ML18227D349: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18227D349
| number = ML18227D349
| issue date = 06/29/1976
| issue date = 06/29/1976
| title = 06/29/1976 Letter Supplemental Information Related to Evaluation of Spent Fuel Transfer Process Submitted on June 23, 1976
| title = Letter Supplemental Information Related to Evaluation of Spent Fuel Transfer Process Submitted on June 23, 1976
| author name = Uhrig R
| author name = Uhrig R
| author affiliation = Florida Power & Light Co
| author affiliation = Florida Power & Light Co
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:.I NRC ARM 195                                                             UoS. NUCLEAR REGULATORY COMMISSION OOCKL'T NUM OE
{{#Wiki_filter:.I NRC ARM 195 UoS. NUCLEAR REGULATORY COMMISSION I IP.TbI.
                                                                      '                                                                  50-25        5 I IP.TbI.                                     V~               ~
V~
FILE NUMBER I                     NRC DISTRIBUTION FGR PART 50 DOCKET MATERIAL To:     . V. Stello                                               Flordid Power 8 Light       Co.                   DATE OF DOCUMENT 6-29-76
~ '
                                          ~
I NRC DISTRIBUTION FGR PART 50 DOCKET MATERIAL OOCKL'T NUMOE 50-25 5
                                            ~ t ~
FILE NUMBER DATE OF DOCUMENT I QfLETTER
Miami,.Flordia R.E. tfhrig                                         DATE RECEIVEb
@ORIGINAL I
                                ~    ~                                                                                                  7-6-76 I  QfLETTER                        QNOTORIZEO                      PROP                  INPUT FORM                          NUMOER OF COPIFS RECEIVED
OCOPY
            @ORIGINAL                  @UNCLASSIFIED I      OCOPY I DES C I
~
R I P T I ON                                ~
~
Supplemental Information related to the Eval uat1 on
To:
                                                                \                      ENCLOSURE
. V. Stello
                                                                                                    / r of Spent Fuel Transfer Process....... M/Attachm nhs (3 Signed Cyz. Received)                                                             '~02 ag (6 Pages)                                                                                             '"I g                                 ~,."i q'i, I.
~
sl
~
                                                                                                                                                ,t.'
~ t QNOTORIZEO
h~o g  ~)',
@UNCLASSIFIED PROP Flordid Power 8 Light Co.
                                                                                                                                  /
Miami,.Flordia R.E. tfhrig INPUT FORM 6-29-76 DATE RECEIVEb 7-6-76 NUMOER OF COPIFS RECEIVED ENCLOSURE / r on I DES C R I P T ION
Turkey Pt. 0 .3 8 4 SAFETY                                        FOR ACTION/INFORMATION ASSIGNED AD!                                                                          ASST !IED AD ~
~\\
RANCH        CIIIEF:
I Supplemental Information related to the Eval of Spent Fuel Transfer Process.......
OJECT ifANAGER:                                                                  PRO      'Yd XA         ~
M/Atta (3 Signed Cyz. Received)
                                                                                                                              ~
(6 Pages)
IC ~ ASST INTERNAL 0 IST Rl BUTION
Turkey Pt.
'""I     '                                      "SYSTEHS SAFFTY F                                                                                                                 SITE    S~A I         RC PDK                               IIE INEiHAN                                      C                                    ENVIRO AI~IT~S I       I&E                 2                 SCHROEDER                              " BENAROYA                                    FN ELD I       GOSSICK & STAFF                       ENGINEERING                               IPPOLITO HIPC                                  I IACCAIIRY                              KTR'Oi'OOD CASE                                   KNIGIIT SIHlPEIL                                 OPERATING REACTORS ES                          PAVLXCKI PROJECT I fANAGEI'IENT                 REACTOR SAFE'IIY                          OPF.RAT N    . II BOYD                                   ROSS                                      EISEliH P     COLLINS                         NOVAK                                    SHAO
0.3 8 4 uat1 chm nhs
                                                  '6g6 HOUSTON                               ROSZTOCZY                                BARR PETF.RSON                             CHECK                                    BUTI.F.R                                    S~
'"I g
I        bKLTZ                                                                           GRII'IES                                    OL I       HELTEHES                               AT&I                                                                                   IiiCI SKOVIIOLT                              SALTZI'usN                                                               'DR!
'~02 ag g ~)',
                                                                                                                                              .OLL RUTI> I'. RG EXTE IINAL0 IS I R IOUl'ION                                                             CON I'!IOL NUMIIEfl a      NAT     IAB'EG BROOKHAVFN 'NA IC:                                        ~        VII                                  ORNL  'LRI~KSON
/
          ...SIC                                   LA PDR ASLB ~                                 CONSULTANTS GRAYS               I AH~,"7.''.N
~,. q'i, I.
"isl
,t.'
h~o SAFETY ASSIGNED AD!
RANCH CIIIEF:
OJECT ifANAGER:
IC ~ ASST FOR ACTION/INFORMATION ASST
!IED AD ~
PRO
'Yd XA ~
~
'""I F
I RC PDK I
I&E 2
ELD I
GOSSICK & STAFF HIPC INTERNAL0 IST "SYSTEHS SAFFTY IIEINEiHAN SCHROEDER ENGINEERING IIACCAIIRY Rl BUTION C
" BENAROYA IPPOLITO KTR'Oi'OOD SITE S~A ENVIRO AI~IT~S FN CASE ES KNIGIIT SIHlPEIL PAVLXCKI OPERATING REACTORS
'DR!
IC:
a PROJECT IfANAGEI'IENT BOYD P
COLLINS HOUSTON PETF.RSON I
bKLTZ I
HELTEHES SKOVIIOLT REACTOR SAFE'IIY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZI'usN RUTI>I'.RG EXTEIINAL0 IS I R IOUl'ION NAT IAB'EG
~ VII OPF.RAT N
. II EISEliH SHAO BARR BUTI.F.R GRII'IES BROOKHAVFN 'NA
'LRI~KSON ORNL S~
OL IiiCI
.OLL CON I'!IOL NUMIIEfl LA PDR CONSULTANTS
...SIC ASLB ~
GRAYS I AH~,"7.''.N'6g6


f I
f I
                              + CQ FLORIDA POWER & LIGHT COMPANY June 29, 1976 gstG            L-76-238 b
 
