ML18114A828: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18114A828 | | number = ML18114A828 | ||
| issue date = 04/24/2018 | | issue date = 04/24/2018 | ||
| title = Opportunity to Review and Comment on an NRC Information Collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR Part 54 (3150-0155) | | title = NRR E-mail Capture - Opportunity to Review and Comment on an NRC Information Collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR Part 54 (3150-0155) | ||
| author name = Brady B | | author name = Brady B | ||
| author affiliation = NRC/NRR/DMLR | | author affiliation = NRC/NRR/DMLR | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:1 NRR-DMPSPEm Resource From: | ||
Brady, Bennett Sent: | |||
Tuesday, April 24, 2018 3:40 PM To: | |||
'john.hufnagel@exeloncorp.com' | |||
==Subject:== | |||
Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155) | |||
Attachments: | |||
NRC-2017-0213-0002.pdf | |||
: John, The Nuclear Regulatory Commission recently published a Federal Register Notice announcing our intent to submit information collection requests to the Office of Management and Budget (OMB) for 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. A supporting statement describing the requested information and burden estimates are available at http://regulations.gov by searching docket NRC-2017-0213. | |||
As a potential respondent to this information collection, we are interested in your feedback. Specifically, we are seeking input on the following questions by June 12, 2018: | |||
: 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? | |||
: 2. Is the burden estimate accurate? | |||
: 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? | |||
: 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology? | |||
Comments can be submitted by going to http://www.regulations.gov and searching for Docket No. NRC-2017-0213. Please note that comments will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed. | |||
Bennett M. Brady Senior Project Manager Division of License Renewal Office of Nuclear Reactor Regulation O 11 - D8 301-415-2981 | |||
Hearing Identifier: | |||
NRR_DMPS Email Number: | |||
314 Mail Envelope Properties (Bennett.Brady@nrc.gov20180424154000) | |||
==Subject:== | |||
Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155) | |||
Sent Date: | |||
4/24/2018 3:40:22 PM Received Date: | |||
4/24/2018 3:40:00 PM From: | |||
Brady, Bennett Created By: | |||
Bennett.Brady@nrc.gov Recipients: | |||
"'john.hufnagel@exeloncorp.com'" <john.hufnagel@exeloncorp.com> | |||
Tracking Status: None Post Office: | |||
Files Size Date & Time MESSAGE 1680 4/24/2018 3:40:00 PM NRC-2017-0213-0002.pdf 221666 Options Priority: | |||
Standard Return Notification: | |||
No Reply Requested: | |||
No Sensitivity: | |||
Normal Expiration Date: | |||
Recipients Received: | |||
initial operating license and a 20-year | 16134 Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices license renewals in 2018, 2019, and 2020. Subsequent License Renewal is a term referring to all license renewals allowing a plant to operate beyond the 60-year period (40-year period of an initial operating license and a 20-year period of the first license renewal). | ||
Based on a survey conducted by the nuclear power industry, the NRC staff believes that additional applications for subsequent license renewal will be submitted in future years. | |||
period of the first license renewal). | The NRC has developed and published final guidance for licensees that intend to apply for subsequent license renewal. The guidance documents for subsequent license renewal (i.e., for operation from 60 to 80 years), NUREG-2191, the Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, and NUREG-2192, the Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (SRP-SLR), | ||
address the issues for increased operating time from 60 to 80 years. The guidance also considers recent operating experience identified since the release of GALL Report, Rev. 2. The GALL-SLR Report and SRP-SLR also include changes that have been previously issued for public comment as part of the staffs license renewal Interim Staff Guidance (ISG) process. These ISGs can be found at http://www.nrc.gov/reading-rm/doc-collections/isg/license-renewal.html. These ISGs (ML12286A275, ML11297A085, ML12138A296, ML12270A436, ML12044A215, ML12352A057, ML13227A361, ML15308A018, and ML16237A383) have been incorporated into the GALL-SLR Report and the associated sections of the SRP-SLR. The NRC has previously received public comments on these ISGs, and is not requesting additional comments on the ISGs. | |||
