ML18003B344: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = | | author name = | ||
| author affiliation = AFFILIATION NOT ASSIGNED | | author affiliation = AFFILIATION NOT ASSIGNED | ||
| addressee name = | | addressee name = Denton H | ||
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | | addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR) | ||
| docket = 05000400 | | docket = 05000400 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:RE('UL%'ORY INFQRNATION DISTRIBUTE | {{#Wiki_filter:RE('UL%'ORY INFQRNATION DISTRIBUTE 'YSTEN (R IDS> | ||
'YSTEN (R IDS>ACCESSIQN NBR: 8606160175 DOC.DATE: 86/06/16. | ACCESSIQN NBR: 8606160175 DOC. DATE: 86/06/16 | ||
NANE | . NOTARIZED: | ||
NO DOCKET ¹ FACIL:50-400 Sheav on Hav v is Nuclear Pouer Planti Unit ii Cav olina 05000400'UTH. | |||
NANE AUTHOR AFFILIATION Affiliation Not Assigned RECIP. NANE | |||
'ECIPIENT AFFILIATION DENTONp H. | |||
Office of Nuclear Reactor Regul ationi Direc tor (p ost 851125 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Oppo ses util exemption fv om requirement of full pav'ticipation emev gencg plan test within 1 gr of QL 1 5 suan c e.DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL SI ZE: TITLE: Request fov'RR Action (e.g.2.206 Petitions) i%Related Corv'espondenc NOTES: Application fov permit v eneual Filed.05000400 REC | Oppo ses util exemption fv om requirement of full pav'ticipation emev gencg plan test within 1 gr of QL 1 5 suan c e. | ||
'~>>,V" E,"" | DISTRIBUTION CODE: | ||
YE03D COPIES RECEIVED: LTR ENCL SI ZE: | |||
TITLE: Request fov'RR Action (e. g. | |||
: 2. 206 Petitions) i% Related Corv'espondenc NOTES: Application fov permit v eneual Filed. | |||
05000400 REC IP IENT ID CODE/NANE PMR-A PD2 LA BUCKLEY, B Oi COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL'DO/ACB ELD/RED EXTERNAL: 24X NRC PDR 04 ELD/HDS1 NRR DIR LPDR NSIC 03 05 TOTAL NUi~fBER OF COPIES REQUIRED: | |||
LTTR 12 ENCL I | |||
'~>>,V"E,"" | |||
3,'I I | |||
"t~ | |||
)I v) 'W= | |||
VV<i)i | |||
":W'Og) l)'~* ' | |||
) | |||
v | |||
~ ) | |||
W I | |||
>>~W A | |||
()J '"<<=i | |||
)ttl V r | |||
<<,') "> j! | |||
f'"i'f) | |||
Itl), | |||
<< I'I V | |||
) I)tl')>> | |||
I I | |||
il | |||
~ | |||
p>> | |||
)tI') ) jj)'>>" ):t. | |||
) ~ | |||
V | |||
.W)'' | |||
)tg | |||
) | |||
) ) (.) I V) | |||
<<. )fA LW ]Lp | |||
',", ~ | |||
~ | |||
VP 4 )).I, V' | |||
9" W, | |||
~ | |||
t. | |||
I II f f + | |||
'l g | |||
I I, t I I | |||
vlf jt | |||
.,!<<" '3 0r jl | |||
) | |||
i )<<3 F').t | |||
)Sl <<c>>" | |||
j Jli >>W k It g,t W | |||
V',iJ:9 V, >><<,tt It | |||
) | |||
j | |||
~, | |||
V t | |||
II v | |||
.'V C) ll | |||
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. | |||
20555 (301) 492-7000 | |||
==Subject:== | ==Subject:== | ||
Shearon Harris nuclear plant, Carolina Power&Light, Emergency Plan | Shearon Harris nuclear plant, Carolina Power | ||
& Light, Emergency Plan | |||
==Dear Mr. Denton,== | |||
Carolina Power | |||
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50. | |||
This is most significant since Chatham | |||
: County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan. | |||
: Thus, no plan which could actually be implemented if the plant were to operate has been tested. | |||
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan. | |||
: Clearly, any such action would further complicate this matter. | |||
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a | |||
full participation test within one year prior to the granting of any full power license should be considered or approved. | |||
Sincerely, r f. | |||
~, | |||
8606160175 860616 PDR ADOCK '05000400 M | |||
PDR go6 b | |||
V~ | |||
elf | |||
) | |||
I "s'~x. '<<'~}} | |||
Latest revision as of 07:31, 7 January 2025
| ML18003B344 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/16/1986 |
| From: | AFFILIATION NOT ASSIGNED |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8606160175 | |
| Download: ML18003B344 (4) | |
Text
RE('UL%'ORY INFQRNATION DISTRIBUTE 'YSTEN (R IDS>
ACCESSIQN NBR: 8606160175 DOC. DATE: 86/06/16
. NOTARIZED:
NO DOCKET ¹ FACIL:50-400 Sheav on Hav v is Nuclear Pouer Planti Unit ii Cav olina 05000400'UTH.
