ML18115A068

From kanterella
Jump to navigation Jump to search
NRR E-mail Capture - Opportunity to Review and Comment on an NRC Information Collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR Part 54 (3150-0155)
ML18115A068
Person / Time
Issue date: 04/24/2018
From: Wong A
Division of Materials and License Renewal
To: Giles M
Dominion Energy
Shared Package
ML17310A926 List:
References
3150-0155, NRC-2017-0213
Download: ML18115A068 (4)


Text

NRR-DMPSPEm Resource From: Wong, Albert Sent: Tuesday, April 24, 2018 4:44 PM To: Mark A Giles Cc: Tran, Tam

Subject:

FYI_Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155)

Attachments: NRC-2017-0213-0002.pdf Hello Mark, The Nuclear Regulatory Commission recently published a Federal Register Notice announcing our intent to submit information collection requests to the Office of Management and Budget (OMB) for 10 CFR Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants. A supporting statement describing the requested information and burden estimates are available at http://regulations.gov by searching docket NRC-2017-0213.

As a potential respondent to this information collection, we are interested in your feedback. Specifically, we are seeking input on the following questions by June 12, 2018:

1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?
2. Is the burden estimate accurate?
3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?
4. How can the burden of the information collection be minimized, including the use of automated collection techniques or other forms of information technology?

Comments can be submitted by going to http://www.regulations.gov and searching for Docket No. NRC-2017-0213.

Please note that comments will be made available for public inspection. Because your comments will not be edited to remove any identifying or contact information, the NRC cautions you against including any information in your submission that you do not want to be publicly disclosed.

Albert Wong, Senior Project Manager NRC/NRR/DMLR 301-415-3081 1

Hearing Identifier: NRR_DMPS Email Number: 316 Mail Envelope Properties (Albert.Wong@nrc.gov20180424164300)

Subject:

FYI_Opportunity to review and comment on an NRC information collection Requirements for Renewal of Operating Licenses for Nuclear Power Plants 10 CFR part 54 (3150-0155)

Sent Date: 4/24/2018 4:43:38 PM Received Date: 4/24/2018 4:43:00 PM From: Wong, Albert Created By: Albert.Wong@nrc.gov Recipients:

"Tran, Tam" <Tam.Tran@nrc.gov>

Tracking Status: None "Mark A Giles" <mark.a.giles@dominionenergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1611 4/24/2018 4:43:00 PM NRC-2017-0213-0002.pdf 226018 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

16134 Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices license renewals in 2018, 2019, and at this time, NUREG-2221, Technical For additional direction on obtaining 2020. Subsequent License Renewal is a Bases for Changes in the Subsequent information and submitting comments, term referring to all license renewals License Renewal Guidance Documents see Obtaining Information and allowing a plant to operate beyond the NUREG-2191 and NUREG-2192, and Submitting Comments in the 60-year period (40-year period of an NUREG-2222, Disposition of Public SUPPLEMENTARY INFORMATION section of initial operating license and a 20-year Comments on the Draft Subsequent this document.

period of the first license renewal). License Renewal Guidance Documents FOR FURTHER INFORMATION CONTACT:

Based on a survey conducted by the NUREG-2191 and NUREG-2192. The David Cullison, Office of the Chief nuclear power industry, the NRC staff NRCs resolution of these comments are Information Officer, U.S. Nuclear believes that additional applications for incorporated in the final SLR guidance Regulatory Commission, Washington, subsequent license renewal will be documents, NUREG-2191 and NUREG- DC 20555-0001; telephone: 301-415-submitted in future years. 2192. 2084; email: INFOCOLLECTS.Resource@

The NRC has developed and NRC.GOV.

Dated at Rockville, Maryland, this 10th day published final guidance for licensees of April 2018. SUPPLEMENTARY INFORMATION:

that intend to apply for subsequent For the Nuclear Regulatory Commission.

license renewal. The guidance I. Obtaining Information and documents for subsequent license Eric R. Oesterle, Submitting Comments renewal (i.e., for operation from 60 to 80 Chief, License Renewal Project Branch, Division of Materials and License Renewal, A. Obtaining Information years), NUREG-2191, the Generic Office of Nuclear Reactor Regulation. Please refer to Docket ID NRC-2017-Aging Lessons Learned for Subsequent License Renewal (GALL-SLR) Report, [FR Doc. 2018-07698 Filed 4-12-18; 8:45 am] 0213 when contacting the NRC about and NUREG-2192, the Standard BILLING CODE 7590-01-P the availability of information for this Review Plan for Review of Subsequent action. You may obtain publicly-License Renewal Applications for available information related to this Nuclear Power Plants (SRP-SLR), NUCLEAR REGULATORY action by any of the following methods:

address the issues for increased COMMISSION

  • Federal Rulemaking website: Go to operating time from 60 to 80 years. The [NRC-2017-0213] http://www.regulations.gov and search guidance also considers recent operating for Docket ID NRC-2017-0213.

