Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406 | |||
==Dear Mr. Grier:== | ==Dear Mr. Grier:== | ||
NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION ?Y .. <? .In response to NRG Bulletin 79-27, dated November 30, 1979, an | NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION | ||
* interim-report was made to the* NRG on February 26 ,. 1980 with a *connnitment that a final report would be accomplished by October 1, 1980. A new connnitment date for a report to the NRC concerning this bulletin has been developed. | ~1~ | ||
The response date will be July 1, 1980. The information which will be.transmitted to the staff will include the following: | ?Y.. <? | ||
.In response to NRG Bulletin 79-27, dated November 30, 1979, an | |||
: 2. A schedule for implementing any required design modifications. | * interim-report was made to the* NRG on February 26,. 1980 with a | ||
: 3. Information pertaining to any required operating procedure revisions. | *connnitment that a final report would be accomplished by October 1, 1980. | ||
A new connnitment date for a report to the NRC concerning this bulletin has been developed. | |||
The response date will be July 1, 1980. | |||
The information which will be.transmitted to the staff will include the following: | |||
: 1. | |||
The results of the analysis and reviews of systems necessary to achieve cold shutdown~ | |||
: 2. | |||
A schedule for implementing any required design modifications. | |||
: 3. | |||
Information pertaining to any required operating procedure revisions. | |||
Mr. Boyce 3/26/80 | |||
: 4. | |||
The results of a re-review of station inverters originally required by IE Circular 79-02. | |||
Sincerely, CC: | |||
Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector | |||
. Hanc_ocks Bridge, N. J.}} | |||
Latest revision as of 06:43, 6 January 2025
| ML18082A288 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/26/1980 |
| From: | Schneider F Public Service Enterprise Group |
| To: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| IEB-79-27, NUDOCS 8005020365 | |
| Download: ML18082A288 (2) | |
Text
c;6N?'~.pu£s 800602 0 365
\\
Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Mr. Grier:
NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION
~1~
?Y.. <?
.In response to NRG Bulletin 79-27, dated November 30, 1979, an
- interim-report was made to the* NRG on February 26,. 1980 with a
- connnitment that a final report would be accomplished by October 1, 1980.
A new connnitment date for a report to the NRC concerning this bulletin has been developed.
The response date will be July 1, 1980.
The information which will be.transmitted to the staff will include the following:
- 1.
The results of the analysis and reviews of systems necessary to achieve cold shutdown~
- 2.
A schedule for implementing any required design modifications.
- 3.
Information pertaining to any required operating procedure revisions.
Mr. Boyce 3/26/80
- 4.
The results of a re-review of station inverters originally required by IE Circular 79-02.
Sincerely, CC:
Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector
. Hanc_ocks Bridge, N. J.