8 Director of Nuclear Reactor Regulation Attn: Mr. Victor'Stello, Jr., Director           <<a'ut. 6 Division of Operating Reactors                         1976 U. S. Nuclear Regulatory Commission Washin'gton', D. C.'0555                               ~~4m
+ CQ gstG b
        'I
FLORIDA POWER & LIGHT COMPANY June 29, 1976 L-76-238 Director of Nuclear Reactor Regulation Attn:
Mr. Victor'Stello, Jr., Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washin'gton',
D. C.'0555
'I


==Dear Mr. Stello':==
==Dear Mr. Stello':==
 
Re:
Re:   Turkey Point Plant Units 3 and   4 Docket, Nos. 50-250 and 50-251 Su   lemental Information Attached herewith is supplemental information related to our submittal of June 23, 1976, L-76-234.
Turkey Point Plant Units 3 and 4
Very truly yours, Robert E. Uhrig Vice President REU/GDN/hlc Attachment cc:   Mr. Norman C. Moseley, Region II Jack R. Newman, Esq.
Docket, Nos.
50-250 and 50-251 Su lemental Information 8
<<a'ut.
6 1976
~~4m Attached herewith is supplemental information related to our submittal of June 23, 1976, L-76-234.
Very truly yours, Robert E. Uhrig Vice President REU/GDN/hlc Attachment cc:
Mr. Norman C. Moseley, Region II Jack R.
: Newman, Esq.
PEOPLE... SERVING PEOPLE
PEOPLE... SERVING PEOPLE


4' t
4' t
I I'
I I'
'


The   potential for loss of load   due to sudden stopping of the hoist has been   evaluated. The condition of simultaneous main hoist cask crane brakes setting while the cask is being lowered at the maximum rated speed of 7 fpm can be accommodated.       (See Appendix B provided by Licensee's letter of Hay 25, 1976.) For this analysis the wire ropes were considered to be only 50 inches long (the cask is at near maximum lift)   to minimize the energy absorption of the wire ropes. The cask weight analyzed was 51,200 lbs., elongation of a given wire rope was 0.023 inches and the approximate cask stopping time was 0.017 seconds.
The potential for loss of load due to sudden stopping of the hoist has been evaluated.
The   potential radiological consequences of the rupture of one or more fuel assemblies resulting from a cask drop are less than those evaluated in the fuel handling accident (FSAR Section 14.2.1) and found acceptable by the Staff in its Safety Evaluation report at page 50. The Staff concluded 17 rem thyroid and < 2 rem whole body were acceptable offsite exposures for this low probability event. The calculation assumptions are listed in Table 5, and the potential whole body and thyroid doses at the site boundary are shown in Figures 2 and 3, as a function of decay time and number of assemblies damaged respectively. Forty fuel element assemblies in the unit 4 pool have the shortest decay (1416 hours as of June 15, 1976       see Table 1). It is concluded that even   if all 40 assemblies are damaged the potential exposures are at least an order of magnitude below those calculated for the fuel handling accident.         It must also be noted that these 40 assemblies will be transferred last. At time of transfer, there will be about 90 days decay (2160 hours) on these assemblies.
The condition of simultaneous main hoist cask crane brakes setting while the cask is being lowered at the maximum rated speed of 7 fpm can be accommodated.
During transit between units the cask will pass over buried pipes and duct banks, as well as, piping in trenches, which also may be routed along the transfer corridor. A failure mode effect analysis assuming damage to piping is provided infra. The in situ protection afforded buried pipes and duct banks is discussed below.
(See Appendix B provided by Licensee's letter of Hay 25, 1976.)
All but a few buried pipes are protected by a 4" concrete slab, plus the earth cover. The buried pies not afforded the additional protection of the 4" concrete slab have at least 5'3" of compacted         fill cover. The electrical duct banks are reinforced concrete structures at least 3'3" below the concrete slab. The buried pipes are 30" and 36" nominal pipe with 7/8" and 1" wall thickness respectively. In addition, the pipes are cement   lined.
For this analysis the wire ropes were considered to be only 50 inches long (the cask is at near maximum lift) to minimize the energy absorption of the wire ropes.
To assess   the penetrability capability of the     25 ton cask in the in situ protection,     a 40 foot free fall in air   at an 11.37 degree   tilt was eval-
The cask weight analyzed was 51,200 lbs., elongation of a given wire rope was 0.023 inches and the approximate cask stopping time was 0.017 seconds.
                                                                                  .
The potential radiological consequences of the rupture of one or more fuel assemblies resulting from a cask drop are less than those evaluated in the fuel handling accident (FSAR Section 14.2.1) and found acceptable by the Staff in its Safety Evaluation report at page 50.
uated. The modified Petry equation yields a penetration of 3.2 inches in concrete. Additionally, the equations of dynamic equilibrium were solved and potential penetrability into the earth calculated utilizing the Sandia report by C. Wayne Young, "Depth Prediction. for Earth-Penetrating Projectiles", ASCE, May 1976. Penetration from 40 feet in soil only was calculated to be 6.4 inches, and in soil, plus the 4 inch concrete slab, to be 4.5 inches. Thus, even for a substantial drop (40 feet), penetra-tion of in situ protection is modest.
The Staff concluded 17 rem thyroid and
During   transit   between units the elevation of the cask above grad will be limited to one foot by administrative controls. The surcharge load on buried pipe and duct banks has been determined for a vertical cask drop from one foot and for horizontal impact of the cask. Since the soil would not transmit load to the pipe greater than its resistance (impact area times     soil bearing capacity)   the vertical   drop is the limiting case.
< 2 rem whole body were acceptable offsite exposures for this low probability event.
Rev. 1 6/28/76
The calculation assumptions are listed in Table 5, and the potential whole body and thyroid doses at the site boundary are shown in Figures 2 and 3, as a function of decay time and number of assemblies damaged respectively.
Forty fuel element assemblies in the unit 4 pool have the shortest decay (1416 hours as of June 15, 1976 see Table 1). It is concluded that even if all 40 assemblies are damaged the potential exposures are at least an order of magnitude below those calculated for the fuel handling accident. It must also be noted that these 40 assemblies will be transferred last. At time of transfer, there will be about 90 days decay (2160 hours) on these assemblies.
During transit between units the cask will pass over buried pipes and duct banks, as well as, piping in trenches, which also may be routed along the transfer corridor.
A failure mode effect analysis assuming damage to piping is provided infra.
The in situ protection afforded buried pipes and duct banks is discussed below.
All but a few buried pipes are protected by a 4" concrete slab, plus the earth cover.
The buried pies not afforded the additional protection of the 4" concrete slab have at least 5'3" of compacted fillcover.
The electrical duct banks are reinforced concrete structures at least 3'3" below the concrete slab.
The buried pipes are 30" and 36" nominal pipe with 7/8" and 1" wall thickness respectively.
In addition, the pipes are cement lined.
To assess the penetrability capability of the 25 ton cask in the in situ protection, a 40 foot free fall in air at an 11.37 degree tilt was eval-uated.
The modified Petry equation yields a penetration of 3.2 inches in concrete.
Additionally, the equations of dynamic equilibrium were solved and potential penetrability into the earth calculated utilizing the Sandia report by C.
Wayne Young, "Depth Prediction. for Earth-Penetrating Projectiles",
: ASCE, May 1976.
Penetration from 40 feet in soil only was calculated to be 6.4 inches, and in soil, plus the 4 inch concrete slab, to be 4.5 inches.
: Thus, even for a substantial drop (40 feet), penetra-tion of in situ protection is modest.
During transit between units the elevation of the cask above grad will be limited to one foot by administrative controls.
The surcharge load on buried pipe and duct banks has been determined for a vertical cask drop from one foot and for horizontal impact of the cask.
Since the soil would not transmit load to the pipe greater than its resistance (impact area times soil bearing capacity) the vertical drop is the limiting case. Rev.
1 6/28/76
 