Based on a survey conducted by the | A notice of availability and request for comments on draft NUREG-2191 and draft NUREG-2192 was published in the Federal Register on December 23, 2015 (80 FR 79956). The public comment period ended on February 29, 2016. The NRC received over 500 comments on these draft guidance documents. The NRC also published a supplement to the draft guidance documents in the Federal Register on March 29, 2016 (81 FR 17500). The public comment period on the supplements to draft NUREG-2191 and draft NUREG-2192 ended May 31, 2016. The NRC reviewed and dispositioned all of the comments and published the disposition of the comments and the technical bases for their disposition in companion NUREG documents, which are being published at this time, NUREG-2221, Technical Bases for Changes in the Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192, and NUREG-2222, Disposition of Public Comments on the Draft Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192. The NRCs resolution of these comments are incorporated in the final SLR guidance documents, NUREG-2191 and NUREG-2192. | ||
Dated at Rockville, Maryland, this 10th day of April 2018. | |||
nuclear power industry, the NRC staff | |||
believes that additional applications for | |||
subsequent license renewal will be | |||
submitted in future years. | |||
The NRC has developed and published final guidance for licensees | |||
that intend to apply for subsequent | |||
license renewal. The guidance | |||
documents for subsequent license | |||
renewal (i.e., for operation from 60 to 80 years), NUREG-2191, the Generic | |||
Aging Lessons Learned for Subsequent | |||
License Renewal (GALL-SLR) Report, | |||
and NUREG-2192, the Standard | |||
Review Plan for Review of Subsequent | |||
License Renewal Applications for | |||
Nuclear Power Plants (SRP-SLR), | |||
address the issues for increased | |||
operating time from 60 to 80 years. The | |||
guidance also considers recent operating | |||
experience identified since the release | |||
of GALL Report, Rev. 2. The GALL-SLR | |||
Report and SRP-SLR also include | |||
changes that have been previously | |||
issued for public comment as part of the | |||
staffs license renewal Interim Staff | |||
Guidance (ISG) process. These ISGs can | |||
be found at http://www.nrc.gov/reading-rm/doc-collections/isg/license- | |||
renewal.html. | |||
These ISGs (ML12286A275, ML11297A085, ML12138A296, ML12270A436, ML12044A215, ML12352A057, ML13227A361, ML15308A018, and | |||
ML16237A383) have been incorporated | |||
into the GALL-SLR Report and the | |||
associated sections of the SRP-SLR. The | |||
NRC has previously received public | |||
comments on these ISGs, and is not | |||
requesting additional comments on the | |||
ISGs. A notice of availability and request for comments on draft NUREG-2191 and | |||
draft NUREG-2192 was published in the | |||
Federal Register on December 23, 2015 (80 FR 79956). The public comment | |||
period ended on February 29, 2016. The | |||
NRC received over 500 comments on | |||
these draft guidance documents. The | |||
NRC also published a supplement to the | |||
draft guidance documents in the | |||
Federal Register on March 29, 2016 (81 FR 17500). The public comment period | |||
on the supplements to draft NUREG- | |||
2191 and draft NUREG-2192 ended May | |||
31, 2016. The NRC reviewed and | |||
dispositioned all of the comments and | |||
published the disposition of the | |||
comments and the technical bases for their disposition in companion NUREG | |||
documents, which are being published at this time, NUREG-2221, Technical Bases for Changes in the Subsequent | |||
License Renewal Guidance Documents | |||
NUREG-2191 and NUREG-2192, and | |||
NUREG-2222, Disposition of Public | |||
Comments on the Draft Subsequent | |||
License Renewal Guidance Documents | |||
NUREG-2191 and NUREG-2192. The | |||
NRCs resolution of these comments are | |||
incorporated in the final SLR guidance documents, NUREG-2191 and NUREG-2192. Dated at Rockville, Maryland, this 10th day of April 2018. | |||
For the Nuclear Regulatory Commission. | For the Nuclear Regulatory Commission. | ||
Eric R. Oesterle, Chief, License Renewal Project Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation. | Eric R. Oesterle, Chief, License Renewal Project Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation. | ||
| Line 148: | Line 66: | ||
BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION | BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION | ||
[NRC-2017-0213] | [NRC-2017-0213] | ||
