ML17353A575: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:CATEGORY j.
{{#Wiki_filter:CATEGORY j.
REGULATO       INFORMATION DISTRIBUTION         'TEM (RIDS)
REGULATO INFORMATION DISTRIBUTION
ACCESSION NBR:9603060238           DOC.DATE:   96/02/27     NOTARIZED: NO           DOCKET FACIL:50-250   Turkey Point Plant, Unit       3, Florida Power and Light       C 05000250 50-251   Turkey Point Plant, Unit       4, Florida Power and Light       C 05000251 50-335   St. Lucie Plant, Unit 1,       Florida Power a Light Co.           05000335 50-389   St. Lucie Plant, Unit 2,       Florida Power & Light Co.           05000389 AUTH. NAME           AUTHOR   AFFILIATION CRAIG,K.R.           Florida   Power s Light Co.
'TEM (RIDS)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document           Control Desk)
ACCESSION NBR:9603060238 DOC.DATE: 96/02/27 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME AUTHOR AFFILIATION CRAIG,K.R.
Florida Power s Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Forwards   fitness-for-duty     program performance data       for period ending 951231.
Forwards fitness-for-duty program performance data for period ending 951231.
T DISTRIBUTION CODE: A021D         COPIES RECEIVED:LTR         ENCL       SIZE:
DISTRIBUTION CODE:
TITLE: "Semiannual Fitness       for Duty Program Performance       Rept/Data" 10CFR26.7 E NOTES:
A021D COPIES RECEIVED:LTR ENCL SIZE:
RECIPIENT           COPIES            RECjPIENT          COPIES            0 ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR ENCL PD2-1 PD                  1   1     CROTEAUiR                1     1           R NORRISgJ                  1   1 INTERNAL: ACRS                        1   1     FILE CEDER       0%     1    1 NRR/DRPM/PSGB              2    2      NRR/DSSA/SPSB           1     1 NUDOCS-ABSTRACT            1   1     RGN2                    1     1 EXTERNAL: NOAC                        1   1     NRC PDR                  1     1 D
TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" NOTES:
U NOTE TO ALL "RIDS" RECIPIENTS:
DOCKET 05000250 05000251 05000335 05000389 T
PLEASE HELP US TO REDUCE WASTE) CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR             12   ENCL   .12
10CFR26.7 E
RECIPIENT ID CODE/NAME PD2-1 PD NORRISgJ INTERNAL: ACRS NRR/DRPM/PSGB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 2
2 1
1 1
1 RECjPIENT ID CODE/NAME CROTEAUiR FILE CEDER 0%
NRR/DSSA/SPSB RGN2 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 0
R D
U NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE)
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)
TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL
.12


pp                                       Florida Power & Light Company, P.O. Box 14000, Juno Boach, FL 33408-0420 FEB   27   1996 L-96-47 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
pp Florida Power & Light Company, P.O. Box 14000, Juno Boach, FL 33408-0420 FEB 27 1996 L-96-47 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555


==Subject:==
==Subject:==
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Pro   m Performance Da Gentlemen:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Pro m Performance Da Gentlemen:
In accordance with 10 CFR 26.71(d), please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1995.
In accordance with 10 CFR 26.71(d),
please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1995.
Should you have any questions, please contact us.
Should you have any questions, please contact us.
Very truly yours, K. R. Craig Acting Vice Presi ent Nuclear Engineering and Licensing KRC/spt Attachment cc:     Stewart D. Ebneter, Regional Administrator, USNRC, Region               II Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant OgOOOS                                                                                         gP 9603060238 960227           (
Very truly yours, K. R. Craig Acting Vice Presi ent Nuclear Engineering and Licensing KRC/spt Attachment cc:
PDR     ADOCK 05000250                                                                                         \
Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant OgOOOS 9603060238 960227
R                        PDR                                                                                     (
(
an FPL Group company
PDR ADOCK 05000250 R
PDR an FPL Group company gP
\\ (


