ML18003B324: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:REGU   TORY INFORNATION       DISTRIBU     N SYSTEH <R IDB>
{{#Wiki_filter:REGU TORY INFORNATION DISTRIBU N SYSTEH
ACCESSION NDR: 8606160028         DOC. DATE:   86/06/11     NOTARIZED: NO           DOCKET FACIL: 50-400 Shearon     Harris Nuclear     PoUer   Planti Unit   ii Carolina   '05000400 AUTH. NAME           AUTHOR AFFILIATION RILEY'.             Affiliation Not   Assigned RECIP. NANE         RECIPIENT AFFILIATION DENTONp H.           Office of Nuclear Reactor Regulation. Director (post             851125
<R IDB>
ACCESSION NDR: 8606160028 DOC. DATE: 86/06/11 NOTARIZED:
NO DOCKET FACIL:50-400 Shearon Harris Nuclear PoUer Planti Unit ii Carolina
'05000400 AUTH. NAME AUTHOR AFFILIATION RILEY'.
Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulation.
Director (post 851125


==SUBJECT:==
==SUBJECT:==
Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.
Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.
DISTRIBUTION CODE: YE03D       COPIEB RECEIVED: LTR     Q   ENCL   ~ SI ZE:
DISTRIBUTION CODE:
TITLE: Request   for NRR   Action (e. g. Z. 206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal +iled.                                         05000400 RECIPIENT         COPIEB              RECIPIENT          COP IES ID CODE/NAl'1E     LTTR E  CL'        ID CODE/MANE        LTTR ENCL PWR-A PD2 LA                             PAR-A PD2 PD gUCNLEY, 8       01 INTERNAL: EDO/ACH                                   ELD/HDSi ELD/                                     NRR DIR 04 EXTERNAL: 24X                                       LPDR          03 NRC PDR         02                     NSIC           05 TOT*L NUNOER OF COPTEB REQUIRED: LTTR             12   ENCL
YE03D COPIEB RECEIVED: LTR Q ENCL ~
SI ZE:
TITLE: Request for NRR Action (e. g.
Z. 206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal +iled.
05000400 RECIPIENT ID CODE/NAl'1E PWR-A PD2 LA gUCNLEY, 8 01 INTERNAL: EDO/ACH ELD/
04 COPIEB LTTR E CL' RECIPIENT ID CODE/MANE PAR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOT*L NUNOER OF COPTEB REQUIRED:
LTTR 12 ENCL


0 4'
0 4'
  " 0 C
0 C
I 1
I C
C
1
                    '" tl II II
'" tl II II


Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (301) 492-7000
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear           plant, Carolina Power       & Light, Emergency Plan
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan


==Dear Mr. Denton,==
==Dear Mr. Denton,==
 
1 Carolina Power
Light Company has not conducted a full 1
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris
Carolina Power          &
: nuclear, plant as required by federal regulation, 10 CFR Part 50.
participation test of the present emergency plan for the Shearon     Harris nuclear, plant as required by federal regulation, 10 CFR Part 50.                                                         F This is most         significant since           Chatham     County,   by formal action of the Board of Commissioners, has withdrawn from the emergency plan.             Thus, no plan which could actually be implemented if the plant were to operate has been tested.
F This is most significant since Chatham
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
: Thus, no plan which could actually be implemented if the plant were to operate has been tested.
Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
Clearly, any such action would further complicate this matter.
: Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
Sincerely, H-,
full participation test within one year prior to the granting of any full power license should be considered or approved.
l'606160028 860611 PDR   ADOCK   05000400 PDR
Sincerely, l'606160028 860611 PDR ADOCK 05000400 H-,
        /
PDR
/
/vl
/0 lpi%
V/ 7
V/ 7
          ~  j
/'fl It/lllJ.
                /vl
~ j
                    /'fl
<]l
                  <]l
)lP//l
          /l;o p<Jt,
/l;o p<Jt, RIM/L
                          /0    lpi%
<<l~ (l~~l /pl l
It/lllJ.
//PPl/gl(
                          )lP//l RIM/L l/II Al(
/~~l l/IIJ
l J
/i/
                                              'n9
klan p i/
                                            //PPl/gl(
/pi Ep pl /f i/i/p Al('n9
                                              / i/
'/ll
klan p
                                                            <<l~
                                                            /~~l i/ /pi (l~~l /pl Ep pl
                                                                            /f i/ i/p
                                                                                          '/ll


        ~,I 0 ~ Q A}}
0
~,I
~Q A}}

Latest revision as of 07:31, 7 January 2025

Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
ML18003B324
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1986
From: Riley K
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160028
Download: ML18003B324 (4)


Text

REGU TORY INFORNATION DISTRIBU N SYSTEH

<R IDB>

ACCESSION NDR: 8606160028 DOC. DATE: 86/06/11 NOTARIZED:

NO DOCKET FACIL:50-400 Shearon Harris Nuclear PoUer Planti Unit ii Carolina

'05000400 AUTH. NAME AUTHOR AFFILIATION RILEY'.

Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.

Office of Nuclear Reactor Regulation.

Director (post 851125

SUBJECT:

Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.

DISTRIBUTION CODE:

YE03D COPIEB RECEIVED: LTR Q ENCL ~

SI ZE:

TITLE: Request for NRR Action (e. g.

Z. 206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal +iled.

05000400 RECIPIENT ID CODE/NAl'1E PWR-A PD2 LA gUCNLEY, 8 01 INTERNAL: EDO/ACH ELD/

04 COPIEB LTTR E CL' RECIPIENT ID CODE/MANE PAR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOT*L NUNOER OF COPTEB REQUIRED:

LTTR 12 ENCL

0 4'

0 C

I C

1

'" tl II II

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power

& Light, Emergency Plan

Dear Mr. Denton,

1 Carolina Power

& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris

nuclear, plant as required by federal regulation, 10 CFR Part 50.

F This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely, l'606160028 860611 PDR ADOCK 05000400 H-,

PDR

/

/vl

/0 lpi%

V/ 7

/'fl It/lllJ.

~ j

<]l

)lP//l

/l;o p<Jt, RIM/L

<<l~ (l~~l /pl l

//PPl/gl(

/~~l l/IIJ

/i/

klan p i/

/pi Ep pl /f i/i/p Al('n9

'/ll

0

~,I

~Q A