Information Collection: Requirements | Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. | ||
for Renewal of Operating Licenses for | |||
Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. | |||
ACTION: Renewal of existing information collection; request for comment. | ACTION: Renewal of existing information collection; request for comment. | ||
==SUMMARY== | ==SUMMARY== | ||
: The U.S. Nuclear Regulatory Commission (NRC) invites public | : The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of the Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. | ||
DATES: Submit comments by June 12, 2018. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date. | |||
ADDRESSES: You may submit comments by any of the following methods: | |||
* Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0213. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287-9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. | |||
* Mail comments to: David Cullison, Office of the Chief Information Officer, Mail Stop: T-5 F53, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. | |||
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document. | |||
FOR FURTHER INFORMATION CONTACT: | |||
David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: INFOCOLLECTS.Resource@ | |||
NRC.GOV. | |||
SUPPLEMENTARY INFORMATION: | |||
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2017-0213 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods: | |||
* Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0213. | |||
* NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/ | |||
adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The supporting statement for part 54 of title 10 of the Code of Federal Regulations (10 CFR), Requirements for Renewal of Operating Licenses for Nuclear Power Plants, is available in ADAMS under Package Accession No. ML17310A926. | |||
* NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. | |||
* NRCs Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting NRCs Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: INFOCOLLECTS.Resource@ | |||
NRC.GOV. | |||
B. Submitting Comments Please include Docket ID NRC-2017-0213 in the subject line of your comment submission in order to ensure that the NRC is able to make your VerDate Sep<11>2014 17:41 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\\FR\\FM\\13APN1.SGM 13APN1 daltland on DSKBBV9HB2PROD with NOTICES | |||
16135 Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices 1 15 U.S.C. 78s(b)(1). | |||
2 17 CFR 240.19b-4. | 2 17 CFR 240.19b-4. | ||
3 15 U.S.C. 78s(b)(3)(A). | 3 15 U.S.C. 78s(b)(3)(A). | ||
4 17 CFR 240.19b-4(f)(6)(iii). | 4 17 CFR 240.19b-4(f)(6)(iii). | ||
comment submission available to the public in this docket. | comment submission available to the public in this docket. | ||
The NRC cautions you not to include identifying or contact information in | The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at http:// | ||
www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information. | |||
comment submissions that you do not | If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. | ||
Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS. | |||
want to be publicly disclosed in your | II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. | ||
Chapter 35), the NRC is requesting public comment on its intention to request the OMBs approval for the information collection summarized below: | |||
comment submission. All comment | : 1. The title of the information collection: 10 CFR part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. | ||
: 2. OMB approval number: 3150-0155. | |||
submissions are posted at http://www.regulations.gov and entered into ADAMS. Comment submissions are not | : 3. Type of submission: Extension. | ||
routinely edited to remove identifying | |||
or contact information. | |||
If you are requesting or aggregating comments from other persons for | |||
submission to the NRC, then you should | |||
inform those persons not to include | |||
identifying or contact information that | |||
they do not want to be publicly | |||
disclosed in their comment submission. | |||
Your request should state that the NRC | |||
does not routinely edit comment | |||
submissions to remove such information | |||
before making the comment | |||
submissions available to the public or | |||
entering the comment submissions into | |||
ADAMS. II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. | |||
Chapter 35), the NRC is requesting | |||
public comment on its intention to | |||
request the OMBs approval for the | |||
information collection summarized | |||