experience identified since the release Information Collection: Requirements

  • NRCs Agencywide Documents of GALL Report, Rev. 2. The GALL-SLR for Renewal of Operating Licenses for Access and Management System Report and SRP-SLR also include Nuclear Power Plants (ADAMS): You may obtain publicly-changes that have been previously available documents online in the AGENCY: Nuclear Regulatory ADAMS Public Documents collection at issued for public comment as part of the Commission. http://www.nrc.gov/reading-rm/

staffs license renewal Interim Staff Guidance (ISG) process. These ISGs can ACTION: Renewal of existing information adams.html. To begin the search, select be found at http://www.nrc.gov/reading- collection; request for comment. ADAMS Public Documents and then rm/doc-collections/isg/license- select Begin Web-based ADAMS

SUMMARY

The U.S. Nuclear Regulatory renewal.html. These ISGs Search. For problems with ADAMS, Commission (NRC) invites public (ML12286A275, ML11297A085, please contact the NRCs Public comment on the renewal of the Office of ML12138A296, ML12270A436, Document Room (PDR) reference staff at Management and Budget (OMB)

ML12044A215, ML12352A057, 1-800-397-4209, 301-415-4737, or by approval for an existing collection of ML13227A361, ML15308A018, and email to pdr.resource@nrc.gov. The information. The information collection ML16237A383) have been incorporated supporting statement for part 54 of title is entitled, Requirements for Renewal into the GALL-SLR Report and the 10 of the Code of Federal Regulations of Operating Licenses for Nuclear Power associated sections of the SRP-SLR. The (10 CFR), Requirements for Renewal of Plants.

NRC has previously received public Operating Licenses for Nuclear Power comments on these ISGs, and is not DATES: Submit comments by June 12, Plants, is available in ADAMS under requesting additional comments on the 2018. Comments received after this date Package Accession No. ML17310A926.

ISGs. will be considered if it is practical to do

  • NRCs PDR: You may examine and A notice of availability and request for so, but the Commission is able to ensure purchase copies of public documents at comments on draft NUREG-2191 and consideration only for comments the NRCs PDR, Room O1-F21, One draft NUREG-2192 was published in the received on or before this date. White Flint North, 11555 Rockville Federal Register on December 23, 2015 ADDRESSES: You may submit comments Pike, Rockville, Maryland 20852.

(80 FR 79956). The public comment by any of the following methods:

  • NRCs Clearance Officer: A copy of period ended on February 29, 2016. The
  • Federal Rulemaking website: Go to the collection of information and related NRC received over 500 comments on http://www.regulations.gov and search instructions may be obtained without these draft guidance documents. The for Docket ID NRC-2017-0213. Address charge by contacting NRCs Clearance NRC also published a supplement to the questions about NRC dockets to Jennifer Officer, David Cullison, Office of the draft guidance documents in the Borges; telephone: 301-287-9127; Chief Information Officer, U.S. Nuclear Federal Register on March 29, 2016 (81 email: Jennifer.Borges@nrc.gov. For Regulatory Commission, Washington, FR 17500). The public comment period technical questions, contact the DC 20555-0001; telephone: 301-415-on the supplements to draft NUREG- individual listed in the FOR FURTHER 2084; email: INFOCOLLECTS.Resource@

daltland on DSKBBV9HB2PROD with NOTICES 2191 and draft NUREG-2192 ended May INFORMATION CONTACT section of this NRC.GOV.

31, 2016. The NRC reviewed and document.

dispositioned all of the comments and

  • Mail comments to: David Cullison, B. Submitting Comments published the disposition of the Office of the Chief Information Officer, Please include Docket ID NRC-2017-comments and the technical bases for Mail Stop: T-5 F53, U.S. Nuclear 0213 in the subject line of your their disposition in companion NUREG Regulatory Commission, Washington, comment submission in order to ensure documents, which are being published DC 20555-0001. that the NRC is able to make your VerDate Sep<11>2014 17:41 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00091 Fmt 4703 Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1

Federal Register / Vol. 83, No. 72 / Friday, April 13, 2018 / Notices 16135 comment submission available to the reporting + 58,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> SECURITIES AND EXCHANGE public in this docket. recordkeeping). COMMISSION The NRC cautions you not to include 10. Abstract: Part 54 of 10 CFR [Release No. 34-83022; File No. SR-identifying or contact information in establishes license renewal CboeEDGX-2018-012]

comment submissions that you do not requirements for commercial nuclear want to be publicly disclosed in your power plants and describes the Self-Regulatory Organizations; Cboe comment submission. All comment EDGX Exchange, Inc.; Notice of Filing information that licensees must submit submissions are posted at http:// and Immediate Effectiveness of a to the NRC when applying for a license www.regulations.gov and entered into Proposed Rule Change To Modify Rule ADAMS. Comment submissions are not renewal. The application must contain information on how the licensee will 21.9 of the Exchanges Rules and routinely edited to remove identifying Related Functionality Applicable to the or contact information. manage the detrimental effects of age-Routing Options Made Available by the If you are requesting or aggregating related degradation on certain plant Exchanges Equity Options Platform comments from other persons for systems, structures, and components so submission to the NRC, then you should as to continue the plants safe operation April 9, 2018.

