ML18003B304: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION
{{#Wiki_filter:REGULATORY INFORMATION
=-DISTRIBUTION SYSTEN (R IDS>ACCESSION NBR: 8606120202 DOC.DATE: 86/06/12 NOTARIZED:
=- DISTRIBUTION SYSTEN (R IDS>
NO DOCKET FACIL: 50-400 Sheavon Hav v is Nucleav Pomer Plant Unit 1 Cav olina 05000O00 AUTH.NANE AUTHOR AFFILIATION FAH>J.K.Affiliation Not Assigned REC IP.NANE RECIPIENT AFFILIATION DENTONp H.Office of Nuclear Reactor Regulation>
ACCESSION NBR: 8606120202 DOC. DATE: 86/06/12 NOTARIZED:
Div ectov (post 851125  
NO DOCKET FACIL:50-400 Sheavon Hav v is Nucleav Pomer Plant Unit 1
Cav olina 05000O00 AUTH. NANE AUTHOR AFFILIATION FAH> J. K.
AffiliationNot Assigned REC IP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulation>
Div ectov (post 851125


==SUBJECT:==
==SUBJECT:==
Opposes util exemption+rom requirement of full pav'ticipation emev gencg plan test within 1 gr pv'iov to OL issuance.DISTRIBVTION CODE: YECSD COPIES RECEIVED: LTR~ENCL 0 SIZE: TITLE: Request for NRR Action (e.g.2.206 Petitions>
Opposes util exemption
5 Related Correspondenc NOTES: Application fov permit v eneeal filed.05000400'EC I P I ENT ID CODE/NANE PWR-A PD2 LA BUCKLEY, B 01 COPIES LTTR E CL 1 1 RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL EDO/ACB D C FIL EXTERNAL 24X NRC PDR 04 ELD/HDS1 NRR DIR LPDR NSIC 03 05 TOTAL NVNBER OP COPIES REQVIRED: LTTR 13 ENCL  
+rom requirement of full pav'ticipation emev gencg plan test within 1 gr pv'iov to OL issuance.
~f,~~.g~"%,~>>>>I>>C~,kk>>'I 1 k>>.'I I"1>>'1>>f".>>>>">>I'I I II I ik I''1>>~r, l'l'P*">>c'."X)~>~'~>>)V'1',>>;C>>l'.")C ()'I li Il ,I 1 1 I E, I I I k~.
DISTRIBVTION CODE:
Mr.Harold Denton Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
YECSD COPIES RECEIVED: LTR
~ ENCL 0 SIZE:
TITLE: Request for NRR Action (e. g.
: 2. 206 Petitions>
5 Related Correspondenc NOTES: Application fov permit v eneeal filed.
05000400
'EC IP IENT ID CODE/NANE PWR-A PD2 LA BUCKLEY, B 01 COPIES LTTR E CL 1
1 RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL EDO/ACB D
C FIL EXTERNAL 24X NRC PDR 04 ELD/HDS1 NRR DIR LPDR NSIC 03 05 TOTAL NVNBER OP COPIES REQVIRED:
LTTR 13 ENCL
 
~ f,
~
~. g
~ "%,~
I>>C
~,kk
'I 1
k>>
.'I I
"1
>>'1
>>f I'
I I
II I
ikI''
1>>~r, l'
l'P*
c '.
"X)~>
~'~>>)
V '1',>>;
C>>
l'." )C ()
'I li Il
,I 1
1 I E, I I
I k
~.
 
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan  
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan
 
==Dear Mr. Denton,==
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
: Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
: Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved; Sincerely gu/
eye~
Sv-.
CARR8oZo, de Z, ~s/O Bb06120202 860612
: PDR, ADOCK 05000400 H,", 'DR I


==Dear Mr.Denton,==
sa
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.Clearly, any such action would further complicate this matter.At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved;Sincerely gu/eye~Sv-.CARR8oZo, de Z,~s/O Bb06120202 860612 PDR, ADOCK 05000400 H,",'DR I' sa~h l'l, c I~A'1}}
~
h l
l, c
I ~
A
'1}}

Latest revision as of 07:31, 7 January 2025

Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
ML18003B304
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/12/1986
From: Fah J
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606120202
Download: ML18003B304 (4)


Text

REGULATORY INFORMATION

=- DISTRIBUTION SYSTEN (R IDS>

ACCESSION NBR: 8606120202 DOC. DATE: 86/06/12 NOTARIZED:

NO DOCKET FACIL:50-400 Sheavon Hav v is Nucleav Pomer Plant Unit 1

Cav olina 05000O00 AUTH. NANE AUTHOR AFFILIATION FAH> J. K.

AffiliationNot Assigned REC IP. NANE RECIPIENT AFFILIATION DENTONp H.

Office of Nuclear Reactor Regulation>

Div ectov (post 851125

SUBJECT:

Opposes util exemption

+rom requirement of full pav'ticipation emev gencg plan test within 1 gr pv'iov to OL issuance.

DISTRIBVTION CODE:

YECSD COPIES RECEIVED: LTR

~ ENCL 0 SIZE:

TITLE: Request for NRR Action (e. g.

2. 206 Petitions>

5 Related Correspondenc NOTES: Application fov permit v eneeal filed.

05000400

'EC IP IENT ID CODE/NANE PWR-A PD2 LA BUCKLEY, B 01 COPIES LTTR E CL 1

1 RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL EDO/ACB D

C FIL EXTERNAL 24X NRC PDR 04 ELD/HDS1 NRR DIR LPDR NSIC 03 05 TOTAL NVNBER OP COPIES REQVIRED:

LTTR 13 ENCL

~ f,

~

~. g

~ "%,~

I>>C

~,kk

'I 1

k>>

.'I I

"1

>>'1

>>f I'

I I

II I

ikI

1>>~r, l'

l'P*

c '.

"X)~>

~'~>>)

V '1',>>;

C>>

l'." )C ()

'I li Il

,I 1

1 I E, I I

I k

~.

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan

Dear Mr. Denton,

Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.

This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved; Sincerely gu/

eye~

Sv-.

CARR8oZo, de Z, ~s/O Bb06120202 860612

PDR, ADOCK 05000400 H,", 'DR I

sa

~

h l

l, c

I ~

A

'1