID           PENETRANT EXAMINATION       SOLVENT REMOVABLE   VISIBLE   DYE TECHNIQUE NDE 5.4                          ,  N/A  ULTRASONIC   EXAMINATION OF   AUSTENITIC   PIPING WELDS NDE 5.19                           N/A   ULTRASONIC   EXAMINATION OF   SOCKET   WELDS   IN PRESSURIZER     AUXILIARY SPRAY LINE (PTN 3&4) 25
'APPENDIX H EXAMINATIONPROCEDURES PROCEDURE NUMBER NDE 3.3 NDE 5.4 REVISION FIELD NUMBER CHANGE 2
N/A
, N/A TITLE LIQUID PENETRANT EXAMINATION SOLVENT REMOVABLE VISIBLE DYE TECHNIQUE ULTRASONIC EXAMINATION OF AUSTENITIC PIPING WELDS NDE 5.19 N/A ULTRASONIC EXAMINATION OF SOCKET WELDS IN PRESSURIZER AUXILIARY SPRAY LINE (PTN 3&4) 25


FINAL REPORT OF ZNSERVZCE ZNSPECT10N NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX   I CALIBRATION BLOCK CALIBRATION BLOCK                   DESCRIPTION     DRAWING NO.
FINAL REPORT OF ZNSERVZCE ZNSPECT10N NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX I CALIBRATION BLOCK CALIBRATION BLOCK NUMBER DESCRIPTION 2
NUMBER                            2 UT-44               .438 INCH THICK, 3..0 INCH DIA C-4174-019 UT-52              2.0 INCH DIA. SOCKET WELDED MOCK-UP 26
DRAWING NO.
UT-44 UT-52
.438 INCH THICK, 3..0 INCH DIA C-4174-019 2.0 INCH DIA. SOCKET WELDED MOCK-UP 26


FINAL REPORT   OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO 88-08 APPENDIX PENETRANT DOCUMENTATZON LOG J'IQUID DATA SHEET   IDENTIFICATION                    DESCRIPTION NUMBER          NUMBER 3.3-288     3"-CH-1401-32                PIPE TO ELBOW 3.3-304     ELBOW                        BASE METAL 3.3-287     3 "-CH-1401-33                ELBOW TO  PIPE 3.3-281      PIPE                          BASE METAL 3.3-286      3 n-CH-1401-34                PIPE TO ELBOW 3.3-290      ELBOW                        BASE METAL 3.3-285      3"-CH-1401-35                ELBOW TO  PIPE 3.3-291      PIPE                         BASE METAL 3.3-284      3"-CH-1401-36                PIPE TO ELBOW 3.3-289      ELBOW                         BASE METAL 3.3-283      3"-CH-1401-37                 ELBOW TO PIPE 3.3-342      2"-RC-1410-33                 VLV. 4-313 TO PIPE 3.3-341      2"-RC-1410-34                 PIPE TO RED. TEE 27
FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO 88-08 APPENDIX J'IQUID PENETRANT DOCUMENTATZON LOG DATA SHEET NUMBER 3.3-288 3.3-304 3.3-287 3.3-281 3.3-286 3.3-290 3.3-285 3.3-291 3.3-284 3.3-289 3.3-283 3.3-342 3.3-341 IDENTIFICATION NUMBER 3"-CH-1401-32 ELBOW 3 "-CH-1401-33 PIPE 3 n-CH-1401-34 ELBOW 3"-CH-1401-35 PIPE 3"-CH-1401-36 ELBOW 3"-CH-1401-37 2"-RC-1410-33 2"-RC-1410-34 DESCRIPTION PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE VLV. 4-313 TO PIPE PIPE TO RED.
TEE 27


t FINAL REPORT   OF ZNSERVICE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN 'NO ~ 88-08 APPENDIX K ULTRASONIC EXAMINATION DOCUMENTATZON LOG DATA SHEET       IDENTIFICATION          DESCRIPTION NUMBER              NUMBER 5.4-25         3"-CH-1401-32           PIPE TO ELBOW ELBOW                   BASE METAL 3 Ii-CH-1401-33         ELBOW TO PIPE PIPE                    BASE METAL 3"-CH-1401-34           PIPE TO ELBOW ELBOW                    BASE METAL 3"-CH-1401-35           ELBOW TO PIPE PIPE                     BASE METAL 3't-CH-1401-36           PIPE TO ELBOW ELBOW                   BASE METAL 3'r-CH-1401-37           ELBOW TO PIPE 28
t FINAL REPORT OF ZNSERVICE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN'NO ~ 88-08 APPENDIX K ULTRASONIC EXAMINATIONDOCUMENTATZON LOG DATA SHEET NUMBER 5.4-25 IDENTIFICATION NUMBER 3"-CH-1401-32 ELBOW 3 Ii-CH-1401-33 PIPE 3"-CH-1401-34 ELBOW 3"-CH-1401-35 PIPE 3't-CH-1401-36 ELBOW 3'r-CH-1401-37 DESCRIPTION PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE 28


FZNAL REPORT OP ZHSZRVZCE ZNSPZCTZOH HONDESTRUCTZVZ ZXAMZNATZONS OF UNZSOLABLE PZPZHG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE HRC BULLETZH HO 88-08 APPENDIX K ULTRASONIC EXAMZHAT1ON DOCUMENTATION LOG DATA SHEET   IDENTIFICATION              DESCRIPTION NUMBER          NUMBER 5 '9-1         2"-RC-1410-33         VLV. 4-313 TO PIPE 2"-RC-1410-34         PIPE TO RED. TEE 29
FZNAL REPORT OP ZHSZRVZCE ZNSPZCTZOH HONDESTRUCTZVZ ZXAMZNATZONS OF UNZSOLABLE PZPZHG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE HRC BULLETZH HO 88-08 DATA SHEET NUMBER 5'9-1 2"-RC-1410-33 2"-RC-1410-34 VLV. 4-313 TO PIPE PIPE TO RED.
TEE APPENDIX K ULTRASONIC EXAMZHAT1ON DOCUMENTATION LOG IDENTIFICATION DESCRIPTION NUMBER 29


FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX L ENGINEERING RECOMMENDATZONS DOCUMENT NO. SE&PT-SSAD-7814 30
FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX L ENGINEERING RECOMMENDATZONS DOCUMENT NO.
SE&PT-SSAD-7814 30


FINAL REPORT OF INSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX M NRC BULLETIN NO ~ 88-08 NRC BULLETIN NO. 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS 31
FINAL REPORT OF INSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX M NRC BULLETIN NO ~ 88-08 NRC BULLETIN NO. 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS 31


