ML18082A288: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:** * .pu£s 800602 0 365 \ Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406  
{{#Wiki_filter:**
c;6N?'~.pu£s 800602 0 365  
\\
Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406  


==Dear Mr. Grier:==
==Dear Mr. Grier:==
NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION ?Y .. <? .In response to NRG Bulletin 79-27, dated November 30, 1979, an
NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION  
* interim-report was made to the* NRG on February 26 ,. 1980 with a *connnitment that a final report would be accomplished by October 1, 1980. A new connnitment date for a report to the NRC concerning this bulletin has been developed.
~1~
The response date will be July 1, 1980. The information which will be.transmitted to the staff will include the following:
?Y.. <?  
* 1. The results of the analysis and reviews of systems necessary to achieve cold
.In response to NRG Bulletin 79-27, dated November 30, 1979, an
: 2. A schedule for implementing any required design modifications.
* interim-report was made to the* NRG on February 26,. 1980 with a  
: 3. Information pertaining to any required operating procedure revisions.  
*connnitment that a final report would be accomplished by October 1, 1980.
*
A new connnitment date for a report to the NRC concerning this bulletin has been developed.
* Mr. Boyce H. Grier 3/26/80 4. The results of a re-review of station inverters originally required by IE Circular 79-02. Sincerely, CC: Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector . Hanc_ocks Bridge, N. J.}}
The response date will be July 1, 1980.
The information which will be.transmitted to the staff will include the following:
: 1.
The results of the analysis and reviews of systems necessary to achieve cold shutdown~
: 2.
A schedule for implementing any required design modifications.
: 3.
Information pertaining to any required operating procedure revisions.  
 
Mr. Boyce 3/26/80
: 4.
The results of a re-review of station inverters originally required by IE Circular 79-02.
Sincerely, CC:
Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector  
. Hanc_ocks Bridge, N. J.}}

Latest revision as of 06:43, 6 January 2025

Updates 791130 Interim Response to IE Bulletin 79-27. New Commitment Date for Final Rept Is 800701
ML18082A288
Person / Time
Site: Salem  
Issue date: 03/26/1980
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-27, NUDOCS 8005020365
Download: ML18082A288 (2)


Text

c;6N?'~.pu£s 800602 0 365

\\

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION

~1~

?Y.. <?

.In response to NRG Bulletin 79-27, dated November 30, 1979, an

  • interim-report was made to the* NRG on February 26,. 1980 with a
  • connnitment that a final report would be accomplished by October 1, 1980.

A new connnitment date for a report to the NRC concerning this bulletin has been developed.

The response date will be July 1, 1980.

The information which will be.transmitted to the staff will include the following:

1.

The results of the analysis and reviews of systems necessary to achieve cold shutdown~

2.

A schedule for implementing any required design modifications.

3.

Information pertaining to any required operating procedure revisions.

Mr. Boyce 3/26/80

4.

The results of a re-review of station inverters originally required by IE Circular 79-02.

Sincerely, CC:

Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector

. Hanc_ocks Bridge, N. J.