ML19280A002: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRR-DRMAPEm Resource From:                         Lee, Samson Sent:                         Thursday, October 3, 2019 3:58 PM To:                           Williams, Christian D:(Exelon Nuclear)
{{#Wiki_filter:1 NRR-DRMAPEm Resource From:
Lee, Samson Sent:
Thursday, October 3, 2019 3:58 PM To:
Williams, Christian D:(Exelon Nuclear)


==Subject:==
==Subject:==
FitzPatrick Emergency amendment public conference call discussion points - 3 On-Load Tap Changer In the draft LAR dated October 2, 2019, Attachment 1, Section 2.0, the following is stated: Loss or degradation of normal AC power at the 4 KV level results in an automatic fast transfer or automatic residual transfer to the offsite AC power sources through the RSSTs 71T-2 and 71T-3. These transformers contain an On-Load Tap Changer to maintain the 4KV Bus voltages under various analyzed scenarios.
FitzPatrick Emergency amendment public conference call discussion points - 3 On-Load Tap Changer In the draft LAR dated October 2, 2019, Attachment 1, Section 2.0, the following is stated: Loss or degradation of normal AC power at the 4 KV level results in an automatic fast transfer or automatic residual transfer to the offsite AC power sources through the RSSTs 71T-2 and 71T-3. These transformers contain an On-Load Tap Changer to maintain the 4KV Bus voltages under various analyzed scenarios.
The licensee stated today in case the existing RSST 71T-3 cannot be repaired, the alternative will be to replace RSST 71T-3 with an old spare transformer. Does the old spare transformer has an On-Load Tap Changer? If not, will it impact the degraded voltage setpoints specified in JAFNPP TS Table 3.3.8.1-1.
The licensee stated today in case the existing RSST 71T-3 cannot be repaired, the alternative will be to replace RSST 71T-3 with an old spare transformer. Does the old spare transformer has an On-Load Tap Changer? If not, will it impact the degraded voltage setpoints specified in JAFNPP TS Table 3.3.8.1-1.
: Thanks, Sam 1
: Thanks, Sam  


Hearing Identifier:     NRR_DRMA Email Number:           240 Mail Envelope Properties     (BL0PR0901MB3185597138AF01AEA40CC7E99A9F0)
Hearing Identifier:
NRR_DRMA Email Number:
240 Mail Envelope Properties (BL0PR0901MB3185597138AF01AEA40CC7E99A9F0)  


==Subject:==
==Subject:==
FitzPatrick Emergency amendment public conference call discussion points - 3 Sent Date:               10/3/2019 3:57:50 PM Received Date:           10/3/2019 3:57:00 PM From:                   Lee, Samson Created By:             Samson.Lee@nrc.gov Recipients:
FitzPatrick Emergency amendment public conference call discussion points - 3 Sent Date:
10/3/2019 3:57:50 PM Received Date:
10/3/2019 3:57:00 PM From:
Lee, Samson Created By:
Samson.Lee@nrc.gov Recipients:  
"Williams, Christian D:(Exelon Nuclear)" <Christian.Williams@exeloncorp.com>
"Williams, Christian D:(Exelon Nuclear)" <Christian.Williams@exeloncorp.com>
Tracking Status: None Post Office:             BL0PR0901MB3185.namprd09.prod.outlook.com Files                             Size                     Date & Time MESSAGE                           757                     10/3/2019 3:57:00 PM Options Priority:                         Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Tracking Status: None Post Office:
BL0PR0901MB3185.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 757 10/3/2019 3:57:00 PM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:}}
Recipients Received:}}

Latest revision as of 00:54, 3 January 2025

NRR E-mail Capture - FitzPatrick Emergency Amendment Public Conference Call Discussion Points - 3
ML19280A002
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/03/2019
From: Samson Lee
NRC/NRR/DORL/LPL1
To: Williams C
Exelon Generation Co
References
Download: ML19280A002 (2)


Text

1 NRR-DRMAPEm Resource From:

Lee, Samson Sent:

Thursday, October 3, 2019 3:58 PM To:

Williams, Christian D:(Exelon Nuclear)

Subject:

FitzPatrick Emergency amendment public conference call discussion points - 3 On-Load Tap Changer In the draft LAR dated October 2, 2019, Attachment 1, Section 2.0, the following is stated: Loss or degradation of normal AC power at the 4 KV level results in an automatic fast transfer or automatic residual transfer to the offsite AC power sources through the RSSTs 71T-2 and 71T-3. These transformers contain an On-Load Tap Changer to maintain the 4KV Bus voltages under various analyzed scenarios.

The licensee stated today in case the existing RSST 71T-3 cannot be repaired, the alternative will be to replace RSST 71T-3 with an old spare transformer. Does the old spare transformer has an On-Load Tap Changer? If not, will it impact the degraded voltage setpoints specified in JAFNPP TS Table 3.3.8.1-1.

Thanks, Sam

Hearing Identifier:

NRR_DRMA Email Number:

240 Mail Envelope Properties (BL0PR0901MB3185597138AF01AEA40CC7E99A9F0)

Subject:

FitzPatrick Emergency amendment public conference call discussion points - 3 Sent Date:

10/3/2019 3:57:50 PM Received Date:

10/3/2019 3:57:00 PM From:

Lee, Samson Created By:

Samson.Lee@nrc.gov Recipients:

"Williams, Christian D:(Exelon Nuclear)" <Christian.Williams@exeloncorp.com>

Tracking Status: None Post Office:

BL0PR0901MB3185.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 757 10/3/2019 3:57:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: