ML18092A869: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*---------- _____ o--_----~--*---~-**-----*---*--.:..-*- - - , -
{{#Wiki_filter:*---------- _____
PROPOSED CHANGE TO                                                             LCR 85-20 TECHNICAL SPECIFICATIONS UNIT NOS.- 1 AND 2 Description of Change In Table 3.3-10 of Section 3/4.3 of the Technical Specifications, increase the number of installed detectors and minimum required operabl~ for the Control Room Area as .shown* on the attached pag,e revisions.
o--_----~--*---~-**-----*---*--.:..-*- --,-
Reason for Change Our original commitment in response to Appendix R was to add fire detection capabilities to the peripheral areas of the tontrol Room. This commitment was subsequently determined to*be unnecessary on the basis that those areas that were continuously occupied did not require fire detection capabilities. This -
___ -_. __ -._._-_-_-_-___ -_ -... _-_ ---=---------------====--------------_ -_-__ -__ -_-___ -__ -_-___ -_ -_-__ -__ -__ -_ - __ ----
resulted in the addition of detectors to the Auxiliary Equipment Room only. As a result of an NRC inspection, it was concluded that this did not completely address 10CFRSO Appendix R requirements. Therefore, additional detectors have been added to the peripheral areas of the Control Room resulting in -the changes
PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS UNIT NOS.- 1 AND 2 Description of Change LCR 85-20 In Table 3.3-10 of Section 3/4.3 of the Technical Specifications, increase the number of installed detectors and minimum required operabl~ for the Control Room Area as.shown* on the attached pag,e revisions.
(~             to the Technical Specifications described above.
Reason for Change Our original commitment in response to Appendix R was to add fire detection capabilities to the peripheral areas of the tontrol Room.
  \
This commitment was subsequently determined to*be unnecessary on the basis that those areas that were continuously occupied did not require fire detection capabilities.
SIGNIFICANT HAZARDS CONSIDERATION EVALUATION This change constitutes an additional limitation, in that it adds additional fire detection instruments to a table of instruments required to be OPERABLE. This corresponds to example (ii) of the guidance provided by the Commission, in Federal Register 48FR14870, for Amendments That Are Considered Not Likely To Involve Significant Hazards Considerations.
This -
Based on the above, and on our determination that operation of the Salem plant with the requested changes in place would not increase the probability or consequences of any previously analyzed acc:tdent, would not_ create the possibility for any new accident, and, by adding-additional instrumentation to detect fires, will increase the margin of safety, we deem that this change does not involve a significant hazards consideration.
resulted in the addition of detectors to the Auxiliary Equipment Room only.
                  ~                         951016
As a result of an NRC inspection, it was concluded that this did not completely address 10CFRSO Appendix R requirements.
(     8510220354 5000272 I     PDR ADOCK 0                   PDR I     p
Therefore, additional detectors have been added to the peripheral areas of the Control Room resulting in -the changes
(~
to the Technical Specifications described above.  
\\
SIGNIFICANT HAZARDS CONSIDERATION EVALUATION This change constitutes an additional limitation, in that it adds additional fire detection instruments to a table of instruments required to be OPERABLE.
This corresponds to example (ii) of the guidance provided by the Commission, in Federal Register 48FR14870, for Amendments That Are Considered Not Likely To Involve Significant Hazards Considerations.
Based on the above, and on our determination that operation of the Salem plant with the requested changes in place would not increase the probability or consequences of any previously analyzed acc:tdent, would not_ create the possibility for any new accident, and, by adding-additional instrumentation to detect fires, will increase the margin of safety, we deem that this change does not involve a significant hazards consideration.  
~
951016
(
8510220354 5000272 I
PDR ADOCK 0 PDR I
p  


--------*---------'~-----**--                   *-* ---**---*----*-------.....: _____ --- -------------------- ------* -- -**---
--------*---------'~-----**-- *-* ---**---*----*-------.....: _____ --- -------------------- ------* ---**---
\\- *:--..
..J
** "1
\\-
(~-~**,
(~-~**,
              ..J
{ :. *. -l
                        \-
\\ - *.**
                          "1
/
                                    ..\-
' \\
* TABLE 3.3-10 I.
\\
I
(
{ :. *. -l                                                                        FIRE DETECTION INSTRUMENTS
TABLE 3.3-10 FIRE DETECTION INSTRUMENTS Mini 111Jm Installed Installed.
  \ ""* --**.**
Instrument Instrument Location Thermal Snoke o*PERABLE*
Mini 111Jm Installed                   Installed . Instrument Instrument Location                                 Thermal                       Snoke     o*PERABLE*
1 ~
1 ~
* Containment**
* Containment**
Main Coolant Pumps
Main Coolant Pumps  
                                                #11                                                                               4           3
#11 4
                                                #12                                                                               4           3
3  
                                                #13                                                                               4           3
#12 4
                                                #14                                                                               4           3
3  
: 2. Control Room A.       Control Room and Corridor Ceiling Void Space                                                             12           8 B.       Control Console                                                         2           1
#13 4
: c.       Aux. Equip. Room and Corridor                                           13           8 D.       Computer Room
3  
* 2           1
#14 4
: 3. Cable Vaults
3
  /          '\
: 2. Control Room A. Control Room and Corridor Ceiling Void Space 12 8
  \          -;                                #lC&D el 113                                                                     3           2
B. Control Console 2
                                                #2A&B el 113                                                                     3           2
1
                                                #2C&D el 113                                                                     3           2
: c. Aux. Equip. Room and Corridor 13 8
: 4.     Switchgear Rooms A. Relay Room *el 100                                                           18         16 B.       Switch gear el 84                                                     18         16
D.
: c.       Vital Bus             el 64                                           18         16 D.       El ec. Pent el 78                                                     13         11
Computer Room
: 5.     Battery Rooms A.       #tA     125     V el 100                   2                                         1
* 2 1
                                              .B ~       #1     250     V el 100                     3                                         2
: 3. Cable Vaults  
: c.       #lB     125     V el 100                   2                                         1 O'.       #lC     125     V el 64                     2                                         1
#lC&D el 113 3
: 6.     Diesel Generators.
2  
A. #1A                                                 5                                         4 B.       #lB                                         5                                         4
#2A&B el 113 3
: c.       #lC                                         5                                         4
2  
(                                              *The fire detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.
#2C&D el 113 3
SALEM - UNIT 1                                                   3/4 '3-51}}
2
: 4. Switchgear Rooms A.
Relay Room *el 100 18 16 B. Switch gear el 84 18 16
: c. Vital Bus el 64 18 16 D.
El ec. Pent el 78 13 11
: 5. Battery Rooms A.  
#tA 125 V el 100 2
1  
.B ~  
#1 250 V el 100 3
2
: c. #lB 125 V el 100 2
1 O'.  
#lC 125 V el 64 2
1
: 6. Diesel Generators.
A.  
#1A 5
4 B.  
#lB 5
4
: c. #lC 5
4  
*The fire detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.
SALEM - UNIT 1 3/4 '3-51 I.}}