ATTACHMENT 2 Re:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 NRC Bulletin 88-08 Thermal Stresses in Piping Connected to Reactor Coolant   S stems ITEM 3     Plan and implement 'a program to provide       continuing assurance   that unisolable sections of connected to the RCS will not be subjected all  piping to combined cyclic and static thermal and other stresses that could cause fatigue failure during the remaining life of the unit,
ATTACHMENT 2 Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 NRC Bulletin 88-08 Thermal Stresses in Piping Connected to Reactor Coolant S stems ITEM 3 Plan and implement 'a program to provide continuing assurance that unisolable sections of all piping connected to the RCS will not be subjected to combined cyclic and static thermal and other stresses that could cause fatigue failure during the remaining life of the
: unit,


===Response===
===Response===
FPL identified two flowpaths where the concern profile of       NRC Bulletin 88-08 is applicable:
FPL identified two flowpaths where the concern profile of NRC Bulletin 88-08 is applicable:
0     Charging pumps to pressurizer auxiliary spray 0    Charging pumps to C Hot Leg.
0 0
1 ~  Flow Evaluation and   Com arison A detailed review of the unisolable piping in the two inch auxiliary spray and the three inch charging to the C Hot Leg flowpaths, shows that thermal transients from in-leakage are unlikely to occur for the following reasons:
1 ~
a)   The differential pressure across isolation valves 310B and   311   is approximately 50 psi, compared to approximately 320 psi across the leakage valve of NRC Bulletin 88-08.
Charging pumps to pressurizer auxiliary spray Charging pumps to C Hot Leg.
b)   The auxiliary spray     and charging flow is delivered, through the regenerative heat exchanger, at 493'F for steady state conditions. For sufficiently large leakage flow (approximately .5 gpm or more), the flow is expected to remain hot.       Therefore, stratification will not significantly occur as the difference in temperatures between the two fluids will be relatively small.
Flow Evaluation and Com arison A detailed review of the unisolable piping in the two inch auxiliary spray and the three inch charging to the C Hot Leg flowpaths, shows that thermal transients from in-leakage are unlikely to occur for the following reasons:
c)   The piping configurations at Turkey Point Units 3 and 4 for the   two flowpaths under consideration tend to minimize the potential for pipe failure related to the phenomenon described in NRC Bulletin 88-08.       For the three inch charging line this is due to the upward routing of the line into the RCS, as opposed to the
a)
The differential pressure across isolation valves 310B and 311 is approximately 50
: psi, compared to approximately 320 psi across the leakage valve of NRC Bulletin 88-08.
b)
The auxiliary spray and charging flow is delivered, through the regenerative heat exchanger, at 493'F for steady state conditions.
For sufficiently large leakage flow (approximately.5 gpm or more), the flow is expected to remain hot.
Therefore, stratification will not significantly occur as the difference in temperatures between the two fluids will be relatively small.
c)
The piping configurations at Turkey Point Units 3 and 4
for the two flowpaths under consideration tend to minimize the potential for pipe failure related to the phenomenon described in NRC Bulletin 88-08.
For the three inch charging line this is due to the upward routing of the line into the
: RCS, as opposed to the


Farley and Tihange piping routing described in the bulletin which are routed downward towards the RCS. In addition, flow stratification would be less severe in the smaller lines (two and three inch vs. the six inch 'pipe reported in the bulletin) due to larger heat transfer around the pipe circumference.
Farley and Tihange piping routing described in the bulletin which are routed downward towards the RCS.
In an effort to further substantiate the above, FPL contracted with Westinghouse to perform a hydrodynamic test of actual plant specific geometries. This test is described below.
In addition, flow stratification would be less severe in the smaller lines (two and three inch vs. the six inch 'pipe reported in the bulletin) due to larger heat transfer around the pipe circumference.
H drod namic Testin Westinghouse performed hydrodynamic tests in order to assess the potential for the concerns of NRC Bulletin 88-08 at Turkey Point Units 3 and 4. The hydrodynamic test simulated the thermal-hydraulic conditions in the flowpaths under review at Turkey Point Units 3 and 4. The test utilized clear piping, dyed water, and actual plant dimensions. Temperature differences were simulated by specific gravity variations in water (hot fluid) and sodium bicarbonate (cold fluid).
In an effort to further substantiate the
: above, FPL contracted with Westinghouse to perform a hydrodynamic test of actual plant specific geometries.
This test is described below.
H drod namic Testin Westinghouse performed hydrodynamic tests in order to assess the potential for the concerns of NRC Bulletin 88-08 at Turkey Point Units 3 and 4.
The hydrodynamic test simulated the thermal-hydraulic conditions in the flowpaths under review at Turkey Point Units 3
and 4.
The test utilized clear piping, dyed water, and actual plant dimensions.
Temperature differences were simulated by specific gravity variations in water (hot fluid) and sodium bicarbonate (cold fluid).
The geometries for both the two inch and three inch flowpaths were modeled.
The geometries for both the two inch and three inch flowpaths were modeled.
The   results of the flow tests show that although stratification   can occur, no mixing mechanism is present for the, configuration at Turkey Point. Hence, there is an absence of thermal cycling. Without thermal cycling, pipe failure is not a concern.
The results of the flow tests show that although stratification can occur, no mixing mechanism is present for the, configuration at Turkey Point.
Ins ections and   0 eratin Ex erience a)   The recently completed NDE, showed no indication of cracks   in the most susceptible locations of the unisolable sections of the two inch auxiliary spray and three inch charging lines.
Hence, there is an absence of thermal cycling.
b)   Turkey Point Units 3 and 4 each have over fifteen years of operating experience to date and no failures of the type described in NRC Bulletin 88-08 have occurred.
Without thermal cycling, pipe failure is not a concern.
c)   NDE will also be completed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.
Ins ections and 0 eratin Ex erience a)
The recently completed
: NDE, showed no indication of cracks in the most susceptible locations of the unisolable sections of the two inch auxiliary spray and three inch charging lines.
b)
Turkey Point Units 3 and 4 each have over fifteen years of operating experience to date and no failures of the type described in NRC Bulletin 88-08 have occurred.
c)
NDE will also be completed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.