The surcharge has been evaluated for both the areas with and without the 4 inch concrete cover slab.
The soil resistance (59.4 kips, based on a bearing capacity of 10 ksf and an impact area of 5.94 ft ) is less than 2
the dynamic force of the falling cask assumed (100 kips).
Thus, the cask will expend all the energy in the penetration of the soil.
The soil will not transmit the dynamic effect from the falling cask to the buried duct banks or pipes.
For this evaluation, it was assumed that after penetration, there is no energy transfer consideration, and at the last
: instant, the weight is suddenly applied using a dynamic load factor of 2.0.
This assumption is considered extremely conservative and quite unrealistic because at the last instant when all energy is expended, there is no dynamic load.
Even with this assumption, buried pipes and duct banks are within allowable stresses.
The assumptions, etc., associated with the analysis of buried pipes and duct banks follows:
1.
Drop height


The surcharge    has been evaluated for both the areas with and without the 4 inch concrete cover slab. The soil resistance (59.4 kips, based on a bearing capacity of 10 ksf and an impact area of 5.94 ft2 ) is less than the dynamic force of the falling cask assumed (100 kips). Thus, the cask will expend all the energy in the penetration of the soil. The soil will not transmit the dynamic effect from the falling cask to the buried duct banks or pipes. For this evaluation,      it was assumed that after penetration, there is no energy transfer consideration, and at the last instant, the weight is suddenly applied using a dynamic load factor of 2.0. This assumption is considered extremely conservative and quite unrealistic because at the last instant when all energy is expended, there is no dynamic load. Even with this assumption, buried pipes and duct banks are within allowable stresses.
The assumptions,    etc., associated with the analysis of buried pipes    and duct banks follows:
: 1. Drop height lbs.
1'.
1'.
Cask Weight 50,000
Cask Weight 50,000 lbs.
: 3. Cask Diameter 37"
3.
: 4. Drop is vertical
Cask Diameter 37" 4.
: 5. Static load (equivalent) = 46 psi
Drop is vertical 5.
: 6. Dynamic load factor (DLF) = 2
Static load (equivalent)
: 7. = Modulus of Elasticity of Concrete = 4 x 10 psi
= 46 psi 6.
: 8. Modulus of Elasticity of Soil = 28,000 psi
Dynamic load factor (DLF) = 2 7.
: 9. Xnternal Pressure in Pipe = 50 psi
= Modulus of Elasticity of Concrete
: 10. Modulus of Elasticity of Pipe Material = 29 x 10 psi 11., Modulus of Subgrade reaction = 1500 k/ft
= 4 x 10 psi 8.
: l. Using Burmister two layer theory and influence curve, an equivalent stress at top of pipe was determined. Boussinesq theory is used for soil cover.
Modulus of Elasticity of Soil = 28,000 psi 9.
: 2. Equivalent soil cover to produce stress   was calculated and added to actual soil depth.
Xnternal Pressure in Pipe
: 3. The pipe thickness required to carry the soil depth was determined using USAS A21.1 1967 method of ring test load equivalent to earth load.
= 50 psi 10.
: 4. Required thickness was compared to actual pipe thickness.
Modulus of Elasticity of Pipe Material = 29 x 10 psi 11.,
: 5. The bending   stresses in the pipe and in the duct bank were calcu-lated assuming the pipe and the duct bank act   as beams supported on an elastic foundation.
Modulus of Subgrade reaction
Rev. 1 6/28/76
= 1500 k/ft l.
Using Burmister two layer theory and influence curve, an equivalent stress at top of pipe was determined.
Boussinesq theory is used for soil cover.
2.
Equivalent soil cover to produce stress was calculated and added to actual soil depth.
3.
The pipe thickness required to carry the soil depth was determined using USAS A21.1 1967 method of ring test load equivalent to earth load.
4.
Required thickness was compared to actual pipe thickness.
5.
The bending stresses in the pipe and in the duct bank were calcu-lated assuming the pipe and the duct bank act as beams supported on an elastic foundation.
Rev.
1 6/28/76