NANE AUTHOR AFFILIATION Affiliation Not Assigned RECIP. NANE
'ECIPIENT AFFILIATION DENTONp H.
Office of Nuclear Reactor Regul ationi Direc tor (p ost 851125
SUBJECT:
Oppo ses util exemption fv om requirement of full pav'ticipation emev gencg plan test within 1 gr of QL 1 5 suan c e.
DISTRIBUTION CODE:
YE03D COPIES RECEIVED: LTR ENCL SI ZE:
TITLE: Request fov'RR Action (e. g.
- 2. 206 Petitions) i% Related Corv'espondenc NOTES: Application fov permit v eneual Filed.
05000400 REC IP IENT ID CODE/NANE PMR-A PD2 LA BUCKLEY, B Oi COPIES LTTR ENCL RECIPIENT ID CODE/NANE PWR-A PD2 PD COPIES LTTR ENCL INTERNAL'DO/ACB ELD/RED EXTERNAL: 24X NRC PDR 04 ELD/HDS1 NRR DIR LPDR NSIC 03 05 TOTAL NUi~fBER OF COPIES REQUIRED:
LTTR 12 ENCL I
'~>>,V"E,""
3,'I I
"t~
)I v) 'W=
VV<i)i
":W'Og) l)'~* '
)
v
~ )
W I
>>~W A
()J '"<<=i
)ttl V r
<<,') "> j!
f'"i'f)
Itl),
<< I'I V
) I)tl')>>
I I
il
~
p>>
)tI') ) jj)'>>" ):t.
) ~
V
.W)
)tg
)
) ) (.) I V)
<<. )fA LW ]Lp
',", ~
~
VP 4 )).I, V'
9" W,
~
t.
I II f f +
'l g
I I, t I I
vlf jt
.,!<<" '3 0r jl
)
i )<<3 F').t
)Sl <<c>>"
j Jli >>W k It g,t W
V',iJ:9 V, >><<,tt It
)
j
~,
V t
II v
.'V C) ll
Mr. Harold Denton Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 (301) 492-7000
Subject:
Shearon Harris nuclear plant, Carolina Power
& Light, Emergency Plan
Dear Mr. Denton,
Carolina Power
& Light Company has not conducted a full participation test of the present emergency plan for the Shearon Harris nuclear plant as required by federal regulation, 10 CFR Part 50.
This is most significant since Chatham
- County, by formal action of the Board of Commissioners, has withdrawn from the emergency plan.
- Thus, no plan which could actually be implemented if the plant were to operate has been tested.
In addition, citizens and officials in other counties are considering withdrawing from the present emergency plan.
- Clearly, any such action would further complicate this matter.
At least until such time as state and local governmental participation in an emergency plan for Shearon Harris is fully resolved, no exemption(s) from the requirement of a
full participation test within one year prior to the granting of any full power license should be considered or approved.
Sincerely, r f.
~,
8606160175 860616 PDR ADOCK '05000400 M
PDR go6 b
V~
elf
)
I "s'~x. '<<'~