CONCLUSION The   applicable flowpaths were examined and the locations most susceptible to in-leakage induced thermal fatigue were identified.
CONCLUSION The applicable flowpaths were examined and the locations most susceptible to in-leakage induced thermal fatigue were identified.
NDE was   performed in these areas and no cracks were discovered.
NDE was performed in these areas and no cracks were discovered.
The NDE   technique utilized accounts for the observations and enhancements implemented at Farley. Volumetric examinations were done on both the two inch and three inch piping sections.         A special calibration specimen and procedure were developed to implement the volumetric NDE of the two inch piping section.
The NDE technique utilized accounts for the observations and enhancements implemented at Farley.
Based   on the flow evaluation performed, thermal transients from in-leakage are unlikely to occur even   if the globe valve leaks.
Volumetric examinations were done on both the two inch and three inch piping sections.
This is based on the fact that a,mixing mechanism to cause thermal cycling does'ot exist as indicated by the results of the hydrodynamic   testing.
A special calibration specimen and procedure were developed to implement the volumetric NDE of the two inch piping section.
The   flow evaluation conclusions,   in conjunction with the   NDE performed on the subject flowpaths, provide assurance that the concerns of NRC Bulletin 88-08 are satisfactorily addressed. No further actions are required, but NDE will be performed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.}}
Based on the flow evaluation performed, thermal transients from in-leakage are unlikely to occur even if the globe valve leaks.
This is based on the fact that a,mixing mechanism to cause thermal cycling does'ot exist as indicated by the results of the hydrodynamic testing.
The flow evaluation conclusions, in conjunction with the NDE performed on the subject flowpaths, provide assurance that the concerns of NRC Bulletin 88-08 are satisfactorily addressed.
No further actions are required, but NDE will be performed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.}}

Latest revision as of 11:35, 7 January 2025

Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects Ref NRC Bulletin 88-008
ML17345A663
Person / Time
Site: Turkey Point  
Issue date: 03/21/1989
From: Anderson E
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17345A662 List:
References
IEB-88-008, IEB-88-8, MCI-PTN-004-88, MCI-PTN-004-88-08-R0, MCI-PTN-4-88, MCI-PTN-4-88-8-R, NUDOCS 8905110029
Download: ML17345A663 (43)


Text

i ATTACHMENT 1 NUCLEAR ENERGY SERVICES MATERIALS, CODES and INSPECTIONS SECTION 700 Universe Blvd.

Juno Beach, Florida FINAL REPORT OF INSERVICE INSPECTION NONDESTRUCTZVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~

88 08 PREPARED BY:

FLORIDA POWER AND LIGHT COMPANY FOR TURKEY POINT-NUCLEAR POWER PLANT UNIT NO ~

4 P+0 ~

BOX 3088 FLORIDA CITY'LORIDA 33034 COMMERCIAL SERVICE DATE! PTN-4 7

SEPTEMBER 1973 NRC DOCKET NUMBER:

DOCUMENT NUMBER:

50-251 MCI-PTN-004-88-08 REV.

0 PREPARED BY'I ENGINEER C&P

~aa REVIEWED BY:

P VI 0 PRO CODES OUP DATE'

~ ~7 APPROVEDBY'ATE:

A ER MATERIALS, CODES

& INSPECTIONS SECTION C~905ii0029 890504 pap" ADOCK C>

OOC>2 0

9 PDC

FINAL REPORT OF ZNSERVZCE INSP CTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS TITLE PAGE/COVER SHEET TABLE OF CONTENTS RECORD OF REVISION ABSTRACT ABBREVIATIONS

1.0 INTRODUCTION

1.1 PROGRAM APPLICABILITY 1.2 INSPECTION INTERVAL 1.3 INSPECTION PERIODS 1 '

APPLICABLE DOCUMENTS 1.5 APPLICABLE CODE EDITIONS AND ADDENDA 2.0 ENGINEERING RECOMMENDATIONS 2.1 CHARGING PUMP TO PRESSURIZER AUXILIARYSPRAY LINE 2.2 CHARGING PUMP TO "C" HOT LEG 3.0 ABSTRACT OF EXAMINATIONS PERFORMED 3.1 APPLICABLE AREAS 3 ~ 1 ~ 1 AUXILIARYSPRAY LINE 3.1.2 CHARGING LINE

~

~

FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPXNG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 3.2 LIQUID PENETRANT EXAMINATIONS 3.3 ULTRASON1'C EXAMINATIONS 4.0 ABSTRACT OF CONDITIONS NOTED 4.1 AUXILIARYSPRAY LINE 4.1.1 2"-RC-1410-33 4.1.2 2"-RC-1410-34 4. 2 CHARGXNG LINE 4

2 1

3it CH 1401 32 4.2.2 ELBOW BASE METAL 4

2 3

3't-CH-1401-33 4'.4 PXPE BASE METAL 4.2.5 3"-CH-1401-34 4.2.6 ELBOW BASE METAL 4.2.7 3"-CH-1401-35 4.2.8 PIPE BASE METAL 4.2.9 3it CH 1401 36 4 '.10 ELBOW BASE METAL 4

2 11 3"-CH-1401-37 5

~ 0 CORRECTIVE ACTIONS TAKEN AND/OR RECOMMENDED

FINAL REPORT OF INSERVZCE ZNSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 TABLE OF CONTENTS 6.0 EVALUATION CRITERIA F 1 CLASS 1

6.1.1 ACCEPTANCE STANDARDS FOR CLASS 1

7.0 INSERVICE INSPECTION

SUMMARY

TABLES

7.1 DESCRIPTION

OF TABLES 7.1.1

SUMMARY

PLAN TABLES EXPLANATIONS 8.0 RECORDS 8.1 GENERAL 8.2 INSERVICE INSPECTION

SUMMARY

REPORTS APPENDICES A

REFERENCE DRAWINGS B

PERSONNEL CERTIFICAT10NS C

ULTRASONIC EQUIPMENT D

ULTRASONIC TRANSDUCERS E

ULTRASONIC COUPLANT F

THERMOMETERS G

LIQUID PENETRANT MATERIALS H

EXAMINATION PROCEDURES I

ULTRASONIC CALIBRATION BLOCKS J

LIQUID PENETRANT DOCUMENTATION DATA PACKAGES K

ULTRASONIC DOCUMENTATION DATA PACKAGES L

ENGINEERING RECOMMENDATIONS DOCUMENT SEGPT-SSAD-7814 M

NRC BULLETIN 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL. STRESS EFFECTS REFERENCE NRC BULLETIN NO>> 88-08 RECORD OF REVISION REVISION NUMBER DESCRIPTION OF REVISION REASON FOR THE CHANGE DATE REVISED APPROVALS

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 ABBREVIATIONS LISTED BELOW ARE THE ABBREVIATIONS UTILIZED IN THIS DOCUMENT:

ASME B&PV C&P CH FP&L ISI JNS MCI NDE AMERICAN SOCIETY OF MECHANICAL ENGINEERS BOILER AND PRESSURE VESSEL CODE CODES AND PROGRAMS GROUP CHARGING FLORIDA POWER AND LIGHT COMPANY INSERVICE INSPECTION JUNO NUCLEAR ENERGY SERVICES MATERIALS, CODES AND INSPECTIONS SECTION NONDESTRUCTIVE EXAMINATION NRC NUCLEAR REGULATORY COMMISSION PTN-4 RCS RC TURKEY POINT PLANT UNIT NO.