0 Acce tance Considerations
0 Acce tance Considerations
: 1. If required   thickness was   less than actual, there would be no failure of pipe.
: 1. If required thickness was less than actual, there would be no failure of pipe.
: 2. If the bending stresses in the pipe are within the allowable limits, there   would be no failure of the pipe.
: 2. If the bending stresses in the pipe are within the allowable limits, there would be no failure of the pipe.
: 3. If the   bending stresses   in the electrical duct   bank are within the allowable   limits, there   would be no failure of the duct bank.
: 3. If the bending stresses in the electrical duct bank are within the allowable limits, there would be no failure of the duct bank.
: 4. If equivalent   stress at top of duct bank     was less than allowable concrete capacity (2,000     psi), then no failure would occur.
: 4. If equivalent stress at top of duct bank was less than allowable concrete capacity (2,000 psi), then no failure would occur.
Referenc'es:
Referenc'es:
: l. Yoder 6 Witizak "Pavement Design", 2nd       Edition
l.
: 2. Foundation Engineering by Bowles 3 ~   USAS A21 1 g 1967
Yoder 6 Witizak "Pavement Design",
: 4. ASA A21.4 1964
2nd Edition 2.
: 5. Roark, "Formulas     for Stresses   and Strain" Fourth Edition In transit (between units) drop evaluations indicate that penetration of in situ protection is slight         and the additional load imposed on buried duct banks and pipes can be accommodated within allowable working stresses.
Foundation Engineering by Bowles 3 ~
During   transit   between units, only trolley motion or only bridge motion will be'allowed.       Combined simultaneous     bridge/trolley motion will be pre-cluded by administrative controls. Reference to Figure 1 clearly illus-trates that the transfer between units is straightforward motion "only" moves the cask from the washdown area out to the transfer trolley corridor between units, bridge movement "only" moves the cask along the transfer,corxidor, and finally, trolley movement "only" moves the cask to the adjacent units'ashdown area. Thus, any cask swing potential due to sudden stopping of bridge or trolley is along the allowable hook envelope.
USAS A21 1 g 1967 4.
The kinetic energy associated with tranverse motion of the cask precludes significant swinging of the cask. Sudden stopping of the bridge or trolley will result in a maximum cask rise of not greater than about 0.004 feet.
ASA A21.4 1964 5.
: Roark, "Formulas for Stresses and Strain" Fourth Edition In transit (between units) drop evaluations indicate that penetration of in situ protection is slight and the additional load imposed on buried duct banks and pipes can be accommodated within allowable working stresses.
During transit between units, only trolley motion or only bridge motion willbe'allowed.
Combined simultaneous bridge/trolley motion will be pre-cluded by administrative controls.
Reference to Figure 1 clearly illus-trates that the transfer between units is straightforward trolley motion "only" moves the cask from the washdown area out to the transfer corridor between units, bridge movement "only" moves the cask along the transfer,corxidor, and finally, trolley movement "only" moves the cask to the adjacent units'ashdown area.
: Thus, any cask swing potential due to sudden stopping of bridge or trolley is along the allowable hook envelope.
The kinetic energy associated with tranverse motion of the cask precludes significant swinging of the cask.
Sudden stopping of the bridge or trolley will result in a maximum cask rise of not greater than about 0.004 feet.
The horizontal distance from the vertical will not exceed l-l/2 feet.
The horizontal distance from the vertical will not exceed l-l/2 feet.
The transfer corridor is about 17 feet wide.
The transfer corridor is about 17 feet wide.
The potential for cask swing in transit is not great due to the simplex nature of this transfer operation, any swing will be along the hook envelope and the maximum swing distance is acceptably small. Thus, cask swing during transfer does not pose a threat to safety related equipment.
The potential for cask swing in transit is not great due to the simplex nature of this transfer operation, any swing will be along the hook envelope and the maximum swing distance is acceptably small.
Rev. =1 6/28/76
: Thus, cask swing during transfer does not pose a threat to safety related equipment. Rev.
=1 6/28/76