10 CFR part 54, Requirements for Renewal of Operating | |||
Licenses for Nuclear Power Plants. | |||
: 2. OMB approval number: | |||
3150-0155. | |||
: 3. Type of submission: | |||
Extension. | |||
: 4. The form number, if applicable: | : 4. The form number, if applicable: | ||
Not applicable. | Not applicable. | ||
: 5. How often the collection is required or requested: | : 5. How often the collection is required or requested: There is a one-time application for any licensee wishing to renew the operating license for its nuclear power plant. There is a one-time requirement for each licensee with a renewed operating license to submit a letter documenting the completion of inspection and testing activities. All holders of renewed licenses must perform yearly record keeping. | ||
There is a one-time application for any licensee wishing to | : 6. Who will be required or asked to respond: Commercial nuclear power plant licensees who wish to renew their operating licenses and holders of renewed licenses. | ||
: 7. The estimated number of annual responses: 66 (8 reporting responses + | |||
renew the operating license for its | |||
nuclear power plant. There is a one-time | |||
requirement for each licensee with a | |||
renewed operating license to submit a | |||
letter documenting the completion of | |||
inspection and testing activities. All | |||
holders of renewed licenses must | |||
perform yearly record keeping. | |||
: 6. Who will be required or asked to respond: Commercial nuclear power plant licensees who wish to renew their | |||
operating licenses and holders of | |||
renewed licenses. | |||
: 7. The estimated number of annual responses: | |||
66 (8 reporting responses + | |||
58 recordkeepers). | 58 recordkeepers). | ||
: 8. The estimated number of annual respondents: | : 8. The estimated number of annual respondents: 6. | ||
: | : 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 226,320 (168,320 hours reporting + 58,000 hours recordkeeping). | ||
: 10. Abstract: Part 54 of 10 CFR establishes license renewal requirements for commercial nuclear power plants and describes the information that licensees must submit to the NRC when applying for a license renewal. The application must contain information on how the licensee will manage the detrimental effects of age-related degradation on certain plant systems, structures, and components so as to continue the plants safe operation during the renewal term. The NRC needs this information to determine whether the licensees actions will be effective in assuring the plants continued safe operation during the period of extended operation. Holders of renewed licenses must retain in an auditable and retrievable form, for the term of the renewed operating license, all information and documentation required to document compliance with 10 CFR part 54. The NRC needs access to this information for continuing effective regulatory oversight. | |||
information collection requirement or | |||
request: 226,320 (168,320 hours reporting + 58,000 hours recordkeeping). | |||
: 10. Abstract: | |||
Part 54 of 10 CFR establishes license renewal | |||
requirements for commercial nuclear | |||
power plants and describes the | |||
information that licensees must submit | |||
to the NRC when applying for a license | |||
renewal. The application must contain | |||
information on how the licensee will | |||
manage the detrimental effects of age- | |||
related degradation on certain plant | |||
systems, structures, and components so | |||
as to continue the plants safe operation during the renewal term. The NRC needs this information to determine | |||
whether the licensees actions will be | |||
effective in assuring the plants | |||
continued safe operation during the | |||
period of extended operation. Holders of | |||
renewed licenses must retain in an | |||
auditable and retrievable form, for the | |||
term of the renewed operating license, all information and documentation | |||
required to document compliance with | |||
10 CFR part 54. The NRC needs access | |||
to this information for continuing | |||
effective regulatory oversight. | |||
III. Specific Requests for Comments The NRC is seeking comments that address the following questions: | III. Specific Requests for Comments The NRC is seeking comments that address the following questions: | ||
: 1. Is the proposed collection of information necessary for the NRC to | : 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility? | ||
properly perform its functions? Does the | |||
information have practical utility? | |||