4 MAIN REACTOR COOLANT SYSTEM REACTOR COOLANT

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 ABSTRACT This document describes the Inservice Inspection results of Nondestructive Examinations performed during the 1988 refueling outage which began on 17 September 1988.

This document addresses the nondestructive examinations performed, conditions noted and corrective measures recommended or taken as required by ASME Section XI 1980 Edition through the Winter 1981 Addenda, IWA-6220.

This document addresses NRC ACTION ITEM 2

and the reporting requirements as identified in item 4 of the Action Requested by the Nuclear Regulatory Commission.

This report documents the examination activity performed on Florida Power and Light Company Turkey Point Nuclear Power Plant Unit No. 4.

NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08

1.0 INTRODUCTION

1.1 PROGRAM APPLICABILITY This Report details the Florida Power

& Light Company's results of Inservice Inspection, Nondestructive examinations performed at the Turkey Point Nuclear Power Plant, Unit No. 4.

1.1.1 The operating License for Turkey Point Unit no.

4 was issued on April 10 1973, and Florida Power and Light Company is the owner of record.

1.2 INSPECTION INTERVALS The Second Inservice inspection Interval became effective on April 15, 1984 and ends on April 14, 1994.

1.3 INSPECTION PERIODS The Inspection Interval is divided into three successive inspection periods as defined by Program "B".

Period START END April 15, 1984 April 15, 1987 April 15, 1987 April 15, 1991 3

April 15, 1991 April 14, 1994 1.4 APPLICABLE DOCUMENTS II The Nondestructive examination Program performed during this activity was developed after giving due consideration to the following documents:

ASME BOILER AND PRESSURE VESSEL CODE p SECTION XIg 1 98 0 EDITION THROUGH THE WINTER 1981 ADDENDA, "RULES FOR INSERVICE INSPECTION OF NUCLEAR POWER PLANT COMPONENTS"

NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 U.

S.

NUCLEAR REGULATORY BULLETIN 88-08 TITLED "THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMSn DATED.

JUNE 22~

1988~

SUPPLEMENT 1

DATED JUNE 24~

1988 AND SUPPLEMENT 2

DATED AUGUST 4g

. 1988 TURKEY POINT UNITS 3

AND 4 (NRC BULLETIN 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEM)

ENGINEERING DOCUMENT FOR THE IDENTIFICATION OF UNISOLABLE PIPING AND DETERMINATION OF INSPECTION LOCATIONS ~

DOCUMENT NO SE&PT SSAD 78 1 4 ~

DATED AUGUST 1988

1. 5 APPLICABLE CODE EDITIONS AND ADDENDA As required by Title 10 of the Code of Federal Regulations.

paragraph 55a (g)

(4) Inservice Inspections requirements applicable to nondestructive examination at Turkey Point Unit 4 are based on the rules set forth in the 1980 Edition of Section XI through the Winter 1981

Addenda, hereafter referred to as the Code.

2.0 ENGINEERING RECOMMENDATIONS Following is the engineering recommendations of areas were NONDESTRUCTIVE EXAMINATIONS were identified for potential thermal stress effects as described in NRC Bulletin 88-08.

The components subject to examination were determined to include portions of the following lines:

2.1 CHARGING PUMP TO PRESSURIZER AUXILIARYSPRAY LINE The 2 inch weld on the 4" x 4" x 2" reducing tee at the Main Spray Line connection was recommended for examination as identified on isometric drawing 004-A29, and also, the weld at the outlet of valve 4-313.

2 2

CHARGING PUMP TO ttC" HOT LEG All welds from the third to fourth elbow down stream of check valve 4-312B (4 weld locations) and base metal of the fourth elbow downstream of check valve 4-312B as identified on isometric drawing 004-A39.

FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.0 ABSTRACT OF EXAMINATIONS PERFORMED 3 '

APPLICABLE AREAS Based on the recommendations identified above the following items were scheduled for nondestructive examination.

3.1.1 AUXILIARYSPRAY LINE DRAWING 004-A29 ZONE IDENTIFICATION DESCRIPTION EXAM METHOD 035 2"-RC-1410-33 VLV 4-313 PIPE UT

& PT 035 2"-RC-1410-34 PIPE RED.

TEE UT

& PT 3.1.2 CHARGING LINE LOOP C DRAWING 004-A39 ZONE IDENTIFICATION DESCRIPTION EXAM METHOD 045 3"-CH-1401-32 V

ELBOW 3n-CH-1401-33 PIPE 3"-CH-1401-34 ELBOW 3't-CH-1401-35 PIPE 3"-CH-1401-36 ELBOW 3"-CH-1401-37 PIPE ELBOW BASE METAL ELBOW PIPE BASE METAL PIPE ELBOW BASE METAL ELBOW PIPE BASE METAL PIPE ELBOW BASE METAL ELBOW PIPE UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT UT

& PT 10

FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 3.2 LIQUID PENETRANT EXAMINATIONS The Liquid Penetrant examinations performed were conducted in accordance with FP&L NDE procedure 3.3. This procedure complies with the ASME Code.

The examinations performed were required by Table IWB-2500-1 and FP&L intends to utilize the examination records for ASME Code credit and are part of the Inservice Inspection Program.

3.3 ULTRASONIC EXAMINATIONS

\\

The ultrasonic examinations were not required by the ASME Code Tables IWB-2500-1 due to the size being 2" and 3".

The supplemental examinations were conducted in accordance with standard piping techniques for the 3"

charging system.

For the 2" Auxiliary Spray system a

new NDE procedure and a

new calibration block had to be fabricated for the examination of socket weld areas.

The procedure and calibration block were qualified and demonstrated to the satisfaction of the Authorized Nuclear Inservice Inspector on January 26, 1989.

NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 4.0 ABSTRACT OF CONDITIONS NOTED Described below by component is a summary of conditions noted during the Unit No.

4 examination activity:

4.1 AUXILIARYSPRAY LINE 4 ~ 1 ~ 1 ZONE 035 ~

2 RC 14 10 33 f VLV 4 3 13 PIPE A liquid penetrant and ultrasonic examination using a 45 and 70 degree search unit.

ONE (1) indication recorded with a

amplitude recorded to be less than 204 DAC, determined to be probable beam redirection.