          <r 1 r
<r 1 r k
  ~4 ll k
~4ll W
      . W


Fitness for Duty Program
Fitness for Duty Program
                                                      ,Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht                                           December 31 1995 Company                                                   6 Months Ending St. Lucie Plant Location Arthur R. Cummin s                                                   407 694-3573 Contact Name                                            Phono (Inofude Area Code)
,Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht Company St. Lucie Plant Location Arthur R. Cummin s
Cutoffs: Screeruconfirmation (ng/ml)                                   0 Appendbr A to 10 CFR Part 26 Marijuana             50/10       Amphetamines       1000/500 00fy150       Phencycfir5ne         2$ 25 0 plates              SfXV300,     Afoohof (%BAG)       .04%
Contact Name December 31 1995 6 Months Ending 407 694-3573 Phono (Inofude Area Code)
LICENSEE                 LONG-TERM                         SHORT-TERM TESTING RESULTS                                                    CONTRACTOR                         CONTRACTOR EMPLOYEES PERSONNEL                          PERSONNEL Average Number with Unescorted Access                           1475                      216                                538 CATEGORIES                       &#xb9;               &#xb9;         &#xb9;                 &#xb9;               &#xb9;             &#xb9; TESTED          POSITIVE    TESTED        POSITIVE            TESTED        POSITIVE Pre-Access                                 292                                                          987              20 Post Accident For Cause Observed Behavior Random                                    421                         66                               163 Follow-up                                  49                                                            13 Other TOTAL                           764                         73                   0         1165               23
Cutoffs:
Screeruconfirmation (ng/ml) 0 Appendbr Ato 10 CFR Part 26 Marijuana 50/10 Amphetamines 1000/500 00fy150 Phencycfir5ne 2$25 0plates
: SfXV300, Afoohof (%BAG)
.04%
TESTING RESULTS LICENSEE EMPLOYEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL Average Number with Unescorted Access CATEGORIES
&#xb9; TESTED 1475
&#xb9; POSITIVE
&#xb9; TESTED 216
&#xb9; POSITIVE
&#xb9; TESTED 538
&#xb9; POSITIVE Pre-Access For Cause Random Follow-up Other Post Accident Observed Behavior 292 421 49 66 987 163 13 20 TOTAL 764 73 0
1165 23


Breakdown of Confirmed Positive Tests for Specific Substances
Breakdown of Confirmed Positive Tests for Specific Substances
                                                                              *'arijuana Amphetamines Phencycidine     Refusal     2   3 4 to Test Long-Term Contractors Short-Term Contractors       15 PSL TOTALS                   21
*'arijuana Amphetamines Phencycidine Refusal to Test 2
                        ** All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.
3 4
Long-Term Contractors Short-Term Contractors PSL TOTALS 15 21
**All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.


MANAGEMENTACTlONS ST. LUCIE PLANT Fitness for Duty Reportable Event Qn August 21, 1995, a confirmed positive random test result was received on a supervisor for Cocaine. Telephone notification to the NRC was made at 7:35pm on August 21, 1995 (from the Turkey Point Plant). The individual was selected from the St. Lucie Plant random pool and the test was conducted at the Turkey Point Plant. A review was conducted, with negative results of the Subject's past work activities for a period prior to the test.
MANAGEMENTACTlONS ST. LUCIE PLANT Fitness for Duty Reportable Event Qn August 21, 1995, a confirmed positive random test result was received on a supervisor for Cocaine.
Telephone notification to the NRC was made at 7:35pm on August 21, 1995 (from the Turkey Point Plant). The individual was selected from the St. Lucie Plant random pool and the test was conducted at the Turkey Point Plant. A review was conducted, with negative results of the Subject's past work activities for a period prior to the test.