The east wall of the auxiliary building area runs adjacent to the transfer corridor between units. The unit 3 and 4 CCW areas are located behind this wall. There is one location in each unit that a CCW'ine is partially supported by the auxiliary building wall. In Unit 3, a hanger provides vertical support only and there is a 3 inch gap between the wall and the pipe. In Unit 4, the hanger             is'f a different design, but even considering the maximum wall deflection, the piping stresses are within elastic limits.
The east wall of the auxiliary building area runs adjacent to the transfer corridor between units.
For the reasons cited ~su ra swinging of the cask into this wall is not: a consideration. However, a cask drop and tip into the wall could be postu-lated. This has been evaluated. Penetration into the wall is negligible and the deflection of the wall will not exceed 1/2 inch.                 (Note that Appen-dix C to Licensee's June 1, 1976, letter L-76-203 erroneously stated pene-tration of 1/2"). Structural integrity is not threatened by the impact.
The unit 3 and 4
The assumptions, etc., associated           with cask, drop and tip into     the CCW area wall are   as follows:
CCW areas are located behind this wall.
: 1. Work done by     tilting cask = 34,500 ft-lbs.
There is one location in each unit that a CCW'ine is partially supported by the auxiliary building wall.
: 2. The resisting work       will be represented by deflection of       the wall times the load acting on it.
In Unit 3, a hanger provides vertical support only and there is a 3 inch gap between the wall and the pipe.
      '3. Effective width = 6 ft.
In Unit 4, the hanger is'f a different design, but even considering the maximum wall deflection, the piping stresses are within elastic limits.
: 4. Impact elevation = 14 ft.
For the reasons cited
      ,5.. Work done by cask = W = Px 6
~su ra swinging of the cask into this wall is not: a consideration.
: 6. Cask weight '= 50,000 lbs.
: However, a cask drop and tip into the wall could be postu-lated.
: 7. Cask height = 16       ft.
This has been evaluated.
: 8. Cask   tilt from horizontal = 66'; distance =     6.5'.
Penetration into the wall is negligible and the deflection of the wall will not exceed 1/2 inch.
(Note that Appen-dix C to Licensee's {{letter dated|date=June 1, 1976|text=June 1, 1976, letter}} L-76-203 erroneously stated pene-tration of 1/2").
Structural integrity is not threatened by the impact.
The assumptions, etc., associated with cask, drop and tip into the CCW area wall are as follows:
1.
Work done by tilting cask = 34,500 ft-lbs.
2.
The resisting work will be represented by deflection of the wall times the load acting on it.
'3.
Effective width = 6 ft.
4.
Impact elevation
= 14 ft.
,5.. Work done by cask
=
W = Px 6 6.
Cask weight '= 50,000 lbs.
7.
Cask height = 16 ft.
8.
Cask tilt from horizontal
= 66'; distance
=
6.5'.
Assume vertical wall acts as slab for deflection calculations.
Assume vertical wall acts as slab for deflection calculations.
    .10. Dynamic compressive strength of the wall = 4500 psiie ll. Reinforced concrete wall, height = 17'; thickness = 12"
.10.
: 1. Deflection     was   calculated using:
Dynamic compressive strength of the wall = 4500 psiie ll.
W   = P x 6 c
Reinforced concrete wall, height = 17'; thickness
P =   k 6 then W   = k 6 c
= 12" 1.
therefore,   6 = (W/k) 1/2 where k = 3.146       x 10 lbs/inch and,                              ,
Deflection was calculated using:
W    = work done by cask c
W
P   = load
= P x 6 c
                = deflection k   = spring constant
P = k 6 then W
            'p   = ductility ratio
= k 6 c
: 2. Penetration by Petry formula.
1/2 and, therefore, 6 =
Rev. 1 6/28/76
(W/k)
, where k = 3.146 x 10 lbs/inch W
= work done by cask c
P
= load
= deflection k
= spring constant
'p
= ductility ratio 2.
Penetration by Petry formula.
Rev.
1 6/28/76


V k '
V k


p2 w   =   (p 1/2)
p2 w
          , c   k Acce tance Considerations
= (p 1/2)
: 1. Deflection calculated   (6 = 0.36   in) was less than allowable   for slabs by   ACZ 318-71 (allowable h = 0.43     in).
, c k
: 2. Ductility Ratio calculated     (D = 2.9) . Refer to BC-TOP-9A, Sec-.     [Qi tion 4.3.
Acce tance Considerations 1.
References
Deflection calculated (6 = 0.36 in) was less than allowable for slabs by ACZ 318-71 (allowable h = 0.43 in).
: l. Building   code requirements   for reinforced concrete     (ACI 318-71).
2.
: 2. BC-TOP-9A, Rev. 2   (9/74), Design of Structures for missile Impact.       ~Qi The discussion supra demonstrates that maintenance of the spent fuel pool function is maintained, that in situ protection for buried pipes and duct banks is adequate and the integrity of the wall enclosing the CCW area is not imperiled.       Thus, attention can now be focused on the consequences of damaging various process lines that are subject to cask impact to determine the potential impact on the ability to achieve and maintain safe 'shutdown conditions. Reference to Table 4 is important.
Ductility Ratio calculated (D = 2.9).
It demonstrates the copious amount of water on site. Mater requirements are about 30,000 gallons to accommodate moderator shrink during cooldown and about 18 gpm to compensate for spent fuel pool boil-off.
Refer to BC-TOP-9A, Sec-.
[Qi tion 4.3.
References l.
Building code requirements for reinforced concrete (ACI 318-71).
2.
BC-TOP-9A, Rev.
2 (9/74), Design of Structures for missile Impact. ~Qi The discussion supra demonstrates that maintenance of the spent fuel pool function is maintained, that in situ protection for buried pipes and duct banks is adequate and the integrity of the wall enclosing the CCW area is not imperiled.
Thus, attention can now be focused on the consequences of damaging various process lines that are subject to cask impact to determine the potential impact on the ability to achieve and maintain safe 'shutdown conditions.
Reference to Table 4 is important.
It demonstrates the copious amount of water on site.
Mater requirements are about 30,000 gallons to accommodate moderator shrink during cooldown and about 18 gpm to compensate for spent fuel pool boil-off.
Normal Refueling Cask Handling:
Normal Refueling Cask Handling:
The vulnerability of   process lines   in the cask   washdown area has been addressed   heretofore. The lines are close to the surface of the spent fuel'uilding wall and will not likely be struck by a dropped cask (see Licensee's letter to 1fr. Lear of January 2, 1976 and to Hr. Goller of January 10, 1975 for further detailed discussion).           Table 6 provides a listing of lines in the cask washdown area and the effect of loss of function on the ability to achieve and,maintain safe shuLdown or to maintain spent fuel pool function. The two noteworthy'otential occurrences are loss of spent fuel cooling function (with a partial loss in fuel pool inventory) and interruption of the component cooling water non-essential header function.
The vulnerability of process lines in the cask washdown area has been addressed heretofore.
'ihe severing of   fuel pool cooling lines is discussed ~su ra. Partial loss of inventory will not result in loss of an adequate supply of water for cooling and shielding of stored spent fuel. The loss of this inventory will not result in flooding of any essential areas, i.e., loss of es-sential components due to inundation is not possible. There are at least 13 hours before the remaining pool inventory could achieve boiling conditions. Ample makeup is available to compensate for the 18 gpm or so boil-off rate. The sheared lines will be plugged, the pool refilled, and repairs to restore the cooling function will be initiated.
The lines are close to the surface of the spent fuel'uilding wall and will not likely be struck by a dropped cask (see Licensee's letter to 1fr. Lear of January 2, 1976 and to Hr. Goller of January 10, 1975 for further detailed discussion).
Rev. 1-6/28/76
Table 6 provides a
listing of lines in the cask washdown area and the effect of loss of function on the ability to achieve and,maintain safe shuLdown or to maintain spent fuel pool function.
The two noteworthy'otential occurrences are loss of spent fuel cooling function (with a partial loss in fuel pool inventory) and interruption of the component cooling water non-essential header function.
'ihe severing of fuel pool cooling lines is discussed
~su ra.
Partial loss of inventory will not result in loss of an adequate supply of water for cooling and shielding of stored spent fuel.
The loss of this inventory will not result in flooding of any essential areas, i.e., loss of es-sential components due to inundation is not possible.
There are at least 13 hours before the remaining pool inventory could achieve boiling conditions.
Ample makeup is available to compensate for the 18 gpm or so boil-off rate.
The sheared lines will be plugged, the pool refilled, and repairs to restore the cooling function will be initiated. Rev. 1-6/28/76