4.1.2 ZONE 035( 2"-RC-1410-34, PIPE RED.

TEE:

A liquid penetrant and ultrasonic examination using a

45 and 70 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2 CHARGING LINE LOOP C

4.2.1 ZONE 045 f 3

CH 1401 32 g PIPE ELBOW A liquid penetrant and ultrasonic examination 'using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2.2 ZONE 045, ELBOW BASE METAL:

A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2.3 4 ~ 2 ~ 4 4.2.5 ZONE 045 3it CH 1401 33'LBOW PIPE A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

Two (2)

GEOMETRIC INDICATIONS were noted and determined to be caused by root geometry.

ZONE 045, PIPE BASE METAL:

A liquid penetrant and=-ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE ZONE 045 3n-CH-1401-34, PIPE ELBOW A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

Two (2)

GEOMETRIC INDICATIONS were noted and determined to be caused by root geometry.

12

FINAL REPORT OF INSERVICE INSP TION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 4.2.6 ZONE 045, ELBOW BASE METAL:

A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4 ~ 2

~ 7 ZONE 045 g

3 CH 1401 35 ~

ELBOW PIPE A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2;8 ZONE 045, PIPE BASE METAL:

A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4 ~ 2 ~ 9 ZONE 045 g 3

CH 140 1 36 g PIPE ELBOW A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2.10 ZONE 045, ELBOW BASE METAL:

A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 4.2.11 ZONE 045 3n-CH-1401-37, ELBOW PIPE A liquid penetrant and ultrasonic examination using a

45 and 60 degree search unit.

NO RECORDABLE INDICATIONS NOTED 13

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS

'FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 5.0 CORRECTIVE ACTIONS TAKEN OR RECOMMENDED All indications noted were evaluated in accordance with the requirements of the ASME Boiler and Pressure Vessel

Code,Section XI (were acceptance criteria exists).

There were no indications that exceeded the acceptance criteria of the ASME Code, IWB-3000.

14

FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTZAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 6.0 EVALUATION CRITERIA During Inservice Inspection, flaw indications are evaluated against the acceptance standards of 'he ASME Code as follows:

6. 1 CLASS 1

6.1.1 Acceptance standards for class 1 are as follows:

EXAMINATION COMPONENTS OR PARTS EXAMINED ACCEPTANCE CATEGORY STANDARD DISSIMILAR AND SIMILAR METAL IWB-3514 WELDS IN PIPING 15

~

~

FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~

88 08 7.0 INSPECTION

SUMMARY

TABLES

7.1 DESCRIPTION

OF TABLES The TURKEY POINT PLANT UNIT 4 Inservice Inspection tables are summarized by code categories and code item numbers and provides the results of the FP&L examination activity that were performed on the Auxiliary Spray Line and the Charging Line.

7.1.1

SUMMARY

PLAN TABLES The final report tables were developed based on systems and components which are subject to examination and include such information as follows:

(1)

ZONE NUMBER Components and or systems are divided into zones.

Each zone is further subdivided by the following categories:

(a)

ASME Code Category (b)

ASME Code Item Number (c)

ZONE Identification Number (d)

REFERENCE DRAWING IDENTIFICATION (e)

LINE ITEM NUMBER administrative number used for computer identification purposes (f) Examination Area Identification identifies the item or area to be examined (g)

INSTRUCTIONS special comments that may be required for a specific item (h)

RESULTS divided into four areas:

1.

NOREC no recordable indications 2.

INSIG when indications were observed that were below the recording level 3.

GEOM was applied when indications which have a

amplitude equal to or greater than 1004 of the DAC curve, and have been documented to be geometric in nature 4.

OTHER are those indications evaluated to be other than insignificant or geometric (i) Examination Method to be used for the examination

'(j)

NDE Examination Procedure to be used for the examination 16

NDX 'CORPORATION ZSIC ISI Data Management System FLORIDA POWER 4 LIGHT CO ~

TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVICE INSPECTION FINAL REPORT TABLES RESULTS FOR OUTAGE 1 (1988)g, SECOND PERIODS SECOND INTERVAL

SUMMARY

NUMBERS 111500 THROUGH 111600 March 20, 1989 REVISION 3

DATE:

03/20/89 REOISION:

3 AUXILIARY SPRAY LIHE TURKEY POINT NUCLEAR PLANT UNIT 4 INSERVICE INSPECTION FINAL REPORT TABLES OUtAGE 1 (1988),

SECOND PERIOD, SECOND INTERVAL CLASS 1

COHPOHEHTS PAGE:

1 ZONE NUHBER: 035 SUHHARY EXAHIHATI OH AREA HUHBER IDENT IFI CATION ASHE SEC. XI CATGY EXAH ITEN NO HETHCO PROCEDURE N I 0

S OHGT T

RSEH A

E I 0 E

REHARKS T

C 0 H R

  • ~CALIBRATIOH BLOCK~~

R F

0 NO 004 A

111500 2"-RC-1410-33 VALVE (4-313) -

TO - PIPE 75 I 0 II 8 J e9.21 P'I NDE 3.3 342 C

C UT 45 AX NDE 5.19 1

C UT 70 AX HDE 5.19-1 C

1-28.89 UT COHPLETE

~~UT.44 111600 2".RC.1410-34 PIPE TO - RED.

TEE 75 '0" 8-J 89.21 PT HDE 3.3.341 UT 45 AX HDE 5.19-1 UT 70 AX HDE 5.19 1

C C

1.28.89 UT CCHPLETE

  • AQT 441*

rrDx coRpoRATIorr

~

rsrc rsr bdcd rrdh890$ 0!lt sgstclll FLORIDA POWER fi LIGHT CO ~

TURKEY POINT NUCLEAR PLANT UNIT 4 ZNSERVZCE INSPECTION PZNAL REPORT TABLES RESULTS FOR OUTAGE 1 (1988) i SECOND PERIODi SECOND INTERVAL

SUMMARY

NUMBERS 154800 THROUGH 155300 March 20, 1989 REVISION 3

DATE:

03/20/89 REVISION:

3 CHARGE LINE RHX TO COLD LEG OOP C

TURKEY POINT NUCLEAR PLANT UNIT 4 IHSERVICE INSPECTION FIHAL REPORT TABLES OUTAGE 1 (1988),

SECOND PERI(X)l SECOND INTERVAL CLASS 1

COHPONEHTS PAGE:

1 ZONE HUHBER: 045 SUHHARY EXAHINATIOH AREA HUHBER IDEHTIFICATIOH ASHE SEC. Xl CATGY EXAH ITEN NO NETNOO PROCEDURE N I 0

S OH 0T T

RSEH A

E I 0 E

REHARKS T

C G H R

  • >>CALIBRATIOHBLOCK*t-REF.

