ML18003B324: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/11/1986
| issue date = 06/11/1986
| title = Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
| title = Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
| author name = RILEY K
| author name = Riley K
| author affiliation = AFFILIATION NOT ASSIGNED
| author affiliation = AFFILIATION NOT ASSIGNED
| addressee name = DENTON H
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, PUBLIC ENTITY/CITIZEN/ORGANIZATION/MEDIA TO NRC
| page count = 4
| page count = 4
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:REGU TORY INFORNATION DISTRIBU N SYSTEH<R IDB>ACCESSION NDR: 8606160028 DOC.DATE: 86/06/11 NOTARIZED:
{{#Wiki_filter:REGU TORY INFORNATION DISTRIBU N SYSTEH
NO DOCKET FACIL: 50-400 Shearon Harris Nuclear PoUer Planti Unit ii Carolina'05000400 AUTH.NAME AUTHOR AFFILIATION RILEY'.Affiliation Not Assigned RECIP.NANE RECIPIENT AFFILIATION DENTONp H.Office of Nuclear Reactor Regulation.
<R IDB>
Director (post 851125  
ACCESSION NDR: 8606160028 DOC. DATE: 86/06/11 NOTARIZED:
NO DOCKET FACIL:50-400 Shearon Harris Nuclear PoUer Planti Unit ii Carolina
'05000400 AUTH. NAME AUTHOR AFFILIATION RILEY'.
Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regulation.
Director (post 851125


==SUBJECT:==
==SUBJECT:==
Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.DISTRIBUTION CODE: YE03D COPIEB RECEIVED: LTR Q ENCL~SI ZE: TITLE: Request for NRR Action (e.g.Z.206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal+iled.05000400 RECIPIENT ID CODE/NAl'1E PWR-A PD2 LA gUCNLEY, 8 01 INTERNAL: EDO/ACH ELD/04 COPIEB LTTR E CL'RECIPIENT ID CODE/MANE PAR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOT*L NUNOER OF COPTEB REQUIRED: LTTR 12 ENCL 0 4'" 0 C I C 1'" tl II II Mr.Harold Denton Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.
DISTRIBUTION CODE:
YE03D COPIEB RECEIVED: LTR Q ENCL ~
SI ZE:
TITLE: Request for NRR Action (e. g.
Z. 206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal +iled.
05000400 RECIPIENT ID CODE/NAl'1E PWR-A PD2 LA gUCNLEY, 8 01 INTERNAL: EDO/ACH ELD/
04 COPIEB LTTR E CL' RECIPIENT ID CODE/MANE PAR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOT*L NUNOER OF COPTEB REQUIRED:
LTTR 12 ENCL
 
0 4'
0 C
I C
1
'" tl II II
 
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear plant, Carolina Power&Light, Emergency Plan  
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
 
==Dear Mr. Denton,==
1 Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris
: nuclear, plant as required by federal regulation, 10 CFR Part 50.
F This is most significant since Chatham
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
: Thus, no plan which could actually be implemented if the plant were to operate has been tested.
Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
: Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, l'606160028 860611 PDR ADOCK 05000400 H-,
PDR
/
/vl
/0 lpi%
V/ 7
/'fl It/lllJ.
~ j
<]l
)lP//l
/l;o p<Jt, RIM/L
<<l~ (l~~l /pl l
//PPl/gl(
/~~l l/IIJ
/i/
klan p i/
/pi Ep pl /f i/i/p Al('n9
'/ll


==Dear Mr.Denton,==
0
1 Carolina Power&Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear, plant as required by federal regulation, 10 CFR Part 50.F This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.Clearly, any such action would further complicate this matter.At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.Sincerely,l'606160028 860611 PDR ADOCK 05000400 H-, PDR//vl/0 lpi%V/7/'fl It/lll J.~j<]l)lP//l/l;o p<Jt, RIM/L<<l~(l~~l/pl l//PPl/gl(/~~l l/II J/i/klan p i//pi Ep pl/f i/i/p Al('n9'/ll 0~,I~Q A}}
~,I
~Q A}}

Latest revision as of 07:31, 7 January 2025

Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
ML18003B324
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1986
From: Riley K
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160028
Download: ML18003B324 (4)


Text

REGU TORY INFORNATION DISTRIBU N SYSTEH

<R IDB>

ACCESSION NDR: 8606160028 DOC. DATE: 86/06/11 NOTARIZED:

NO DOCKET FACIL:50-400 Shearon Harris Nuclear PoUer Planti Unit ii Carolina

'05000400 AUTH. NAME AUTHOR AFFILIATION RILEY'.

Affiliation Not Assigned RECIP. NANE RECIPIENT AFFILIATION DENTONp H.

Office of Nuclear Reactor Regulation.

Director (post 851125

SUBJECT:

Opposes util exemption from requirement of full participation emergency plan test within 1 gr prior to QL issuance.

DISTRIBUTION CODE:

YE03D COPIEB RECEIVED: LTR Q ENCL ~

SI ZE:

TITLE: Request for NRR Action (e. g.

Z. 206 Petitions) fc Related Correspondenc NOTES: Application for permit renewal +iled.

05000400 RECIPIENT ID CODE/NAl'1E PWR-A PD2 LA gUCNLEY, 8 01 INTERNAL: EDO/ACH ELD/

04 COPIEB LTTR E CL' RECIPIENT ID CODE/MANE PAR-A PD2 PD ELD/HDSi NRR DIR COP IES LTTR ENCL EXTERNAL: 24X NRC PDR 02 LPDR NSIC 03 05 TOT*L NUNOER OF COPTEB REQUIRED:

LTTR 12 ENCL

0 4'

0 C

I C

1

'" tl II II

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power

& Light, Emergency Plan

Dear Mr. Denton,

1 Carolina Power

& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris

nuclear, plant as required by federal regulation, 10 CFR Part 50.

F This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

Zn addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely, l'606160028 860611 PDR ADOCK 05000400 H-,

PDR

/

/vl

/0 lpi%

V/ 7

/'fl It/lllJ.

~ j

<]l

)lP//l

/l;o p<Jt, RIM/L

<<l~ (l~~l /pl l

//PPl/gl(

/~~l l/IIJ

/i/

klan p i/

/pi Ep pl /f i/i/p Al('n9

'/ll

0

~,I

~Q A