Updates 791130 Interim Response to IE Bulletin 79-27. New Commitment Date for Final Rept Is 800701
ML18082A288
Person / Time
Site: Salem  
Issue date: 03/26/1980
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-27, NUDOCS 8005020365
Download: ML18082A288 (2)


Text

c;6N?'~.pu£s 800602 0 365

\\

Frederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-7373 Production Mr. Boyce H. Grier, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Connnission Region l 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC BULLETIN NO. 79-27 LOSS. OF NON-CLASS 1-E INSTRUMENTATION March 26, 1980 AND CONTROL POWER SYSTEM BUS DURING OPERATION NO. 1 AND 2 UNITS SALEM GENERATING STATION

~1~

?Y.. <?

.In response to NRG Bulletin 79-27, dated November 30, 1979, an

  • interim-report was made to the* NRG on February 26,. 1980 with a
  • connnitment that a final report would be accomplished by October 1, 1980.

A new connnitment date for a report to the NRC concerning this bulletin has been developed.

The response date will be July 1, 1980.

The information which will be.transmitted to the staff will include the following:

1.

The results of the analysis and reviews of systems necessary to achieve cold shutdown~

2.

A schedule for implementing any required design modifications.

3.

Information pertaining to any required operating procedure revisions.

Mr. Boyce 3/26/80

4.

The results of a re-review of station inverters originally required by IE Circular 79-02.

Sincerely, CC:

Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.. C. 20555 Mr. L. J. Norrholm, NRC Resident Inspector