DMG. NO. OOC-A39 154800 3".CH-1401.32 PIPE TO -

ELBOM 23 I 9 II 23'-9" 8-J 89.21 PT NDE 3.3 288 UT 45 AX HDE 5.4-25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4-25 C

C C

C C

10-19-88 PT COHPLETE: 10.24 88 UT C(WPLETE t>>UT.CC>>t 15C850 ELBOM (32.33)

ELBOM.BASE HETAL 23'.9" 23 I 9 II 8 J 89.21 PT NDE 3.3.304

'T 45 AX HDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4 25 C

C C

C C

10-24-88 UT COHPLETE 10-19-88 PT COHPLETE t*UT-44*>>

154900 3"-CH.1401-33 ELBOM -

TO - PIPE 23 I 9ll 23 I 9 II 8-J 89.21 PT NDE 3.3.287 UT 45 AX HDE 5.4-25 UT 45 CIRC NDE 5.4.25 UT 60 AX HDE 5.4 25 C

C 10.19.88 PT COHPLETE: 10.24 F 88 UT COHPLETE: 2 IHDS. (1) 45 AX, 30K DAC, HL*3.7CCM, HM*1.27, HP>>1.85,DS:

(2) 60 AXI 35K DAC, HL>>3. 7CCM, HM"-.95, HP>>. 75 ~

DS:

    • MT 44tt 154950 PIPE (33.34)

PIPE BASE HETAL 23'"

23 I 9 II 8 J 89.21 PT HDE 3.3-281 UT 45 AX HDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4.25 C

C C

C C

10 19-M PT COHPLETE: 10.24-88 UT COHPLETE

  • >>O'I-44*>>

155000 3>>-CH-1401.34 PIPE TO -

ELBOM 23'-9" 23 I 9 II 8 J 89.21 PT NDE 3.3-286 UT 45 AX NDE 5.4-25 UT 45 CIRC HDE 5.4 25 UT 60 AX HDE 5.4 25 C

C 10.19-88 PT CNPLETE: 10-24.M UT COHPLETE: 2 INDS, (1) 45 AX, 30K DAC, HL>>1.4CMI HM 1.31, HP>>1.9, US:

(2) 60 AX, 20K DAC, HL>>I.CCM, HM*,71, HP=.75, US:

t UT-44>>t 155050 ELBOM (34.35)

BASE HATERIAL 23'-9" 23 I 9 II 8-J 89.21 PT HDE 3o3 290 UT 45 AX NDE 5.4-25 UT C5 CIRC HDE 5.4.25 UT 60 AX HDE 5.4-25 C

C C

C C

10 19.88 PT CNPLETE:

10 24 88 UT COHPLETE t UT-44*>>

DATE:

03/20/89.

REVISION:

3 CHARG LIH RHX TO COLD LE LOOP C

TURKEY POINT NUCLEAR PLANT UNIT 4 INSERVICE IHSPECTION FINAL REPORT TABLES OUTAGE 1 ( 1988) I SECOND PERIOD I SECOND INTERVAL CLASS 1

COHPOHEHTS PAGE:

2 ZONE NUHBER: 045 SUHHARY EXAHI NATION AREA HUHBER IDEHTIFICATION ASHE SEC. Xl CATGY EXAH ITEH NO HETHDO H I S

OH 0 T

RSE A

E I 0 PROCEDURE T

C G H H

E REHARKS R

~~CALIBRATION BLOCKii REF DlJG.

NO. 004-A39 155100 3"-CH-1401.35 ELSOM TO - PIPE 23 I 9ll 23 I 9ll 8-J 89.21 PT HDE 3.3-285 UT C5 AX NDE 5.4 25 UT 45 CIRC NDE 5.4-25 UT 60 AX NDE 5.4 25 C

C C

C C

10-19 88 PT CCHPLETE: 10-24.88 UT COHPLETE 155150 PIPE (35 36)

PIPE BASE HETAL 23 I 9 II 23 I 9ll SJ PT HDE 3.3.291

8921, UT45 AX NDE54 25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4-25 C

C C

C C

10.19.88 PT COHPLETE: 10-24-88 UT COHPLETE e UT-44~~

155200 3".CH-1401-36 PIPE.

TO ELBOM 25'5' J

89.21 PT HDE 3.3.284 UT 45 AX HDE 5.4 25 UT 45 CIRC NDE 5.4-25 UT 60 AX HDE 5.4-25 C

C C

C C

10.19.88 PT CCHPLETE: 10-2C-88 UT COHPLETE 155250 ELBOM (36-37)

BASE HATERIAL 25'5' J

89.21 PT NDE 3.3.289 UT 45 AX NDE 5.4-25 UT 45 CIRC NDE 5.4 25 UT 60 AX HDE 5.4 25 C

C C

C C

10 19-88 PT CCHPLETE: 10-24.88 UT COHPLETE t UT-44~~

155300 3"-CH-1C01-37 ELSOM -

TO - PIPE 8-J 89.21 PT NDE 3.3.283 UT 45 AX NDE 5.4-25 UT 45 CIRC NDE 5.4.25 UT 60 AX HDE 5.4.25 C

C C

C C

10.19.88 PT COHPLETE: 10-24-SS UT COHPLETE 11@ 44t*

~

~

FINAL REPORT OP ZNSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 8 '

RECORDS 8.1 GENERAL Records of Inservice Inspections

Plans, Outage schedules, Calibration standards, examination and test procedures, results of activities, final reports, certifications, corrective actions taken or recommended will be developed and maintained in accordance with IWA-6000 of the ASME Boiler and Pressure Vessel Code.

8.2 INSERVICE INSPECTION SUGARY REPORTS Ninety days (90) following'the units return to service MCI shall forward a summary report (NIS-1) of the ISI activity to the Nuclear Regulatory Commission in accordance with IWA-6220.

8.3 SPECIAL REPORTS This report is prepared to meet the reporting action required by the bulletin and satisfy the FP&L requirements.

17

t FINAL REPORT OF ZNSERVZCE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS

~

REFERENCE NRC BULLETIN NO ~

88 08 APPENDIX A REFERENCE DRAWINGS DRAWING NUMBER REV.

NO.

004-A29 004-A39 TITLE 2" AUXILIARYSPRAY LINE 3" CHARGING LINE 18

4 -RC-1404 4

PRESSURIZER SPRAY CONT. ON OWG. 004-A14 REDUCING TEE 3 -CH-1401

~

3 CHARGING CONT. ON OWG. 004-A39 REO.

'-311 WR-63-2 SR-922 229-0 25 2 -RC-1410 5

SR-933~

SR-932' SR-927

"-'-'-'L~

21 22 779-C 1

10 13

~EL 24'-0 WR-39 19 18 779-8 779-A

~ER-930 12 6

15 BIO SHIELD WALL 16 17 SR-93 920 O NRC BULLETIN 88-08 lHERMAL SlRESSES OVe. 5614-r -782-S 32 31 30 WR-63-1 WR-63-3 O

2 II SR-923-B SR-923-A ll 26 II 27 28 2 -RC-1410 SR-926 REFERENCE DRAWINGS PRESSURE dc TEMPERAlURE STATS MATERIAL SPECS SIZE SCH TYPE CODES dc PROGRAMS GROUP lURKEY POINT UNIT 4 5177-102-SK-P-875 REV. C 5610-lE-4501 SHT.