: 2. Is the estimate of the burden of the information collection accurate? | : 2. Is the estimate of the burden of the information collection accurate? | ||
: 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? | : 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected? | ||
: 4. How can the burden of the information collection on respondents | : 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology? | ||
be minimized, including the use of automated collection techniques or other forms of information technology? | |||
Dated at Rockville, Maryland, this 10th day of April 2018. | Dated at Rockville, Maryland, this 10th day of April 2018. | ||
For the Nuclear Regulatory Commission. | For the Nuclear Regulatory Commission. | ||
| Line 418: | Line 123: | ||
BILLING CODE 7590-01-P SECURITIES AND EXCHANGE COMMISSION | BILLING CODE 7590-01-P SECURITIES AND EXCHANGE COMMISSION | ||
[Release No. 34-83022; File No. SR-CboeEDGX-2018-012] | [Release No. 34-83022; File No. SR-CboeEDGX-2018-012] | ||
Self-Regulatory Organizations; Cboe EDGX Exchange, Inc.; Notice of Filing | Self-Regulatory Organizations; Cboe EDGX Exchange, Inc.; Notice of Filing and Immediate Effectiveness of a Proposed Rule Change To Modify Rule 21.9 of the Exchanges Rules and Related Functionality Applicable to the Routing Options Made Available by the Exchanges Equity Options Platform April 9, 2018. | ||
Pursuant to Section 19(b)(1) of the Securities Exchange Act of 1934 (the Act),1 and Rule 19b-4 thereunder,2 notice is hereby given that on April 9, 2018, Cboe EDGX Exchange, Inc. (the Exchange) filed with the Securities and Exchange Commission (Commission) the proposed rule change as described in Items I and II below, which Items have been prepared by the Exchange. The Exchange has designated this proposal as a non-controversial proposed rule change pursuant to Section 19(b)(3)(A) of the Act 3 and Rule 19b-4(f)(6)(iii) thereunder,4 which renders it effective upon filing with the Commission. The Commission is publishing this notice to solicit comments on the proposed rule change from interested persons. | |||
and Immediate Effectiveness of a | I. Self-Regulatory Organizations Statement of the Terms of Substance of the Proposed Rule Change The Exchange filed a proposal to modify Rule 21.9 of Exchanges rules and related functionality applicable to the routing options made available by the Exchanges equity options platform (EDGX Options). | ||
The text of the proposed rule change is available at the Exchanges website at www.markets.cboe.com, at the principal office of the Exchange, and at the Commissions Public Reference Room. | |||
Proposed Rule Change To Modify Rule | II. Self-Regulatory Organizations Statement of the Purpose of, and Statutory Basis for, the Proposed Rule Change In its filing with the Commission, the Exchange included statements concerning the purpose of and basis for the proposed rule change and discussed any comments it received on the proposed rule change. The text of these statements may be examined at the places specified in Item IV below. The Exchange has prepared summaries, set VerDate Sep<11>2014 19:04 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\\FR\\FM\\13APN1.SGM 13APN1 daltland on DSKBBV9HB2PROD with NOTICES}} | ||
21.9 of the Exchanges Rules and | |||
Related Functionality Applicable to the | |||
Routing Options Made Available by the | |||
Exchanges Equity Options Platform April 9, 2018. | |||
Pursuant to Section 19(b)(1) of the Securities Exchange Act of 1934 (the | |||
Act), 1 and Rule 19b-4 thereunder, 2 notice is hereby given that on April 9, 2018, Cboe EDGX Exchange, Inc. (the | |||
Exchange) filed with the Securities | |||
and Exchange Commission | |||
(Commission) the proposed rule | |||
change as described in Items I and II | |||
below, which Items have been prepared | |||
by the Exchange. The Exchange has | |||
designated this proposal as a non- | |||
controversial proposed rule change | |||
pursuant to Section 19(b)(3)(A) of the | |||
Act 3 and Rule 19b-4(f)(6)(iii) thereunder, 4 which renders it effective upon filing with the Commission. The | |||
Commission is publishing this notice to | |||
solicit comments on the proposed rule | |||
change from interested persons. | |||
I. Self-Regulatory Organizations Statement of the Terms of Substance of | |||
the Proposed Rule Change The Exchange filed a proposal to modify Rule 21.9 of Exchanges rules | |||
and related functionality applicable to | |||
the routing options made available by | |||
the Exchanges equity options platform | |||
(EDGX Options). | |||
The text of the proposed rule change is available at the Exchanges website at | |||