E
E
'h 4}}
'h 4}}

Latest revision as of 14:34, 5 January 2025

Letter Supplemental Information Related to Evaluation of Spent Fuel Transfer Process Submitted on June 23, 1976
ML18227D349
Person / Time
Site: Turkey Point  
Issue date: 06/29/1976
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
Download: ML18227D349 (12)


Text

.I NRC ARM 195 UoS. NUCLEAR REGULATORY COMMISSION I IP.TbI.

V~

~ '

I NRC DISTRIBUTION FGR PART 50 DOCKET MATERIAL OOCKL'T NUMOE 50-25 5

FILE NUMBER DATE OF DOCUMENT I QfLETTER

@ORIGINAL I

OCOPY

~

~

To:

. V. Stello

~

~

~ t QNOTORIZEO

@UNCLASSIFIED PROP Flordid Power 8 Light Co.

Miami,.Flordia R.E. tfhrig INPUT FORM 6-29-76 DATE RECEIVEb 7-6-76 NUMOER OF COPIFS RECEIVED ENCLOSURE / r on I DES C R I P T ION

~\\

I Supplemental Information related to the Eval of Spent Fuel Transfer Process.......

M/Atta (3 Signed Cyz. Received)

(6 Pages)

Turkey Pt.

0.3 8 4 uat1 chm nhs

'"I g

'~02 ag g ~)',

/

~,. q'i, I.

"isl

,t.'

h~o SAFETY ASSIGNED AD!

RANCH CIIIEF:

OJECT ifANAGER:

IC ~ ASST FOR ACTION/INFORMATION ASST

!IED AD ~

PRO

'Yd XA ~

~

'""I F

I RC PDK I

I&E 2

ELD I

GOSSICK & STAFF HIPC INTERNAL0 IST "SYSTEHS SAFFTY IIEINEiHAN SCHROEDER ENGINEERING IIACCAIIRY Rl BUTION C

" BENAROYA IPPOLITO KTR'Oi'OOD SITE S~A ENVIRO AI~IT~S FN CASE ES KNIGIIT SIHlPEIL PAVLXCKI OPERATING REACTORS

'DR!

IC:

a PROJECT IfANAGEI'IENT BOYD P

COLLINS HOUSTON PETF.RSON I

bKLTZ I

HELTEHES SKOVIIOLT REACTOR SAFE'IIY ROSS NOVAK ROSZTOCZY CHECK AT&I SALTZI'usN RUTI>I'.RG EXTEIINAL0 IS I R IOUl'ION NAT IAB'EG

~ VII OPF.RAT N

. II EISEliH SHAO BARR BUTI.F.R GRII'IES BROOKHAVFN 'NA

'LRI~KSON ORNL S~

OL IiiCI

.OLL CON I'!IOL NUMIIEfl LA PDR CONSULTANTS

...SIC ASLB ~

GRAYS I AH~,"7..N'6g6

f I

+ CQ gstG b

FLORIDA POWER & LIGHT COMPANY June 29, 1976 L-76-238 Director of Nuclear Reactor Regulation Attn:

Mr. Victor'Stello, Jr., Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washin'gton',

D. C.'0555

'I

Dear Mr. Stello':

Re:

Turkey Point Plant Units 3 and 4

Docket, Nos.

50-250 and 50-251 Su lemental Information 8

<<a'ut.

6 1976

~~4m Attached herewith is supplemental information related to our submittal of June 23, 1976, L-76-234.

Very truly yours, Robert E. Uhrig Vice President REU/GDN/hlc Attachment cc:

Mr. Norman C. Moseley, Region II Jack R.

Newman, Esq.

PEOPLE... SERVING PEOPLE

4' t

I I'

The potential for loss of load due to sudden stopping of the hoist has been evaluated.