1 OF I 5610-M-410-214 SHT. 3 OF 3 5610-M-410-202 SHT. 2 OF 2 DESIGN PSIG: 2485 TEMP(F): 650 OPERATING PSIG: 2235 TEMP(F): 550 HYDROSTAllC PSIG: 2335 TEMP(F): 547 UT CAUBRAllON BLOCK: N/A DATE:26 SEPT 1988 REVISION APPROVEO BY:

3 2

160 A376-lP316 SMLS TITLE:

2 AU)4 SPRAY UNE ZONE: 35 DRAWING NUMBER:

004-A29

14 I

I I

15 BIO. SHIELD 16 WALL 17 19 4-VCH-5 20 21 22 23 WR-41 24 25 NRC BULLETIN 88-08 0 THERMAL STRESSES 5614-P-782-S 26 30 28 4-312B Q

FLOW WR-41A 4-VCH-13 PASPMB'AL 31 PIPE Q7 29 -RCS-1408 MAIN REACTOR COOLANT CONT. ON DWG. 004-AB HQIB 3 -RC-2501R-3 5177-102-SK-P-876 LOCATION:

CONTAINMENT C

LOOP HOT LEG E-2389-10-297 E-2389-10-479 SR-944A ltj I

I I

I 3'HARGING CONT. ON DWG. 004-A40 2"-RC-1410 2

AUX. SPRAY CONT. ON DWG. 004-A29 I

7 I

8 I 4-311 8A 3 -CH-1401 6

5 L~ 936 9

SR-934 11 4-310A 12~SW-S43 29, 4-VCH-14 3 -CH-1402 ~

Og 4

Q BASE IIETAL ON ELBOW BASE METAL ON PIPE BASE METAL ON ELBOW REFERENCE DRAWINGS PRESSURE dc lEMPERAlURE STAlS MATERIAL SPECS SIZE SCH TYPE

~pg~

CODES dc PROGRAMS GROUP TURKEY PONT UNIT 4 5177-102-SK-P-876 REV. C 5177-102-SK-P-875 REV. C 5610-TE-4501 5610-M-420-214 SHT. 3 OF 3 E-2389-10-284 DESIGN PSIG: 2485 OPERATING PSIG: 2235 HYDROSTAllC PSIG: 2335 TEMP(F): 650 TEMP(F): 550 TEMP(F): 547 3

160 UT CAUBRATION BLOCK:

A-376, TP316 SMLS TITLE:

3 CHARGING UNE DATE:26 SEPT. 1988 REVISION APPROVED BY 3

E. L ANDERSON ZONF 45 DRAWING NUMBER:

004-A39

FINAL REPORT OF ZNSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL'THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX B PERSONNEL CERTZFZCATIONS EXAMINERS NAME

BAKER, ROGER LEVEL III PT UT 10-11-88 METHOD EYE EXAM DATE BRILEY g ROBERT DUBREUIL, RICHARD LAFLEUR, RUSSEL LAKE, EDWARD MC CABE, WILLIAM NOWAKOWSKIg DAN III UT/PT UT/PT UT/PT UT/PT PT UT/PT 11-10-87

, 4-13-88 6-27-88 5-23-88 6-30-88 4-26-88 19

t FINAL REPORT OF INSERVZCE ZNSP TZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX C EQUIPMENT CERTIPICATZONS ULTRASONIC EQUIPMENT SERIAL NUMBER 06446E 784519 MANUFACTURER SONIC MARK I SONIC MARK I DESCRIPTION ULTRASONIC FLAW DETECTOR ULTRASONIC FLAW DETECTOR" 20

~

~

FINAL REPORT OF INSERVZCE INSPECTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX D EQUIPMENT CERTZFZCATZONS ULTRASONIC SEARCH UNITS SERIAL NUMBER 021692 021729 AEROTECH

.25 AEROTECH

.25

2. 25 2.25 ROUND ROUND MANUFACTURER SIZE FREQUENCY DESCRIPTION 21

t FINAL REPORT OF'ZNSERVICE ZNSP TZON NONDESTRUCTIVE EXAMZNATZONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX E EQUIPMENT CERTZFZCATZONS ULTRASONIC COUPLANT BATCH NUMBER MANUFACTURER DESCRIPTION 8764 8872 ECHO LABS ECHO LABS ULTRAGEL II ULTRAGEL II 22

FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX F EQUIPMENT CERTIFZCATZONS SURFACE THERMOMETERS

'SERIAL NUMBER MANUFACTURER DESCRIPTION 1191 1197 87-04 PTC PTC PTC SURFACE THERMOMETER SURFACE THERMOMETER SURFACE THERMOMETER 23

~

~

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS

, REFERENCE NRC BULLETIN NO ~

88 08 APPENDIX G EQUIPMENT CERTZFICATZONS PENETRANT MATERIAL BATCH NUMBER 87M025 87L071 88E035 MANUFACTURER DESCRIPTION MAGNAFLUX CLEANER SKC-NF-ZC-7B MAGNAFLUX PENETRANT SKL-HF/S MAGNAFLUX DEVELOPER SKD-NF/ZP-9B 24

FZNAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08

'APPENDIX H EXAMINATIONPROCEDURES PROCEDURE NUMBER NDE 3.3 NDE 5.4 REVISION FIELD NUMBER CHANGE 2

N/A

, N/A TITLE LIQUID PENETRANT EXAMINATION SOLVENT REMOVABLE VISIBLE DYE TECHNIQUE ULTRASONIC EXAMINATION OF AUSTENITIC PIPING WELDS NDE 5.19 N/A ULTRASONIC EXAMINATION OF SOCKET WELDS IN PRESSURIZER AUXILIARY SPRAY LINE (PTN 3&4) 25

FINAL REPORT OF ZNSERVZCE ZNSPECT10N NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PZPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX I CALIBRATION BLOCK CALIBRATION BLOCK NUMBER DESCRIPTION 2

DRAWING NO.