www.markets.cboe.com, at the principal office of the Exchange, and at the | |||
Commissions Public Reference Room. | |||
II. Self-Regulatory Organizations Statement of the Purpose of, and | |||
Statutory Basis for, the Proposed Rule | |||
Change In its filing with the Commission, the Exchange included statements | |||
concerning the purpose of and basis for | |||
the proposed rule change and discussed | |||
any comments it received on the | |||
proposed rule change. The text of these statements may be examined at the places specified in Item IV below. The Exchange has prepared summaries, set VerDate Sep<11>2014 19:04 Apr 12, | |||
Latest revision as of 23:29, 5 January 2025
| ML18114A828 | |
| Person / Time | |
|---|---|
| Issue date: | 04/24/2018 |
| From: | Bennett Brady Division of Materials and License Renewal |
| To: | Hufnagel J Exelon Corp |
| Shared Package | |
| ML17310A926 | List: |
| References | |
| 3150-0155, NRC-2017-0213 | |
| Download: ML18114A828 (4) | |
Text
1 NRR-DMPSPEm Resource From:
Brady, Bennett Sent:
Tuesday, April 24, 2018 3:40 PM To:
'john.hufnagel@exeloncorp.com'
Subject:
Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155)
Attachments:
NRC-2017-0213-0002.pdf
- John, The Nuclear Regulatory Commission recently published a Federal Register Notice announcing our intent to submit information collection requests to the Office of Management and Budget (OMB) for 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. A supporting statement describing the requested information and burden estimates are available at http://regulations.gov by searching docket NRC-2017-0213.
As a potential respondent to this information collection, we are interested in your feedback. Specifically, we are seeking input on the following questions by June 12, 2018:
- 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?
- 2. Is the burden estimate accurate?
- 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
- 4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?
Comments can be submitted by going to http://www.regulations.gov and searching for Docket No. NRC-2017-0213. Please note that comments will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed.
Bennett M. Brady Senior Project Manager Division of License Renewal Office of Nuclear Reactor Regulation O 11 - D8 301-415-2981
Hearing Identifier:
NRR_DMPS Email Number:
314 Mail Envelope Properties (Bennett.Brady@nrc.gov20180424154000)
Subject:
Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155)
Sent Date:
4/24/2018 3:40:22 PM Received Date:
4/24/2018 3:40:00 PM From:
Brady, Bennett Created By:
Bennett.Brady@nrc.gov Recipients:
"'john.hufnagel@exeloncorp.com'" <john.hufnagel@exeloncorp.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 1680 4/24/2018 3:40:00 PM NRC-2017-0213-0002.pdf 221666 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
16134 Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices license renewals in 2018, 2019, and 2020. Subsequent License Renewal is a term referring to all license renewals allowing a plant to operate beyond the 60-year period (40-year period of an initial operating license and a 20-year period of the first license renewal).
Based on a survey conducted by the nuclear power industry, the NRC staff believes that additional applications for subsequent license renewal will be submitted in future years.
The NRC has developed and published final guidance for licensees that intend to apply for subsequent license renewal. The guidance documents for subsequent license renewal (i.e., for operation from 60 to 80 years), NUREG-2191, the Generic Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, and NUREG-2192, the Standard Review Plan for Review of Subsequent License Renewal Applications for Nuclear Power Plants (SRP-SLR),
address the issues for increased operating time from 60 to 80 years. The guidance also considers recent operating experience identified since the release of GALL Report, Rev. 2. The GALL-SLR Report and SRP-SLR also include changes that have been previously issued for public comment as part of the staffs license renewal Interim Staff Guidance (ISG) process. These ISGs can be found at http://www.nrc.gov/reading-rm/doc-collections/isg/license-renewal.html. These ISGs (ML12286A275, ML11297A085, ML12138A296, ML12270A436, ML12044A215, ML12352A057, ML13227A361, ML15308A018, and ML16237A383) have been incorporated into the GALL-SLR Report and the associated sections of the SRP-SLR. The NRC has previously received public comments on these ISGs, and is not requesting additional comments on the ISGs.