Fitness for Duty Program Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht                                           December 31 1995 Company                                                   8 Months Ending Turke Point Plant Location Arthur R. Cummin s                                                 407 694-3573 Contact Name                                          Phone (Include Area Code)
Fitness for Duty Program Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht Company Turke Point Plant Location Arthur R. Cummin s
Cutothr: ScreenCcnfirmation (ng/ml)                                 0 Appendix A to 10 CFR Part 26 5$ 10       Amphelamines       1000/500 300/150       Phencyclidine       25/25 Optates             300300       Alcohol (%BAG)       04%
Contact Name December 31 1995 8 Months Ending 407 694-3573 Phone (Include Area Code)
LICENSEE                 LONG-TERM                         SHORT-TERM TESTING RESULTS                                                  CONTRACTOR                         CONTRACTOR EMPLOYEES PERSONNEL                          PERSONNEL Average Number with Unescorted Access                           1099                      237                                334 CATEGORIES                       &#xb9;             &#xb9;           &#xb9;                 &#xb9;               &#xb9;             &#xb9; TESTED          POSITIVE    TESTED        POSITIVE          TESTED          POSITIVE Pre-Access                               233                                                        1085              32 Post Accident                                               0 For Cause Observed Behavior Random                                  333                         81                                 83 Follow-up                                  26                                                          10 Other TOTAL                         594                         81                             1185               38
Cutothr:
ScreenCcnfirmation (ng/ml) 0 Appendix A to 10 CFR Part 26 5$10 Amphelamines 1000/500 300/150 Phencyclidine 25/25 Optates 300300 Alcohol (%BAG) 04%
TESTING RESULTS LICENSEE EMPLOYEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL Average Number with Unescorted Access CATEGORIES
&#xb9; TESTED 1099
&#xb9; POSITIVE
&#xb9; TESTED 237
&#xb9; POSITIVE
&#xb9; TESTED 334
&#xb9; POSITIVE Pre-Access For Cause Random Follow-up Other Post Accident Observed Behavior 233 333 26 0
81 1085 83 10 32 TOTAL 594 81 1185 38


Breakdown-of Confirmed Positive Tests for Specific Substances Cocatne                                            Refusal    2    3 4 to Test Ucensee Employees Long-Term Contractors Short-Term Contractors       20                                                                                Total PTN TOTALS                   21         13                                                                     42
Breakdown-of Confirmed Positive Tests for Specific Substances Ucensee Employees Long-Term Contractors Cocatne Refusal to Test 2
                                                                                                                      ~
3 4
                        ** All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.
Short-Term Contractors PTN TOTALS 20 21 13 Total 42 ~
**All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.


  ~ ~
~
      ~A MANAGENIENTACTIONS TURKEY POINT PLANT 1
~
On September 26, 1995 a data input error occurred that resulted in 11 individuals obtaining access authorization but were not entered into the Fitness for Duty/Access Authorization data system to be made available for random chemical testing. All individuals were temporary workers and when all errors were identified the individuals had left the plant due to the completion of the outage.
~ A MANAGENIENTACTIONS TURKEYPOINT PLANT 1
On September 26, 1995 a data input error occurred that resulted in 11 individuals obtaining access authorization but were not entered into the Fitness for Duty/Access Authorization data system to be made available for random chemical testing.
All individuals were temporary workers and when all errors were identified the individuals had left the plant due to the completion of the outage.
The cause was human error by the individual responsible for data input. The immediate corrective action was to have each individual's supervisor provide a written behavioral observation review. There were no behavioral observation concerns identified. Additionally, the data input process was modified to require the first access authorization entry to be made in the Fitness for Duty/Access Authorization system prior to activating the individual's authorized site access.
The cause was human error by the individual responsible for data input. The immediate corrective action was to have each individual's supervisor provide a written behavioral observation review. There were no behavioral observation concerns identified. Additionally, the data input process was modified to require the first access authorization entry to be made in the Fitness for Duty/Access Authorization system prior to activating the individual's authorized site access.


0 I}}
0 I}}

Latest revision as of 08:37, 7 January 2025

Forwards fitness-for-duty Program Performance Data for Period Ending 951231
ML17353A575
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 02/27/1996
From: Craig K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-96-47, NUDOCS 9603060238
Download: ML17353A575 (10)


Text

CATEGORY j.

REGULATO INFORMATION DISTRIBUTION

'TEM (RIDS)

ACCESSION NBR:9603060238 DOC.DATE: 96/02/27 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 50-335 St. Lucie Plant, Unit 1, Florida Power a Light Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION CRAIG,K.R.

Florida Power s Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards fitness-for-duty program performance data for period ending 951231.

DISTRIBUTION CODE:

A021D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" NOTES:

DOCKET 05000250 05000251 05000335 05000389 T

10CFR26.7 E

RECIPIENT ID CODE/NAME PD2-1 PD NORRISgJ INTERNAL: ACRS NRR/DRPM/PSGB NUDOCS-ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 2

2 1

1 1

1 RECjPIENT ID CODE/NAME CROTEAUiR FILE CEDER 0%

NRR/DSSA/SPSB RGN2 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 0

R D

U NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE)

CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL

.12

pp Florida Power & Light Company, P.O. Box 14000, Juno Boach, FL 33408-0420 FEB 27 1996 L-96-47 10 CFR 26.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Semi-Annual Fitness-For-Duty Pro m Performance Da Gentlemen:

In accordance with 10 CFR 26.71(d),

please find attached the fitness-for-duty program performance data for the six (6) month period ending December 31, 1995.