UT-44 UT-52

.438 INCH THICK, 3..0 INCH DIA C-4174-019 2.0 INCH DIA. SOCKET WELDED MOCK-UP 26

FINAL REPORT OF INSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO 88-08 APPENDIX J'IQUID PENETRANT DOCUMENTATZON LOG DATA SHEET NUMBER 3.3-288 3.3-304 3.3-287 3.3-281 3.3-286 3.3-290 3.3-285 3.3-291 3.3-284 3.3-289 3.3-283 3.3-342 3.3-341 IDENTIFICATION NUMBER 3"-CH-1401-32 ELBOW 3 "-CH-1401-33 PIPE 3 n-CH-1401-34 ELBOW 3"-CH-1401-35 PIPE 3"-CH-1401-36 ELBOW 3"-CH-1401-37 2"-RC-1410-33 2"-RC-1410-34 DESCRIPTION PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE VLV. 4-313 TO PIPE PIPE TO RED.

TEE 27

t FINAL REPORT OF ZNSERVICE ZNSP CTZON NONDESTRUCTIVE EXAMINATIONS OF UNZSOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN'NO ~ 88-08 APPENDIX K ULTRASONIC EXAMINATIONDOCUMENTATZON LOG DATA SHEET NUMBER 5.4-25 IDENTIFICATION NUMBER 3"-CH-1401-32 ELBOW 3 Ii-CH-1401-33 PIPE 3"-CH-1401-34 ELBOW 3"-CH-1401-35 PIPE 3't-CH-1401-36 ELBOW 3'r-CH-1401-37 DESCRIPTION PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE BASE METAL PIPE TO ELBOW BASE METAL ELBOW TO PIPE 28

FZNAL REPORT OP ZHSZRVZCE ZNSPZCTZOH HONDESTRUCTZVZ ZXAMZNATZONS OF UNZSOLABLE PZPZHG SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE HRC BULLETZH HO 88-08 DATA SHEET NUMBER 5'9-1 2"-RC-1410-33 2"-RC-1410-34 VLV. 4-313 TO PIPE PIPE TO RED.

TEE APPENDIX K ULTRASONIC EXAMZHAT1ON DOCUMENTATION LOG IDENTIFICATION DESCRIPTION NUMBER 29

FINAL REPORT OF ZNSERVZCE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX L ENGINEERING RECOMMENDATZONS DOCUMENT NO.

SE&PT-SSAD-7814 30

FINAL REPORT OF INSERVICE INSPECTION NONDESTRUCTIVE EXAMINATIONS OF UNISOLABLE PIPING SYSTEM AND COMPONENTS FOR POTENTIAL THERMAL STRESS EFFECTS REFERENCE NRC BULLETIN NO ~ 88-08 APPENDIX M NRC BULLETIN NO ~ 88-08 NRC BULLETIN NO. 88-08 THERMAL STRESSES IN PIPING CONNECTED TO REACTOR COOLANT SYSTEMS 31

ATTACHMENT 2 Re:

Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 NRC Bulletin 88-08 Thermal Stresses in Piping Connected to Reactor Coolant S stems ITEM 3 Plan and implement 'a program to provide continuing assurance that unisolable sections of all piping connected to the RCS will not be subjected to combined cyclic and static thermal and other stresses that could cause fatigue failure during the remaining life of the

unit,

Response

FPL identified two flowpaths where the concern profile of NRC Bulletin 88-08 is applicable:

0 0

1 ~

Charging pumps to pressurizer auxiliary spray Charging pumps to C Hot Leg.

Flow Evaluation and Com arison A detailed review of the unisolable piping in the two inch auxiliary spray and the three inch charging to the C Hot Leg flowpaths, shows that thermal transients from in-leakage are unlikely to occur for the following reasons:

a)

The differential pressure across isolation valves 310B and 311 is approximately 50

psi, compared to approximately 320 psi across the leakage valve of NRC Bulletin 88-08.

b)

The auxiliary spray and charging flow is delivered, through the regenerative heat exchanger, at 493'F for steady state conditions.

For sufficiently large leakage flow (approximately.5 gpm or more), the flow is expected to remain hot.

Therefore, stratification will not significantly occur as the difference in temperatures between the two fluids will be relatively small.

c)

The piping configurations at Turkey Point Units 3 and 4

for the two flowpaths under consideration tend to minimize the potential for pipe failure related to the phenomenon described in NRC Bulletin 88-08.

For the three inch charging line this is due to the upward routing of the line into the

RCS, as opposed to the

Farley and Tihange piping routing described in the bulletin which are routed downward towards the RCS.

In addition, flow stratification would be less severe in the smaller lines (two and three inch vs. the six inch 'pipe reported in the bulletin) due to larger heat transfer around the pipe circumference.

In an effort to further substantiate the

above, FPL contracted with Westinghouse to perform a hydrodynamic test of actual plant specific geometries.

This test is described below.

H drod namic Testin Westinghouse performed hydrodynamic tests in order to assess the potential for the concerns of NRC Bulletin 88-08 at Turkey Point Units 3 and 4.

The hydrodynamic test simulated the thermal-hydraulic conditions in the flowpaths under review at Turkey Point Units 3

and 4.

The test utilized clear piping, dyed water, and actual plant dimensions.

Temperature differences were simulated by specific gravity variations in water (hot fluid) and sodium bicarbonate (cold fluid).

The geometries for both the two inch and three inch flowpaths were modeled.

The results of the flow tests show that although stratification can occur, no mixing mechanism is present for the, configuration at Turkey Point.

Hence, there is an absence of thermal cycling.

Without thermal cycling, pipe failure is not a concern.

Ins ections and 0 eratin Ex erience a)

The recently completed

NDE, showed no indication of cracks in the most susceptible locations of the unisolable sections of the two inch auxiliary spray and three inch charging lines.

b)

Turkey Point Units 3 and 4 each have over fifteen years of operating experience to date and no failures of the type described in NRC Bulletin 88-08 have occurred.

c)

NDE will also be completed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.

CONCLUSION The applicable flowpaths were examined and the locations most susceptible to in-leakage induced thermal fatigue were identified.

NDE was performed in these areas and no cracks were discovered.

The NDE technique utilized accounts for the observations and enhancements implemented at Farley.

Volumetric examinations were done on both the two inch and three inch piping sections.

A special calibration specimen and procedure were developed to implement the volumetric NDE of the two inch piping section.

Based on the flow evaluation performed, thermal transients from in-leakage are unlikely to occur even if the globe valve leaks.

This is based on the fact that a,mixing mechanism to cause thermal cycling does'ot exist as indicated by the results of the hydrodynamic testing.

The flow evaluation conclusions, in conjunction with the NDE performed on the subject flowpaths, provide assurance that the concerns of NRC Bulletin 88-08 are satisfactorily addressed.

No further actions are required, but NDE will be performed during the next refueling outage for each unit to provide additional support to the conclusions reached by the hydrodynamic testing.