| title = Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
| title = Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
| author name = SCHUMANN S C
| author name = Schumann S
| author affiliation = AFFILIATION NOT ASSIGNED
| author affiliation = AFFILIATION NOT ASSIGNED
| addressee name = DENTON H
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000400
| docket = 05000400
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:REQ TORY INFORt'lATION DISTR IBU N SYBTEN (R IDB)ACCESSION NBR: 8606160092 DOC.DATE: 86/06/11 NOTARIZED:
{{#Wiki_filter:REQ TORY INFORt'lATION DISTR IBU N SYBTEN (R IDB)
NO DOCNET 5 FAC IL: 50-400 Shearon Harri s Nuclear Power Plant>Unit 1>Carolina 05000400 AUTH.NANE AUTHOR AFFILIATION SCHUNANN>S.C.Affiliation Not Ass.igned RECIP.NAl'1E RECIPIENT AFFILIATION DENTON>H.Office of Nuclear Reactor Regulation>
ACCESSION NBR: 8606160092 DOC. DATE: 86/06/11 NOTARIZED:
Director<post 851125  
NO DOCNET 5 FAC IL:50-400 Shearon Harri s Nuclear Power Plant>
Unit 1> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION SCHUNANN> S. C.
AffiliationNot Ass.igned RECIP. NAl'1E RECIPIENT AFFILIATION DENTON> H.
Office of Nuclear Reactor Regulation>
Director <post 851125


==SUBJECT:==
==SUBJECT:==
Opposes util exemption+rom requirement of full parti c gapa'tion emergenc Q p lan test within 1 gl pri 0'r to QL issuance.DISTRIBUTION CODE: YEODD COPIES RECEIVED: LTR i ENCL Q SIZE:~TITLE: Request for NRR Action (e.g.2.206 Petitions) 8c Related Correspondenc NOTES:Application for permit renewal filed.05000400 REC IP I ENT ID, CODE/MANE PNR-A PD2 LA BUCKLEY>8 01 INTERNAL: EDO/ACB ELD/RED COP IEB LTTR E 1 CL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR'CL LTTR E COPIES EXTERNAL 24X NRC PDR 02 LPDR NBIC 03 05 TOTAL NUl'lBER OF COPIES REQUIRED:--
Opposes util exemption +rom requirement of full parti c gapa'tion emergenc Q
LTTR 12 ENCL  
p lan test within 1 gl pri 0'r to QL issuance.
~y><'i H'f>>".4 1 A'q11"K"'$~)'5/I A',, i I'll~t l ll E JgP'fJyC$'f'Ill I"'')'l$j t'g Ii<<,e n P.'.'":~f: P,Q,'j'ei'9C'>)I~I,~l',!.,CZi"x T.3D-.~R i i.."',0"r 1 4 (>>~$:Q:>(,'~'i)
DISTRIBUTION CODE:
P b.D4<'w'3 kk!l I 4 (5i1 1 fi I,'tt I"'I H'~l 4)'">(*i.A i 1g sK"~)'(tl),tl<<'i)ri'g j'~(,~g ht Mr.Harold Denton Director, Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 (301)492-7000  
YEODD COPIES RECEIVED: LTR i ENCL Q SIZE:~
TITLE: Request for NRR Action (e. g.
: 2. 206 Petitions) 8c Related Correspondenc NOTES:Application for permit renewal filed.
05000400 REC IP IENT ID, CODE/MANE PNR-A PD2 LA BUCKLEY>8 01 INTERNAL: EDO/ACB ELD/RED COP IEB LTTR E 1
CL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR
'CL LTTR E COPIES EXTERNAL 24X NRC PDR 02 LPDR NBIC 03 05 TOTAL NUl'lBER OF COPIES REQUIRED:-- LTTR 12 ENCL
 