The condition of simultaneous main hoist cask crane brakes setting while the cask is being lowered at the maximum rated speed of 7 fpm can be accommodated.

(See Appendix B provided by Licensee's letter of Hay 25, 1976.)

For this analysis the wire ropes were considered to be only 50 inches long (the cask is at near maximum lift) to minimize the energy absorption of the wire ropes.

The cask weight analyzed was 51,200 lbs., elongation of a given wire rope was 0.023 inches and the approximate cask stopping time was 0.017 seconds.

The potential radiological consequences of the rupture of one or more fuel assemblies resulting from a cask drop are less than those evaluated in the fuel handling accident (FSAR Section 14.2.1) and found acceptable by the Staff in its Safety Evaluation report at page 50.

The Staff concluded 17 rem thyroid and

< 2 rem whole body were acceptable offsite exposures for this low probability event.

The calculation assumptions are listed in Table 5, and the potential whole body and thyroid doses at the site boundary are shown in Figures 2 and 3, as a function of decay time and number of assemblies damaged respectively.

Forty fuel element assemblies in the unit 4 pool have the shortest decay (1416 hours0.0164 days <br />0.393 hours <br />0.00234 weeks <br />5.38788e-4 months <br /> as of June 15, 1976 see Table 1). It is concluded that even if all 40 assemblies are damaged the potential exposures are at least an order of magnitude below those calculated for the fuel handling accident. It must also be noted that these 40 assemblies will be transferred last. At time of transfer, there will be about 90 days decay (2160 hours0.025 days <br />0.6 hours <br />0.00357 weeks <br />8.2188e-4 months <br />) on these assemblies.

During transit between units the cask will pass over buried pipes and duct banks, as well as, piping in trenches, which also may be routed along the transfer corridor.

A failure mode effect analysis assuming damage to piping is provided infra.

The in situ protection afforded buried pipes and duct banks is discussed below.

All but a few buried pipes are protected by a 4" concrete slab, plus the earth cover.

The buried pies not afforded the additional protection of the 4" concrete slab have at least 5'3" of compacted fillcover.

The electrical duct banks are reinforced concrete structures at least 3'3" below the concrete slab.

The buried pipes are 30" and 36" nominal pipe with 7/8" and 1" wall thickness respectively.

In addition, the pipes are cement lined.

To assess the penetrability capability of the 25 ton cask in the in situ protection, a 40 foot free fall in air at an 11.37 degree tilt was eval-uated.

The modified Petry equation yields a penetration of 3.2 inches in concrete.

Additionally, the equations of dynamic equilibrium were solved and potential penetrability into the earth calculated utilizing the Sandia report by C.

Wayne Young, "Depth Prediction. for Earth-Penetrating Projectiles",

ASCE, May 1976.

Penetration from 40 feet in soil only was calculated to be 6.4 inches, and in soil, plus the 4 inch concrete slab, to be 4.5 inches.

Thus, even for a substantial drop (40 feet), penetra-tion of in situ protection is modest.

During transit between units the elevation of the cask above grad will be limited to one foot by administrative controls.

The surcharge load on buried pipe and duct banks has been determined for a vertical cask drop from one foot and for horizontal impact of the cask.

Since the soil would not transmit load to the pipe greater than its resistance (impact area times soil bearing capacity) the vertical drop is the limiting case. Rev.

1 6/28/76

The surcharge has been evaluated for both the areas with and without the 4 inch concrete cover slab.

The soil resistance (59.4 kips, based on a bearing capacity of 10 ksf and an impact area of 5.94 ft ) is less than 2

the dynamic force of the falling cask assumed (100 kips).

Thus, the cask will expend all the energy in the penetration of the soil.

The soil will not transmit the dynamic effect from the falling cask to the buried duct banks or pipes.

For this evaluation, it was assumed that after penetration, there is no energy transfer consideration, and at the last

instant, the weight is suddenly applied using a dynamic load factor of 2.0.

This assumption is considered extremely conservative and quite unrealistic because at the last instant when all energy is expended, there is no dynamic load.

Even with this assumption, buried pipes and duct banks are within allowable stresses.

The assumptions, etc., associated with the analysis of buried pipes and duct banks follows:

1.

Drop height

1'.

Cask Weight 50,000 lbs.

3.

Cask Diameter 37" 4.

Drop is vertical 5.

Static load (equivalent)

= 46 psi 6.

Dynamic load factor (DLF) = 2 7.

= Modulus of Elasticity of Concrete

= 4 x 10 psi 8.

Modulus of Elasticity of Soil = 28,000 psi 9.

Xnternal Pressure in Pipe

= 50 psi 10.

Modulus of Elasticity of Pipe Material = 29 x 10 psi 11.,

Modulus of Subgrade reaction

= 1500 k/ft l.

Using Burmister two layer theory and influence curve, an equivalent stress at top of pipe was determined.

Boussinesq theory is used for soil cover.

2.

Equivalent soil cover to produce stress was calculated and added to actual soil depth.

3.

The pipe thickness required to carry the soil depth was determined using USAS A21.1 1967 method of ring test load equivalent to earth load.

4.

Required thickness was compared to actual pipe thickness.

5.

The bending stresses in the pipe and in the duct bank were calcu-lated assuming the pipe and the duct bank act as beams supported on an elastic foundation.

Rev.

1 6/28/76

0 Acce tance Considerations

1. If required thickness was less than actual, there would be no failure of pipe.
2. If the bending stresses in the pipe are within the allowable limits, there would be no failure of the pipe.
3. If the bending stresses in the electrical duct bank are within the allowable limits, there would be no failure of the duct bank.
4. If equivalent stress at top of duct bank was less than allowable concrete capacity (2,000 psi), then no failure would occur.

Referenc'es:

l.