A notice of availability and request for comments on draft NUREG-2191 and draft NUREG-2192 was published in the Federal Register on December 23, 2015 (80 FR 79956). The public comment period ended on February 29, 2016. The NRC received over 500 comments on these draft guidance documents. The NRC also published a supplement to the draft guidance documents in the Federal Register on March 29, 2016 (81 FR 17500). The public comment period on the supplements to draft NUREG-2191 and draft NUREG-2192 ended May 31, 2016. The NRC reviewed and dispositioned all of the comments and published the disposition of the comments and the technical bases for their disposition in companion NUREG documents, which are being published at this time, NUREG-2221, Technical Bases for Changes in the Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192, and NUREG-2222, Disposition of Public Comments on the Draft Subsequent License Renewal Guidance Documents NUREG-2191 and NUREG-2192. The NRCs resolution of these comments are incorporated in the final SLR guidance documents, NUREG-2191 and NUREG-2192.
Dated at Rockville, Maryland, this 10th day of April 2018.
For the Nuclear Regulatory Commission.
Eric R. Oesterle, Chief, License Renewal Project Branch, Division of Materials and License Renewal, Office of Nuclear Reactor Regulation.
[FR Doc. 2018-07698 Filed 4-12-18; 8:45 am]
BILLING CODE 7590-01-P NUCLEAR REGULATORY COMMISSION
[NRC-2017-0213]
Information Collection: Requirements for Renewal of Operating Licenses for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission.
ACTION: Renewal of existing information collection; request for comment.
SUMMARY
- The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of the Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.
DATES: Submit comments by June 12, 2018. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
ADDRESSES: You may submit comments by any of the following methods:
- Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0213. Address questions about NRC dockets to Jennifer Borges; telephone: 301-287-9127; email: Jennifer.Borges@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- Mail comments to: David Cullison, Office of the Chief Information Officer, Mail Stop: T-5 F53, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT:
David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: INFOCOLLECTS.Resource@
NRC.GOV.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2017-0213 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:
- Federal Rulemaking website: Go to http://www.regulations.gov and search for Docket ID NRC-2017-0213.
- NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/
adams.html. To begin the search, select ADAMS Public Documents and then select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The supporting statement for part 54 of title 10 of the Code of Federal Regulations (10 CFR), Requirements for Renewal of Operating Licenses for Nuclear Power Plants, is available in ADAMS under Package Accession No. ML17310A926.
- NRCs PDR: You may examine and purchase copies of public documents at the NRCs PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
- NRCs Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting NRCs Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: INFOCOLLECTS.Resource@
NRC.GOV.
B. Submitting Comments Please include Docket ID NRC-2017-0213 in the subject line of your comment submission in order to ensure that the NRC is able to make your VerDate Sep<11>2014 17:41 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\\FR\\FM\\13APN1.SGM 13APN1 daltland on DSKBBV9HB2PROD with NOTICES
16135 Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices 1 15 U.S.C. 78s(b)(1).
2 17 CFR 240.19b-4.
3 15 U.S.C. 78s(b)(3)(A).
4 17 CFR 240.19b-4(f)(6)(iii).
comment submission available to the public in this docket.
The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. All comment submissions are posted at http://
www.regulations.gov and entered into ADAMS. Comment submissions are not routinely edited to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission.
Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment submissions into ADAMS.
II. Background In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C.
Chapter 35), the NRC is requesting public comment on its intention to request the OMBs approval for the information collection summarized below:
- 1. The title of the information collection: 10 CFR part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants.
- 2. OMB approval number: 3150-0155.