Latest revision as of 04:23, 6 January 2025

Proposed Tech Specs Incorporating Fire Detection Instrument Operability
ML18092A869
Person / Time
Site: Salem 
Issue date: 10/16/1985
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A868 List:
References
NUDOCS 8510220354
Download: ML18092A869 (2)


Text

  • ---------- _____

o--_----~--*---~-**-----*---*--.:..-*- --,-

___ -_. __ -._._-_-_-_-___ -_ -... _-_ ---=---------------====--------------_ -_-__ -__ -_-___ -__ -_-___ -_ -_-__ -__ -__ -_ - __ ----

PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS UNIT NOS.- 1 AND 2 Description of Change LCR 85-20 In Table 3.3-10 of Section 3/4.3 of the Technical Specifications, increase the number of installed detectors and minimum required operabl~ for the Control Room Area as.shown* on the attached pag,e revisions.

Reason for Change Our original commitment in response to Appendix R was to add fire detection capabilities to the peripheral areas of the tontrol Room.

This commitment was subsequently determined to*be unnecessary on the basis that those areas that were continuously occupied did not require fire detection capabilities.

This -

resulted in the addition of detectors to the Auxiliary Equipment Room only.

As a result of an NRC inspection, it was concluded that this did not completely address 10CFRSO Appendix R requirements.

Therefore, additional detectors have been added to the peripheral areas of the Control Room resulting in -the changes

(~

to the Technical Specifications described above.

\\

SIGNIFICANT HAZARDS CONSIDERATION EVALUATION This change constitutes an additional limitation, in that it adds additional fire detection instruments to a table of instruments required to be OPERABLE.

This corresponds to example (ii) of the guidance provided by the Commission, in Federal Register 48FR14870, for Amendments That Are Considered Not Likely To Involve Significant Hazards Considerations.

Based on the above, and on our determination that operation of the Salem plant with the requested changes in place would not increase the probability or consequences of any previously analyzed acc:tdent, would not_ create the possibility for any new accident, and, by adding-additional instrumentation to detect fires, will increase the margin of safety, we deem that this change does not involve a significant hazards consideration.

~

951016

(

8510220354 5000272 I

PDR ADOCK 0 PDR I

p


*---------'~-----**-- *-* ---**---*----*-------.....: _____ --- -------------------- ------* ---**---

\\- *:--..

..J

    • "1

\\-

(~-~**,

{ :. *. -l

\\ - *.**

/

' \\

\\

(

TABLE 3.3-10 FIRE DETECTION INSTRUMENTS Mini 111Jm Installed Installed.

Instrument Instrument Location Thermal Snoke o*PERABLE*

1 ~

  • Containment**

Main Coolant Pumps

  1. 11 4

3

  1. 12 4

3

  1. 13 4

3

  1. 14 4

3

2. Control Room A. Control Room and Corridor Ceiling Void Space 12 8

B. Control Console 2

1

c. Aux. Equip. Room and Corridor 13 8

D.

Computer Room

  • 2 1
3. Cable Vaults
  1. lC&D el 113 3

2

  1. 2A&B el 113 3

2

  1. 2C&D el 113 3

2

4. Switchgear Rooms A.

Relay Room *el 100 18 16 B. Switch gear el 84 18 16

c. Vital Bus el 64 18 16 D.

El ec. Pent el 78 13 11

5. Battery Rooms A.
  1. tA 125 V el 100 2

1

.B ~

  1. 1 250 V el 100 3

2

c. #lB 125 V el 100 2

1 O'.

  1. lC 125 V el 64 2

1

6. Diesel Generators.

A.

  1. 1A 5

4 B.

  1. lB 5

4

c. #lC 5

4

  • The fire detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.

SALEM - UNIT 1 3/4 '3-51 I.