Yoder 6 Witizak "Pavement Design",

2nd Edition 2.

Foundation Engineering by Bowles 3 ~

USAS A21 1 g 1967 4.

ASA A21.4 1964 5.

Roark, "Formulas for Stresses and Strain" Fourth Edition In transit (between units) drop evaluations indicate that penetration of in situ protection is slight and the additional load imposed on buried duct banks and pipes can be accommodated within allowable working stresses.

During transit between units, only trolley motion or only bridge motion willbe'allowed.

Combined simultaneous bridge/trolley motion will be pre-cluded by administrative controls.

Reference to Figure 1 clearly illus-trates that the transfer between units is straightforward trolley motion "only" moves the cask from the washdown area out to the transfer corridor between units, bridge movement "only" moves the cask along the transfer,corxidor, and finally, trolley movement "only" moves the cask to the adjacent units'ashdown area.

Thus, any cask swing potential due to sudden stopping of bridge or trolley is along the allowable hook envelope.

The kinetic energy associated with tranverse motion of the cask precludes significant swinging of the cask.

Sudden stopping of the bridge or trolley will result in a maximum cask rise of not greater than about 0.004 feet.

The horizontal distance from the vertical will not exceed l-l/2 feet.

The transfer corridor is about 17 feet wide.

The potential for cask swing in transit is not great due to the simplex nature of this transfer operation, any swing will be along the hook envelope and the maximum swing distance is acceptably small.

Thus, cask swing during transfer does not pose a threat to safety related equipment. Rev.

=1 6/28/76

The east wall of the auxiliary building area runs adjacent to the transfer corridor between units.

The unit 3 and 4

CCW areas are located behind this wall.

There is one location in each unit that a CCW'ine is partially supported by the auxiliary building wall.

In Unit 3, a hanger provides vertical support only and there is a 3 inch gap between the wall and the pipe.

In Unit 4, the hanger is'f a different design, but even considering the maximum wall deflection, the piping stresses are within elastic limits.

For the reasons cited

~su ra swinging of the cask into this wall is not: a consideration.

However, a cask drop and tip into the wall could be postu-lated.

This has been evaluated.

Penetration into the wall is negligible and the deflection of the wall will not exceed 1/2 inch.

(Note that Appen-dix C to Licensee's June 1, 1976, letter L-76-203 erroneously stated pene-tration of 1/2").

Structural integrity is not threatened by the impact.

The assumptions, etc., associated with cask, drop and tip into the CCW area wall are as follows:

1.

Work done by tilting cask = 34,500 ft-lbs.

2.

The resisting work will be represented by deflection of the wall times the load acting on it.

'3.

Effective width = 6 ft.

4.

Impact elevation

= 14 ft.

,5.. Work done by cask

=

W = Px 6 6.

Cask weight '= 50,000 lbs.

7.

Cask height = 16 ft.

8.

Cask tilt from horizontal

= 66'; distance

=

6.5'.

Assume vertical wall acts as slab for deflection calculations.

.10.

Dynamic compressive strength of the wall = 4500 psiie ll.

Reinforced concrete wall, height = 17'; thickness

= 12" 1.

Deflection was calculated using:

W

= P x 6 c

P = k 6 then W

= k 6 c

1/2 and, therefore, 6 =

(W/k)

, where k = 3.146 x 10 lbs/inch W

= work done by cask c

P

= load

= deflection k

= spring constant

'p

= ductility ratio 2.

Penetration by Petry formula.

Rev.

1 6/28/76

V k

p2 w

= (p 1/2)

, c k

Acce tance Considerations 1.

Deflection calculated (6 = 0.36 in) was less than allowable for slabs by ACZ 318-71 (allowable h = 0.43 in).

2.

Ductility Ratio calculated (D = 2.9).

Refer to BC-TOP-9A, Sec-.

[Qi tion 4.3.

References l.

Building code requirements for reinforced concrete (ACI 318-71).

2.

BC-TOP-9A, Rev.

2 (9/74), Design of Structures for missile Impact. ~Qi The discussion supra demonstrates that maintenance of the spent fuel pool function is maintained, that in situ protection for buried pipes and duct banks is adequate and the integrity of the wall enclosing the CCW area is not imperiled.

Thus, attention can now be focused on the consequences of damaging various process lines that are subject to cask impact to determine the potential impact on the ability to achieve and maintain safe 'shutdown conditions.

Reference to Table 4 is important.

It demonstrates the copious amount of water on site.

Mater requirements are about 30,000 gallons to accommodate moderator shrink during cooldown and about 18 gpm to compensate for spent fuel pool boil-off.

Normal Refueling Cask Handling:

The vulnerability of process lines in the cask washdown area has been addressed heretofore.

The lines are close to the surface of the spent fuel'uilding wall and will not likely be struck by a dropped cask (see Licensee's letter to 1fr. Lear of January 2, 1976 and to Hr. Goller of January 10, 1975 for further detailed discussion).

Table 6 provides a

listing of lines in the cask washdown area and the effect of loss of function on the ability to achieve and,maintain safe shuLdown or to maintain spent fuel pool function.

The two noteworthy'otential occurrences are loss of spent fuel cooling function (with a partial loss in fuel pool inventory) and interruption of the component cooling water non-essential header function.

'ihe severing of fuel pool cooling lines is discussed

~su ra.

Partial loss of inventory will not result in loss of an adequate supply of water for cooling and shielding of stored spent fuel.

The loss of this inventory will not result in flooding of any essential areas, i.e., loss of es-sential components due to inundation is not possible.

There are at least 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> before the remaining pool inventory could achieve boiling conditions.

Ample makeup is available to compensate for the 18 gpm or so boil-off rate.

The sheared lines will be plugged, the pool refilled, and repairs to restore the cooling function will be initiated. Rev. 1-6/28/76

E