Should you have any questions, please contact us.

Very truly yours, K. R. Craig Acting Vice Presi ent Nuclear Engineering and Licensing KRC/spt Attachment cc:

Stewart D. Ebneter, Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant OgOOOS 9603060238 960227

(

PDR ADOCK 05000250 R

PDR an FPL Group company gP

\\ (

<r 1 r k

~4ll W

Fitness for Duty Program

,Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht Company St. Lucie Plant Location Arthur R. Cummin s

Contact Name December 31 1995 6 Months Ending 407 694-3573 Phono (Inofude Area Code)

Cutoffs:

Screeruconfirmation (ng/ml) 0 Appendbr Ato 10 CFR Part 26 Marijuana 50/10 Amphetamines 1000/500 00fy150 Phencycfir5ne 2$25 0plates

SfXV300, Afoohof (%BAG)

.04%

TESTING RESULTS LICENSEE EMPLOYEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL Average Number with Unescorted Access CATEGORIES

¹ TESTED 1475

¹ POSITIVE

¹ TESTED 216

¹ POSITIVE

¹ TESTED 538

¹ POSITIVE Pre-Access For Cause Random Follow-up Other Post Accident Observed Behavior 292 421 49 66 987 163 13 20 TOTAL 764 73 0

1165 23

Breakdown of Confirmed Positive Tests for Specific Substances

  • 'arijuana Amphetamines Phencycidine Refusal to Test 2

3 4

Long-Term Contractors Short-Term Contractors PSL TOTALS 15 21

    • All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.

MANAGEMENTACTlONS ST. LUCIE PLANT Fitness for Duty Reportable Event Qn August 21, 1995, a confirmed positive random test result was received on a supervisor for Cocaine.

Telephone notification to the NRC was made at 7:35pm on August 21, 1995 (from the Turkey Point Plant). The individual was selected from the St. Lucie Plant random pool and the test was conducted at the Turkey Point Plant. A review was conducted, with negative results of the Subject's past work activities for a period prior to the test.

Fitness for Duty Program Performance Data Personnel Subject to 10CFR Part 26 Florida Power & Li ht Company Turke Point Plant Location Arthur R. Cummin s

Contact Name December 31 1995 8 Months Ending 407 694-3573 Phone (Include Area Code)

Cutothr:

ScreenCcnfirmation (ng/ml) 0 Appendix A to 10 CFR Part 26 5$10 Amphelamines 1000/500 300/150 Phencyclidine 25/25 Optates 300300 Alcohol (%BAG) 04%

TESTING RESULTS LICENSEE EMPLOYEES LONG-TERM CONTRACTOR PERSONNEL SHORT-TERM CONTRACTOR PERSONNEL Average Number with Unescorted Access CATEGORIES

¹ TESTED 1099

¹ POSITIVE

¹ TESTED 237

¹ POSITIVE

¹ TESTED 334

¹ POSITIVE Pre-Access For Cause Random Follow-up Other Post Accident Observed Behavior 233 333 26 0

81 1085 83 10 32 TOTAL 594 81 1185 38

Breakdown-of Confirmed Positive Tests for Specific Substances Ucensee Employees Long-Term Contractors Cocatne Refusal to Test 2

3 4

Short-Term Contractors PTN TOTALS 20 21 13 Total 42 ~

    • All of the positive drug tests listed above exceeded the DHHS/NRC cutoff levels.

~

~

~ A MANAGENIENTACTIONS TURKEYPOINT PLANT 1

On September 26, 1995 a data input error occurred that resulted in 11 individuals obtaining access authorization but were not entered into the Fitness for Duty/Access Authorization data system to be made available for random chemical testing.

All individuals were temporary workers and when all errors were identified the individuals had left the plant due to the completion of the outage.

The cause was human error by the individual responsible for data input. The immediate corrective action was to have each individual's supervisor provide a written behavioral observation review. There were no behavioral observation concerns identified. Additionally, the data input process was modified to require the first access authorization entry to be made in the Fitness for Duty/Access Authorization system prior to activating the individual's authorized site access.

0 I