inform those persons not to include during the renewal term. The NRC Pursuant to Section 19(b)(1) of the identifying or contact information that needs this information to determine Securities Exchange Act of 1934 (the they do not want to be publicly whether the licensees actions will be Act),1 and Rule 19b-4 thereunder,2 disclosed in their comment submission. effective in assuring the plants notice is hereby given that on April 9, Your request should state that the NRC continued safe operation during the 2018, Cboe EDGX Exchange, Inc. (the does not routinely edit comment period of extended operation. Holders of Exchange) filed with the Securities submissions to remove such information renewed licenses must retain in an and Exchange Commission before making the comment auditable and retrievable form, for the (Commission) the proposed rule submissions available to the public or term of the renewed operating license, change as described in Items I and II entering the comment submissions into all information and documentation below, which Items have been prepared ADAMS. required to document compliance with by the Exchange. The Exchange has 10 CFR part 54. The NRC needs access designated this proposal as a non-II. Background controversial proposed rule change to this information for continuing In accordance with the Paperwork pursuant to Section 19(b)(3)(A) of the effective regulatory oversight.

Reduction Act of 1995 (44 U.S.C. Act 3 and Rule 19b-4(f)(6)(iii)

Chapter 35), the NRC is requesting III. Specific Requests for Comments thereunder,4 which renders it effective public comment on its intention to upon filing with the Commission. The request the OMBs approval for the The NRC is seeking comments that Commission is publishing this notice to information collection summarized address the following questions: solicit comments on the proposed rule below: 1. Is the proposed collection of change from interested persons.

1. The title of the information information necessary for the NRC to I. Self-Regulatory Organizations collection: 10 CFR part 54, properly perform its functions? Does the Statement of the Terms of Substance of Requirements for Renewal of Operating information have practical utility? the Proposed Rule Change Licenses for Nuclear Power Plants. 2. Is the estimate of the burden of the
2. OMB approval number: 3150-0155. The Exchange filed a proposal to information collection accurate? modify Rule 21.9 of Exchanges rules
3. Type of submission: Extension.
4. The form number, if applicable: 3. Is there a way to enhance the and related functionality applicable to Not applicable. quality, utility, and clarity of the the routing options made available by
5. How often the collection is required information to be collected? the Exchanges equity options platform or requested: There is a one-time (EDGX Options).
4. How can the burden of the application for any licensee wishing to The text of the proposed rule change information collection on respondents is available at the Exchanges website at renew the operating license for its be minimized, including the use of nuclear power plant. There is a one-time www.markets.cboe.com, at the principal automated collection techniques or office of the Exchange, and at the requirement for each licensee with a other forms of information technology?

renewed operating license to submit a Commissions Public Reference Room.

letter documenting the completion of Dated at Rockville, Maryland, this 10th day II. Self-Regulatory Organizations inspection and testing activities. All of April 2018.

Statement of the Purpose of, and holders of renewed licenses must For the Nuclear Regulatory Commission.

Statutory Basis for, the Proposed Rule perform yearly record keeping. David Cullison, Change

6. Who will be required or asked to NRC Clearance Officer, Office of the Chief In its filing with the Commission, the respond: Commercial nuclear power Information Officer.

Exchange included statements plant licensees who wish to renew their [FR Doc. 2018-07729 Filed 4-12-18; 8:45 am]

concerning the purpose of and basis for operating licenses and holders of BILLING CODE 7590-01-P the proposed rule change and discussed renewed licenses. any comments it received on the

7. The estimated number of annual proposed rule change. The text of these responses: 66 (8 reporting responses + statements may be examined at the daltland on DSKBBV9HB2PROD with NOTICES 58 recordkeepers). places specified in Item IV below. The
8. The estimated number of annual Exchange has prepared summaries, set respondents: 6.
9. The estimated number of hours 1 15 U.S.C. 78s(b)(1).

needed annually to comply with the 2 17 CFR 240.19b-4.

information collection requirement or 3 15 U.S.C. 78s(b)(3)(A).

request: 226,320 (168,320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> 4 17 CFR 240.19b-4(f)(6)(iii).

VerDate Sep<11>2014 19:04 Apr 12, 2018 Jkt 244001 PO 00000 Frm 00092 Fmt 4703 Sfmt 4703 E:\FR\FM\13APN1.SGM 13APN1