ML18009A863: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERATED DI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | {{#Wiki_filter:ACCELERATED DI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
.ACCESSION NBR: 9104170016 DOC. DATE: 91/04/10 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION FLOYD,S.D. | |||
RECIP.NAME | Carolina Power 6 Light Co. | ||
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | |||
DOCKET 05000400 R | |||
D | |||
/ | |||
05000400 NOTES:Application for permit renewal filed. | |||
==SUBJECT:== | ==SUBJECT:== | ||
Forwards retyped Tech Spec pages to support 901228 application for amend to License NPF-63.Amend revises action requirements associated w/TS 3.1.2.2,3.1.2.4 6 3.7.1.1 re | Forwards retyped Tech Spec pages to support 901228 application for amend to License NPF-63.Amend revises action requirements associated w/TS 3.1.2.2,3.1.2.4 6 3.7.1.1 re flow paths operating | ||
DISTRIBUTION CODE: A001D | & charging pumps operating. | ||
TITLE: | DISTRIBUTION CODE: | ||
A001D COPIES RECEIVED:LTR ENCL SIZE: | |||
INTERNAL: ACRS | TITLE: OR Submittal: | ||
General Distribution REC1PIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1 | |||
1 2 | |||
2 6 | |||
6 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
0 1 | |||
1 1 | |||
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC LFMB 01 NSIC COPIES LTTR ENCL 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
1 1 | |||
0 1 | |||
1 1 | |||
1 D | |||
D S | |||
D NOTE TO ALL"RIDS" RECIPIENTS: | |||
D D | D D | ||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: | |||
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED: LTTR | LTTR 24 ENCL 22 | ||
1 Pl, | 0 0 | ||
p' | 1 Pl, P p' a | ||
Carolina Power 8 Light Company APR10 tggl SERIAL: | Carolina Power 8 Light Company APR10 tggl SERIAL: | ||
RETYPED TECHNICAL SPECIFICATION PAGES LIMITING CONDITION FOR OPERATION ACTION REQUIREMENTS Gentlemen: | NLS-91-100 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO ~ NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES LIMITING CONDITION FOR OPERATION ACTION REQUIREMENTS Gentlemen: | ||
On December | On December 28, 1990, Carolina Power | ||
Please refer any questions regarding | & Light Company requested revisions to the Shearon Harris Nuclear Power Plant (SHNPP), Unit 1, Technical Specifications (TS). | ||
Yours very | The proposed amendment revises the Action Requirements associated with TS 3.1.2.2; 3.1.2.4, and-3.7.1.1. | ||
Enclosure cc: | Enclosure 1 provides the | ||
: retyped, amendment bar pages for your convenience in issuance of the proposed Technical Specification change. | |||
Please refer any questions regarding this submitt:al to Mr. J. | |||
H. Eads at (919) 546-4165. | |||
Yours very truly, Manager Nuclear Licensing Section SDF/lmr (shnpp-lco) | |||
Enclosure cc: | |||
Mr. R. A. Becker Mr. S. | |||
D. Ebneter Mr. J. | |||
E. Tedrow 411 Fayetteville Street | |||
+ P. O. 8ox 1551 o Raleigh, N. C. 27602 9i04i700ib 9i04i0 PDR ADOCK 05000400 I | |||
P PDR | |||
'0 C | |||
0 ~ .i ~}} | 0 ~.i | ||
~}} | |||
Latest revision as of 06:51, 7 January 2025
| ML18009A863 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 04/10/1991 |
| From: | Floyd S CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML18009A864 | List: |
| References | |
| NLS-91-100, NUDOCS 9104170016 | |
| Download: ML18009A863 (4) | |
Text
ACCELERATED DI REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
.ACCESSION NBR: 9104170016 DOC. DATE: 91/04/10 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION FLOYD,S.D.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000400 R
D
/
05000400 NOTES:Application for permit renewal filed.
SUBJECT:
Forwards retyped Tech Spec pages to support 901228 application for amend to License NPF-63.Amend revises action requirements associated w/TS 3.1.2.2,3.1.2.4 6 3.7.1.1 re flow paths operating
& charging pumps operating.
DISTRIBUTION CODE:
A001D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
General Distribution REC1PIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB 7E NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 6
6 1
1 1
1 1
1 1
1 1
0 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD NRR/DET/ECMB 9H NRR/DOEA/OTSB11 NRR/DST/SELB 8D NRR/DST/SRXB 8E OC LFMB 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
0 1
1 1
1 D
D S
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDI TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 22
0 0
1 Pl, P p' a
Carolina Power 8 Light Company APR10 tggl SERIAL:
NLS-91-100 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO ~ NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES LIMITING CONDITION FOR OPERATION ACTION REQUIREMENTS Gentlemen:
On December 28, 1990, Carolina Power
& Light Company requested revisions to the Shearon Harris Nuclear Power Plant (SHNPP), Unit 1, Technical Specifications (TS).
The proposed amendment revises the Action Requirements associated with TS 3.1.2.2; 3.1.2.4, and-3.7.1.1.
Enclosure 1 provides the
- retyped, amendment bar pages for your convenience in issuance of the proposed Technical Specification change.
Please refer any questions regarding this submitt:al to Mr. J.
H. Eads at (919) 546-4165.
Yours very truly, Manager Nuclear Licensing Section SDF/lmr (shnpp-lco)
Enclosure cc:
Mr. R. A. Becker Mr. S.
D. Ebneter Mr. J.
E. Tedrow 411 Fayetteville Street
+ P. O. 8ox 1551 o Raleigh, N. C. 27602 9i04i700ib 9i04i0 PDR ADOCK 05000400 I
P PDR
'0 C
0 ~.i
~