~
y
> <'i H
'f > >".
4 1
A' q11 "K"'$
~
)
5/
I A',, i I' ll
~t l
ll E
JgP fJyC
$ 'f '
Ill I"
)'l $j t'g Ii<<,e n
P.'.'":
~
f: P,Q,'j
'ei '9 C'> )
I
~ I,~
l',!.,CZi"x T.3D-.~R i
i.."',0 "r 1
4
(
>>~$ :Q:>(,'~'i)
P b.D4 w'3 kk!
l I 4 (5i1 1 fi I,'ttI"'I H '~l 4
) '">(*i.
A i 1g sK
"~)'(
tl
),tl
<<'i) ri 'g j'
~ (,
~
g ht
 
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000


==Subject:==
==Subject:==
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan  
Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan


==Dear Mr.Denton,==
==Dear Mr. Denton,==
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.This is most significant since Chatham County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.Thus, no plan which could actually be implemented if the plant were to operate has been tested.In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.Clearly, any such action would further complicate this matter.At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a full participation test within one year prior to the granting of any full power license should be considered or approved.Sincerely,'60b160092 8b0611 PDR ADOCK 05000400 H PDR gy5 if'}}
Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.
This is most significant since Chatham
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
: Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
: Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely,
'60b160092 8b0611 PDR ADOCK 05000400 H
PDR gy5 if'}}

Latest revision as of 07:31, 7 January 2025

Opposes Util Exemption from Requirement of Full Participation Emergency Plan Test within 1 Yr Prior to OL Issuance
ML18003B339
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/11/1986
From: Stacy Schumann
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8606160092
Download: ML18003B339 (3)


Text

REQ TORY INFORt'lATION DISTR IBU N SYBTEN (R IDB)

ACCESSION NBR: 8606160092 DOC. DATE: 86/06/11 NOTARIZED:

NO DOCNET 5 FAC IL:50-400 Shearon Harri s Nuclear Power Plant>

Unit 1> Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION SCHUNANN> S. C.

AffiliationNot Ass.igned RECIP. NAl'1E RECIPIENT AFFILIATION DENTON> H.

Office of Nuclear Reactor Regulation>

Director <post 851125

SUBJECT:

Opposes util exemption +rom requirement of full parti c gapa'tion emergenc Q

p lan test within 1 gl pri 0'r to QL issuance.

DISTRIBUTION CODE:

YEODD COPIES RECEIVED: LTR i ENCL Q SIZE:~

TITLE: Request for NRR Action (e. g.

2. 206 Petitions) 8c Related Correspondenc NOTES:Application for permit renewal filed.

05000400 REC IP IENT ID, CODE/MANE PNR-A PD2 LA BUCKLEY>8 01 INTERNAL: EDO/ACB ELD/RED COP IEB LTTR E 1

CL RECIPIENT ID CODE/NANE PWR-A PD2 PD ELD/HDS1 NRR DIR

'CL LTTR E COPIES EXTERNAL 24X NRC PDR 02 LPDR NBIC 03 05 TOTAL NUl'lBER OF COPIES REQUIRED:-- LTTR 12 ENCL

~

y

> <'i H

'f > >".

4 1

A' q11 "K"'$

~

)

5/

I A',, i I' ll

~t l

ll E

JgP fJyC

$ 'f '

Ill I"

)'l $j t'g Ii<<,e n

P.'.'":

~

f: P,Q,'j

'ei '9 C'> )

I

~ I,~

l',!.,CZi"x T.3D-.~R i

i.."',0 "r 1

4

(

>>~$ :Q:>(,'~'i)

P b.D4 w'3 kk!

l I 4 (5i1 1 fi I,'ttI"'I H '~l 4

) '">(*i.

A i 1g sK

"~)'(

tl

),tl

<<'i) ri 'g j'

~ (,

~

g ht

Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 (301) 492-7000

Subject:

Shearon Harris nuclear plant, Carolina Power 6 Light, Emergency Plan

Dear Mr. Denton,

Carolina Power 6 Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CPR Part 50.

This is most significant since Chatham

County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
Thus, no plan which could actually be implemented if the plant were to operate has been tested.

In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.

Clearly, any such action would further complicate this matter.

At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a

full participation test within one year prior to the granting of any full power license should be considered or approved.

Sincerely,