- 3. Type of submission: Extension.
- 4. The form number, if applicable:
Not applicable.
- 5. How often the collection is required or requested: There is a one-time application for any licensee wishing to renew the operating license for its nuclear power plant. There is a one-time requirement for each licensee with a renewed operating license to submit a letter documenting the completion of inspection and testing activities. All holders of renewed licenses must perform yearly record keeping.
- 6. Who will be required or asked to respond: Commercial nuclear power plant licensees who wish to renew their operating licenses and holders of renewed licenses.
- 7. The estimated number of annual responses: 66 (8 reporting responses +
58 recordkeepers).
- 8. The estimated number of annual respondents: 6.
- 9. The estimated number of hours needed annually to comply with the information collection requirement or request: 226,320 (168,320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> reporting + 58,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> recordkeeping).
- 10. Abstract: Part 54 of 10 CFR establishes license renewal requirements for commercial nuclear power plants and describes the information that licensees must submit to the NRC when applying for a license renewal. The application must contain information on how the licensee will manage the detrimental effects of age-related degradation on certain plant systems, structures, and components so as to continue the plants safe operation during the renewal term. The NRC needs this information to determine whether the licensees actions will be effective in assuring the plants continued safe operation during the period of extended operation. Holders of renewed licenses must retain in an auditable and retrievable form, for the term of the renewed operating license, all information and documentation required to document compliance with 10 CFR part 54. The NRC needs access to this information for continuing effective regulatory oversight.
III. Specific Requests for Comments The NRC is seeking comments that address the following questions:
- 1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?
- 2. Is the estimate of the burden of the information collection accurate?
- 3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
- 4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology?
Dated at Rockville, Maryland, this 10th day of April 2018.
For the Nuclear Regulatory Commission.
David Cullison, NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 2018-07729 Filed 4-12-18; 8:45 am]
BILLING CODE 7590-01-P SECURITIES AND EXCHANGE COMMISSION
[Release No. 34-83022; File No. SR-CboeEDGX-2018-012]
Self-Regulatory Organizations; Cboe EDGX Exchange, Inc.; Notice of Filing and Immediate Effectiveness of a Proposed Rule Change To Modify Rule 21.9 of the Exchanges Rules and Related Functionality Applicable to the Routing Options Made Available by the Exchanges Equity Options Platform April 9, 2018.
Pursuant to Section 19(b)(1) of the Securities Exchange Act of 1934 (the Act),1 and Rule 19b-4 thereunder,2 notice is hereby given that on April 9, 2018, Cboe EDGX Exchange, Inc. (the Exchange) filed with the Securities and Exchange Commission (Commission) the proposed rule change as described in Items I and II below, which Items have been prepared by the Exchange. The Exchange has designated this proposal as a non-controversial proposed rule change pursuant to Section 19(b)(3)(A) of the Act 3 and Rule 19b-4(f)(6)(iii) thereunder,4 which renders it effective upon filing with the Commission. The Commission is publishing this notice to solicit comments on the proposed rule change from interested persons.
I. Self-Regulatory Organizations Statement of the Terms of Substance of the Proposed Rule Change The Exchange filed a proposal to modify Rule 21.9 of Exchanges rules and related functionality applicable to the routing options made available by the Exchanges equity options platform (EDGX Options).
The text of the proposed rule change is available at the Exchanges website at www.markets.cboe.com, at the principal office of the Exchange, and at the Commissions Public Reference Room.
II. Self-Regulatory Organizations Statement of the Purpose of, and Statutory Basis for, the Proposed Rule Change In its filing with the Commission, the Exchange included statements concerning the purpose of and basis for the proposed rule change and discussed any comments it received on the proposed rule change. The text of these statements may be examined at the places specified in Item IV below. The Exchange has prepared summaries, set VerDate Sep<11>2014 19:04 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\\FR\\FM\\13APN1.SGM 13APN1 daltland on DSKBBV9HB2PROD with NOTICES